NBS Source
I'm a manufacturer

"stair finishes"

2,543 results found

Sort by:

Showing 253-288 of 337

Sponsored
Broadleaves Extra Care, Newark

Broadleaves Extra Care, Newark

Smart Balustrades

Broadleaves, in Boughton, near Ollerton, is the fourth ‘housing with care’ scheme to be opened by Newark and Sherwood District Council. The state-of-the-art scheme has been designed for people aged over 60.There are 30 spacious and accessible apartments designed to meet possible future needs, with features including a wet room and wider doorways.SMART Balustrades were contracted by NMCN to design, manufacture and install their stainless steel balustrade system with oak handrail to 4 stairs as well as 15 stainless steel Juliet balconies, 250m of timber corridor handrails, and a large external terrace with 1600mm high stainless steel balustrade.SMART’s timber balustrade system comes complete with a steel core rail to ensure the balustrades meets the required 0.74kN/m horizontal line load requirements.
Sponsored
Longest-ever Stannah inclined platform lift

Longest-ever Stannah inclined platform lift

Stannah Lifts

Although lifts are in use in the London offices of a leading professional services firm located on the iconic South Bank of the Thames, they did not provide step-free access to all areas of the building. However an area of the building in need of additional accessibility could not structurally accommodate the construction of a vertical lift shaft. Demonstrating the firm’s commitment to EDI, the firm worked with lift and escalator consultants to find a solution that would make the building even more accessible.The consultants decided that a stairlift in an existing stairwell would be the best possible solution, but building a multi-level inclined lift would be a significant engineering challenge. Stannah was then selected as the lift company to supply and install the lift.It is Stannah’s longest-ever inclined platform lift , travelling over 29 metres of travel and ascending 7 flights of stairs.
Sponsored
ANTWERP PORT HOUSE

ANTWERP PORT HOUSE

Tata Steel

Designed by Zaha Hadid Architects, the new landmark Antwerp Port House comprises of a new highly architectural four-storey extension positioned above a restored former fire station. Providing 12,800m2 of office space, the project has given the Port Authority a single headquarters building for the first time.ComFlor® was the preferred flooring option out of five put forward, based on its light weight and cost. The system also provides the required strength, could achieve the required load and span requirements and offered a fast build time.5,000m2 of ComFlor® 80 in 0.90mm gauge, as well as a quantity of ComFlor® 60 in a 1.20mm gauge for the sloped stairs, was used to deliver the flooring solution, all supplied by Dutch Engineering.
Sponsored
Brighton College

Brighton College

CAT (Carpet Accessory Trims) Limited

C.A.T. AN15R stair nosings lead the way on numerous staircases throughout the centre. With aluminium castellated ATI49.5 inserts, visually the all aluminium profiles define the step edges also creating excellent slip resistance. A C.A.T. survey team member attended the site with the customer to discuss the suitability of products and requirements, which enabled faster project completion. Designed by OMA Architects, the £55m centre creates an interplay between sports and sciences. A rooftop running track with panoramic views of the sea leads down to the science and laboratory departments, auditorium, double-height sports hall, internal running track and a 25-metre swimming pool. Central to the building concept was social communication with large break-out spaces connected by wide, visually open staircases that link up departments. ​ ​
Sponsored
Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Safety Fabrications Limited

The Ascent Aluminium Roof Access Steps were specified to meet the clients requirement to create a safe access route up & over the “saw-tooth” roof for maintenance personnel. In this instance the Ascent steps were specified for use with an adjacent MSA Latchways climb-latch fall protection system. If collective protection is required handrails can be supplied to one or both sides of the steps. The Ascent Aluminium steps were specified for this project by Eurosafe Solutions Ltd a specialist fall protection company who also installed steps. The Ascent Aluminium walkway steps are tested for use on the aluminium standing seam roof and are secured back to the roof sheet using a proprietary support clamp. The Ascent aluminium walkway is designed in accordance with BS EN 516:2006 Prefabricated accessories for roofing, BS 4592, Industrial Type Flooring and stair treads, BS EN ISO 14122-3 Stairs, stepladders and Guardrail, BS 7976-2:2002+A1:2013 Pendulum slip resistance. And is manufactured under ISO 9001 and CE 1090 factory production control procedures, creating a walkway that is CE / UKCA compliant.The walkway steps can be configured with a handrail to withstand a loading of either 0.36 kN (general duty) or 0.74 kN (heavy duty) and can be supplied with an optional toe-board if required. The system can achieve these loadings without the need for additional bracing, allowing the walkway to be placed against the area to be accessed. UKCA / CE marked. Designed & Tested in accordance with BS EN 516:2006 Class 1 Type C. Designed & Tested in accordance with BS EN ISO 14122-3:2016 where a handrail is fitted. Designed & Tested in accordance with BS 4592-0:2006+A1:2012 for loadbearing and BS 7976-2:2002+A1:2013 for anti-slip. With or without handrail.Standardized modular system roof walkway system. Can be supplied with a range of fixing kits to suit different roof profiles.
Sponsored
Queens Crescent, London

Queens Crescent, London

Polyroof Products Ltd

Queens Crescent is a bustling retail street situated in London’s Kentish Town. The roof area above the Post Office building, which also served as a communal walkway area with access to the upper level of the adjacent buildings, had been suffering from leaks. To add to the issues, the aged promenade tiles had worn and become a slip hazard when trafficked. Looking for a lasting waterproof solution that can also provide heavy duty anti-slip surfacing, the client turned to Polyroof for a solution. To minimise access disruption to the upper level adjacent buildings, the client had organised a 5-day window for the waterproofing and surfacing works to be completed.The SolutionThe main contractor had removed the old paving slabs and membrane back to the concrete deck underneath and carried out repairs to create a level surface.Approved Polyroof Contractor Emperor Roofing began by priming the concrete surface to create a sealed, non-porous substrate. With its quick-curing properties, the Polyroof primer was ready to be over-coated only 30 minutes after its installation.A specialist twin-pack epoxy metallic primer was applied to metal detailing sections, including ducting vents and the intricate balustrade detail alongside the communal stairwell, which also formed part of the specified works.Local reinforcements were carried out to these details involving taking Protec resin and PolyMat 450 up by 150mm before applying the full waterproofing system.Upon completion, the balustrades were re-painted, with the paint being taken over the waterproofing membrane to create a neat detail. A key advantage of liquid systems in general is their ability to seamlessly seal around complex detailing; in this instance, quite simply, the balustrades could not have been sealed effectively using a traditional waterproofing technology.Polyroof’s Protec System enjoys exceptionally fast detailing speeds, where its formulation allows it to rapidly break down the chopped strand mat reinforcement and neatly moulds around the detail it is covering. To the left of the stairwell, the Protec system was chased in at a height of 150mm above the level of the stairs.The termination point of the waterproofing membrane was sealed with mastic to create a fully weatherproof detail. The Protec system was dressed onto the wall abutments to the main areas but left self-terminated as new render is to be applied to the walls and taken down over the top of the Protec system.After local reinforcements were completed the main waterproofing system was applied to the walkway and stair areas.The two-coat Protec system was able to be rapidly installed with its 30-60 minutes cure times, meaning the project was comfortably ahead of schedule by the time it was complete.Next, the designated anti-slip areas were carefully masked off, leaving the exposed waterproofing to the roof perimeters, detailing and vertical sides of the step and stairs. A third coat of Protec was applied to the masked sections and, whilst the liquid was still wet, 0.7-1.2mm quartz sand aggregate was broadcast into the resin.Once dried, the aggregate is embedded within the membrane and lose sand was brushed off and collected to be re-used. In order to provide an extra-tough surface that sealed that aggregate in place, a coating of PolyFinish was applied over the aggregate in the client’s choice of light grey.
Sponsored
UltraTile creates tropical paradise at Center Parcs

UltraTile creates tropical paradise at Center Parcs

Instarmac Group plc

The Great Northern Tiling Company have used UltraTile to create a subtropical swimming paradise at iconic family resort, Center Parcs.BackgroundLocated in the heart of Nottingham’s famous Sherwood Forest, Center Parcs is a much-loved family resort home to variety of activities and villages, including the recently renovated Subtropical Swimming Paradise Village.The ChallengeThe project began mid-2020 during the UK’s first lockdown. To make the most of the facilities being empty, the project continued to grow in size as the team at Center Parcs rejuvenated further areas across the family resort.“Working in constant 30°C+ temperatures during summer 2020 was challenging for both our tilers and the adhesive. Fitting Quartzite stone to the seating areas, Jacuzzi and stairs was technically demanding”. Darren Nockall, Director at The Great Northern Tiling Company.
Sponsored
New improved bike wheeling ramp in Walthamstow

New improved bike wheeling ramp in Walthamstow

Cyclehoop

In 2016, we installed our new improved Bike Wheeling Ramp on the bridge across the River Lea at the bottom of Spring Hill at Springfield Park. This bridge sits exactly on the Hackney-Walthamstow border.It is a key thoroughfare for commuters on a daily basis, however, not everyone has such an easy job negotiating stairs particularly if you own a heavier bicycle with panniers or luggage.The challenge of this project was in the design of the bridge which was multi-level as well as curved. This problem was solved by the real ingenuity of the ramp which lay in its modular design. This comprised floor fixing brackets that adjust to the different angles of the slope. The flexible angle adjustment of the ramp allows installation into any pre-existing environment which is a big bonus when retrofitting cities with historical architecture.The Bike Wheeling Ramp has been specifically designed to improve bicycle access when travelling along multi-level routes, and allows to people who cycle to gently wheel their bike up or down without having to carry it or forcefully bump it along the stairs.This ramp also includes flip-up functionality allowing for easy cleaning underneath and preventing trapped rubbish or leaf litter building up. The length of the ramp can be ordered in made-to-measure sizes to ensure a truly bespoke solution.“As former project manager for the Wetlands to Wetlands route I am delighted to work with award-winning Cyclehoop on this initiative. This innovative wheel ramp will enable cyclists to access the beautiful surroundings of the Lea Valley Regional Park without lifting heavy bicycles up steep steps and help improve connections for visitors to London’s exciting new Wetlands Centres at Woodberry Downs and Walthamstow.The greenway marks the start of a 3km route that will connect the recently opened Woodberry Wetlands centre with the soon-to-be-open Walthamstow Wetlands centre. The wheel ramp will complement two recently completed public realm schemes at Newton Close and Clapton Common. The initial phase of the scheme was part-funded by Hackney Council and the Mayor of London’s Big Green Fund.” – Kevin Burke, former Senior Transport Planner for both Waltham Forest and Hackney
Sponsored
Shanghai Tower - Interchar 1983 - Infrastructure

Shanghai Tower - Interchar 1983 - Infrastructure

International®, brand of AkzoNobel

Essential Protection for Tall Buildings.As one of the world's leading coatings companies, we strive to be at the forefront of design trends and our International range of protective coatings and passive fire protection products is developed to complement architectural innovations.With its curved façade and spiralling form symbolizing China’s emergence as a global financial power, the Shanghai Tower is world's second tallest building (behind Burj Khalifa in Dubai), after its six-year construction was completed at the end of 2015.Shanghai Tower is one of the most advanced sustainable tall buildings in the world and goes to great lengths to generate its own energy.Around 200,000 liters of our protective coatings and intumescent fire protection products, including Interchar 1983, were used to provide fire protection for stair steel structures and the façade’s supporting steel structures for up to 90 minutes.We were the company of choice for the owner, painting applicators and the fabricator.
Sponsored
Clement Windows supply fire rated steel doors and screens to historic Surrey school

Clement Windows supply fire rated steel doors and screens to historic Surrey school

Clement Windows Group

City of London Freemens first opened in Brixton in 1854 for ‘the maintenance and the religious and virtuous education of orphans of Freemen of the City of London’. Paid for by the Corporation of London both boys and girls were enrolled from the outset making it the one of the oldest co-educational independent schools.In 1926 the school moved to Ashtead Park in Surrey. The Grade II* listed Main House at Ashtead Park had been the home of Sir Robert Howard, Chancellor of the Exchequer during the 17th century.In 2016 an ambitious development project was commenced, due to span the next decade. The modernisation of the Main House, now the Sixth Form Centre, involved a redesign of the building and the new layout required fire screens to ensure the building met with current Building Regulations. Clement Windows Group supplied the internal fire rated doors and screens at the top of the adjacent internal stairs which are access controlled and linked into the main fire control of the building.
Sponsored
Isle of Skye

Isle of Skye

Senso UK Designs Limited

SENSO UK teamed up with Room Studio to help create this unique space that uses warm tones throughout the property. Senso creating a seamless look that not only unites the rooms seamlessly but creates a sense of warmth, something that we all look for in a home.‘NO LOCATION IS TOO FAR FOR SENSO’ As you can see this project was on the Isle of Skye. Location is no obstacle for us, if you do have a project that is not in London or surrounding area, we can still accommodate you.Senso helps creates an environment that is not only minimalist but sumptuous. Why stop with the kitchen, continue the Senso look throughout the project from the living area to bedroom and even the stairs ( treds' and risers'). The colour dune has two hues together which create a beautiful fusion.Following this we add in our aggregate of recyclable materials from old concrete remains, this creating a look of polished concrete but without the ramifications you get with a concrete.
Sponsored
Vista V510S, Mono M311 and Orbis OS211 for Alder Hey Children's Hospital

Vista V510S, Mono M311 and Orbis OS211 for Alder Hey Children's Hospital

Delta Balustrades Ltd

Products:Stairs: OS211 Orbis Glass Infill Top FixCourtyard Podium: M311 Mono Glass Infill Top FixCone Glazing: V510S Glass Infill Fascia Mount Side FixContractor: Galliford TryArchitect: 10architectDelta were proud to work alongside Galliford Try and 10architect to supply balustrades and handrails to the new community cluster on behalf of Alder Hey Children’s NHS Foundation Trust.The £15m development included the construction of a new build facility that provides space for mental health and neurodevelopmental outpatient facilities and a 12-bed specialist inpatient mental health unit.Community Cluster forms a key element of the growing Alder Hey campus, the facility brings a centre of excellence for Children’s health closer to nature within a newly created landscape.Delta’s structural glass range, Vista, helped to materialise the architects vision for the unique cone glazing design.
Sponsored
Stenden University of Applied Sciences

Stenden University of Applied Sciences

Forbo Flooring Systems

The main building of the NHL Stenden University in the Netherlands has recently been extended. In addition to a focus on sustainability, the architect wanted to stimulate meetings and bring students and teachers together. In the middle of the central hall you can climb, sit, lie and build with the cube-shaped elements. The long wooden stairs and the walls are partly overgrown with plants and the floor features a beautiful green lawn digitally printed on Flotex Vision.Furthermore, BRTArchitecten has created various meeting places and has given the building it its own landscape. There is an area with a corn field, a tropical rainforest and a delta landscape. These landscapes are all also printed on Flotex Vision and thus form a beautiful focal point in the room. In addition to Flotex Vision,Forbo's Flotex Metro and Marmoleum Real were installed within the University Building.The renovation of the Stenden Hotel Management School was completed in December 2019. A beautiful new campus of 4,500 m2 where Flotex has been chosen thanks to its unique combination of design flexibility, acoustics and ease of cleaning.
Sponsored
Archwood House

Archwood House

Forbo Flooring Systems

FORBO’S CONTEMPORARY PORTFOLIO HELPS TO CREATE INSPIRATIONAL AND SUSTAINABLE STUDENT ACCOMMODATIONArchwood House, a new purpose-built student accommodation scheme in Peckham, was commissioned by the University of the Arts London (UAL) to house its students. Tasked with creating proactive and forward-thinking spaces for residents to live and study in, architects Nelson and Long specified an array of solutions from Forbo Flooring Systems’ contemporary portfolio to make this happen. Forbo’s Coral entrance flooring, Allura Luxury Vinyl Tiles (LVT), Tessera carpet tiles, Eternal de Luxe Decibel general purpose vinyl and Surestep and Safestep safety floor coverings were all installed throughout the building.Comprising 343 bedrooms and 50 studios, Archwood House provides students with accommodation close to UAL buildings and is designed to provide students with the creative and inspirational spaces they need, to enhance their university experiences. Nelson and Long worked closely with UAL to develop a design that would create spaces which were flexible and would allow residents to flourish in their surroundings.Alicia Nelson, Co-founder of Nelson and Long commented on the brief they received: “Our client’s brief was to create innovative and inspiring spaces for UAL’s creative students to learn and grow in. It was also important that the spaces equipped students with the tools they needed to have a successful time at university, from studying to socialising. Sustainability was top of the agenda too, so we needed to carefully consider the materials we specified to ensure we met the requirements.”With the project brief in mind, Alicia set about sourcing materials that reflected the needs of the building: “Due to the variety of high-quality and sustainable products available within Forbo’s portfolio, as well as its reliable customer service, we opted for a variety of Forbo floor coverings for Archwood House, including its Allura LVT and Tessera carpet tiles.“We specified Forbo’s Allura LVT in a variety of colourways for a few different areas of the student accommodation, including the games room and common room which are situated in the street building – a separate part of the accommodation. The warm colours that Forbo’s Allura LVT are available in helped to provide a stunning backdrop for each space which then enabled us to build out, incorporating different textures and colours to the overall design. For example, we used the Smoke Cement shade for the ground floor corridors, games room and study room, to elevate the design and provide a nice neutral finish. As well as the beautiful designs available, Forbo’s Allura LVT is also easy to clean, which was an important factor for this project, given that lots of students would be using these spaces.“We then opted for various designs from Forbo’s Tessera collection, which are lovely, elegant and durable loop pile carpet tiles. Forbo’s Tessera Layout in the Graphine colourway was the perfect solution for the stairs, cluster corridors and other high traffic areas, thanks to its hard-wearing nature. The understated grey shade also complemented the neutral colour palette we were using for these areas.”Alicia also specified Forbo’s Tessera Chroma carpet tiles in the Pathway and Tuxedo colourways, which were installed in the bedrooms and the cinema room respectively to create a homely feel to the rooms. Not only this, but Forbo’s Tessera Chroma carpet tiles are made with 62% recycled content by weight, aiding in creating a more sustainable scheme.This was combined with Forbo’s Eternal de Luxe Decibel vinyl floor covering in the communal and studio kitchens. This solution served a double purpose: It reduced impact sound by 17 dB and provided an R10 slip rating, both of which were key to creating healthier and safer spaces for residents to live in.With safety in mind, Alicia also specified a range of Forbo’s safety flooring, as she explains further: “For the staff kitchen areas, toilets and prayer room, we needed to ensure maximum slip protection and that’s why we chose Forbo’s Surestep and Safestep floor coverings. The prayer room, in particular, which contains a wudu sink, needed to be a safe and neutral environment for residents to use, and Forbo’s Surestep offered the perfect solution. As a genuine safety flooring with guaranteed lifetime slip resistance, as well as an R10 slip rating and a 36 PTV score, it was the ideal solution to ensure the safety of residents. Not only this, but it comes available in a range of stylish colourways, such as the neutral wood décor we specified, which complemented the overall design.”In addition to this, to maintain the condition of the interior floor coverings, Alicia opted to use Forbo’s Coral Classic entrance flooring system in the Mouse Grey colourway. Alicia explains more here: “We wanted a solid barrier matting, that would reduce the walked-in dirt that you’d expect to see in a city centre university accommodation. With students coming and going all day, it was key to install an effective entrance flooring system to reduce cleaning and maintenance. Forbo’s Coral was just the solution we needed, with the Mouse Grey colourway matching the other grey textile carpets we’d specified, whilst also helping to reduce the amount of dirt and moisture from being brought in on the soles of shoes and treads of wheels.”Having opened in September 2022, Archwood House has been positively received by both staff and residents, who are delighted with the overall design and feel of the building.To find out more about Forbo’s offering for student accommodation, visit:WWW.FORBO-FLOORING.CO.UK/STUDENTACCOMMODATION
Sponsored
Backstage ² Upkot student flats - gratings

Backstage ² Upkot student flats - gratings

Elefant Gratings T/A PcP Gratings Ltd

The ancient printing house of “De Vooruit” in the Center of Ghent, was completely stripped to only the ancient concrete supporting structure. From there the renovation to an ultramodern student home was to be made with steel, providing safe stairways, safe and easy to walk on platforms, as well as outside sitting areas for the students. This was all to be made in aesthetical harmony with other products, such as COR-TEN steel that was used in the project. This to create a modern look, aspiring to the students.The project criteriaPcP had to meet the criteria for a sustainable, durable product which was safe and comfortable to walk on. At the same time, the product needed to blend in well with the COR-TEN steel being used for other parts of the project, providing a modern look that would appeal to students. Another challenge was installing the new steel structure onto the existing concrete supporting structure of the original building.The solutionLannoo Konstruktie chose the OPTIMO® O2, Spiral treads – Type K and panels, as these high-quality products met all the stated requirements for the new student accommodation building. In addition, it was a bonus that the OPTIMO® O2 perforation is easy to walk on in all types of shoes, and is even suitable for outdoor furniture, such as tables and lounge chairs.“The strength-to-weight ratio of the PcP solution is very favourable. This was very helpful for us, as we had to mount the new steel structure onto the old concrete supporting beams. It was important to have a light but very strong panel and steps. PcP was ideal for this purpose.”– Christophe Lannoo, CEO, Lannoo KonstruktieThe resultThe ancient printing house of ‘Dagblad Vooruit’ in the centre of Ghent was completely stripped back to its concrete supporting structure. The structure was then developed to create ultramodern student accommodation using steel with safe stairways, safe and comfortable platforms as well as exterior seating areas for students. This work all harmonised aesthetically with the other building materials, such as the COR-TEN steel used in the project. The aim was to create a modern and inspiring student residence.Architectural steel platform and spiral stair treadsThe project lasted a total of five months from first production to final installation of the panels and steps. In total, 150 spiral K treads were used for three spiral stairs on the three-storey building. More than 100 OPTIMO® O2 treads were installed, together with almost 300 square metres of OPTIMO® O2 panels, both standard and customised. For Lannoo Konstruktie, it was a very attractive project to be engaged in, and likewise for PcP, which is used to projects which are more industrial in nature.
Sponsored
Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Altro

IssueA 15-year-old bathroom in a housing development was looking tired and dated and the owner wanted to refresh the area with minimal disruption in a quick timescale. The bathroom had three walls of ceramic tiles, and a sink splashback, which were in good condition but were unfashionable and required high levels of maintenance to remove limescale and mould.The property, a first floor flat, had easy access but no lift, so equipment, materials and any waste needed to be carried up and down the stairs.Approach“We wanted to replace the ceramic tiles, without having to re-plaster the bathroom walls which would mean a complete renovation and redecoration project,” said Helen Green, the owner. “We live in an area with hard water and limescale is a real problem so a wall that is easy to keep clean would be ideal.”SolutionAfter liaising with Altro customer services, the new Altro Walls ShowerKit was recommended as being the ideal solution as the wall panels can be installed over existing ceramic tiles and provides ease of maintenance for residents. There is also no requirement for construction materials or heavy equipment as Altro Walls ShowerKit is lighter to transport than ceramic tiles.
Sponsored
London South Bank University

London South Bank University

Ibstock Telling

Buildable"Glass Fibre Concrete (GRC) was identified early on as the ideal material for the project to achieve the desired civic aesthetic but also to avoid adding significant stress to the existing structure." - Nat Keast, Associate, Wilkinson-Eyre.DesignableThe project is an AJ Retrofit Higher Education & Campus Award 2023.The lightweight, three-dimensional GRC cladding panels featuring a stylisation of LSBU’s “sail” emblem give the building a welcoming, civic quality."We worked closely with subcontractor Tellings during the design phase to develop the three-dimensional panels, as well as vertical slats and horizontal bands. Alongside the 100% white bromo brick with white grout used for the existing concrete stair cores and shear walls, GRC helped change the perception of the building."We had to fight hard to keep the GRC through various value engineering exercises, but the university supported us and was able to appreciate the impact of the new facade." - Nat Keast, Associate, Wilkinson-Eyre.SustainableThe building has received a very good BREEAM rating and by retaining the existing structure, total embodied carbon is half of the RIBA 2030 Climate Challenge target benchmark.
Sponsored
Uni of Reading Library, Berkshire

Uni of Reading Library, Berkshire

Sika Limited

A £40 million investment, 13 roof areas, eight different roof levels, and a steady stream of visiting students to keep happy throughout – the University of Reading (UoR) Library’s complete refurbishment was a large and challenging project spanning three years.Originally opened in 1964 and later extended in 1985, the library’s internal and external revamp was designed to increase space, improve facilities for individual study, provide better access and security across the building, and improve energy efficiency.In addition to a new-build Café extension, a new entrance canopy, a new ground-to-roof level lift and stair core extension – each featuring a new flat roof area – there were also 10 existing flat roof areas refurbished, coupled with the replacement of windows and re-cladding of the building’s exterior.Following a competitive tender based on an outline specification, Owlsworth Roofing, Sika Sarnafil single ply flat roofing specialists, impressed with the level of detail included in their quote and were awarded the contract by main contractor ISG.Roofing:Sika® Sarnafil G410-12 ELF.Sika® Sarnafi G410-12 EL.Sarnavap®-5000E SA.Sarnavap® HD SA.Primer 600.Sikatherm® PIR Insulation and Sarnacol®-2162.
Sponsored
The Steading - Scottish Borders

The Steading - Scottish Borders

Advanced

An intelligent Advanced Go panel has been installed in The Steading, the home of sculptor and furniture maker, Tim Stead MBE.The Steading is an A-Listed building, located in Blainslie near Lauder in the Scottish Borders, and was both the creative centre and home to the Stead family across several decades. It was purchased by the Tim Stead Trust in 2021 and a programme of restoration work has included the addition of an Advanced Go new-generation, single-loop fire alarm control panel to protect this historic home.The Steading is considered Tim’s masterpiece with an interior that was transformed over many years. The interior is completely clad in sculpted wood: floors, walls, ceilings, stairs, cupboards, beds, a grandfather clock, sink, conservatory, hanging sculptures, desks and so on – all made by Stead himself. This exceptional building now aims to become a hub for practical expertise in everything to do with wood and the environment, hosting a variety of day and residential courses in the unique environment of The Steading.Fire and security service providers, Safe Services, installed the Advanced Go fire alarm panel in The Steading and were involved from the design stage though to installation and commissioning. The Advanced Go panel is integrated with EMS Firecell radio equipment for a complete cable-free fire system – which was an essential requirement to preserve and protect the unique interior of the building.
Sponsored
Soffit Panels, Screening and Barrier Fence at Abbey Wood Station

Soffit Panels, Screening and Barrier Fence at Abbey Wood Station

Lang+Fulton

Crossrail’s new station at Abbey Wood has been built over the railway tracks where the Elizabeth line terminates. From above, the building is shaped like a manta ray, its ‘wings’ extending into canopies sheltering staircases either side which swoop down to platform level below.Stretto-22 Soffit PanelsThe soffit panels for the staircases and elevated walkways were made from Stretto-22 pressure-locked grating, customised to a bespoke 66x22mm aperture to provide an enhanced level of visual screening. Each panel was exactly contoured to match the demanding serpentine shape of the footbridge canopies.Torino-22 Barrier FencingBarrier fencing was made for the platforms from Torino fence panels which were customised and engineered with a heavy intermediate framing bar at the loading point to comply with Network Rail’s specified requirement.DeltaBox-70 Louvred ScreeningStorage areas beneath the stairs were secured with DeltaBox-70 louvred screening panels.Torino-11 and Stretto-11 Protective Screens Lang+Fulton also supplied a Torino-11 screen to protect the overhead lines and track from the threat of thrown objects.An alternative access to the station was enclosed with a Stretto-11 anti-projectile screen.
Sponsored
Cheltenham Ladies College

Cheltenham Ladies College

DYNAMIK Sports Flooring

The DYNAMIK Komfort Elite Play is an A4 area elastic floor system finished in Oak to provide a classic wood floor finish with all the benefits of a sprung system. Combined with DYNAMIK Acoustic Sports Wall panels the finished result shows a stylish Sports Hall.
Sponsored
Athletes Village N14, London

Athletes Village N14, London

Akzo Nobel Powder Coatings Ltd

Finish: Interpon D2525 Golden Beach YW255F Parts coated: Balcony shading panels Applicator: LBL Finishers
Sponsored
ASF Bespoke Waterfront Railings, Birkenhead

ASF Bespoke Waterfront Railings, Birkenhead

Architectural Street Furnishings part of WB White Foundry

This long run of railings brought with it a number of manufacturing challenges and techniques. They needed to be curved in profile so they form a quayside post, curving and leaning inwards so they do not make a 'natural ladder' beside the water. The panels themselves are manufactured in mild steel, finished galvanised and then painted in satin finished graphite grey. The top rails are of a contrasting polished finished grade 316 stainless steel, finished satin brushed. The run of railings has a combination of straight and curved panels, meaning each individual horizontal infill bar needed to be curved individually.
Sponsored
Davit Arms - They are not sugar cubes

Davit Arms - They are not sugar cubes

Sayfa Group Ltd

The number of Davit Arms required for a project should not sound like the quintessential British question of "one lump or two" for your cup of tea.It should depend on the specific project parameters but it is a question we are often asked, even if the employer's requirements or access strategy specifically identify a quantity.There are however a few definitive requirements. If the system is designed for single users (due to roof/building structural load limitations for instance), then two Davits must be provided to facilitate safe rescue. Equally, although Davits are component form and portable, the units are not light to carry between buildings, might be too large for service lifts and no one even wants to think about the stairs - the buildings being cleaned by rope access for a reason!Additionally, the duty holder and building owner should consider cleaning times and crew efficiency. Responsible IRATA contractors operate in a team of three, with one level 3 supervisor and two operatives. With a single davit, two of the team are effectively non-productive.Finally, it can be that multiple outreach davits are required. The projection requirements can vary depending on rooftop socket locations, parapet sizes, and façade elements. For extended cleaning cycles, Davit arms should project so that there is a naturally extended reach.Leave the one lump or two questions for your cup of tea, or number or shots of espresso if you prefer……….
Sponsored
Field of Dreams

Field of Dreams

Forterra Building Products

The ChallengeThe client’s requirements were to provide value for money and create a building that was easy to maintain and appropriate to its function and setting.Deafblind Scotland provided training for the architects so they could gain an appreciation of the barriers faced by those who would use the building. The design was then developed to satisfy funding requirements. Technology was utilised to assist the client’s team with visual impairment to understand the building layout.The SolutionWorking closely with the client the architects carefully selected materials, colours, stair detailing, thresholds and ironmongery. Our Welford Buff brick was chosen for the brickwork.Careful consideration was also given to the pedestrian route configuration that visitors would use when approaching the building – it was important to ensure a strong colour contrast between road and pedestrian walkway.Natural ventilation was maximised to reduce energy consumption and associated costs.The BenefitsThe 7,500 square foot building provides a centre of excellence for deafblind people with a hub for training and development. It is a daily resource for more than 300 deafblind people in the Glasgow area, and a further resource for the 2,700 people across Scotland who are severely dual sensory impaired.The project offers deafblind people more opportunities to learn, enjoy a range of subjects, collaborate, and to become more familiar with IT through the assistance of specially adapted technology and equipment.Feedback from building users has been extremely positive with the client remarking on the ease of way finding and legibility within the layout.
Sponsored
UK Hydrographic Office

UK Hydrographic Office

Lusso Systems Ltd

The United Kingdom Hydrographic Office (UKHO) is the UK’s agency for providing hydrographic and marine geospatial data to mariners and maritime organisations across the world. Their visually stunning new headquarters in Taunton has been designed based on the concept of contours and currents by multi-award winning architects, AHR. An impressive central atrium with feature stair connects the two wings with access to the upper floors reached by a feature stairway which leads onto open platforms and connecting walkways. The fluid lines and vast spaces gives the interior a sense of openness in such a large structure and is an incredibly inspiring environment in which to work. Lusso worked closely with BAM and AHR on the internal glazing requirements to create administration offices, a meeting suite, training rooms, as well as recreation and dining areas to the ground floor. The use of Lusso 25 single glazed partition system and Lusso 105 double glazed partition system allowed for the different acoustic and structural design specifications throughout the building. The clever use of glass partitions has ensured that the requirement for a “one team approach” design brief has been met. The UKHO can now boast highly impressive headquarters, befitting of a world leading geospatial information company. Opened by HRH The Princess Royal, it has now been nominated and won several design awards and is on course to achieve BREEAM Excellent.  
Sponsored
Emseal DSM System used to seal wide & high movement Deck Joints on New Brighton University Car Park

Emseal DSM System used to seal wide & high movement Deck Joints on New Brighton University Car Park

NCC – Emseal Movement Joints

Client: University of Brighton Consultant: Stripe Main Contractor: Keir Construction Specialist Contractor Thelwell Flooring Main Products Used: Emseal DSM SystemThis new multi-storey car park for the University of Brighton is part of a major redevelopment of the former Preston Barracks site in the City. There are 550 parking spaces on 7 floors, including 55 EV charging bays, plus there is a PV array on the roof with the power stored in batteries on the ground floor, which also includes 330 cycle parking spaces. The car park design uses a Vertical Circulation Module (VCM) that provides a more efficient solution for confined sites, as this contains no external ramps and traffic circulation is via slopes within the floors themselves. This creates more parking spaces in the steel framed structure in the centre, with two lift and stair cores positioned at each end. This design also made it possible to locate the necessary structural expansion joints transversely between these 3 parts of the structure and away from major traffic impact areas. The engineers specified these joints to be a nominal 40mm wide to accommodate a high movement capability of up to +/- 50% (i.e. total 100%), as they knew these could be quickly, securely, and durably sealed using the Emseal DSM System. This also saves time on site as it is installed from above, allowing other trades to continue working below, plus as it is bonded into position, there is no potentially damaging drilling for mechanical fixings.
Sponsored
Skylark Roof Garden, Kingdom Street, Paddington, London

Skylark Roof Garden, Kingdom Street, Paddington, London

AG

Our premium granite TerraPave® flagstones were a perfect choice for this scheme at one of London’s foremost rooftop cocktail bars and pizzerias. Skylark Roof Garden, located on Kingdom Street, sits on the 10th floor of Paddington Central, offering incredible views overlooking the beautiful Notting Hill, on the banks of Little Venice. For this project, a combination of Pedestals and TerraPave® flags were utilised. The incorporation of Pedestals (stools on which the flags were laid) , meant no base was required. The depth of TerraPave® flags is calibrated as part of the manufacturing process, delivering exceptional dimensional accuracy which in turn delivered consistent levelling across the terrace. Project architects, Allies and Morrison selected our TerraPave® Flags, in Rimini and Milano Ground due to their rich, distinctive styles and impressive durability in highly pedestrianised areas. These flags are produced with locally-sourced, natural aggregates instead of pigments meaning their unique colouration won’t fade. TerraPave® also offers a cost-effective, and practical alternative to traditional stone paving. The £80m Paddington Central scheme was completed built by Wates Construction and designed by Allies & Morrison. Some of the impressive project’s additional features include London’s highest basketball court, an external glazed stair tower, and a public colonnade around the retail space on the ground floor.
Sponsored
Bright modern spaces created in quick timeframe with Altro Ensemble

Bright modern spaces created in quick timeframe with Altro Ensemble

Altro

IssueA rental property in Stourport-on-Severn needed a quick refurbishment, allowing the landlord to turn the property around for tenants who were keen to move in. The main areas to be refurbished were the kitchen and bathroom, both of which needed to be fully re-fitted, providing a fresh, clean home for the new residents. ApproachThe landlord had previously worked with Altro products and needed quick to install products, which would provide ease of installation, durability, and ease of cleaning. “We had received information about a new product, Altro Walls ShowerKit, and were keen to try it out. The house needed a quick turnaround as our tenants were waiting to move in. The installer was also keen to have products that were easy to manoeuvre, carry up and down stairs, and resulted in less waste” said S.Birch, Landlord.SolutionAltro Ensemble luxury vinyl tile in colour Pewter Concrete was selected for the kitchen, providing a luxury feel together with comfort underfoot and impact sound reduction.Altro Walls ShowerKit in colour Cool Mineral and Stacked Metro design was selected for the bathroom, partnered with Altro Wood adhesive-free in colour Post Oak. The combination of an Altro floor and wall results in an easy-to-maintain and safe space, giving the bathroom a homely aesthetic, with ease of cleaning and our Altro one in a million slip-resistance reassurance.
Sponsored
Orbis OS211 and OS251 for St John Plessington Sixth Form

Orbis OS211 and OS251 for St John Plessington Sixth Form

Delta Balustrades Ltd

Products:OS211 Orbis Glass Infill Top Fix Stainless Steel BalustradeOS251 Orbis Standalone (No Infill) Powder Coated Double Handrail BalustradeContractor: Read ConstructionArchitects: AHR ArchitectsIt was great to work with Read Construction on this new two storey extension to St John Plessington Catholic College. With a total project value of £1.3m, the vision was to create a new state of the art Sixth Form Centre with significant internal renovations prior to the extension to enhance existing spaces.Deltas role in the project consisted of supplying and fitting:68m of our Orbis OS211 Glass infill Balustrade System with Stainless Steel Handrail to the internal atrium and stairs.37m of powder-coated Orbis OS211 Top Fix Glass infill Balustrade Systems to the external retaining wall.27.5m of powder-coated Orbis OS251 no infill balustrade with a double handrails to the external steps and ramps.Aside from balustrading requirements, this education sector project introduced an open plan learning centre, media room, eight new classrooms, and new break out space with a canopy for students. The outcome has exceeded expectations and created an adult-focused learning environment for sixth form students, similar to a university setting, as well as providing more space for the increasing pupil numbers at St John Plessington Sixth Form College.Image credits: Read Construction Holdings Ltd
Sponsored
Wondertex creates luxury apartments at iconic Liverpool Warehouse

Wondertex creates luxury apartments at iconic Liverpool Warehouse

Instarmac Group plc

Wondertex prem fill & finish has been used to create 540 exceptional apartments at the iconic Tobacco Warehouse in Liverpool.BackgroundThe grade two-listed, 14 storey building was built in 1901 and was thought to be the largest warehouse the world had ever seen – a huge achievement for a thriving city at the heart of global trade.After falling into disrepair, the Tobacco Warehouse has been given a new lease of life and is now home to 540 exceptional waterfront apartments.The ChallengeThe team working at this exciting location includes main contractor Abercorn Construction and architect Darmody Architecture. The team at Abercorn Construction were responsible for installing and finishing the walls and ceilings across a 150,000sqm area. With time of the essence and a durable and smooth finish essential in preparation for decorating, Abercorn Construction chose to use Wondertex prem fill & finish.The SolutionWith over 50 years experience in supplying dryliners and decorators with expert solutions, Wondertex prem fill & finish was the perfect product to ready the walls and ceilings for decorating these beautiful and luxurious apartments.Wondertex prem fill & finish is a filler and smoother, designed for filling and finishing plasterboard joints, smoothing unwanted textured surfaces as well as repairing any accidental damage, snagging or channelling work.Available in two handy sizes, prem fill & finish boasts an extremely smooth texture which allows the product to glide easily into joints – making light work of even the largest of projects, such as this one.What’s more, prem fill & finish has a 60 minute working time, is effortless to sand – there’s no elbow grease required here – and has minimal shrinkage so you can be assured that once applied, prem fill & finish will stay put and will not crack and come out of the joints.Once applied and fully dried, the walls and ceilings were painted with Dulux paint.ResultsThe project was completed on time and residents are now able to move in and enjoy Titanic-sized warehouse homes at the heart of Merseyside’s historic docks.
Sponsored
CANARY WHARF RESIDENTIAL PROJECT

CANARY WHARF RESIDENTIAL PROJECT

Metalline Architectural Fabrications

Rainscreen cladding specialists Metalline are the first to use an innovative stone textured finish on their range of CWCT certified Unity rainscreen cladding panels. The finish, which to the naked eye looks like stone is a perfect substitute for natural stone cladding panels and offers a range of cost saving benefits. The use of aluminum also offers the architect more design options. Metalline, who have worked closely with contractors Alumet on a number of capital projects in London presented their new finish to the design team and outlined the huge cost savings that could be achieved by specifying their aluminium Unity rainscreen panel with the new stone textured PPC applied. The external façade when completed will feature over 3000 panels, both flat and curved in stone white and include fittings and bracketry for a unitized system. This ability to mirror a natural finish on aluminium Unity rainscreen panels has led to a number of interesting approaches from developers looking to enhance the external envelope of their project. Metalline’s expertise in fascia finishes extends beyond Polyester Powder Coating applications. Taking advantage of the latest research and development into anodised finishes has seen Metalline engaged by a number of leading architects and contractors to advise and supply fabricated aluminium with an anodised finish whose colour is guaranteed for the life cycle of a building. Available in a full range of Anolok anodising finishes, specifiers are now able to enhance the aesthetic look and feel of a building’s façade in a choice of colours including Natural Silver, Bronzes from light to dark, Regency Gold 1 & 2, Black and specialist Anolok anodising II Blue-Grey and Stone-Grey finishes. The Metalline range of Unity rainscreen panels and Ultima insulated panels are made from solid aluminium and use an A1 rated non – combustible insulation core on their insulated panels to help meet the latest requirements in fire safety.
Sponsored
Kings Cross R7

Kings Cross R7

Akzo Nobel Powder Coatings Ltd

'The finish is a high-quality, durable powder coating with a long life. It was selected with a metallic finish to form a protective layer, creating a lasting, soft sheen. This sheen offers a dynamic play of light on adjacent surfaces that will vary with changing light conditions throughout the day and across the different seasons of the year.'' Joe Morris, founding director, Duggan MorrisFinishes: Interpon D2525 YW107I Etna and Y2200I Pink Metallic
Sponsored
Office building Temse featuring EQUITONE facade materials

Office building Temse featuring EQUITONE facade materials

EQUITONE

Situated between Antwerp and Ghent, this new build office in the town of Temse was finished with EQUITONE [tectiva], arranged in variously sized and placed panels, giving a contemporary, but minimalist finish to the building.
Sponsored
CTAR Leeds Beckett University

CTAR Leeds Beckett University

United Anodisers Ltd

Organic UnAtex Red was utilised on the feature façade and the interior running track.  The architect at Shepard Robson (Simon Davies) developed a patinated two tone multi-layered finish within the Anodised Aluminium surface.  This finish is unique to the UnAmil process and was developed as a bespoke solution for this project.  The Anodic Finish is A1 fire rated and carries a lifetime guarantee.UA worked closely with the architect and Sotech to produce the unique facade on the building.
Sponsored
Exmouth Beach, ASF Exmouth Post and Rail Step Units

Exmouth Beach, ASF Exmouth Post and Rail Step Units

Architectural Street Furnishings part of WB White Foundry

ASF were asked to manufacture the popular Exmouth Post and Rail system for step units leading from the promenade to Exmouth Beach. Manufactured in grade 316 stainless steel these posts and rails are finished bright polished, so the combination of material grade and high standard polish finish makes the finish extremely durable even when covered in sand and completely submerged by the sea - which happens a number of times year.

Showing 253-288 of 337

Feedback