OVERVIEW
Originally built in 1880, Winton Chapel recently
celebrated it’s 135th anniversary. As part of the University
of Winchester campus, the chapel plays a key role in
University life and hosts a multitude of events including
music concerts and war memorial services.
Over the decades, the growth of the University campus
has encroached on the space around the existing
chapel. As part of Design Engine’s masterplan for the
University, the chapel has been extended and renovated
to respond to the ever-changing needs of the campus.
When approaching the interior aesthetic, Design Engine
wanted an ironmongery solution to complement the
existing oak structures whilst providing a modern form.
Allgood were ideally place to provide the exclusive Holt
range of oak door furniture. Crafted from hand selected
FSC accredited oak, the range enhances the warm,
natural feel of the chapel.
At the request of Design Engine Architects, Holt pull
handles were specified on the glass entry doors and
supplied throughout the building, perfectly augmenting
the interior.
Proprietary Single Range Ironmongery
Holt® Pull Handles
26-31 Charlotte Street
Hodge House
RHS Bridgewater
Spitfire Studios
26-31 Charlotte Street
Hodge House
RHS Bridgewater
Spitfire Studios
BSF concept store
Cambridge Central Mosque
The Black Diamond
The Manzoni