This version of the case study is no longer available. View latest
OVERVIEW
The revamp of this regional flagship shopping centre was a time-critical project. During construction, the existing retail businesses and visitor access needed to be kept to a minimum. Steintec's tuffset G was used in the preparation of the bedding, priming and jointing mortars to achieve earliest trafficking wherever possible. The proven capability of tuffset G to achieve this in ONLY 3 HOURS was used to great effect minimising disruption and inconvenience for the duration of the project.
tuffset G Specialist Rapid Mortar - Specialist bedding, bonding and jointing
Leicester Square.
Luton Town Centre.
One Tower Bridge
Hull City of Culture 2017
Tamesis 1. Granite entrance area with HGV trafficking.
Ealing Broadway Shopping Centre