As part of the Railway Upgrade Plan, Platform 1 at Stamford Station in Lincolnshire was recently refurbished. Careful consideration resulted in the use of Twinfix Multi-Link-Panels Non-Fragile to replace the old curved corrugated roofing of the canopy and the end result is more in keeping with the original age and design of this elegant Grade II listed building. Passengers and staff are now all benefiting from the high levels of natural light that floods the platform.
Contact Twinfix Limited by clicking the button below to find out which products were used in this case study.
Victoria Station Refurbishment
Wigan Wallgate Station roof glazing project.
Twinfix Marks First Use of its Bolted Glass Canopies
St Mary’s Catholic Primary School, Whitehaven