NBS Source
I'm a manufacturer

Blackfordby St Margaret’s Primary School

OVERVIEW

The building that would be the St Margaret’s Primary School, officially opened by Robert Leitch the local parish vicar in 1889 provided education to children up to fourteen. The school underwent many changes in structure throughout its over 100-year existence continuing to provide the high level of teaching it always held. In 2012 it underwent a further change in the form of a huge modernisation project that would extend the school and allow more students to be taken. Unfortunately, leaks were reported on the older parts of the building and despite localised repairs were not ultimately solving the problem.


After reports of leaks it was imperative that the roofs in question were inspected to find where the issues were originating, in action to this a site survey was undertaken. The survey highlighted the original build-up consisted of an asphalt on a timber deck, this original system was in a aged condition. It was also shown that standing water and vegetarian had developed on the roof. In order to protect the building from further leaking it was determined that the roof would benefit greatly from the installation of a high-performance waterproofing system.


Along with waterproofing improvements, there would also be improvements made to the falls which would reduce the amount of standing water present on the roof.


Waterproofing would not be the only recommendation; the roof was also to receive a full thermal upgrade which would further provide the benefit of increase fuel bills and less energy consumption for the school.


Taking into consideration all these points, the Polyroof Technical team began creating a bespoke specification that would provide the details needed to make these recommendations a reality. The Polyroof Approved contractor Thomas Cassie & Sons was specifically chosen to undertake this project due to their experience in liquid roofing systems. With a specification and approved contractor ready the project could officially commence.

Products featured in this case study

View all products (6)
Protec Overlay Roof Systems - Cold-applied liquid waterproofing

Protec Overlay Roof Systems - Cold-applied liquid waterproofing

Protec Warm Roof Systems - Cold-applied liquid membrane

Protec Warm Roof Systems - Cold-applied liquid membrane

More case studies from Polyroof Products Ltd

View all case studies (31)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

More case studies from Liquid-applied cold roof covering systems

View all case studies (28)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

More case studies from Liquid-applied warm roof covering systems

View all case studies (14)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Barton Hill Academy

Barton Hill Academy

Beckfoot Allerton Primary School

Beckfoot Allerton Primary School

Aston Martin Headquarters

Aston Martin Headquarters