NBS Source
I'm a manufacturer

251 Newington Causeway

OVERVIEW

43 storey high rise with under floor heating. Gyvlon Thermio+ liquid screed was chosen as the screed depth is thinner than the original specification, giving better insulation depth and a better performance for the UFH with Thermio’s guaranteed Thermal Performance.

No featured products in this case study

Contact Anhydritec Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Anhydritec Ltd

View all case studies (8)
The Shard

The Shard

Derby Civic Center

Derby Civic Center

Stadthaus N1

Stadthaus N1

Tile Showroom Kings Heath Birmingham

Tile Showroom Kings Heath Birmingham