OVERVIEW
GRP End of Platform Steps | Case Study
Contractor AmcoGiffen selected Dura Composites to design and fabricate 6 sets of GRP End of Platform Steps for Kings Cross Station in London, which were installed by Amco in a very short time frame to meet the needs of the tight project timescales. Weighing up to 80% less than steel and 30% less than aluminium, Dura Composites End of Platform Steps offer equivalent performance for considerably less weight. This results in major savings including lower installation costs due to more economical transportation, handling and on-site positioning.
The client was delighted with the quality of the design and workmanship and with Dura’s ability to turn the fabrications around in such a short space of time, describing the structures as having “gone in like a dream”. As well as fully fabricated non-corrosive and non-conductive single unit GRP end of platform steps Dura Composites can also supply in component or flat pack kit form ready for quick assembly on-site.
Dura Slab Structural Stair Treads - GRP structural stair treads
West Ham Stadium, London
The Lock, Greenford Quay, West London
Offshore Technician Training Facility, Grimsby
Composite Decking Garden Transformation, Essex
West Ham Stadium, London
Chirag Oil Field
GDF Suez Cygnus Bravo
Solan Topside