Robroyston Station, Glasgow

OVERVIEW

GRP Rail Station Platform - Hybrid Install | Case Study


Robroyston station features two brand new platforms constructed using the Dura Composites recommended hybrid GRP and steel solution which is designed to meet the requirements of Network Rail standard NR/L3/CIV/030 and combines the strength of a steel foundation with a Glass Reinforced Polymer (GRP) Dura Platform surface. The platform surface has incredible durability and anti-slip properties which is shown to reduce by only 5% after a million footfalls (tested to BS 7976-2:2002+A1:2013).


AmcoGiffen were responsible for delivering the design and build works for the development, with funding for the station coming from Glasgow City Council, Network Rail and the Strathclyde Partnership for Transport.


In choosing the GRP/Steel system from Dura Composites, the platform installation for the project (using GRP Dura Platform and steel trestles) has been able to take place largely while the line is open, minimising the impact on customers using the line.

Products featured in this case study

View all products (31)
Dura Platform 40 - GRP Rail Station Platform Panels

Dura Platform 40 - GRP Rail Station Platform Panels

More case studies from Dura Composites Ltd

View all case studies (12)
West Ham Stadium, London

West Ham Stadium, London

The Lock, Greenford Quay, West London

The Lock, Greenford Quay, West London

Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

Composite Decking Garden Transformation, Essex

Composite Decking Garden Transformation, Essex

More case studies from Solid glass fibre-reinforced plastics (GRP) plates

View all case studies (15)
West Ham Stadium, London

West Ham Stadium, London

Chirag Oil Field

Chirag Oil Field

GDF Suez Cygnus Bravo

GDF Suez Cygnus Bravo

Solan Topside

Solan Topside