NBS Source
I'm a manufacturer

The SSE Hydro - Concrete Connections

OVERVIEW

J&P was involved early in discussions with several members of the project team, and using its BEAMCON product, provided a coordinated and value-engineered range of solutions to the multiple fixing requirements on the project. These included brackets that could take vertical shear loads of 72 kN, horizontal shear of 270 kN, tension of 495 kN and a moment of 25 kNm. BEAMCON was used to fix the innovative ETFE cladding “cushions” which give The SSE Hydro its distinctive appearance.

Products featured in this case study

View all products (26)
JORDAHL® Toothed Anchor Channel Fixings JXA W

JORDAHL® Toothed Anchor Channel Fixings JXA W

JORDAHL® Cast in Anchor Channel Fixings JTA - Cast-in Channel Connection System

JORDAHL® Cast in Anchor Channel Fixings JTA - Cast-in Channel Connection System

More case studies from J & P Building Systems

View all case studies (6)
St George Wharf - Connecting Glass Facades

St George Wharf - Connecting Glass Facades

No.1 Riverside Precast Concrete Connections

No.1 Riverside Precast Concrete Connections

Lingfield Racecourse & Hotel Resort

Lingfield Racecourse & Hotel Resort

Usher Hall Concert Hall

Usher Hall Concert Hall