NBS Source
I'm a manufacturer

Blackhorse Lane

OVERVIEW

The purpose:


Taylor Wimpey’s Eclipse development was the final phase of the large-scale modernisation and renewal strategy for the London Borough of Walthamstow Forest, known as The Blackhorse Lane Action Plan. Eclipse would offer affordable social and private housing via 500 homes in two six-storey apartment blocks.

To help satisfy one of the Plan’s objectives- “to ensure new developments incorporate the highest levels of sustainable design and their impact on climate change is minimised”- we installed green roofs on both blocks. As it was the final development phase, space was limited; time was also an influencing factor in facilitating the tight build programme,

avoiding delays, and enabling the client to deliver much-needed new homes.


Our solution

To enable fulfilment of the brief, we recommended our HM-40 Paratech Hot Melt Roofing System as the inverted waterproofing base for the green roof. A fully-bonded system, HM-40 is a robust, durable, and highly flexible monolithic, self-healing hot-melt waterproofing system for protected roofs, green roofs, terraces, and podium decks with a 40-year durability statement. In addition, it is firerated for unrestricted use when covered with a green or ballast roof.

Unlike other hot melt systems that use fleeces, the Paratech system incorporates a reinforcement mesh: this allows the system to be rolled out, making waterproofing installation faster, thereby enabling the contractor to lay the top roofing layer of artificial grass and landscaped green roofs. Unfortunately, an on-site compound to store the roofing components was unavailable. We worked closely with T&T Roofing and Taylor Wimpey to ensure deliveries arrived in build sequence for immediate use, but without adversely impacting residents who had already moved into their new

homes.

“The features of the flat roof system provided a seamless, issue-free roof installation, with rapid installation time causing minimal disruption. Langley’s technical team was always on hand to provide assistance when necessary, working collaboratively to guarantee a consistent and highquality installation.”

Products featured in this case study

View all products (13)
Langley HM-40 Paratech Hot Melt Roofing System

Langley HM-40 Paratech Hot Melt Roofing System

More inspiration from Langley Waterproofing Systems Ltd

View inspiration
Salisbury Walk

Salisbury Walk

Allenby Barracks

Allenby Barracks

Jesus College

Jesus College

Waverley Court

Waverley Court

More inspiration from Hot-applied polymer-modified bitumen waterproof coatings

View inspiration
Crossrail Place

Crossrail Place

Westfield Shopping Centre

Westfield Shopping Centre

Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Case Study - Proteus Hot Melt® - The Tottenham Experience

Case Study - Proteus Hot Melt® - The Tottenham Experience