NBS Source
I'm a manufacturer

Riverside Ice and Leisure

OVERVIEW

Riverside Ice and Leisure, Chelmsford

Client: Chelmsford City Council

Architect: Pick Everard

Installer: Geschwender Gmbh

Product: Bespoke Locker and Cubicle solutions from GeschwenderAs part of a major renovations project for the leisure centre in 2019, LSA and Geschwender supplied and installed lockers and cubicles to the changing rooms and studio areas.

The complete facility refurbishment includes a new 25m swimming pool and learning pool with a spectator area and flume, as well as modern studio spaces and 130 station state-of-the-art gym. Other new additions to the leisure centre include a new café and creche as well as improvements to general access and the main sports hall and ice rink.

The improvements achieved by Chelmsford City Council and Pick Everard architects aimed to make the space more accessible for disabled guests. The new swimming pool facility has a submersible entry platform and pool pod for wheelchair users as well as an access hoist for the learner pool. With the introduction of new changing places units and additional accessible wet and dry changing rooms the site is geared towards making the experience of their disabled guests as easy as possible with the support of Chelmsford Access Group.

LSA are proud to have worked with Riverside Ice and Leisure since 2006 when we first supplied some lockers and cubicles to changing rooms. Over the next 12 years we kept in touch with the leisure centre, adding more Geschwender cubicles and lockers to the site as well as completing minor repairs and supplying a few replacement keys and locks.

In 2018 we were thrilled when Riverside and the architects at Pick Everard contacted us to be part of the new major refit project. In addition to restyling the space with a more modern colour scheme and accessories we were able to design the changing room from the ground up. Optimising space for our premium lockers and changing cubicles to best suit the needs of all of the users.

In addition to the great still shots of our products at Riverside we are delighted to share on our website the virtual tour walkthrough showing our lockers and changing rooms across the facility.

Products featured in this case study

View all products (19)
Geschwender Duct Walling

Geschwender Duct Walling

Geschwender Cubicle Systems

Geschwender Cubicle Systems

Geschwender Lockers

Geschwender Lockers

Geschwender Vanity Units

Geschwender Vanity Units

More inspiration from LSA Projects Ltd

View inspiration
University of Bedford Luton Campus

University of Bedford Luton Campus

St Johns School Leatherhead

St Johns School Leatherhead

Orchard Brae School

Orchard Brae School

Catlin Insurance

Catlin Insurance

More inspiration from Lockers

View inspiration
Investment bank project, Lockers

Investment bank project, Lockers

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Heated Lockers at the Innovation Hub, Production Park

Heated Lockers at the Innovation Hub, Production Park

Ipswich Town Football Club Project

Ipswich Town Football Club Project

More inspiration from Duct and wall panel lining systems

View inspiration
Aberavon Aqua Splash

Aberavon Aqua Splash

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

Newhaven Holiday Park

Newhaven Holiday Park

More inspiration from Vanity units

View inspiration
Helensburgh Leisure Centre Project

Helensburgh Leisure Centre Project

St Sidwells Point Leisure Centre Project

St Sidwells Point Leisure Centre Project

The Pyramids Centre Leisure Complex Project

The Pyramids Centre Leisure Complex Project

Corby East Midlands International Pool

Corby East Midlands International Pool

More inspiration from Fully-framed panel cubicle systems

View inspiration
Aberavon Aqua Splash

Aberavon Aqua Splash

Newhaven Holiday Park

Newhaven Holiday Park

Heathrow Primary School

Heathrow Primary School

Norwich High School for Girls

Norwich High School for Girls