NBS Source
I'm a manufacturer

Blackburn Cathedral, Blackburn

OVERVIEW

The Cathedral’s Grade II listing represents its importance as an example of an ecclesiastical building which has grown in stages. It was of major importance in design and selection of materials that the new build retained these principles, which is why the architects Purcell chose Wienerberger's Porotherm Cellular Clay Block - PTH100 for the construction of the cathedral.

Products featured in this case study

View all products (44)
Porotherm Clay Block PLS100

Porotherm Clay Block PLS100

More case studies from Wienerberger Ltd

View all case studies (36)
Bedwas Mental Health Facility, South Wales

Bedwas Mental Health Facility, South Wales

Carmelite Monastery, Liverpool

Carmelite Monastery, Liverpool

Druidstone Grange, Cardiff

Druidstone Grange, Cardiff

Lowmeade, Wilmslow

Lowmeade, Wilmslow

More case studies from Clay blocks

View all case studies (3)
Apartments Bainbridge Court, Leicestershire

Apartments Bainbridge Court, Leicestershire

Carrowbreck Meadow, Norwich

Carrowbreck Meadow, Norwich