NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Cambridge University, Department of Civil Engineering

OVERVIEW

This new build project in the centre of Cambridge combines a Sustainable urban Drainage Solution (SuDS) in the form of the new blue roof system from Bauder - BauderBLUE, a biodiverse green roof and solar PV on top of the insulation and waterproofing, essentially combining four roofing systems in one. Bauder believes this to be one of the first of its type in the UK and so it was new for most of the design and construction team. Good communication between the main contractors, roofing contractors and the PV installers was needed to make sure the installation was efficient.

No featured products in this case study

Contact Bauder Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Bauder Ltd

View all case studies (61)
Royal Opera House

Royal Opera House

Scoil Phadraig School

Scoil Phadraig School

Sharrow Primary School

Sharrow Primary School

Small Animal Hospital

Small Animal Hospital