NBS Source
I'm a manufacturer

This case study is no longer available.

North Newbald Village Hall – East Yorkshire

OVERVIEW

North Newbald Village Hall in East Yorkshire had struggled with delays in the build process due to weather and supplier issues throughout the build. The original specification for the floor screed was to have a 60mm Anhydrite/Calcium Sulphate flowing screed installed with multiple finishes including linoleum, carpet and engineered timber flooring over 125m2 without any expansion or contraction joints designed into the floor detail. If the build process had gone to plan, then the acceptance of 80 days drying for the original floor screed design using Anhydrite/Calcium Sulphate was acceptable.

No featured products in this case study

Contact Longfloor Liquid Cement Screed by clicking the button below to find out which products were used in this case study.

More case studies from Quick-drying levelling screed mixes

View all case studies (14)
Madrid Airport

Madrid Airport

Tollcross International Swimming Centre

Tollcross International Swimming Centre

Savoy Hotel Restoration Project

Savoy Hotel Restoration Project

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks