NBS Source
I'm a manufacturer

Usher Hall Concert Hall

OVERVIEW

J&P explored a number of possibilities with the precast contractor, Border Concrete Products and the main contractor Expanded Structures, culminating in a proposal to utilise J&P’s TSS invisible connectors. The innovative solution involved the TSS units being rotated through 90°, to accommodate the bearer within the slender 125mm rib section (see image above). The additional challenge of the supporting downstand being radiused was easily accommodated due to the flexibility of the TSS units, and the detailed dimensional/setting-out information provided by J&P to the contractors ensured accurate positioning for the varying angles required.

No featured products in this case study

Contact J & P Building Systems by clicking the button below to find out which products were used in this case study.

More inspiration from J & P Building Systems

View inspiration
St George Wharf - Connecting Glass Facades

St George Wharf - Connecting Glass Facades

No.1 Riverside Precast Concrete Connections

No.1 Riverside Precast Concrete Connections

Lingfield Racecourse & Hotel Resort

Lingfield Racecourse & Hotel Resort

The SSE Hydro - Concrete Connections

The SSE Hydro - Concrete Connections