NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Clean Rooms - Inficon Cologne

OVERVIEW

Completed Works

Clean Room

Aluminium grid systems

  • Line 55A 200 sqm

Integrated lights

  • SH LED-H 49 Pcs.

Supply air

  • Filter Fan Unit (FFU) 22 Pcs.

Accessories for clean room ceilings

  • Inspection hatch for clean room ceilings 10 Pcs.

Partition systems 100

  • Multiclean LVT 370 sqm
  • Multiclean LVT 437 15 Pcs.

Hinged doors

  • Swing MPH 7 Pcs.

Door interlocking systems

  • Door interlocking system Inline 2 5 Pcs.

Airlock systems

  • Material pass box Matlock REG 1 Pcs.

No featured products in this case study

Contact Lindner Group by clicking the button below to find out which products were used in this case study.

More case studies from Lindner Group

View all case studies (18)
Projektreport Allerhuset Denmark

Projektreport Allerhuset Denmark

Maxwell Centre, University of Cambridge

Maxwell Centre, University of Cambridge

John Lewis Oxford Street

John Lewis Oxford Street

Wembley Stadium

Wembley Stadium