NBS Source
I'm a manufacturer

Kings Cross Station, London

OVERVIEW

GRP End of Platform Steps | Case Study


Contractor AmcoGiffen selected Dura Composites to design and fabricate 6 sets of GRP End of Platform Steps for Kings Cross Station in London, which were installed by Amco in a very short time frame to meet the needs of the tight project timescales. Weighing up to 80% less than steel and 30% less than aluminium, Dura Composites End of Platform Steps offer equivalent performance for considerably less weight. This results in major savings including lower installation costs due to more economical transportation, handling and on-site positioning.


The client was delighted with the quality of the design and workmanship and with Dura’s ability to turn the fabrications around in such a short space of time, describing the structures as having “gone in like a dream”. As well as fully fabricated non-corrosive and non-conductive single unit GRP end of platform steps Dura Composites can also supply in component or flat pack kit form ready for quick assembly on-site.

Products featured in this case study

View all products (31)
Dura Slab Structural Stair Treads - GRP structural stair treads

Dura Slab Structural Stair Treads - GRP structural stair treads

More inspiration from Dura Composites Ltd

View inspiration
West Ham Stadium, London

West Ham Stadium, London

The Lock, Greenford Quay, West London

The Lock, Greenford Quay, West London

Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

Composite Decking Garden Transformation, Essex

Composite Decking Garden Transformation, Essex

More inspiration from Solid glass fibre-reinforced plastics (GRP) plates

View inspiration
West Ham Stadium, London

West Ham Stadium, London

Chirag Oil Field

Chirag Oil Field

GDF Suez Cygnus Bravo

GDF Suez Cygnus Bravo

Solan Topside

Solan Topside