The Shetland Gas plant (SGP) represents a 25bn investment by Total in Shetland to service the Laggan and Tormore gas fields. The site was covered by a large peat bog that needed preserving for reinstatement at the end of life decommissioning. The solution was to build two peat stores in the slopes which were to be overtopped to allow water to peculate through. ABG recommended Pozidrain 12S500/NW8 in place of stone enabling the maximum void space to be utilised for peat storage. Erosaweb GWX 150…
Show moreContact ABG creative geosynthetic engineering by clicking the button below to find out which products were used in this case study.