Network Rail HQ, Milton Keynes

by Planet

BAM construction approached Planet to supply and install interior glass partitioning as part of a Category B fit-out of Network Rail's new HQ. To ensure outstanding sound attenuation, we fitted p100 double glazed partitioning and IsoClear glass doors. To ensure time and cost efficiency, our design team worked with BAM and GMW Architects to ensure the right choice of standard deflection heads and allow for +/- 25mm movement rather than designing and manufacturing a multitude of bespoke deflection heads. We also installed p20 single glazed demountable partitioning for a range if brightly coloured 'eco cabins' dotted throughout the building.