OVERVIEW
Despite the challenges posed by completing construction and opening during the first lockdown, the new Skelton Lake Motorway Services project opened in March 2020 as planned, providing essential services to hauliers and key workers travelling during the start of the pandemic.
The project incorporates an extensive green roof build-up to minimise the visual and physical impacts of the development on the surrounding country park and to enhance the biodiversity of the project.
The wildflower green roof design provides multiple environmental benefits; including provision of a new habitat for local insect and bird life, helping to lower the site’s carbon emissions by absorbing heat emitted from the building into the cooler roof surface - reducing the air conditioning demand in the summer months. The green roof build-up also provides a level of insulation against heat loss in winter.
ABG Extensive Green Roof with Roofdrain 25mm Reservoir Board
ABG Roofdrain 40mm Drainage Geocomposite
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK
Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool
Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK
SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK
Green roof community engagement project featuring moving the green roof
Biosolar wildflower green roof school project
Domestic retro-fit green roof - Sydenham
M-Tray® Green Roof super fast installation
Green Roof, Intensive, Raithwaite Hall, Whitby, UK
Case Studies