by Wallbarn Ltd
The contractor was installing a jacuzzi for a client. The jacuzzi’s filter requires regular cleaning which means lifting a slab to gain access to the area. The best solution for the slabs around the jacuzzi was to elevate them without fixings over the very high void. 915-1020mm Megapads were chosen. Megapads were positioned around the perimeter. Slabs were then laid on top, covering the area whilst allowing access to the filter and giving ventilation to the mechanics. With a weight tolerance of 1,560Kg and temperature resistant to Minus 40°C, Megapads were the perfect solution.
Contact Wallbarn Ltd by clicking the button below to find out which products were used in this case study.
Adjustable Paving Supports - Woodbury Close, Finsbury Park
Instant Green Roof - Wimbledon - Care Home - M-Tray®
M-Tray® Instant Green Roof - The May Fair Hotel
iDecking Project - Dunalastair, Perthshire, Scotland