NBS Source
I'm a manufacturer

Gordon Hopkins New Ward, Southend Hospital

OVERVIEW

Stainless steel ward kitchens by GEC Anderson Limited were specified within new ward facilities at Southend Hospital. The units were chosen and specified by Architects, The Livemore Partnership.


Stainless steel worktops with integrated sink bowls and mounted on stainless steel base cabinets were included alongside stainless steel wall cabinets and shelving. 

Products featured in this case study

View all products (59)
Stainless Steel Wall Cabinets

Stainless Steel Wall Cabinets

Decimetric® Base Cabinets - Stainless Steel Kitchen Units

Decimetric® Base Cabinets - Stainless Steel Kitchen Units

Decimetric® Wall Cabinets - Modular Stainless Steel System

Decimetric® Wall Cabinets - Modular Stainless Steel System

Stainless Steel Worktops - Sanitary Worktop

Stainless Steel Worktops - Sanitary Worktop

More case studies from Anderson, GEC Ltd

View all case studies (97)
Foster + Partners

Foster + Partners

Bartlett School of Architecture

Bartlett School of Architecture

GEC Anderson Island Top

GEC Anderson Island Top

GEC Anderson Outdoor Kitchen

GEC Anderson Outdoor Kitchen

More case studies from Worktops

View all case studies (88)
A Calm Spa Retreat

A Calm Spa Retreat

Modern Simplicity

Modern Simplicity

Ice Blue Reflections

Ice Blue Reflections

The Stone Island

The Stone Island

More case studies from Kitchen drawer units

View all case studies (16)
GEC Anderson Products Feature At The Hold, Suffolk

GEC Anderson Products Feature At The Hold, Suffolk

Wembley Park Underground Station

Wembley Park Underground Station

Okeford Crafts

Okeford Crafts

Theatre Upgrade 1

Theatre Upgrade 1