NBS Source
I'm a manufacturer

"telecommunications systems"

4,641 results found

Sort by:

Showing 37-72 of 1208

Sponsored
Britain's biggest domestic basement?

Britain's biggest domestic basement?

Triton Systems

Combining all three types of waterproofing system (Types A, B and C) supplied by Triton Systems, at the time of construction this project was believed to be the UK’s largest domestic basement. The three storey habitable space below ground was retrofitted under the existing property, and extends beneath the new build adjacent luxury apartment blocks.
Sponsored
Aston University

Aston University

Excelsior Panelling Systems Ltd

The Project Aston University Student Union at the heart of the University’s campus has seen a £6.5m investment.  The new, two-story building, home to over 100 student clubs and societies, acts as the social hub for the 13000+ students at the university & replaces the old 1960’s Building. The Universities brief was to incorporate the local area into the project using images of Birmingham City Skyline. The Challenge Offer a full height cubicle system, suitable for the environment and to a specification befittng the digital imagery. Digitally render images onto Laminate and apply to the façade of the full height system. Manage the precise fabrication process through the factory. The Solution  Excelsior’s Flush 30 Cubicle System encompasses a rebated aluminium frame to the doors and pilasters. The aluminium edge detail provides a robust trim and looks innovative within this modern building, an unrivalled system within the washroom market.The images, supplied by the client were digitally rendered onto laminate by Formica Younique and applied to the façade of a full height Flush system.Max McLoughlin, CEO of the Student Union comments: ‘We want the building to make students feel proud to be at Aston University. From a design perspective, we wanted the students to feel fully immersed in life on campus & we are very happy with the result’.
Sponsored
United Utilities

United Utilities

CLD Physical Security Systems

United Utilities Group PLC (UU) is the largest listed water company in the United Kingdom. Covering 5 counties it is responsible for providing water service to nearly 7,000,000 customers.Between 2010 and 2015 it spent almost £3.6billion on upgrading its services and infrastructure to meet the ever-increasing demand for reliability and standards.The BriefTo meet the then current threat levels all fencing and gate systems had to provide the following.Anti-Climb Fencing SystemsLPS 1175 SR2 rated Fence and Gate SystemsA Minimum guaranteed delay against attackSwing and Sliding gates rated to LPS 1175 SR2 to meet the demanding nature of the sites
Sponsored
Waterproofing the Houses of Parliament

Waterproofing the Houses of Parliament

Newton Waterproofing Systems

Waterproofing this historic London landmark – external waterproofing with Newton 403 HydroBond, internal waterproofing with Newton System 500, installed by Newton Specialist Basement Contractor MacLennanUK.Newton Waterproofing were delighted to return for this project at the prestigious Houses of Parliament in London, a landmark that has dominated London’s skyline for over 150 years. Newton Specialist Basement Contractor MacLennan Waterproofing was approached to specify a guaranteed waterproofing solution for the new-build basement.After reviewing the technical drawings, MacLennan decided to bring the job to Newton, whose product range was perfectly suited to the project requirements. Newton and MacLennan are both privileged to be the companies chosen to share in securing the future of the Palace of Westminster.This complex project required the design and installation of an external waterproofing system, an internal cavity drain system, and a polyurea roofing system to ensure a high standard of waterproofing.Externally, Newton’s innovative ‘Type A’ 403 HydroBond membrane was applied extensively to ensure the necessary waterproofing around the basement, whilst internally, Newton 508 and Newton 520 membranes were both applied from floor to ceiling as part of Newton’s complete System 500 cavity drainage solution. With the finished structure in place, the waterproofing was finally completed by the application of both a polyurea coating and further drainage membrane to the roof deck of the basement.With a waterproof basement fully compliant with the requirements of BS 8102:2009, coupled with guaranteed protection against water ingress, this newly completed, large basement area, situated directly next to the River Thames, provides a durable and well-established waterproofing solution, utilising multiple Newton Systems to great effect.
Sponsored
Bradford Royal Infirmary

Bradford Royal Infirmary

Stone Cladding Systems

Architect: Broadway MalyanContractor: BAM ConstructionStone: YorkstoneThe £28M new Broadway Malyan designed Bradford Royal Infirmary Children’s Ward has now been officially opened by HRH The Princess Royal.The new wing, part of Bradford Teaching Hospitals NHS Foundation Trust, was recognised with the top honour at the Local Authority Building Control awards for West Yorkshire at Wakefield Unity Works. The Children’s ward is clad in Aztec Rainscreen with a façade of our local Yorkstone.Aztec was chosen because of its similarity to other local buildings and for its speed of installation. Bam, having used the system before were confident of Stone Cladding Systems ability to deliver a quality system on time. 
Sponsored
Aluminium Sliding Door System - MasterPatio

Aluminium Sliding Door System - MasterPatio

Reynaers Aluminium

Introducing the next generation of sliding systems. MasterPatio is a high insulation and high performance lift-slide system with minimalistic look and clean design, down to the details. The system combines top thermal performance with slim sightlines and a maximum element height of 3.7 m.
Sponsored
Blackhorse Lane

Blackhorse Lane

Langley Waterproofing Systems Ltd

The purpose:Taylor Wimpey’s Eclipse development was the final phase of the large-scale modernisation and renewal strategy for the London Borough of Walthamstow Forest, known as The Blackhorse Lane Action Plan. Eclipse would offer affordable social and private housing via 500 homes in two six-storey apartment blocks.To help satisfy one of the Plan’s objectives- “to ensure new developments incorporate the highest levels of sustainable design and their impact on climate change is minimised”- we installed green roofs on both blocks. As it was the final development phase, space was limited; time was also an influencing factor in facilitating the tight build programme,avoiding delays, and enabling the client to deliver much-needed new homes.Our solutionTo enable fulfilment of the brief, we recommended our HM-40 Paratech Hot Melt Roofing System as the inverted waterproofing base for the green roof. A fully-bonded system, HM-40 is a robust, durable, and highly flexible monolithic, self-healing hot-melt waterproofing system for protected roofs, green roofs, terraces, and podium decks with a 40-year durability statement. In addition, it is firerated for unrestricted use when covered with a green or ballast roof.Unlike other hot melt systems that use fleeces, the Paratech system incorporates a reinforcement mesh: this allows the system to be rolled out, making waterproofing installation faster, thereby enabling the contractor to lay the top roofing layer of artificial grass and landscaped green roofs. Unfortunately, an on-site compound to store the roofing components was unavailable. We worked closely with T&T Roofing and Taylor Wimpey to ensure deliveries arrived in build sequence for immediate use, but without adversely impacting residents who had already moved into their newhomes.“The features of the flat roof system provided a seamless, issue-free roof installation, with rapid installation time causing minimal disruption. Langley’s technical team was always on hand to provide assistance when necessary, working collaboratively to guarantee a consistent and highquality installation.”
Sponsored
Limehouse Basin,

Limehouse Basin,

K Systems Insulated Facades

Located in East London, on a water gateway between the River Thames and over 2,000 miles of navigable canals, the six-building Limehouse Basin development comprised of a white EPS insulation board that was fixed to horizontal PVC rails that created a drained cavity between the insulated façade system and the substrate.Due to strict regulations introduced in December 2018 following the Grenfell tragedy, which states any building exceeding 18 metres in height must have walls comprised of non-combustible materials, this building was deemed non-compliant, unsafe, and not fit-for-purpose.Development owners Beckford, supported by the Building Safety Fund (BSF), required an expert team to execute the removal of the existing EWI and replace it with an appropriate alternative, without disrupting the unique aesthetic of the building.The combination of K Systems and Retrofit UK, two companies renowned for their expertise, quality of service, and superiority in the market, was an obvious choice for Beckfords.We have a good portfolio of BSF projects to date, and Limehouse Basin is another great example of how our team along with one of our approved installers can help make a building fit for purpose, whilst overcoming numerous challenges along the way. Unrivalled expertise and professional delivery are apparent in every groove and corner of this refurbishment.Our ServiceTogether with Approved Installer Retrofit UK, K Systems continued works despite Covid restrictions (adhering to Government guidelines) to deliver the Limehouse Basin project within the agreed timeframe and with minimal disruption to residents as requested by the client.Removal of the existing EWI system took place in rotation with the installation of the new system, and a robust programme was put into place by the contractor to ensure the building was not exposed to the elements for long periods of time, ensuring the residents were kept as comfortable as possible especially during the winter months. Decanting of the residents did not take place, so we worked alongside all parties to ensure the health, safety and welfare of the residents were prioritised during the works.Due to the nature of this project, technical monitoring from the K Systems team was increased, and weekly visits were planned along with a reactive approach to any on-site issues that arose from a technical perspective. Our technical teams actioned regular quality assessments and maintained open communication with all stakeholders.The result – an industry-leading insulated façade solution that fulfilled Beckfords’ criteria and delivered an outstanding architectural design and structure, fully compliant with fire regulations and boasting a better U-value which translates to better living conditions for the residents.Technical Project DetailsThe key objective for the Limehouse Basin project was to remove the non-compliant EWI system and replace it with a non-combustible system to meet current building regulations.Our team insist on being involved from the very concept of any BSF project to ensure an accurate specification could be developed and allow any initial underlying issues to be identified and rectified swiftly. Therefore, our Technical Team witnessed the removal of the existing system and inspected the substrate thoroughly.After extensive scoping, the K Systems M, mineral wool insulation, system with a silicone render finish was chosen as the preferred option, meeting the demands and needs of the client and current building regulations. This system provides high levels of fire resistance and non-combustibility (an A2-s1, d0) bringing it in line with mandatory Government requirements for buildings over 18m tall.With superb acoustic qualities and excellent environmental properties, the M System didn’t just tick the fire resistance box. The thermal performance of the building was significantly enhanced, with a U-value of 0.30W/m².k being achieved.The shape of the buildings were complex, with numerous curved areas of various facades. This meant the finish required an expert eye and a skilled hand to deliver seamlessly. Both K Systems and Retrofit are renowned for their expertise and superiority in the market, and therefore such challenges were overcome, and high standards of workmanship delivered.Another very challenging aspect of the build was the replication of the rainscreen cladding to the front of the buildings. This detail was successfully created by using tape joints, stop beads, and black silicone mastic to create a shadow gap – further testament to the expert capabilities of our team. This particular finish not only delivered the desired aesthetic but delivered an additional benefit of cost savings for the client.We worked closely with Retrofit UK throughout the duration of the refurb and as a result the Limehouse Basin buildings have a contemporary finish and attractive aesthetic worthy of the projects postcode, and one we are confident existing residents welcomed and potential residents appreciated.
Sponsored
The Distillery, Glassfields

The Distillery, Glassfields

Lusso Systems Ltd

Glassfields is a new high-spec office development which forms the gateway to Bristol’s Temple Quarter. The completed building offers the perfect environment for how businesses work today.With 93,000 square feet of high-quality office space, it has been designed with the tenants’ well-being in mind and provides a flexible, adaptive, and creative space. The design of the interior called for an industrial look which made Lusso 25 Geometric glazed partitioning system, with its black powder coated frames and banded look, the ideal choice. High acoustic Silenzio doors and Lusso 25 frameless single glazed system, also powder coated in black, were used to complement the design. The overall look provides a stunning, dramatic, and classy environment in which to attract and retain talent.The building has achieved BREEAM Excellent accreditation and an EPC rating A, embracing industry best practice, energy efficiency measures and sustainable technology.
Sponsored
World of Books

World of Books

Concept Cubicle Systems

World of Books is the UK’s largest online retailer of second hand books. As part of the ongoing improvements to their head office, they were looking to refresh their existing washrooms to a hard wearing cubicle system that is durable enough to withstand daily use from its staff.Read the full case study on our website.
Sponsored
Lawrence House

Lawrence House

Dunhams Washroom Systems

Dunhams were tasked with designing upscale, premium washrooms to complement the newly refurbished office spaceFull Height Vista flush front cubicle systemFull height IPS duct panels to conceal plumbingBespoke Solid Surface washtroughs in Corian Glacier WhiteBespoke matching HPL mirror frames
Sponsored
Edinburgh College

Edinburgh College

Forbo Flooring Systems

For the refurbishment of Edinburgh College’s busiest campus, its FM team called upon Forbo Flooring Systems’ Modul’up adhesive free sheet vinyl for its unique ability to be installed quickly and easily, while reducing downtime and disruption to day-to-day college life – as the floor covering could be walked on immediately after installation.
Sponsored
Devonshire Mansions, Eastbourne

Devonshire Mansions, Eastbourne

K Systems Insulated Facades

BackgroundFor the perfect example of architectural excellence which not only delivered an impressive aesthetic, significant environmental benefits, and a more robust structural foundation, but also improved thermal performance, look no further than the eight-storey, three-building Building Safety Fund (BSF) project Devonshire Mansions.Situated in beautiful Eastbourne on the south-east coast of England, Devonshire Mansions were an extremely attractive choice for those wanting stunning sea views and some peace and privacy. However, due to their location in a high exposure area, the buildings were aged and weather-beaten, and required a full overhaul and refurbishment to modernise, align with current safety regulations for high rise buildings, and strengthen the buildings at their core whilst rejuvenating the exterior.Understanding and appreciating K System’s renowned ability for outstanding refurbishment projects, Pavehall contracted K Systems to completely refurbish this residential development and deliver on the following four primary objectives:- Remediate unsafe cladding- Improve the thermal performance rating of each home- Update and seamlessly replicate existing façade features- Deliver a solution with acoustic benefitsOur ServiceIn collaboration with Archiflair Design, Pavehall, and Fullers Plastering, K Systems delivered an industry-leading, insulated façade solution that fulfilled the desired criteria, achieved a U-value of 0.26 W/m²K and resulted in an outstanding architectural structure.The commitment of K Systems team, their continuous communication, in-depth level of reporting, and consistent presence on site not only ensured a perfect refurbishment, but also instilled 100% confidence in the supply chain throughout, showing exemplary levels of customer service.This project is a great example of how K Systems overcame various construction challenges to deliver within the agreed time constraints.The make-up of the façade had multiple protrusions in forms of balconies meaning that every sheathing and insulation board had to be cut to fit. Replicating this without compromising on the strict site deadlines was a challenge but under the great install team and K Systems’ expertise and onsite presence, this was achieved.Additionally, Devonshire Mansions had a problematic substrate and challenging aesthetic deliverables. Working closely with all partners, and utilising digital technology, K Systems mapped out the refurbishment and specified the ideal solution to Pavehall for implementation.Technical Project DetailsAfter a comprehensive scoping process, K Systems discovered that the existing system had a drained cavity build up and when removed, the sheathing boards were compromised by water. With the buildings being high rise, steel frame and multi-occupancy, the industry-proven K Systems Exicco Cavity Drainage EWI System was specified.In the Exicco system, the drained cavity behind the insulation ensures that any interstitial moisture escapes without detriment to the performance of the system. Due to their seafront location, Devonshire Mansions were prone to fierce rain and water exposure, so this system was the ideal choice to ensure any future moisture or condensation build up was allowed out to avoid compromising the substrate or newly installed façade.Once the strip out of the existing façade had occurred, further challenges were discovered – the substrate was far from line and level. This meant that every rail within the newly installed EWI system had to be packed out using steel shims to create a level vertical façade, subsequently adjusting the specified fixing lengths to suit.Some elements of the substrate were high strength concrete incorporating a flint aggregate which proved problematic for standard mechanical fixings. Via K Systems’ on site support, a suitable, more bespoke fixing was specified which ensured proper anchoring of rails and intumescent fire barriers. A swift solution was achieved with no detriment to the construction programme.The newly installed Exicco system was combined with the K Systems M (Mineral Wool) system. This high performing system provides optimal levels of fire resistance and noncombustibility and its installation at Devonshire Mansions meant that the fire classification of the buildings was upgraded to A2-s1,d0 meaning that the development is now compliant with the latest building regulations for all high-rise dwellings in England, further ensuring the safety of residents.Devonshire Mansions is visually impressive with its feature balconies, architectural cornices, ashlar panelling and quoin detailing. It was a specific requirement of the client to remediate the unsafe cladding without losing these exterior design features.K Systems created two specifications; one for the elevations and one for the balconies and provided bespoke detailing to allow them to seamlessly harmonise as one façade. Ashlar panelling and quoin detailing was replicated cost-effectively using varying thicknesses of non-combustible mineral wool insulation which was over-rendered skilfully by the contractor using K Systems Silicone Thincoat render.The more intricate cornice features were all bespoke manufactured using compliant non-combustible materials and integrated into the design with K Systems providing robust detailing to create a water-tight barrier and eliminating cold bridging. Decorative columns were installed at ground level to complete the façade.The eye-catching, waterfront dwellings were finished with Silkolitt+ - a versatile, easy to apply, water repellent, durable, and low maintenance thin coat render, perfectly paired and formulated for use with our Exicco systemOverall, K Systems specified a fit-for purpose, non-combustible façade with a high level of complex architectural detailing using cost effective solutions. The installation process was overseen by our unrivalled site support team who were frequently on hand to solve any issues as they arose.“Working alongside K Systems on a project of the size and nature of Devonshire Mansions was a true pleasure. From initial scope and specification to intricate detailing and innovative finishes, the K Systems team lead by example and made the process and delivery a slick and seamless operation. The refurbishment was a complex case but working together in partnership, we all delivered on excellence, and the beautiful Devonshire development is something we can all proudly put our names to.”James Fuller, Fullers Plastering
Sponsored
Donabate Library

Donabate Library

Forbo Flooring Systems

Donabate Portrane Library, recently refurbished by the Fingal County Council, is now a warm and inviting community library as a result of products chosen from Forbo Flooring Systems. The Marmoleum and Tessera products were chosen for their practicality, cleanliness and variety of interesting designs. And Sarlon Topography from Forbo’s acoustic vinyl collection was a must providing a quiet reading or studying environment.
Sponsored
President Kennedy Academy

President Kennedy Academy

Brett Martin Daylight Systems

8 Marvault Vaulted Rooflight Systems were installed at President Kennedy Academy to admit natural daylight into corridors. This formed part of a wider framework project in which Brett Martin Daylight Systems installed rooflights in seven educational facilities. President Kennedy is based in the area local to Brett Martin Daylight Systems and prides itself on its ‘no barriers’ approach to education in which it is committed to ‘Building Brighter Futures’ for its students.
Sponsored
The Vale Apartments - London

The Vale Apartments - London

Licata Building Systems Ltd

With several stops marked out on the future Crossrail route, new-builds on the rise, and an impressive range of ‘Outstanding’ schools, this culturally diverse borough of Ealing is becoming more popular than ever. To meet this popularity new-build property is on the rise however there is strict guidance on design of new buildings. Licata Building Systems in partnership with Build-Therm Services Limited were commissioned to specify and supply the façade systems for The Vale apartments. A prestigious block on Connell Crescent, The Vale was subject to planning guidance that insisted the block remained in-keeping with the more traditional neighboring blocks. The system installed is Licata FireSafe Brick slips. Using a 7mm extruded brick slip the system is one of the lighest systems available on the market. Coupled with class A2 fire performance and a U-value of 0.039W/mK, the apartments not only met all NHBC and local planning design criteria but provides the occupant a safe and energy efficient environment.
Sponsored
The Gateway Student Accommodation

The Gateway Student Accommodation

Epwin Window Systems

Nearly 600 PVC-U tilt-turn windows in the Profile 22 system were chosen for The Gateway, a £22million student accommodation in Lincoln. The tilt-turn windows were fabricated by Profile 22’s Approved Window Contractor, Polar Windows, using the fully chamfered system, foiled with smooth finish RAL 7016 Anthracite grey as a special order to colour match the aluminium design scheme. The work was carried out in line with strict deadlines, and the project was completed in good time ready for the beginning of the academic year.
Sponsored
Friargate, Coventry

Friargate, Coventry

Excelsior Panelling Systems Ltd

The Project  Friargate One is a 150,000 sq ft, 13 storey, low energy building forming part of a £700m project to create a new business district in Coventry.  The building sets the standard for the remainder of the 37 acre Friargate scheme that will include 13 more office buildings, two hotels, homes and shops all set to transform the area around the train station. This project is the largest development in the West Midlands Combined Authority.   The Challenge Deliver a product to satisfy the architects design & meet the highest standards offered within the industry. Provide a full range of accessories to compliment the system. Manufacture bespoke boxed out mirror units complete with rebated lighting strip. Ensure the system is installed to highest standard to create a seamless fronted wall of cubicles and superloos across varying floors.  The Solution Floor to ceiling Flush 44 system installed throughout male & female washrooms and unisex superloos situated over two floors.   The system encompasses a 44mm MR core with a hardwood rebated edge detail. The overall finish is modern and sleek creating a seamless flush wall of cubicles with complete privacy and comfort for the users.Close management of each phase from site survey through CAD drawings, call up and manufacture ensured we had complete control of the project and were able to accurately survey the areas and install the seamless system desired by the client.SpecificationProduct Range: Flush44 HPLDoors: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPilaster: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPartition: Partition: HPL bonded onto 38mm MR Core, Formica Folkstone F7927Ironmongery: Stainless SteelAvailable Finishes:These Systems Are Available In The Following Finishes:• Natural Wood Veneer• High Pressure Laminate• High Gloss LaminateAccessories Product Range W/C'sSpecificationProduct Range: AccessoriesMirror Backing Panels: Blanc Menuires B015 with 4mm Safety Backed MirrorsWaste Bins: Prestige Waste BinOther:Paper Towel HoldersWaste BinToilet Roll HoldersSoap Dispenser
Sponsored
Cartcraigs, Glasgow

Cartcraigs, Glasgow

K Systems Insulated Facades

The Cartcraigs high-rise project located in the heart of Southside Glasgow was a rewarding project to be involved with allowing real transformation and change in several key areas.The tower block was originally built in the 1960’s with a grey cladding finish but due to decades of inclement Scottish weather, the building was weather-beaten, tired and dated. With its stature and prominent location, the building should have been an attractive living option in Southside Glasgow but instead was unappealing to potential residents, and in desperate need of modernisation.Rising fuel prices and the current poor thermal performance of the tower block, meant it was extremely difficult and expensive for tenants to heat their flats – so much so that many occupants were considered in a state of fuel poverty.In collaboration with MAST Architects and our approved installer PWM, we designed a façade solution that not only significantly improved the thermal performance of the building, but transformed Cartcraigs aesthetically creating a modern, fit-for-purpose living space.A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.Our ServiceDue to the scale of this project, the congested location and small site footprint, we had to work closely with our approved installer, main contractor, and local authority to ensure minimum disruption to both the residents of Cartcraigs and residents of the surrounding area.Delivery routes and schedules were agreed to ensure consideration for local residents throughout the project.As part of our service commitment, our Site Application Specialists carried out regular site visits to ensure our system was installed to the highest standard and in line with our specification.They were available throughout the duration of the project to provide technical guidance, installation support and ensure the highest levels of quality. This allowed the K Systems Technical & Logistics Teams to support the schedule of the project with timely delivery of materials to site and ensuring there were no delays during the installation and inspection processes.“In conjunction with the Architects we approached K Systems to design a system to comply with fire regulations and offer a solution to make the look of the building more aesthetically pleasing along with making it a point of interest within the Southside area. Great site support was provided by Ally along with Technical/Service support from Jim and Martin. The team at PWM look forward to working on our next project with K Systems.”Kevin Fox, PWM Projects ManagerTechnical Project DetailsThe original façade incorporated a 25mm cavity with reinforced concrete inner leaf shaped panels, which could be seen beneath the then grey façade panelling. Wheatley Group, the client, had requested a clean, crisp, and smooth finish that would also comply with Scottish Fire Regulations.After numerous design meetings taking into consideration client requirements, budgets, and timeframes, we put forward our industry-proven K Systems M Silicone EWI system. The system was designed using 160mm non-combustible mineral wool insulation to meet the 0.18 (W/m2K) U-value requirement, making it the perfect choice for the refurbishment to combat the heating issues faced by residents and futureproof the building as a viable living space for years to come.Bespoke technical detailing and rigorous adherence to our high-rise policy ensured a high performing system with an A2 non-combustible fire rating, complying with all safety regulations for buildings over 11m in Scotland. The 160mm insulated grey and white façade delivered a really attractive high-rise that will now better withstand the Scottish elements.The finish used was our high-performance thin coat render, Silicone TC15. The contemporary colours of grey and white were chosen from our wide range of colours which visually transformed the 17-storey building. Our polymer rich Silicone TC15 allows ease of application, and its hydrophobic properties will provide a clean, crisp and low-maintenance finish for years to come.Our specification included bespoke detailing to provide solutions for Cartcraig’s individual retrofit design challenges. We also commissioned wind load calculations and fixing pull-out tests to determine optimum fixing patterns to anchor the EWI system to the different substrates. Ultimately, a safe, thermally efficient and visually appealing result was achieved.“K Systems provided a great overall package from the inception of this project with design advice, through the technical stages, with assistance through specification and then with the provision of weekly reports and checks once the project got on site. Cartcraigs, being a high-rise block needed monitoring and adherence to the project specification, and having the K Systems team providing regular on site checks gave the design team the assurance that all requirements were being met.”David Locke, Mast Architects
Sponsored
Rejuvenating Headland Hotel

Rejuvenating Headland Hotel

Schlüter-Systems Ltd

Schlüter-Systems supported Lilly Lewarne Architects in the design and specification of the Aqua Club, a stunning swimming and wellness centre with specialist waterproofing products.
Sponsored
Pure Cars, Wakefield

Pure Cars, Wakefield

Senior Architectural Systems Ltd

When it comes to showcasing prestige cars from the likes of BMW, Maserti and Mercedes, it’s vital to find the perfect setting and at the new Pure Cars premises in Wakefield, the slimline SF52 aluminium curtain wall system has helped create a building as impressive as the stock inside.The flexibility of the SF52 curtain wall system has brought the vision of architects The Harris Partnership to life, from the crisp lines of the showroom’s entrance to the smooth curve of the main façade. The eye-catching building boasts a prime location on the approach to the city centre, with the slim sightlines of the curtain wall highlighting the cars on display and offering panoramic views of the surrounding areas for the enjoyment of staff and customers within.The thermal-efficiency of the SF52 system will also help to prevent heat loss from the extensively glazed building which is a flagship dealership for the Pure Cars brand which specialises in the sale of used luxury and prestige cars.With a proven track record of work across the retail sector, Senior has been involved in a number of other car showroom projects across the UK. Senior curtain walling and glazing systems have been designed to help specifers working in this market meet the required environmental requirements by creating high-visibility shop frontages that minimise solar gain to create a comfortable consumer experience.Senior Architectural Systems’ stylish SF52 aluminium curtain wall system has been used to great effect at a new luxury car showroom in Wakefield, creating an eye-catching and thermally-efficient façade that maximises the use of daylighting. The flagship Pure Cars showroom has been designed by The Harris Partnership, with Senior’s fenestration systems fabricated and installed by Vision Aluminium Systems for main contractor Glass Walls and Doors.
Sponsored
Ballyseede Castle

Ballyseede Castle

Brett Martin Daylight Systems

Ballyseede Castle located near Tralee, dates back to the 16th century but was transformed in the 1960s into one of Ireland’s most luxurious hotels. As part of a new extension Brett Martin Daylight Systems was called upon to provide an aesthetically pleasing daylight solution for the orangery. Brett Martin supplied a comprehensive bespoke rooflights package helping to create a light, bright environment for guests and staff, whilst blending beautifully with the character of this stately, listed building. Our bespoke rooflight systems are precision-engineered and highly adaptable, providing specifiers with a versatile way to create architecturally stunning pitched skylights.
Sponsored
Co-Operative, Birtley

Co-Operative, Birtley

Berry Systems

Berry Systems supply and installed safety barriers and balustrading to protect loading bays, warehouse racking, pedestrian walkways and the plant.The new Co-Operative Composite Distribution Centre in Birtley covers 25,600 sq metres (276,000 sq ft) and supplies a vast range of products from 3,500 lines to 262 Co-Operative stores in the North of England.Activity in the centre is extremely busy with hundreds of vehicle movements daily facilitated by 500+ members of staff. We won the contract to supply and install all the safety barriers, balustrades, loading bay barriers and racking protectors inside the warehouse, as well as the vehicle perimeter barriers and ramp barriers externally.All the products, with the exception of the galvanised spring steel barriers, were painted in high visibility yellow. The spring steel barriers are designed to absorb  impacts from HGVs and forklift trucks while retaining their own integrity and ongoing effectiveness. The Co-Op were determined to ensure their new development was as environmentally friendly as possible. Waste oil helps provide heating and the lighting system is solar controlled to eliminate wastage. It ensures a variable level of interior lighting to automatically complement exterior levels.
Sponsored
Hotel Urbano, Bogota

Hotel Urbano, Bogota

Genesis Global Systems Limited

The Hyatt hotel chain set itself the goal of building a new hotel in the vicinity of the Corferias Convention Centre in Bogotá. One key decisions in the project was the selection of a system for the control of dirt, dust and moisture entering the building, to ensure maximum care of floor coverings. The Genesis Trakmat® system. With it’s aluminium profiling system with PVC links, which makes it 100% roll-up, would guarantee its easy manoeuvrability and ease of maintenance, as well as maximum softness to the contact of the shoes and a minimum noise emission when passing guests.
Sponsored
A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

Automatic Systems UK & Ireland

As a specialist in the automation of access control, Automatic Systems is well aware of the issues faced, especially in the light of recent events, and can offer tailored solutions that not only meet student and staff security needs but also the health and wellbeing of all.
Sponsored
Healthcare | Derriford Hospital

Healthcare | Derriford Hospital

Venesta Washroom Systems Ltd

To complement the opening of their new, state-of-the-art Changing Places facility, Derriford Hospital realised the need to improve the reception foyer washrooms. "We chose the System M cubicle to aid with manual handling and to provide quick access if needed. Of the products supplied, we are most pleased with the System M emergency door release system. The reaction from users has been that they are delighted with the new facilities, commenting on the extra space, increased number of cubicles, useful accessories such as bag hooks, and the colour of the cubicles." - Peter Caton, Site Services, Derriford Hospital.
Sponsored
REEMA Properties, Swindon

REEMA Properties, Swindon

K Systems Insulated Facades

BackgroundK Systems’ retrofit of the REEMA non-traditional construction Properties in Swindon, South-West England, is a stellar example of the company’s ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Swindon Borough Council had a development of 50+ properties in Upper Stratton all with aged facades and poor thermal qualities, some with U-values as inadequate as1.59W/m ² K.K Systems supported Swindon Borough Council, led by Projects Surveyor John Black, to completely refurbish this residential development and deliver on five primary objectives:- Improve the thermal performance rating of each home (SAP rating)- Deliver greater thermal comfort for residents- Choose a solution with acoustic benefits and non-combustable benefits- Reduce tenants’ energy consumption- Deliver an attractive aesthetic that would uplift the areaHaving a good reputation for matching systems with finishes to deliver its clients’ visions, K Systems partnered with approved installer, Rateavon Ltd, to scope out theproject and specification in fine detail, with particular focus on insulating properties and aesthetic.Our ServiceK System worked in collaboration with Swindon Borough Council and Rateavon Ltd to upgrade these poorly insulated houses and deliver a total revamp of the properties, resulting in thermally efficient homes.One of the primary requirements was to improve the performance rating of each home, with a target U-value of 0.30W/m²K. In fact, K Systems exceeded that in the project delivery by achieving a U-value of 0.29W/m²K.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Digital technology was deployed from the very beginning to produce models and CGIs (Computer Generated Imagery) to not only assure Swindon Council the finished project would meet its specific requirements, but to also guide the design process and ensure compliance with all health and safety regulations.Regular inspections and site audits were carried out alongside Swindon Council to ensure the same level of care and attention to detail that applied when specifying theproject was being applied during its implementation and delivery.Technical Project DetailsOn initial inspection, K Systems found a problematic substrate. The REEMA hollow panel non-traditional construction properties are constructed of a concrete frame with thin concrete panels to the exterior façade. This type of thin panel construction created a significant challenge for the team to find a suitable EWI fixing, but with the help from Rawlplug, one of our EWI fixings suppliers a robust and safe fixing solution was found, without compromising the existing REEMA construction.Harnessing years of EWI system design knowledge and unrivalled expertise in this field, K Systems worked closely with Rawlplug and a structural engineer to identify a suitable fixing detail and pattern which would not only be robust but also suitable for this type of substrate.With a structurally strong solution agreed, focus then turned to the appropriate insulation solution.After a comprehensive scoping process taking into consideration client requirements, project objectives, budgets and timeframes, K Systems specified the industry proven K Systems M, Mineral Wool EWI system to not only significantly boost thermal performance of the buildings but also reduce noise pollution for the tenants.K Systems 100mm Mineral Wool insulation has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the refurbishment as it would combat the increased heating costs faced by residents whilst retaining the solid foundations of the existing building and reducing the risk of condensation or mould damage.Other technical benefits which made the K Systems Mineral Wool system the ideal specification for this refurbishment include:- non-combustibility, A2-s1,d0 fire rated- its excellent acoustic properties, reducing noise pollution- its environmentally friendly composition as the insulation is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)- its workability and easy to cut format, reducing labour time across the board for the team.Having identified solutions that improved structure and thermal performance, K Systems then offered the best quality finish for the properties – an aesthetically pleasing, cost effective combination of VBriQ+ clay brick slips and Silkolitt+ silicone render that both Swindon Council and the residents would be proud of.VBriQ+ is a lightweight, highly durable, clay brick slip system and a more cost-effective finish option in comparison to tradition brick systems without compromising on quality, weather resistance, workability and durability. This made it perfect for a project of this scale – a project which required maximum and long-lasting impact without incurring maximum costs.The Silkolitt+ silicone render finish rejuvenated the properties’ exteriors and massively enhanced the area’s overall aesthetic, making it a much more appealing place to set up home.Yet again going the extra mile for clients to ensure unrivalled workmanship and longevity, K Systems finished all 52 properties with K Pro - a water-based protective treatment used to provide long term enhanced water repellent properties to external render and other masonry surfaces, helping combat the problems associated with water intrusion including efflorescence, frost, water-soluble pollutants and algae growth meaning the substrate will stay clean and dry for longer.K Systems and approved installer Rateavon Ltd delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Swindon Council, and the residents of the newly improved homes.John Black, Projects Surveyor at Swindon Borough Council, said:“Throughout the project K Systems have supported Swindon Borough Council agreeing all detailing to ensure current day Building Control Regulations were met. They supported resolutions throughout the project lifecycle and were really reactive, visiting site and supporting when required. They carried out weekly detailed spot check reports with photographic evidence and also checked batch numbers of materials. They delivered a great service. A really successful project.”
Sponsored
Quick Release and Connection Systems

Quick Release and Connection Systems

BROEN-LAB

Get used to a new level of flexibility Our Quick Release and Connection Systems are the smart choice for laboratories that prioritize the ability to reconfigure again and again through the working day
Sponsored
BoxPark Marketplace

BoxPark Marketplace

Brett Martin Daylight Systems

With the pop-up culture seen as a fast, low-cost solution to revitalising urban environments, Brett Martin Daylight Systems’ lightweight, robust Marlon CS profiled polycarbonate glazing panels have been an integral element in the creation of Boxpark Croydon, a new pop-up mall featuring shopping and dining venues built from 96 stripped and refitted shipping containers arranged around a covered courtyard space for year-round events. The project saw the creation of a transparent roof made up of Marlon CS Longlife panels which can be used to form complete roof coverings or incorporated into any corrugated metal roofing and cladding system.
Sponsored
HSBC Bank Leeds

HSBC Bank Leeds

CLD Physical Security Systems

The White Rose Office Park in Leeds; is a purpose-built 27-acre business park owned and operated by Munroe K. In 2014, they unveiled a £12m office for the global banking giant HSBC.Utilising in-depth knowledge, that Munroe K had about their client and the local area; the project had a number of specific requirements that needed to be addressed from the start.The BriefSecurity and Aesthetics were the two key areas taken from the client’s requirements for their car park security fencing. These included the following:A fencing system that would provide open ventilation for the car park.Additional high security fencing to the rear of the car park due to the construction of plant and control equipment compounds.Anti-climb and anti-cut properties to all fencing systems.Aesthetically pleasing without compromising on the inbuilt security.After working through the wide range of car park security fencing systems in the CLD range, the client selected Safeogril Open Mesh Fencing for the front of the car park and Securus 358 Anti-Climb Mesh Fencing System to secure the rear. They required the front of the car park to look visually pleasing and; at the same time, fit within HSBC’s brand to complement the new offices. Alongside the aesthetics, the architects wanted the car park security fencing systems to still encompass a wide range of security features in order to keep the car park secure.The installation was completed by Davison Fencing, a member of CLD Systems Approved Contractors, working with ourselves and the architects for the duration of the installation process.
Sponsored
Ground Gas Barrier for Almshouses

Ground Gas Barrier for Almshouses

Triton Systems

Triton products, including liquid applied TT Vapour Membrane, were specified to form a ground gas barrier system in the redevelopment of listed almshouses situated in close proximity to a landfill site.
Sponsored
Damp Proofing, Brighton

Damp Proofing, Brighton

Newton Waterproofing Systems

Newton System 800 used to damp proof a school in Brighton which required multiple damp proofing treatments as part of its refurbishment. Installed by Newton Specialist Basement Contractor CavityTech.
Sponsored
Savills

Savills

Forbo Flooring Systems

The recent fit out of Savills' new Welsh headquarters saw commercial interior design and supply specialists, Imium, enlisted to create modern-day, cohesive working environment, while still adhering to the brand's traditional values. Forbo Flooring Systems' striking Allura Flex Luxury Vinyl Tiles (LVT) and Tessera Seagrass carpet tiles have played an integral role in the smart new interior. Rhiannon Phillips, Interior Designer at Imium, explained: "The floor comprises of both employee and customer facing areas, therefore it was important that the space was conducive for clients without affecting business as usual . We were notified by the Savills marketing department of the brand guidelines that we needed to adhere to, in terms of finishes, to make sure that the Savills story was portrayed. We took inspiration from the company's heritage and ethos and incorporated different themes within the office based on the various sectors that the firm operates in. For the customer facing area, we used a lot of silk, walnut and a splash of the colour red to reflect the residential sector."
Sponsored
Coleg Cambria

Coleg Cambria

Forbo Flooring Systems

When Ainsley Gommon Architects was tasked with designing the new sixth form college in Connah’s Quay, it called upon Forbo Flooring Systems to ensure the interior design would easily accommodate changes in the curriculum, while clearly defining departments.Deeside Sixth, a joint development between Coleg Cambria, local schools and Flintshire County Council, is a £14.6 million state-of-the-art centre, which provides a learning environment to offer enhanced curriculum options to A Level students.
Sponsored
Early Learning Centre

Early Learning Centre

Forbo Flooring Systems

Forbo Flooring Systems’ integrated portfolio of solutions played a vital role in helping to achieve a welcoming, stimulating and caring learning environment for the early learners of a new purpose-built nursery in Hamilton, South Lanarkshire.
Sponsored
Hurlford Avenue, Glasgow

Hurlford Avenue, Glasgow

K Systems Insulated Facades

The Hurlford Avenue new build project, situated on the former Garscadden Primary School site, truly harnesses innovation and design. This ‘Modern Methods of Construction’ project, completed in partnership with CCG, showcases technical prowess and constructional excellence.Garscadden Primary School closed back in 2017 but the 1930s school building remained standing. Spotting the potential for something impressive on the site, Glasgow Housing Association proposed a modern replacement – a portfolio of properties.The key requirement was to build modern, energy efficient homes which would provide much-needed affordable housing in the sought-after area of Dumbarton and make a significant difference to the local community.After extensive planning, focusing on matching an appropriate insulation system with a complementary finish, K Systems devised a comprehensive delivery plan using our unrivalled experience and expertise.CCG fabricated the building off-site with timber kits and incorporated elements from our Aricco system, with the final finish being completed on-site. This approach was advantageous for a few reasons, including the speed of construction and a reduction in required labour.Hurlford Avenue is a prime example of our experience with off-site modular builds and our project-specific approach to EWI solutions. We brought Glasgow Housing Association’s vision to life and delivered 28 houses and 42 flats for mid-market rent.Our ServiceThe build of the Hurlford Avenue development wasn’t without its challenges. Precision planning was required to ensure minimal disruption to the residents in surrounding estates. All traffic ways remained free for passage and noise pollution was kept to a minimum.During the build, our team encountered some detailing challenges. However, working directly with the contractor and main contractor, these challenges were quickly resolved by key colleagues within our Technical Team, and the build remained on schedule and of the highest quality.From specification and design to planning, delivery and evaluating, our team transformed a derelict site to a contemporary multi-dwelling development that rejuvenated the Dumbarton area.“I would like to thank everyone on the K Systems technical support team for their contribution in accomplishing the Aricco System project at Hurlford Avenue. The regular visits from senior technicians always go a long way to keeping any project in check and it makes the job of our management much easier by having honest, professional judgement to go back to our guys, with well earned praise on this occasion. Everyone was onboard from the outset in working around any potential difficulties and you will agree it shows in the final results.”Garry Barton, Contractor.Technical Project DetailsAs the client of this project, Scotland based construction company CCG, approached K Systems to provide a suitable façade solution that would complement their design. A build with timber kits and a drained ventilated cavity system was specified, along with a silkolitt thin coat render finish.CCG are renowned for off-site manufacturing (OSM) and manufactured the kits from their production site in near-by Cambuslang. They sourced the correct material according to our exact specification. CCG’s ‘iQ’ System was chosen, which is designed with a fabric-first approach where greater tolerances are determined by fewer junctions and thermal bridges to deliver enhanced U-values and significantly improve airtightness. By incorporating OSM and the iQ system into this project, it is just a small insight into our unrivalled knowledge and expert approach that we take to fulfil the requirements of our clients.For the supporting façade, the K Systems Aricco system was specified - a drained ventilated cavity system perfectly suited for use in low rise buildings, particularly new build projects and timber framed construction. The Aricco system is also the most compatible with offsite/modular construction techniques and boasts an A2-s1, d0 fire rating and therefore complies with the latest building regulations, ensuring the safety of all residents.The finish was just as important as the façade system, with the cost-effective, industry-leading Silkolitt thin coat render specified. Silkolitt renders provide a contemporary finish to new-build applications, something this project very much required to modernise the area. Silkolitt is simple to apply, and its hydrophobic properties makes the render low maintenance. It also has excellent vapour permeability, allowing the Hurlford Avenue properties to breathe and avoid interstitial condensation. It is the most flexible system on the market, making cracking over its lifetime less likely and therefore delivering a pleasing aesthetic with outstanding longevity.The combinations specified by the K Systems team resulted in the build of impressive dwellings boasting a U-value of 0.13W/m ² K – meaning homes were easier and cheaper to heat, a particularly attractive benefit given the current cost of living crisis.

Showing 37-72 of 1208

Feedback