OVERVIEW
Dura Deck Flip® Composite Decking | Case Study
Over the past six years this Georgian property has been lovingly restored by Ciara and her husband Ben, including underpinning work to the foundations and a new roof.
Journalist Ciara’s passion for the unique and creative really shone through in her design for her composite decking area. With a love for creamy based neutrals to complement the earthy red brick tones the house, she chose pretty Dura Deck Flip composite decking in the colour Weathered Cedar for the main decking area. UV resistance, scratch and stain resistant and with a Class C fire rating, it was installed on rot-free Dura Deck Aluminium pedestals and bearers for a low-maintenance ‘fit-and-forget’ decking solution.
Dura Deck® Flip 150 - Composite Timber Decking Board
A2 Aluminium Dura Bearers - Aluminium support system
A2 Aluminium Dura Pedestals - Aluminium decking substructure system
West Ham Stadium, London
The Lock, Greenford Quay, West London
Offshore Technician Training Facility, Grimsby
Isle of Wight Platform Stations, UK
Single Ply Warm Roof Waterproofing on Residential block of flats.
Waterproofing to domes on Historic Building
Museum of the Home, London. Koster TPO Single Ply Membrane.
Koster TPO Single Ply membrane - Overlay Project.
Clockwork Building Rooftop Balcony Decking
Malmaison Hotel Composite Decking
The Lock, Greenford Quay, West London
Chelsea Flower Show, London
Ensign Court High Rise Decking
The Lock, Greenford Quay, West London
AliDeck Supply Junior Flat Board & Supporting Joists to Balcony Remediation Project in Bromley, Kent, in Partnership with The Property Crew