  Favourite

Brighton Town Hall is a Grade 1 Listed property. Many unsuccessful attempts had been made to install 300mm diameter Stainless Steel Flexible Liners. Holes were excavated in the chimney to pull the steel liner through but attempts proved unsuccessful and the chimney sealant failed to seal the holes. Using FuranFLEX-25 Black ensured the chimney was lined with one-piece lining with no joints and carrying a 25-Year Guarantee. A survey was carried out on the chimney to confirm dimensions and condition of the flue. The installation of the FuranFlex chimney lining was carried out and finished within one day.

Read more

No featured products in this case study