NBS Source
I'm a manufacturer

Embassy Gardens Phase 2, London

OVERVIEW

Ancon STC Steel-to-Concrete Insulated Balcony Connectors have been chosen to securely connect over 1000 bolt-on steel balconies at London’s ground-breaking Embassy Gardens Phase 2 development.


Sitting alongside the new American Embassy on London’s South Bank, Embassy Gardens is the centrepiece of one of the Capital’s biggest ever regeneration projects. Phase 2 of the project is delivering a total of almost 900 luxury apartments across three stunning 21-storey glazed towers, traditionally brick-faced to reflect the area’s industrial heritage.


Characterised by large modern balconies with views over the surrounding linear gardens and river beyond, the towers are linked together by a raised podium garden and feature a world-first transparent outdoor pool, 35 metres up, allowing residents to swim between the tenth floors of two towers.

Products featured in this case study

View all products (152)
Ancon Steel To Concrete Balcony Connectors

Ancon Steel To Concrete Balcony Connectors

More inspiration from Leviat

View inspiration
TeploTie used in First Zero-Carbon Retrofit

TeploTie used in First Zero-Carbon Retrofit

Saw Swee Hock Student Centre, London School of Economics, UK

Saw Swee Hock Student Centre, London School of Economics, UK

Switch House, Tate Modern Extension, London

Switch House, Tate Modern Extension, London

Queensferry Crossing, Forth Estuary, Scotland

Queensferry Crossing, Forth Estuary, Scotland

More inspiration from Thermal break shear load connectors

View inspiration
Shoreline Folkestone

Shoreline Folkestone

Bayside, Worthing

Bayside, Worthing