NBS Source
I'm a manufacturer

"water pipes and pipe fittings"

2,873 results found

Sort by:

Showing 145-180 of 373

Sponsored
Brett Omega Flow is retrofitted to the Hull City Council & Yorkshire Water partnership £23m SuDS scheme.

Brett Omega Flow is retrofitted to the Hull City Council & Yorkshire Water partnership £23m SuDS scheme.

Brett Landscaping

The first part of a vital £23m project to alleviate the risk of flooding in Hull has been completed with product, design support and on-site assistance from Brett Landscaping.Brett Landscaping has worked with contractor Morrisons Water Services, Yorkshire Water and Hull City Council to retrofit Rosmead Street, a residential street vulnerable to surface water flooding, supplying 4,000 square metres of concrete block permeable paving.The Rosmead Street scheme is the first part of a £23m investment in surface water management schemes planned across Hull and East Riding due to be completed over the next five years, coordinated by the Living With Water partnership. Hull has always been a city susceptible to flooding, due to its location on low lying land alongside the Humber estuary and River Hull. Surface water from the surrounding area and city itself has to flow through a series of drainage and sewer networks to discharge into the estuary. This system was challenged in 2007 when over 9,000 properties were flooded. Since then the partners have joined together to work on increasing the cities resilience through awareness and engagement, alongside investment in the infrastructure. The Living With Water partnership was set up by Hull City Council, East Riding Of Yorkshire, Environment Agency, Yorkshire Water and University of Hull with two key objectives to educate the community and look at ways to mitigate the problems with surface water drainage in the area, based on the concerns and requirements of residents.At Rosmead Street the Living With Water team committed to a SuDS retrofit scheme that would help to mitigate any future serious rainfall incidents by removing the original MacAdam roadway and using permeable paving to attenuate the water flow and ease pressure on the sewer systems.
Sponsored
POPULAR NORFOLK RESTAURANT CHOOSES INSTANTA Sureflow Counter Top

POPULAR NORFOLK RESTAURANT CHOOSES INSTANTA Sureflow Counter Top

Zip Water

Well known as one of North Norfolk’s gems, not just because of its historic setting - it’s believed to be Holt’s oldest building - Byfords is the place to go for delicious home-cooked food, from breakfast, lunch and dinner to everything in between.Busy all year round with loyal locals and visitors to the popular upmarket town of Holt, Byfords is so much more than just a restaurant. On entering, guests are shown through the store, jam-packed with savoury pastries, hot food and cakes to take-away, before arriving at the striking but homely vaulted dining-cafe. Those lucky enough to be staying the night or two are shown to a sumptuous B&B suite upstairs.January 2020 saw Byfords renovate the ‘conservatory’ area of the restaurant, adding an impressive open marble-topped serving bar, behind which are positioned coffee machines and everything needed to make the ever-popular hot drinks throughout the day. One element of this key area that also needed upgrading was the water boiler. Used almost non-stop to fill teapots and cafetieres, Byfords looked to upgrade their current boiler to ensure it could meet the restaurant’s needs.General manager Richard Knights explains: “All of our kitchen & Bar products need to be able to meet a high level of demand, along with being reliable, as we don’t want to be replacing appliances every year.” Richard selected an Instanta product after researching boilers and being impressed with the capacity options and dedication to quality manufacture.A SureFlow Counter Top Filtered (CTS11F) boiler was installed, providing the cafe with up to 162 cups of boiling water per hour, with its built-in multi-functional filtration. This filtration can be adjustable for any catering facility in hard water areas to not only ensure the product isn’t affected by limescale build-up but also to keep hot drinks tasting fresh.“The team makes numerous hot drinks throughout the day,” continues Richard, “so it was vital we have a boiler that is up to the task. The tap is at the right height for filling tall teapots and cafetieres and we never have to worry about waiting for the water to be at the right temperature. As it is in a front-of-house location, it’s also great that it looks good! The smart stainless steel styling complements our other products and looks professional.”The positive feedback from Byfords team means Richard wouldn’t hesitate to recommend Instanta to the other restaurants in the Norfolk Passport brand. “When we come across a product that works so well we always share our insights and I’ll certainly be letting the other teams know that they might be missing out on something!”
Sponsored
Bright white ceiling solution for Wirral Waters office building

Bright white ceiling solution for Wirral Waters office building

Zentia

The challengeCeiling systems by Zentia have provided form and function for an award-winning Grade A office building at the heart of one of the largest regeneration projects in the UK.Zentia’s Cradle to Cradle™ certified mineral tiles were specified by regular Zentia users Falconer Chester Hall Architects for the Kingsgate building at Birkenhead in Wirral Waters which was built at a cost of £11.4 million.The solutionThe decision to choose Zentia Prestige hA+ Tegular24 tiles with Prelude 24mm XL2 grid was made simple due to the 30 year system warranty and both having Cradle to Cradle certificates helping achieve Kingsgate’s BREEAM Excellent rating.Manufactured with up to 41% recycled content, the Prestige family is available in three core densities that allow specifiers to engineer sound absorption and attenuation for optimum acoustic performance – standard Prestige giving medium density, Prestige hA+ giving low density (both of these variables were used at Kingsgate) and Prestige dB giving high density, up to 41 dB.Stephen Fieldsend of Falconer Chester Hall said the Zentia systems were specified to reduce acoustics in the open plan office areas which serve as the core business for The Contact Company in its role as a contact centre. Flexible open-plan office spaces allow greater flexibility for the call centre which takes up three of the four storeys, with offices and meeting rooms on the top floor. While its design concept references Liverpool’s past and the trading vessels that once negotiated the waters on its doorstep, the building remains forward focused on sustainability.
Sponsored
Rockfon is the perfect fit for British lifestyle brand Joules

Rockfon is the perfect fit for British lifestyle brand Joules

Rockfon

Rockfon is very happy to have played its part in ensuring the team at premium British lifestyle brand Joules’ new Market Harborough HQ can work in an interior environment where beauty and acoustic control create the perfect space for collaboration.Founded by Tom Joule over 30 years ago, the Group had ambitious aspirations to create a new home that would support its continued growth over the coming years.  Edge vision melds contemporary with heritageEdge Architecture + Design were appointed to lead the project and chose to specify Rockfon acoustic systems. The result is a contemporary, eye-catching 60,000 sq. ft. new HQ, which brings the brand’s UK-based office teams under one roof for the first time. Amplifying the brand’s heritage and reflecting the site’s semi-rural setting, the campus resembles a series of interconnecting barn structures that appear to have evolved over time. The complex is surrounded by landscaping including wildflower meadows and a kitchen garden which enhances the natural feel of the space. Michael Fern, Principle at Edge, said, “This new space will enable a workplace strategy of nimbleness, agile working and wellness… We also wanted to create a strong sense of place that respects the natural surroundings of the site and have designed the scheme as a human scale experience with the building and the landscape interacting in a symbiotic way. We took the local farmstead vernacular as a starting point for the visual aesthetic and used sustainable materials.”Tom Joule, Chief Brand Officer and founder of Joules, said, “This has been a hugely exciting project for our company and our future. We are delighted with the new HQ which will support agile working and new efficiencies in an environment that will enable our growing business to continue to attract and retain world-class talent. Edge’s design embodies our brand and will help us preserve and support our heritage and culture as we expand.”Agricultural cues inform an 21st Century aestheticThe exterior of the campus looks sharp against the skyline whilst taking visual cues and inspiration from agricultural architecture. The interiors are a mix of single and two storey spaces encapsulating open plan and more defined rooms with levels reached by broad stairways. Structural steel and timber add visual heft to the predominantly white pallete which sees certain elements picked out in oxide red, deep teal and warm grey. It certainly delivers the wow factor and promises to nurture creative thought.Bailey Construction were the main contractor for the project, with Elmsmere Interior Systems responsible for the installation of the Rockfon acoustic systems. Gary Sturgess of Elmsmere spoke about the project, “This was an interesting project with Rockfon Mono® Acoustic used in a variety of roles and settings to help control sound while fitting in with the clean, pared down style of the interiors. Everyone concerned is very happy with the completed work which showcases Mono’s versatility.”Pandemic pause affects design choicesAppointed in 2019, Joules’ CEO Nick Jones joined the Group during the design and construction of the new HQ. However, when the pandemic struck and people shifted to working from home, construction was halted which allowed the company to revise its plans to best suit new methods of working and office culture. In response the company has expanded the central atrium and created more space between desks to promote spontaneous interaction. Meeting rooms are equipped with tech enabling remote workers to easily participate, while floor-to-ceiling windows and outdoor features, including a bug hotel, help to connect the space to the company’s countryside heritage.Nick Jones commented, “With the opening of our new office, we have introduced a new fully flexible approach to how and where our colleagues work, and the space that we have is critical to that. Not only does our new office allow teams to better connect with one and other—whether in the office or working from home—but also brings the countryside in, to help inspire colleagues from across the business.”Rockfon Mono Acoustic – versatility and styleRockfon’s Matt Barratt, “The completed Joules HQ looks fabulous. Throughout its open plan offices Rockfon Mono Acoustic has been installed to great effect, bringing together the seamless, clean lines associated with traditional plastered surfaces and acoustic performance thought only possible with modular systems. Large windows, structural steel and other hard architectural elements can generate unwanted sound within a space. Mono provides Class A sound absorption (0.95αw) which significantly decreases echo and reverberation levels.”The current utility aesthetic is in evidence at ‘the Barn’. Air conditioning, heating, ventilation and other services are on show in several areas, with Mono installed directly above. It offers Class A2 fire protection and remains dimensionally stable at up to 100% relative humidity. It offers 87% light reflection and greater than 99% light diffusion. In common with other Rockfon acoustic systems, Mono is made with a core of naturally occurring inert volcanic rock stonewall, is non-combustible and will not harbour harmful microorganisms and bacteria. It can be installed using a suspended grid system or be directly mounted on to the ceiling soffit or and wall.   
Sponsored
House Curious

House Curious

Zip Water

Interior stylist and Instagrammer reduces single-use plastic waste while retaining style in her beautiful home
Sponsored
IM Properties

IM Properties

Zip Water

Developer IM Properties is used to delivering projects for a range of clients, but 2019 also saw it complete a stunning new headquarters for its own parent company, IM Group. Known as The Gate, the new building - which houses IM Properties and International Motors, has been designed with wellbeing and sustainability in mind.
Sponsored
Alison Potter

Alison Potter

Zip Water

The HydroTap Arc All-in-One keeps Alison Potter's modern family home plastic bottle free
Sponsored
Time Inc

Time Inc

Zip Water

With a staff force brimming with talented journalists, designers, marketers and advertising pros, sharp, creative minds are in abundance. To keep those minds on top form, Time Inc. UK knew that a high performance hydration solution was key.
Sponsored
RD Content

RD Content

Zip Water

Working with big global brands to produce video content, RD Content is a busy agency based in Covent Garden. When it came to moving into their new office, the company decided to leave nothing to chance, and instead made sure every single element was designed by them.
Sponsored
The Office Group

The Office Group

Zip Water

Launched in 2003 by Olly Olsen and Charlie Green, The Office Group pioneered the concept of shared workspace in response to a fast-changing commercial world. Today the company boasts 17,000 members and over 40 locations, 31 of which are in London. Beautiful workspaces and vibrant communal areas foster creativity and collaboration among members, from app creators and entrepreneurs, all the way to financiers and architects.
Sponsored
Cala Homes

Cala Homes

Zip Water

Making a development stand out is a priority for housebuilders, who want to attract buyers in an increasingly competitive marketplace. The kitchen is always going to be a key room for buyers, with the average Brit spending 253 minutes per week in the kitchen cooking meals. Add on top of that washing-up, cleaning, preparing packed lunches and even helping with homework, it’s fair to say that we spend a lot of time in the kitchen. So how can developers ensure they seduce buyers with a functional, striking kitchen, that also adds an element of luxury to daily life?
Sponsored
Sleeper Magazine

Sleeper Magazine

Zip Water

Beautiful design is at the forefront of Sleeper Magazine’s publication, so they needed an office interior that was equally inspiring. Sleeper Magazine called on creative design studio NoChintz to create the workspace they were after, which included the addition of a new HydroTap.
Sponsored
Studio Fortnum

Studio Fortnum

Zip Water

Owner of interior design company Studio Fortnum, Rebecca Wakefield is no stranger to being briefed on all manner of interior design and architecture. Specialising in understated, modern, relaxed living spaces, Rebecca’s portfolio is a stunning array of calming wall colours, comfortable areas to relax and thoughtfully considered artwork.
Sponsored
The PureLake Group

The PureLake Group

Zip Water

The Zip HydroTap Celsius Arc chosen for new Purelake luxury London development
Sponsored
Multi-Tiered Access Platforms at Scottish Water’s Treatment Works

Multi-Tiered Access Platforms at Scottish Water’s Treatment Works

Step On Safety Ltd

We were asked to provide teams at Scottish Water’s Treatment Works in Whitehillocks, Glenesk with safe access to a large chemical bund for operational and maintenance activities.A new installation, our client chose a GRP solution for its non-corrosive, low maintenance properties. We were tasked with designing, fabricating and installing the new platforms, the last phase taking just four days.As always, the project began with a detailed survey after which the CAD engineers created drawings to enable costings. The platform was initially constructed on our site at Brantham to ensure every component was accounted for and that the completed structure would meet all the requirements of our client. Once engineers here were satisfied, everything was shipped up to Scotland where our team rebuilt it in situ, making any fine adjustments as required. An enclosed working space often adds challenges but, by keeping the area tidy and organised at all times, everything went as planned.Step on Safety operatives hold relevant English (EUSR) and Scottish (DOMS) Water Hygiene certification and have a great deal of experience working on Water Treatment Works all over the UK.The finished solution features a raised GRP Anti Slip Grating platform on a GRP Profile frame with our Ergonomic Modular Handrail and steps at each end. This was carefully aligned with the bund wall to make a continuous, trip-free surface without compromising the integrity of the wall itself. A 4m GRP Ladder with Safety Hoops takes you up to a secure Anti-Slip Platform enclosed by Handrail and a Safety Gate.  
Sponsored
A Fitting Campus for the 21st Century

A Fitting Campus for the 21st Century

ACO Technologies plc

Identified by Experian as one of the leading business hubs in Britain, Northampton has seen a flurry of investment in recent years. Perhaps its most bold – and significant – investment is the development of the University of Northampton’s £330m purpose-built Waterside campus, which has seen the relocation and integration of its two main sites into one state-of-the-art centre of learning.
Sponsored
Franke water systems provide products to Tottenham Hotspur Stadium

Franke water systems provide products to Tottenham Hotspur Stadium

KWC DVS Limited

Dart Valley Systems (DVS), part of Franke water systems was chosen for the washroom revamp at Tottenham Hotspur Stadium in North London. The client required a setup that was robust, modern, and aesthetically pleasing. During the initial phase, DVS worked closely with the client to create a solution based on the project teams’ requirements. DVS has in-house capabilities to create bespoke product specifications and has worked alongside the client previously at their leading training facility. This was a great opportunity to put forward tried and tested products which were tailored to the client’s specific needs. DVS put forward customised programmable sensors for WCs, urinals and showers, alongside WC flushvalves. The stadium is now equipped with an intelligent and fully customised washroom system that saves water, increases hygiene and allows data capture. DVS is proud to have contributed to what is considered by many as the benchmark for future stadium and entertainment venues worldwide.
Sponsored
Protecting a primary school from water damage by providing a leak detection system

Protecting a primary school from water damage by providing a leak detection system

Andel Ltd

After a prestigious school near Birmingham suffered extensive damage when a leak went unchecked, we installed our award-winning leak detection system to prevent future devastationA tiny leak left to escalate at St George’s in Edgbaston ruined thousands of pounds of property and equipment and left the school without a properly functioning IT department. Leaks within buildings are very common and if not monitored can cause extensive damage, disruption and loss. So, once the school was back on its feet, we were delighted to work with their insurer, Hettle Andrews, to make sure the property was protected against future flooding. St George’s School, EdgbastonSt George’s School is a fully co-educational independent day school for children from ages three to 18 in Edgbaston, near Birmingham. Established as a charitable trust, the school opened in September 1999 as Birmingham’s first independent school to offer a complete education for boys and girls from kindergarten through to the sixth form.We worked with their insurance broker, Hettle Andrews, who facilitated the project. Hettle Andrews works primarily with schools, universities, colleges and charities. In the winter of 2021, the boiler in the room above the IT department of the school began to leak. The school was closed for the holiday period so no one went on-site and the leak went undetected. On return to the school in the New Year, staff discovered the leak which by that point had caused extensive damage.  The leak had not only destroyed the ceiling and light fittings but the whole IT department below including computers, carpets, plug points and furniture. The challengeNo warning: this was the first time anything like this had happened. There were no warning systems in place, nor were there any preventative measures. Extensive damage: the full ceiling had to be replaced, along with expensive light fittings, computers and IT equipment.Inconvenience: it resulted in substantial inconvenience and downtime for the department which in turn affected its daily function within the school.Disruption: the IT department had to be relocated elsewhere in the building, along with any remaining functioning equipment. Time-consuming process: while the damages were being claimed on insurance, the room was cleared and de-humidifiers installed to try and remove any remaining moisture.The solution;Andel Floodline®Andel's unique, award-winning water, oil and gas leak detection and monitoring solution. We are one of the global market leaders in leak detection systems and we knew our Floodline® solution would be a perfect fit. It is a true hybrid that can report to a single integrated control panel – unlike some other systems that require different alarm panels for different types of leak detection.Floodline® covers all possible leak detection requirements, from single-zone to multi-zone and distance measuring systems, with the capability to protect the largest of buildings, both old and new. Floodline® systems allow additional zones, sensors and upgrades to be added easily and cost-effectively so it is future-proof. So, we installed Floodline® SVCP – 2-Valve Control and Floodline® 1-Zone Leak Detection System. This means the school is now able to: Easily monitor all the Floodline® leak detection sensors installedEasily monitor the display LEDs which provide clear alarm information and system status for both leak detection and system faultHave peace of mind knowing the solenoid valve control panel will immediately close two solenoid valves in the event of a leak, ensuring the water source is stopped, preventing any damageBe alerted quickly as there is an audible alarm with a mute functionBe alerted when away from the property as output relays connect to a GSM communicator which sends out an SMS.The result;Bespoke solution: we were delighted to be able to come up with a tailored solution for St George’s School. Early warning: the boiler room at St George’s Edgbaston is now equipped with a bespoke leak detection system that will give early warning should there be any escaping water detected.Confidence: the client feels relieved and more confident now that our leak detection systems have been installed. Peace of mind: knowing they will no longer have to worry about leaks especially when there is no one on-site. Futureproofed: the school knows their chances of this occurring again and their building and equipment being unprotected have now drastically dropped. Community: as schools are the hubs of most communities, the last thing we want is for their day to day operations disrupted by escaping water, something which can be detected early and solutions provided easily. We are proud to have been involved in this project alongside Hettle Andrews and hope to work with more of their clients in future to provide proactive solutions.What the customer said;“We are relieved and more confident now that our leak detection systems have been installed. It has given us peace of mind, knowing we no longer have to worry about any leaks going undetected and resulting in catastrophic damage. The chances of this occurring again, meaning our building and equipment is unprotected, have now drastically dropped. We are really happy with the services and products provided by Andel and would happily recommend them.”Patrick Ryan, Maintenance Manager, St George’s School
Sponsored
Fit Box , Premium Plus , BSO and Vertical Blinds in Gomila Project

Fit Box , Premium Plus , BSO and Vertical Blinds in Gomila Project

Bandalux Industrial SA

Designed by MVRDV and GRAS Reynés Arquitectos, Project Gomila is a collection of buildings, each with its own individual character derived from their colors, materials, and rooflines, that is transforming the area around Plaza Gomila, located in Mallorca (Spain). The architects have selected our products for their maximum chromatic customization and functionality. More than 60 avant-garde homes with their own identity and custom design. Fit Box and Premium Plus roller shades, BSO outdoor Venetian blinds, and Vertical blinds were totally personalized for each building according to its style, furniture, and deco. The project was nominated “Best Applied Products” category of the Building of the Year Awards by Archdaily.
Sponsored
Alicante Port - Gatic UltraSlot

Alicante Port - Gatic UltraSlot

Alumasc Water Management Solutions

Alicante Port, the well renowned commercial and cruise ship terminal has been upgraded to benefit from a Gatic Slotdrain high-capacity surface water drainage system.Slotdrain UltraSlot was specified during the re-conditioning of Dock 19 to increase capacity from 300,000 twenty-foot equivalent units (TEU) to 463,000 TEU.“UltraSlot was chosen by specifier SETI, SA, who are well established within the ports sector and who have worked with Gatic products for many years,” said International Sales Manager – Luis Triguero “The engineer in charge was familiar with the mechanical and hydraulic advantages of UltraSlot and requested a competitive price for the project. As Gatic is so well established in the Spanish market, we could exceed their expectations.”UltraSlot is used in external concrete areas which are subject to constant traffic, such as airports and ports. This high-capacity system is designed to ensure sufficient depth of concrete cover over the main body of the channel to withstand ultra-heavy-duty loads of up to F900 - 90 tonnes.“The biggest challenge we faced was ensuring the system could withstand the consistent, heavy traffic that will always be moving throughout the port,” continues Luis. “However, thanks to its capacity to bear heavy loads, UltraSlot proved to be one of the best drainage options on the market.”
Sponsored
London’s Victoria and Albert Museum - Wade HCE Channel

London’s Victoria and Albert Museum - Wade HCE Channel

Alumasc Water Management Solutions

In its largest building project in over 100 years, the Victoria and Albert Museum’s Exhibition Road Quarter achieves architectural cohesion between museum and street with the help of Alumasc Water Management Solutions (AWMS) and Alumasc Roofing Systems. In a project that demonstrates expertise across the full building envelope, Alumasc Wade HCE drainage channels and access covers were installed to provide almost invisible yet functional water management, and a bespoke hybrid roofing system installed using Hydrotech and Derbigum waterproof roofing.Designed by Stirling Prize-winning Architect Amanda Levete and her practice AL_A, the landmark project aimed to “break down the barrier” between the great cultural artery of Exhibition Road and home of over 5000 years’ worth of cultural history.The entire project encompassed the construction of the Salisbury Gallery, a flexible 1100m2 temporary exhibition space, the Blavatnik Hall, a new entrance into the V&A from Exhibition Road, the Aston Webb Screen, a newly created colonnade formed from the original 1909 structure, and the Sackler Courtyard, a key area that strives for unity between the street, the museum, the historical and the modern.
Sponsored
Flexible Connectors

Flexible Connectors

BROEN-LAB

The ideal solution when flexibility is key Easy and cost-effective installation BROEN-LAB Flexible Connectors are designed to provide laboratories with more flexibility and lower costs without compromising the need for safe operation. Gives more options when new setups are required We know the requirements of a modern laboratory and have designed our hoses and pipes accordingly. Therefore, you can rely on the performance, durability, easy operation and flexibility of the products.
Sponsored
ADDASTONE TP TREE PITS FOR TOWN CENTRE IMPROVEMENT SCHEME

ADDASTONE TP TREE PITS FOR TOWN CENTRE IMPROVEMENT SCHEME

Addagrip Terraco Ltd

Addagrip are used to seeing their surfacing systems being used for projects all over the country but it is great to see an installation being undertaken in our own town.As part of the Uckfield town centre improvements project, Addagrip approved contractor Street Tree Care Ltd was appointed to install a number of trees and SuDS compliant Resin Bound tree pit surfacing in the newly widened pavements in Uckfield High Street.Field Maple trees were selected for their compact habit, tolerance of pollution and vibrant autumn colour. Once planted, a stainless steel tray was suspended above the tree root ball and filled with a decorative resin bound porous tree pit surfacing system.The Addastone TP tree pit system consists of a 10mm aggregate bound in a PU resin which provides a hard wearing, low maintenance finish that is porous enough to let the water reach young tree roots but robust enough for the urban environment. A drainage pipe and grill was seated in the Resin Bound surfacing to assist with additional watering that will be carried out from April to September over the next few years.A 10mm Trent aggregate was selected for maximum porosity to help alleviate surface water flooding and to provide a decorative finish to complement the new York Stone pavements.
Sponsored
Peri Ltd - Alumasc Gatic CastSlot

Peri Ltd - Alumasc Gatic CastSlot

Alumasc Water Management Solutions

Peri Ltd, one of the world's largest manufacturers of formwork and scaffolding, recently had Gatic CastSlot installed at its extensive multi-purpose service yard, where heavy lorries and vehicles come and go constantly.Our Area Sales Manager who worked on the project - Zach Graham revealed “The Gatic system was opted for due to its great hydraulic capacity and extensive reputation.” “This particular project required a safe solution that could bear the load of up to 40 tonnes, or D400, in technical terms. However, the Gatic range is designed to meet the needs of delivery or distribution areas where load ratings can reach up to 90 tonnes, or to F900 level, making it well within its capabilities.”Where continuous, slow turning traffic is a major consideration, Gatic CastSlot, from the Gatic Slotdrain range, is the front runner for ensuring a reliable water management system. The reputation of Gatic Slotdrain as the go to drainage range for infrastructure hubs such as airport runways and major ports, made this the obvious choice for this project.
Sponsored
Dimplex’s Edel renewable water heater cuts Jersey homeowner’s bills by 80 per cent

Dimplex’s Edel renewable water heater cuts Jersey homeowner’s bills by 80 per cent

Glen Dimplex Heating and Ventilation

The Dimplex Edel air source hot water heat pump has proved its credentials as an exceptionally efficient, easy to install and cost-effective renewable water heating system for one resident on the island of Jersey.
Sponsored
Lee Valley White Water Rafting Centre | Commercial Non-Slip Decking Case study

Lee Valley White Water Rafting Centre | Commercial Non-Slip Decking Case study

Gripsure (UK) Ltd

Lee Valley White Water Centre offers a unique mix of white water rafting and paddle sports, including family activities. The attraction, which is in Hertfordshire’s scenic Lee Valley Country Park, needed a new decking solution for its Terrace Bar & Café. Because many visitors choose to relax over a drink or a meal straight from their water sports experience, it was important to have decking that would be non-slip, even with surface water. And with the Terrace offering a packed programme including live music events, it also needed to be hardwearing. Gripsure supplied nearly 4,000 metres of Balau Hardwood anti-slip decking, an extremely durable product with an expected in-service life of more than 50 years. Lee Valley Regional Park Authority’s surveyor, Robert Kearney said: “We needed decking with the greatest resistance to damp, which we could use to create safe non-slip walkways. We were looking for many years of durability, so this is a long-term investment for us.”
Sponsored
Balcony Soffit Cladding used on Acton Gardens Regeneration

Balcony Soffit Cladding used on Acton Gardens Regeneration

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Acton, London Project Type: Housing Development Cost: £160m Product: Balcony Soffit Cladding, Meridian Copings, 101.6 Dia & 76.2 Dia Contemporary Rainwater Finish: Interpon YW255F Golden Beach (Balcony Soffits), RAL 7016 Matt (Meridian Copings & Rainwater Pipes) Client: Countryside Properties Plc Architects: A&Q Partnership (London) Limited Main Contractor: Countryside Properties Plc Sub Contractor: Roweaver Developments Ltd
Sponsored
Franke Water Systems provide hand sanitiser stations to Didsbury Road School

Franke Water Systems provide hand sanitiser stations to Didsbury Road School

KWC DVS Limited

In partnership with Inspired washrooms, Franke Water Systems UK have provided stainless steel hand sanitiser dispensers to Didsbury Road School, Stockport to encourage hand hygiene when the pupils return. Franke Water Systems were thrilled to provide Dart Valley branded AC00-050 free standing sanitiser dispensers for the entrance of the school before children returned on. The DVS branded touch-free hand sanitiser station is a floor standing dispenser with a premium stand. Manufactured from quality materials, this dispenser is perfect for environments with high footfall such as schools, universities, and other education facilities. The sturdy touch-free design comes with a large sanitiser tank and is battery operated, offering a touch-free, easy to install and low maintenance solution.  
Sponsored
Swimming Pool Circulation, Domestic Water Supply and Climate Control -

Swimming Pool Circulation, Domestic Water Supply and Climate Control -

DAB Pumps Ltd

The hydraulic system providing water to the two swimming pools, changing rooms, and a lounge area is operated by DAB pressure boosting sets and recirculating systems. The installed pumps ensure efficiency, energy conservation, and require minimal maintenance, offering maximum reliability to meet the demands of this contemporary facility.Utilizing Evoplus B and D electronic circulating pumps for the heating system, a consistent pressure is maintained within the system even as the flow rate fluctuates, preventing disruptions in the event of transient operational variations. Delivering an energy efficient system and CO2 reduction.
Sponsored
New house, Perth, Scotland

New house, Perth, Scotland

CDI Innovative Construction Materials Ltd

This new-build house was in a remote location and off-grid for mains gas, the house was to be heated by a heat pump and so efficiency was a major consideration for the project. The Lewis Deck system was chosen for the 1st floor of the building to provide the same efficiencies for the underfloor heating as the concrete ground floor as well as providing a high level of acoustic separation for this quality timber frame project. The build-up included the Lewis flanking and resilient strips, Lewis Deck, Anhydrite liquid screed and underfloor heating pipes.
Sponsored
Andaz London Liverpool Street Hotel

Andaz London Liverpool Street Hotel

Warmup plc

Working with the main Contractors Vascoft, Warmup were asked to provide a bespoke underfloor heating solution for the world famous Andaz London Liverpool Street Hotel.Our hydronic solution the Clypso system, was used in conjunction with our PEX A heating pipe which has a lifetime warranty. The Clypso System is easy for the end-user to control and offers a quick, hassle-free installation.Warmup’s underfloor heating solution will provide the Andaz Hotel with ideal comfort temperatures for many years to come.
Sponsored
Festool UK Head Office

Festool UK Head Office

VIEGA LTD

VIEGA MEGAPRESS – THE IDEAL FIT FOR FESTOOL HQAward-winning international power tools manufacturer, Festool has invested £10 million into its new headquarters based in Bury St. Edmonds. As part of the construction, Viega’s Megapress press connection technology has been utilised for the building’s new state-of-the-art heating system, allowing for an efficient and effective installation.Festool has relocated its 55 office-based employees to the new site in Suffolk Business Park, in Bury St. Edmonds. The large, modern facility includes meeting rooms, cafés and office space with a separate warehouse and demonstration facility. It was important for the company that its new headquarters represented a modern and sustainable design and could be a facility where the company can continue to expand and develop.The headquarters has a complex range of HVAC systems, including a hybrid air conditioning system, underfloor heating and domestic services. Viega’s carbon steel press fitting system, Megapress was an ideal solution to create the pipework connections, offering a fast and effective alternative to traditional methods such as welding.David Aldous, Mechanical Project Manager at Ceetech, the contractor for the project, commented: “We selected Megapress as it ticked all the boxes. It provided a secure press connection without the need for welding and allowed our team to undertake the work efficiently and effectively. This project had to be completed to a tight deadline, so it was essential to make strategic time gains throughout the installation period.“We were also able to make valuable time-savings because with the Megapress system, there is no need to prepare the pipe surface or clean it after as with welding, threading or grooving. From a health and safety perspective – it also removes the element of hot works.”A highly effective pressing method, Megapress connections can be made in just seven seconds – helping to achieve a 60% reduction in installation time. After cutting the pipe to the required length, contractors need only deburr the cut surface, slide the press fitting into place and press the connection.The simplicity of the press fitting process also ensures that a uniform seal is created on each connection throughout the project; particularly important on large-scale developments where there is set to be thousands of joints across a single site. Once the fitting has been pressed, it forms a strong and secure connection.David concluded: “The Megapress system is excellent, I’ll certainly select Viega again for future projects. It was a clean installation and the end-client was pleased with the high quality of work."
Sponsored
Rockfon is the perfect fit throughout Barnsley Blood Centre

Rockfon is the perfect fit throughout Barnsley Blood Centre

Rockfon

Designed by IBI Group, construction of the 7000sqm. Barnsley Blood Centre, was commissioned under the DoH and Social Care’s ProCure 22 Framework. Rockfon retains P22 preferred supplier status and we are very pleased Rockfon® MediCare® Standard has been installed throughout the centre’s four laboratories, open plan offices, meeting rooms and catering facilities. Helping provide a great working environment Chris Sims, NHS Blood and Transplant, said, “It has been fantastic to see the building taking shape. We’re very proud of our new centre... Barnsley will be a great place from which to deliver our life saving and life enhancing services.”
Sponsored
UltraFloor is fit as a fiddle at Kingston Hospital

UltraFloor is fit as a fiddle at Kingston Hospital

Instarmac Group plc

Long-standing UltraFloor customers, Specialist Flooring Group have used Level IT Two to install 800sqm of vinyl sheet flooring throughout Kingston Hospital.BackgroundIn August 2023, work began on a much-needed extension to Kingston Hospital in Surrey. The project included installing brand-new screeds, as well as working with the existing substrates in some areas.The ChallengeKingston Hospital is an extremely busy building, operating 24 hours a day. With that in mind, it was crucial that disruption was kept to a minimum and patients were kept as comfortable as possible during the renovations.Healthcare environments are in constant use and so choosing subfloor preparation materials that would provide a super smooth and hard-wearing finish was equally as important. With hospital staff moving beds, wheelchairs and equipment along the corridors, it was crucial that the floors were completely level and devoid of any lumps, bumps and trip hazards.The SolutionUltraFloor have a long and successful history of providing subfloor preparation products to the healthcare sector. They were delighted to once again partner with flooring experts, Specialist Flooring Group, to complete a 800sqm project at this very busy Surrey hospital.To begin, the screeding division of Specialist Flooring Group installed a 75mm K Screed to the new areas of the hospital. Once complete, they handed over to the flooring arm of the business who primed the entire area with UltraFloor Prime IT Multi-surface Primer.Formulated to promote the adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.After Prime IT Multi-surface Primer had cured, Level IT Two was trowel applied to a depth of 3-5mm.There are many reasons why Level IT Two has become UltraFloor’s most popular floor leveller. Its exceptional flow characteristics make it a very easy material to apply to a variety of subfloors in both commercial and domestic flooring projects.Level IT Two is protein free, reducing the risk and spread of disease as the types of dangerous and contagious bacteria that thrive in protein are eliminated, and is low odour, providing a pleasant environment for both staff, contractors and recovering patients.With a set time of 2.5 hours, Level IT Two can receive bonded floor coverings after just 8 hours, making it an ideal choice for projects with a tight deadline. What’s more, because Level IT Two is available as a two component system, it takes the guesswork out of mixing, reducing site errors and guaranteeing a perfect application every time.Level IT Two created a beautifully smooth subfloor – the perfect preparation for the installation of the Polyflor Verona, Polyflor Palletone and Burmatex Osaka carpet tiles.ResultsOn working with UltraFloor, Riley Goatham, Project Coordinator at Specialist Flooring Group Ltd, commented: “We have a great continuing relationship with Instarmac. We use UltraFloor materials as they are of a great standard, and we receive amazing technical support from the UltraFloor team. This ranges from site visits to having specifications provided to us for certain projects.As always, the materials were great for this project. Level IT Two allowed us to use one levelling compound throughout, regardless of the substrate type, and provided us with a nice level floor to work with.”The project began in August 2023 and finished in October 2023.For further information about UltraFloor and how you can benefit from their expertise, please contact their team of flooring experts by emailing ultrafloor@instarmac.co.uk or calling 01827 254400.
Sponsored
Domestic retro-fit green roof - Sydenham

Domestic retro-fit green roof - Sydenham

Wallbarn Ltd

The client desired a green roof at the back of this beautiful family home. Access was very restricted. The speed and ease of transporting and installing our modular trays meant minimum disruption for the homeowner. Trays were delivered to site on pallets and handballed to the roof. The modules were laid down onto a geotextile fabric. Pebbles were then laid around the perimeter between the trays and any outlets to provide the required firebreak. Vegetation blended quickly creating a seamless green roof and, looking out from the upper floors, a sense of continuity from the house across the garden.
Sponsored
Merseytravel case study

Merseytravel case study

Zip Water

Designed to implement and maintain the transport network throughout the Liverpool region, Merseytravel, which operates as part of the Liverpool City Region Combined Authority, is a key service provider so it’s no surprise it has a large office in the Liverpool docks.

Showing 145-180 of 373

Feedback