This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more
OVERVIEW
application area: commercial ventilation
use type: offices, choir rooms
project scope: reline with minimal access to duct
added value: 25-year guarantee on air-tight and one-piece liner
Background
The 12 existing chimney flues had to be lined to be made suitable for ventilation to serve the newly refurbished building.
From each room the flues were lined with VentilFlex-25 Green up to the attic level and out the top of the chimney. The team had to carry out a precision job in a confined space with minimal access to the duct.
Statement of work
VentilFlex-25 Green was chosen for this project because of its versatility and its long life span. The liner is light and comes as a soft and folded tube, which makes it easy to transport and to lower into the ventilation duct. Once in position, the liner is inflated and heated up, gradually assuming and maximising the internal dimensions of the existing ventilation duct. The resulting one-piece liner is corrosion resistant, completely air-tight and it carries a comprehensive 25-year guarantee.
Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.
Heritage Open Gas Fireplace
Hospital Kitchen Extract Lining
School Heating Renovation
Georgian Fireplace Renovation