The client’s Production Manager, Mr John MacDonald confirmed the printing machine “has to be level otherwise the machine won’t work” and in early September, Gypsol TS20 Screed was poured on a Saturday morning providing a flat level and very thin layer to the existing uneven surface. Due to the physical strengths and rates of drying of Gypsol’s TS20 screed and the very speedy un-bonded installation, the client was able to minimise production delays and mount the press onto the freshly screeded floor after just two weeks.