Internally and externally waterproofing the below-ground developments of the extended Christian Dior store on New Bond Street, with Newton 403 HydroBond, Newton 107F and Newton System 500. The property line construction between two existing buildings meant that there was a requirement for waterproofing both new and existing structural elements, including pile caps, underpinning, a new reinforced concrete slab, the existing foundations, and also existing vaulted areas at the front of the building which extend below New Bond Street.