NBS Source
I'm a manufacturer

"solid fuel fires room heaters stoves"

5,447 results found

Sort by:

Showing 73-108 of 522

Sponsored
Luxury Steam Room Gets The Schlüter Treatment

Luxury Steam Room Gets The Schlüter Treatment

Schlüter-Systems Ltd

A residential property in Lancashire saw a variety of Schlüter-KERDI waterproofing products aid in the correction of a previous installation, resulting in a stunning high-end steam room ensuite.
Sponsored
Selectaglaze and Pilkington support CRASH with secondary glazing for new computer room

Selectaglaze and Pilkington support CRASH with secondary glazing for new computer room

Selectaglaze Ltd

Selectaglaze helps create and enhance a computer suite at London homelessness charity, Caritas Anchor House as part of their on-going relationship with the CRASH charity. CRASH Chief Executive, Francesca Roberts contacted Selectaglaze asking if they would be willing to donate secondary glazing for the computer suite at Caritas Anchor House. Selectaglaze was happy to contribute and involved Pilkington with them donating the fire-resistant glass to support the installation. Three Series 40 units with 10mm Pyrodur fire-rated glass were installed, which has a beaded fixed frame system offering 30 minute fire integrity protection.
Sponsored
EXTENSIVE ROOM FLEXIBILITY AT LEADING UNIVERSITY

EXTENSIVE ROOM FLEXIBILITY AT LEADING UNIVERSITY

Style - Moveable Partition Specialists

Designed throughout for adaptability, space at the new Emily Wilding Davison building, Royal Holloway University, benefits from the installation of numerous moveable wall systems. Partitioning experts Style, worked closely with contractor, Geoffrey Osbourne, and Associated Architects to assist and advise on the design, bringing practical, aesthetic and cost-saving benefits to the project. Demonstrating Style’s extensive portfolio, the final arrangement involved a 50 dB Rw DORMA glass wall in a seminar room, a DORMA Variflex system on which art can be displayed, two 56dB Rw acoustic DORMA moveable walls and a 46dB Rw folding wall dividing meeting/ training rooms.
Sponsored
Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Rutland

About the project:Dublin Doors are a distributor of door leafs to door manufacturers throughout Ireland. Since Brexit, the market in Ireland requires the EN 1634-1 fire testing standard, as opposed to the previously accepted the British Standard BS 476. A customer of Dublin Doors wanted an overhead concealed door closer combined with 44mm thick doors, and it had to pass the EN fire testing standard.The specification of the doors was: (A) 44mm PB hardwood lipped all round door (B) 38mm PB core faced with 3mm mdf, routed with 2mm decorative groove in the faceDublin Doors were very aware that EN testing is widely considered to be more onerous than BS testing. The inclusion of a drop seal was also a point of concern - many companies have found that using drop seals to control smoke can appear to make the fire test harder to pass, with some experiencing prolonged flaming at the threshold. Rutland was able to help by providing its concealed closer ITS.11204, which can be used in 44mm fire doors – one of only a handful of concealed closers on the market that can do this. Rutland was also able to tap into its network of experts and consultants to discuss possible options, to help Dublin Doors to arrive at a combination that met the specification, and was most likely to succeed in the test. Dublin Doors were also required to write a Pre-Test Verification (PTV) before the test – a requirement at many test labs now. Rutland used its expertise in compliance to help complete this specification.The outcome:The results were excellent, with both doors lasting 49 and 51 minutes respectively in the fire test, for what was a 30-minute FD30 doorset, the more onerous European standard EN 1634-1 to achieve – E30. In our experience of fire testing, this is an excellent result for a 44mm solid timber door, and the Rutland team were just as pleased as Dublin Doors that the door, along with its concealed closer, passed with flying colours.
Sponsored
MG200 Glazed Newport Meeting Room

MG200 Glazed Newport Meeting Room

ModernGlide Ltd

Manufactured panels have a different level of acoustic reduction, but all of them provide the kind of flexibility needed to work perfectly within any office or commercial environment following a professional installation from ModernGlide.Because there is no need for a structural head support, this makes the MG200 series perfect for smaller openings. The versatility of our sliding folding wall partitions continue through the format of slimline stacking. This means that when the wall is not in use, it will take up minimal space in your environment.Additionally, the MG200 sliding partition series comes standard with a pass door panel which allows movement from side-to-side with seamless ease. We are able to offer a complete solution for all of your acoustic sliding partition needs.A continuous acoustic wall partitions system, it is perfect for a quick and easy set-up process and is our most popular budget solution for acoustic partitions that move.MG200 Wall Partitions Key FactsAcoustic reduction from 37dB to 49dBFloor-supportingPanel widths 450mm to 900mmHeight up to 4,000mmPass door as standardCentre-folding or end-folding stacking optionsPanel finishes include melamine, laminate, veneer and white boardIntegral glazing options30 minute fire rating option
Sponsored
Franke solid surface sinks transform washrooms in famous British film studios

Franke solid surface sinks transform washrooms in famous British film studios

KWC DVS Limited

Franke products were chosen for the transformation of the renowned Elstree film studios. The solid surface Ronda washbasins were chosen, the unique curved edge of the basins are designed with the highest quality solid surface materials. The pleasing design fits harmoniously into every washroom while providing generous basin space and the ultimate in style and design. Chris Kightley, Project Manager commented "Franke always deliver the highest quality of products and this was a key factor for such a prestigious washroom project. As well as quality their range of Miranit is highly stylish and fits perfectly in almost any washroom environment."
Sponsored
New hygiene room for primary academy

New hygiene room for primary academy

CareSpaces by Wealden Rehab

The SEN Code of Practice mandates that schools must take reasonable steps to identify and support children with special educational needs, facilitating their progress toward personal potential. Recently, Care Spaces collaborated with Kent County Council for a Primary Academy in Gravesend, tasked with creating a hygiene room for a new pupil with additional needs. Despite challenges such as a small initial space, asbestos removal, and a tight timeline, the team reconfigured walls, installed essential features, and completed the project, providing the school with a compliant, safe, and inclusive space.
Sponsored
Cladding Stairs in Engineered Herringbone Parquet Flooring

Cladding Stairs in Engineered Herringbone Parquet Flooring

The Solid Wood Flooring Company

Few people realise that it is possible to clad old stairs with our engineered herringbone parquet floors. It is a specialist skill and you should only employ trusted professionals who have the specialist equipment. The parquet blocks used here are unfinished so that you get perfect square edges. They are then oiled after all other works are completed so that you get your perfect floor. There is no separate stair nose piece as the top layer of solid Oak is a good 4mm thick and this allows the fitters to create an accurate mitre join.
Sponsored
A wet-room adaptation bestowing independence

A wet-room adaptation bestowing independence

CareSpaces by Wealden Rehab

A man with a prosthetic limb faced difficulties in his small, impractical bathroom after a leg injury. Collaborating with an Occupational Therapist, Care Spaces redesigned the space, ensuring approval from both the therapist and the user. They revamped the bathroom into a functional wet room, addressing accessibility issues. Key features included a level-access shower, shower seat, non-slip flooring, safety grab rails, an accessible toilet, and basin. The transformed space now meets the user's needs, enabling independent living. Notably, the adaptation benefits the user's son, who has a disability, ensuring a lasting solution for the family.
Sponsored
American walnut flooring in Canary Wharf Developments

American walnut flooring in Canary Wharf Developments

The Solid Wood Flooring Company

Summer 2019 saw The Solid Wood Flooring Company work with Base Interior and other key suppliers to complete a refurbishment inspired by Scandi design in the affluent district of Kensington, London. Fitzhardinge House offers a crisp, clean and modern aesthetic, achieved by using our Light Brushed Fumed Raw Timber UV Cured Finish Flooring Suitable for underfloor heating, this 15mm thick flooring opened up the space to create a spacious area that would stand the test of time. This project demonstrated what can be achieved when trades and suppliers combine, creating a space that looks as impressive as it functions.
Sponsored
5 Things To Consider When Installing Hygiene Rooms In Schools

5 Things To Consider When Installing Hygiene Rooms In Schools

Astor Bannerman

In recent guidance from the Department for Education (DfE), specifically BB103 and BB104, it has been strongly recommended that both mainstream and Special Educational Needs (SEND) schools incorporate hygiene rooms as an essential component of their facilities to comply with regulations. This highlights the commitment to creating inclusive learning spaces that cater to the diverse needs of students.This guide shares five crucial insights for anyone embarking on the journey of creating hygiene rooms within educational institutions.One. Adhere To DfE Guidelines:Underscored is the importance of aligning with the Department for Education (DfE) guidelines, specifically BB104 and BB103. These guidelines set forth the standards necessary for designing hygiene rooms that cater comprehensively to the diverse needs of students with disabilities. We’ve briefly outlined the guidance below:BB103: “Area Guidelines for Mainstream Schools”:BB103 provides guidance on the space requirements and design considerations for various areas within mainstream schools. This includes classrooms, dining areas, toilet facilities, and more. The goal is to ensure that the physical environment supports effective teaching and learning, as well as the overall well-being of students.BB104: “Access to and Use of Buildings”:BB104 focuses on access to and use of buildings, specifically addressing issues related to accessibility for individuals with disabilities in SEND schools. This guideline outlines the standards for creating an inclusive and accessible built environment within educational facilities. It covers features to ensure that buildings are welcoming and usable by everyone.Most importantly BB103 & BB104 state that a hygiene room should be included in all school settings.Two. Ensure You Have Considered Full Room Hoist CoverageIt’s important to consider the mobility of students when planning for a hygiene room installation. We recommend the Astor OT200 Overhead Ceiling Track Hoist, this advanced hoist system offers full room coverage, ensuring secure and seamless transfers for students with mobility challenges. Improving the utilisation of space and the versatile enhancement of accessibility within hygiene rooms. Discover more about the Astor OT200 Overhead Ceiling Track Hoist here, including its X-Y track system to give access to all amenities and facilities, room-to-room transfer capabilities, considerations for door height/track system impact, and room height/depth of track.Three. Choose The Correct Changing TableIn schools, changing tables are essential for students with disabilities, offering a supportive and dignified space for changing routines. Tailored to various needs, these tables contribute to creating an inclusive environment, ensuring all students feel welcome and supported. When selecting a changing table for a school hygiene room, you’ll need to consider crucial factors. The key considerations when making your decision include:Wall Mounted / Mobile: Considerations include the available space, access and the number of carers needed.Height Adjustability: Protect your carers by insuring easy adjustment to the correct working height,Maximum Working Load: Ensure durability for daily use with a robust design.Size: Optimise functionality by considering the changing table’s size in relation to available space.Shower Tray Required?: Enhance hygiene with the option for a practical shower tray.Space / Need to Stow?: Maximise efficiency with a fold-away design for space-saving and easy stowing.Tilting Headrests: Improve user comfort with tilting headrests for a friendly changing experience.Explore the Astor CTX2-CP, with a water collection tray and drain hose which is ideal for showering and changing. The CP model comes with an emergency stop button which is perfect for multi-user environments such as Changing Places Toilets, schools and care environments.Four. Include A Height Adjustable Wash BasinInstalling a Height-adjustable wash basin will offer accessibility for students with a range of disabilities. Specially designed to cater to diverse needs, these basins ensure comfort and prolonged independence, fostering an inclusive and supportive educational environment. This inclusive design not only enhances the overall functionality of these spaces but also emphasises a commitment to inclusivity, ensuring that every child can navigate and utilise hygiene facilities with ease and dignity.We recommend the Astor ABW-CP Height Adjustable Wall Mounted Wash Basin featuring a spacious basin surround, it aids wheelchair users in transitioning from sitting to standing. Controlled effortlessly by a handheld device, the ABW-CP includes a large integrated mirror and an adjustable soap dispenser for added convenience.Five. Consider The Colour Scheme For Sensory Well-BeingWhen designing hygiene rooms in schools, you will need to consider a strategic colour contrast for enhanced sensory well-being. Instead of solely opting for calming colours, integrate high-contrast elements like light-coloured walls with dark or bright furnishings. This not only aids sensory wayfinding, particularly for children with autism, but also creates visually distinct zones within the space. Consider incorporating varied textures alongside the chosen colour palette to further enrich the sensory experience. By taking a thoughtful approach to colour contrast, hygiene rooms can become incredibly positive and inclusive spaces that support the well-being of all students.To ConcludeIn summary, this guide advocates for a comprehensive approach to inclusivity when installing hygiene rooms in schools. Prioritising adherence to guidelines, making innovative equipment choices, and adopting thoughtful design are central to creating educational spaces that address the diverse needs of students. With these insights, professionals can work towards seamlessly integrating inclusivity into the very fabric of educational environments. Our skilled team has many years of experience planning and installing equipment in public spaces like schools and universities.Please do get in touch if you need help or advice with your project or further support on the government requirements for equipment to support SEND students.
Sponsored
Floor impact sound reduction in snooker room, Cheshire

Floor impact sound reduction in snooker room, Cheshire

Hush Acoustics

Hush Acoustics were tasked with providing a solution to reduce an impact noise issue on the upper floor of a luxury five-bedroom detached home in Knutsford, Cheshire.Home to a professional football player, the issue stemmed from the noise on the flooring of his snooker room. Impact noise from footsteps when using the room was generating nuisance noise within the living area directly below, which was making it difficult for others in the family to enjoy this space.Working with Short Construction, building contractors based in Wilmslow, Hush supplied 167x sheets of our Hush Panel 33 to solve the issue. This is a versatile, high performing acoustic flooring which is widely used in timber construction, making it ideal for the timber separating floors in this property.With a combination of our eco-friendly acoustic felt and our rubber barrier mat, the Hush Panel 33 performs to all UK Building Regulation requirements as well as the Robust Detail performance targets for timber frame developments. Its unique composition makes it easy to install and quick to use.The product works by creating a high mass barrier and isolating the floor finish from the structure. As the nuisance noise issue in this situation was due to impact noise, it was key to introduce a high performing acoustic floor product to break the connection of the floor finish from the structure. This, in turn, improved the impact performance of noise transmission through the floor structure, giving the client the desired effect and enabling him to use the snooker room as intended.
Sponsored
Dorma Variflex Glass Semi automatic Acoustic moveable wall combined to make multiple meeting rooms (Anglo American offices)

Dorma Variflex Glass Semi automatic Acoustic moveable wall combined to make multiple meeting rooms (Anglo American offices)

Style - Moveable Partition Specialists

Combining various types of moveable wall within the same building is fast becoming the latest trend for architects aiming to create the ultimate flexible space solution. One recent example is the London offices of Anglo American, a leading global mining company, where partitioning experts Style installed a complex arrangement of moveable wall systems to divide a single large space into four individual rooms.To achieve the level of adaptability required, Style utilised both solid and glass Dorma Hüppe Variflex semi-automatic moveable walls, as well as vertically rising, fully automatic Skyfold Classic 60 moveable walls.This combination enables the entire space to be re-configured quickly into smaller or larger meeting rooms, with the 57dB acoustic rating of the solid moveable wall, 52dB of the glass moveable wall and 59dB of the Skyfold delivering such an exceptional sound barrier that all rooms can host busy meetings without causing any disturbance between them.Anglo American is a leading global mining company whose products are the essential ingredients in almost every aspect of modern life. Its portfolio of world-class competitive operations, with a broad range of future development options, provides many of the future-enabling metals and minerals for a cleaner, greener, more sustainable world.Style worked with architects, MCM, and contractor, BW, to create wide-ranging flexible space in the ‘Office Zone’ and ‘Innovation Hub’ located at Anglo American’s offices in London. Within the configuration, the Skyfold walls meet with Dorma walls in T shapes, turning this very large room into four individual rooms accessible via a corridor, created when the glass moveable walls are in position.By integrating four fully-glazed pass doors into the glass moveable walls, there is ease of access into each of the meeting rooms from the temporary corridor.“This is a superb example of how a range of complementing moveable walls can combine to deliver truly first class, flexible office space,” said Julian Sargent, Style’s group managing director.“The final configuration gives Anglo American so many options as to how to use the space and is a real showcase for anyone visiting the building.”
Sponsored
Industrial Strength Stainless Steel Sinks For State Of The Art Fire Station

Industrial Strength Stainless Steel Sinks For State Of The Art Fire Station

Anderson, GEC Ltd

Made-to-measure brushed satin stainless steel sinks and worktops, from GEC Anderson, have been installed in the breathing apparatus rooms, kit cleaning rooms and kitchens of the new Winchester Fire Station.The station relocated from its home of 74 years at North Walls to its new state-of-art facility inEaston Lane, Winnall,Winchester. The new five-bay fire station is operationally and strategically located on the outskirts of the city on a major access route, close to the M3. The new facility can accommodate 70-plus personnel and provides a continuously crewed facility as opposed to the previous just day-crewed arrangement, thus providing faster emergency cover over a greater area.Freestanding worktops, totalling more than 10 metres, were installed in the breathing apparatus (BA) room and kit cleaning area of the fire station. Industrial sized sinks were included to provide an effective washing facility for the fire crews specialist equipment. Sarah Collins, architect for Hampshire County Councils Property Services Department said, The specialised sinks were chosen for their ability to cope with an environment of high usage. We wanted a material that was robust enough to take the everyday knocks and last for the lifetime of the building. GEC Anderson sinks certainly met this requirement and are performing extremely well.
Sponsored
DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU Fires

DRU has installed 89 gas fires into Ebury Square, a development of luxury 1-4 bedroom apartments and 5 bedroom penthouses by Berkeley Homes in Belgravia, London. The fires were selected for their contemporary design, easy installation and high energy efficiency. They consist of single-sided and double-sided tunnel models. Berkeley Homes selected DRU because of their unique PowerVent® flue system. Due to the configuration of the apartments, the flues had to be extended up to 64 metres throughout the service ducts in the complex, with most of the fires having external PowerVent® terminals on the roof.
Sponsored
Hygiene Room Changing Places Installation: The University Of East London

Hygiene Room Changing Places Installation: The University Of East London

Astor Bannerman

Nestled within the innovative hub of the Royal Docks Centre of Sustainability at The University of East London, a groundbreaking addition has been made to enhance inclusivity and accessibility for all individuals. The introduction of the hygiene room marks a significant milestone for accessibility in the area. Currently, there is only one other Changing Places facility available, making this new facility a crucial addition to meet the pressing needs of individuals with diverse mobility requirements within the Royal Docks community and its surrounding areas.Hygiene Room EquipmentAt the core of this facility lies the meticulously selected equipment:Astor ABW-CP Height Adjustable Wall Mounted Wash Basin: This basin prioritises comfort and convenience during personal care routines, with its height-adjustable feature catering to individuals with varying mobility levels.Astor OT200 Overhead Ceiling Track Hoist: The hoist facilitates secure and efficient transfers within the hygiene room.Astor Shower Trolley: Offering individuals with mobility challenges a comfortable and dignified showering experience.KwickScreen Wall Mounted Privacy Screen: Incorporating privacy and discretion, this screen empowers individuals to create a personal space within the hygiene room.Power In PartnershipLocated within the Royal Docks Centre of Sustainability, this Changing Places hygiene room reflects a harmonious collaboration between the University of East London and Astor Bannerman. Beyond meeting the highest accessibility standards, this facility seamlessly integrates into the university’s commitment to sustainability and inclusivity.As students, staff, and visitors navigate the dynamic campus of the University of East London, they can now do so with the confidence that accessibility is a priority. The establishment of this hygiene room signifies a significant stride in cultivating an environment where everyone feels welcomed, valued, and able to fully participate in university life.For institutions seeking inspiration or guidance on implementing similar initiatives, the University of East London’s Royal Docks Centre of Sustainability serves as a shining example of how collaboration and innovation can create inclusive spaces that reflect a commitment to both accessibility and sustainability.Feel free to reach out if you require assistance or guidance with your Changing Places project, or if you need additional support regarding the equipment specifications for Changing Places facilities.
Sponsored
Spitfire Homes Head Office - using Saige Solid Grey Decking & Subframe System

Spitfire Homes Head Office - using Saige Solid Grey Decking & Subframe System

SAiGE Longlife Decking

Spitfire Homes chose to use Saige's Solid Grey Decking board for their walkways between offices to create a sleek and safe space.
Sponsored
Fire Rated MySmartBox and Mailboxes

Fire Rated MySmartBox and Mailboxes

DAD - DECAYEUX

Fire-rated mailboxes and fire-rated parcel lockers integrated in the same unit. Recessed into the wall.
Sponsored
SuperPhon gifts sound of silence to Droylsden Academy music rooms

SuperPhon gifts sound of silence to Droylsden Academy music rooms

CMS Danskin Acoustics

Opened in 2009, Droylsden Academy in Manchester is a contemporary, open plan teaching environment. The state-of-the-art secondary school serves 1,400 pupils, however since opening it had become apparent that its design and layout had some challenges, in a large part due to the sound pollution associated with the open-plan layout. Contractors Buildmain were briefed to reconfigure a number of areas in order to minimise reverberation and improve the learning environment – and looked to CMS Danskin to identify an appropriate remedial acoustic solution.The ChallengeOne area of the school that needed particular attention was the music room, which was too large to be conducive to effective music practice. Contractors Buildmain were briefed to reconfigure the space into four separate rooms, to provide a soundproof environment for music recital and practice. The new practice rooms were to adjoin an existing classroom and the communal corridor, so controlling reverberation was an integral part of the scheme – the architects had specified the control of sound levels up to 68dB.The SolutionA complete overhaul of the existing music rooms was required – partition walls were removed and a new layout designed to incorporate the four separate practice rooms, an internal corridor and a store room. To achieve the dB rating of 68, Buildmain opted for a combination of acoustic solutions provided by CMS Danskin, including SuperPhon panels in all four rooms.In order to control reverberation in the area, Buildmain constructed the new rooms using a twin-wall method, using 15mm Soundbloc plasterboard with an acoustic matting sandwiched between the layers. The walls were then over-clad using IsoMax Acoustic Insulation Clips. A total of 20 panels were installed by direct fix to the walls of each of the four new music rooms. The 50mm thick panels were supplied in three sizes; 1200x600mm, 1000x500mm and 1000x750mm, and the colour was matched to the school’s existing interior scheme.To offer even higher levels of absorption, CMS Danskin recommended SuperPhon acoustic wall panels to reduce reverberation times and reflected sound. To assist with the correct specification, a CMS Danskin representative visited the site, at short notice, to assess the rooms and subsequently advised on the best options for the SuperPhon panels.The ResultCMS Danskin worked closely with contractors Buildmain in order to meet the very tight time frame of six weeks to install the Superphon wall panels – the project needed to be completed within the school summer holidays, so that the rooms were ready for pupils on their return to school in September 2016.Paul Bryan of Buildmain said: “We had to fit eight weeks’ work into the six-week summer holiday, and CMS Danskin impressed us with their ability to turn around the product so quickly. Not only were they able to deliver to meet our schedule, they were also able to send out an expert to advise on the best options to meet the specification, all within the timeframe.”
Sponsored
Jackson Fire Rated

Jackson Fire Rated

The Safety Letterbox Company

THE PROJECTThe Jackson fire rated project features freestanding mailboxes that conform to the BS476 Part 6 & 7. The small bank of fire rated mailboxes are installed internally in a residential building to securely store mail for residents. The mailboxes have the use of support legs which are secured to the concrete floor with heavy-duty fixings. Support stands are colour coded to match the same finish as the bank of mailboxes.Mailboxes that meet the BS476 Part 6 & 7 will satisfy the demands of fire protection in most cases, and provide an affordable alternative if the surface spread of flame and non-flammable materials are acceptable. The mailboxes feature an inward sprung flap, which is a standard feature across the fire rated mailbox range. An intumescent strip is placed on the internal side of the mail flap, which expands when the temperature increases and ensures that the flap is kept closed – stopping the oxygen flow into the mailbox and reducing the risk of fire spreading through the mailbox.An alternative fire rated solution is that mailboxes are manufactured to meet the BS476 Part 22, this group of products contain a series of features and benefits that result in a ‘one-hour integrity’ rating. As a result of the comprehensive collection of features, this product range is the premium option.PROJECT DETAILSProject Type: Private ResidentialProduct: Fire Rated 2 MailboxInstallation: FreestandingFire Rating: BS476 Part 6 & 7Accessories: Identification Nametabs/Support legs
Sponsored
Rosa Alpina Alta Badia, Italy (Vetralla)

Rosa Alpina Alta Badia, Italy (Vetralla)

Victoria + Albert Baths

Rosa Alpina is a boutique Alpine hotel that boasts a two Michelin-starred restaurant and a scenic setting in the Dolomites – one of the world’s most beautiful places.The original building dates to 1850 and local antiques, wood carvings and old photographs complement its wood-panelled ceilings and thick, frescoed walls. Fresh flowers and roaring fires complete a convivial vibe.The 51 spacious rooms and suites each feature a seating area and subtle cream and grey colour scheme. Newer guestrooms offer more contemporary design, with glass-encased fires and sleek timber furnishings, yet still respect local traditions with wood-panelled ceilings, fire wood baskets and ceramic stoves. The new Vetralla bath has specified within these new contemporary rooms.Photography: © Six SensesPhotography: © Six Senses
Sponsored
Leabaib Health Centre, Doha, Qatar - FireMaster Concertina and FireMaster Fire Curtains

Leabaib Health Centre, Doha, Qatar - FireMaster Concertina and FireMaster Fire Curtains

Coopers Fire Ltd

Our range of products meant all of the fire curtain requirements were met and the fire regulations could be adhered to keep the occupants of the building safe. Coopers FireMaster Concertina is a great way to offer compartmentation between floors and was installed because there were no columns at the atrium to install side guides and there is no smoke extraction system on the atrium so functional gaps were not allowed.
Sponsored
USING VOLCANIC PUMICE BUILDING BLOCKS TO BUILD A CHIMNEY DURING A SELF-BUILD PROJECT.

USING VOLCANIC PUMICE BUILDING BLOCKS TO BUILD A CHIMNEY DURING A SELF-BUILD PROJECT.

Schiedel Chimney Systems

Avoiding gas reliance when building a new house.Traditional self-build projects have always had heating systems such as gas central heating and solar panels installed. However, with the increasing costs of gas, and the uncertainty of future supplies, a secondary heating source is required.There are options such as ground heating pumps, etc. but a real heating system independent of the grid, plus a stunning focal point has to be a wood burning stove.In fact, wood logs are now the cheapest domestic heating fuel. According to the Stove Industry Alliance, wood now is “costing households 74% less per kWh than electric heating and 21% less than gas heating”. The benefits don’t end there. “Using a modern wood burning stove also costs 29% less to run than an air source heat pump. Wood logs are 87% less carbon intensive than gas, 88% less than electricity and 74% less than an air source heat pump.”Building a traditional steel pipe flue system is always an option, but steel systems are more suitable in retrofit projects where minimum disruption is required. When you are building a house from the ground up, then a more permanent and ultimately lifetime option is the better one.
Sponsored
Five Guys Restaurant, Dubai Marina Mall. FireMaster Concertina multi-side fire curtain

Five Guys Restaurant, Dubai Marina Mall. FireMaster Concertina multi-side fire curtain

Coopers Fire Ltd

Coopers FireMaster Concertina is a great way to offer compartmentation between areas like a kitchen and restaurant and able to divide up these two critical areas in a public building and act as a fire break. By installing the FireMaster Concertina meant it would provide the building with an approved, non-invasive means of fire protection that would satisfy the fire regulations as well as ensuring that the open plan design remained as intended. Compartmentation and Protected Means of Escape were required as part of the fire safety solutions.
Sponsored
Bespoke Oak Versailles Parquet Flooring

Bespoke Oak Versailles Parquet Flooring

The Solid Wood Flooring Company

For the beautiful penthouse atop one of the buildings in South Bank Place, located next to the London Eye, the designers wanted a feature floor with a bespoke colour finish. We worked with the designers at Goddard Littlefair and decided on the timeless design of the Versailles parquet pattern. The designers wanted a show-stopping colour for this floor. We created the Belvedere colour finish; using a mixture of fumed, European Oak and pigmented hard wax oils to create a dark colour tone with red and golden highlights.To ensure a uniform and quick installation on site; we creating metre square panels with the Solid Oak Versailles pattern positioned by hand onto Birch plywood backing. Having discussed the fit-out process in detail with the fit-out team from SJ Eastern Joinery, we grooved all four sides of the panel and supplied the tongues loose. This gave the fitters flexibility to lay the boards as they saw fit on site. Once we had assembled the panels, the bespoke colour finish was applied; after completing multiple coats the panels were stored to fully cure and harden.Once the team from SJ Eastern had fitted the flooring on site, they protected it with a soft breathable cover and topped that with hardboard and taped the edges. This allowed the other trades to snag without damaging the floor. Once snagging was complete, the floor protection was removed. As anyone who has been on a building site knows, dust and debris are everywhere and sure enough the flooring needed a final clean and buff with oil to increase the lustre and make it perfect for the wow factor needed in such a stunning project.The expert team lead by Bardhyl Miskiqi of BRB Flooring came in and cleaned the floor thoroughly, removing plaster dust and other debris by vacuum and cleaning the floor down using a solution of Blanchon Natural Soap and hot water. Once the floor was suitably clean, they applied Blanchon Hard Wax Oil Satin on to the floor and buffed a coat into the floor using a buffing machine equipped with a white buffing pad. This fed the Oak another coat of oil which bolsters the protection against every day use and increased the lustre of the wood highlighting all the colours from that bespoke colour that had been applied at the factory.Once the oil was properly buffed in, the penthouse door was closed and the floor left to dry and cure. Once curing had completed the furniture was placed in the room and made ready for viewing by the client and new owner and a lifetime of happy memories.Please call 01666 504015 for more information.
Sponsored
Junckers solid oak floor for award-winning college campus

Junckers solid oak floor for award-winning college campus

Junckers Ltd

Riverside Campus at City of Glasgow College has won a multitude of architectural awards for its outstanding design. Home to the world-leading Maritime College, the building features a grand atrium where Junckers 22mm Oak Harmony finished in Ultramatt lacquer was specified for the expansive staircase and walkway. Designed in a joint venture between Reiach and Hall Architects and Michael Laird Architects, the building is BREEAM ‘Excellent’ with many innovative on-site energy generation measures. Junckers solid hardwood flooring is made from renewable, sustainable forests and the entire manufacturing process is powered by Junckers’ own on-site power plant, which uses the residual wood of the forested timber. The Oak Harmony floor adds natural warmth to the large, open space and provides a hard-wearing surface for a busy college environment.
Sponsored
Fire-rated mailboxes and MySmartBox

Fire-rated mailboxes and MySmartBox

DAD - DECAYEUX

This is what new lobbies will look like in Smart Buildings. Installed this week in the famous Lewisham Exchange in London:✔ Fire rated mailboxes✔ Fire rated electronic parcel boxes✔ Fire rated electronic control unitResidents will benefit from a secure way to receive both mail and parcels, while property management will have full control via our cloud based management platform.
Sponsored
London Fire Brigade

London Fire Brigade

Jewers Doors Ltd

London Fire Brigade chose Jewers Doors to design and manufacture 46 setsof fast acting exit doors for emergency vehicle bays at nine new Fires Stationsas part of a £51 million refurbishment program.
Sponsored
GEC Anderson V90 Shelving System In Property Store Room

GEC Anderson V90 Shelving System In Property Store Room

Anderson, GEC Ltd

A recent upgrade to the prestigious Empress State Building for the Metropolitan Police was conducted by main contractor, Overbury.As part of the works, stainless steel shelving by GEC Anderson was specified to the vistor’s property store room. The room was very irregularly shaped and so the shelving (5 tiers of 500mm wide shelves) was specially made to suit. A total of 75 metres of shelving was supplied and installed by GEC Anderson for specialist sub contractor, BA Joinery.
Sponsored
Places for People update their heating with the Quantum High Heat Retention Storage Heater

Places for People update their heating with the Quantum High Heat Retention Storage Heater

Glen Dimplex Heating and Ventilation

With outdated electric storage heating in all 72 flats, Places for People knew that heating system upgrades would reduce bills and improve comfort for residents. TMS Electrical Contractors Ltd, based in Rudgwick, Horsham, was instructed to specify the most suitable replacement – and Dimplex Quantum was the obvious choice.
Sponsored
Reducing reverberation within healthcare facility's meeting rooms, London

Reducing reverberation within healthcare facility's meeting rooms, London

Hush Acoustics

Optimising acoustic comfort within radiology facility, LondonHush Acoustics transformed the acoustic environment within a radiology facility where staff and clients experiencing noise nuisance within both a boardroom and video conferencing room, which was noticeably affecting speech clarity.Renowned as specialist consultants throughout the UK, Australia and further afield, offering 24-hour radiology reporting, Everlight Radiology offers urgent after hours and daytime consultant radiologists to hospitals throughout the world. Hence, it was imperative that their rooms were treated quickly in order for the practice to continue with their duty of care and excellent service.After considering printed acoustic boards from another supplier, which would have offered Class C absorption, Everlight’s chief executive officer contacted Hush to gain more specialist advice on sound absorption.Upon a visit to the Everlight Office, we found the rooms to be suffering from very high levels of reverberation and echo noise. Through our professional and technical advice, along with carrying out an acoustic assessment, we presented the client with a recommended solution based around Hush Absorber Panels 50 & 50A panels. The reason for including the Hush Absorber 50A panel in the specification was because it was imperative for the ceilings to be treated in order to get the sound result that our client was anticipating.Faced with a vast array of asymmetrical ventilation ducts and lights on the ceilings in the rooms in question, additional consideration was needed regarding the placement of the acoustic panels. A plan was drawn up to give possible layout options, which were agreed by the client.Unlike the client’s initial consideration prior to contacting Hush, Hush Absorber Panels are Class A absorbers, made from fabric wrapped 50mm thick acoustic foam. They have built in support frames to allow for bracket fixing, to provide an air void behind the absorber for enhanced acoustic performance. Class A absorption is of the highest level, with Class E being the lowest and this scale ensures simple comparison between acoustic products, which is important when choosing the right product for maximum impact on sound reduction and speech clarity.Included in the client’s brief was a request for particular panels to be printed. The client wanted to incorporate their brand logo and hero statements, intended to remind their clients and staff members using the room of their key messaging and values. The pictures supplied to Hush were designed in-house and delivered in high resolution which ensured an outstanding result.The client expressed interest in having larger boards for the video conferencing room to the bespoke sizing of 2050 x 1300 x 50mm. These panels were made to order, and provided in colours Chrome and Smoke, which were then organised in a checked pattern on the ceiling. Hush 50A Absorber Panels were installed using suspension packs, which allows for the air void behind, whereas the Hush Absorber 50 Panels were installed using the Hush Absorber Adhesive, making them clean and easy to install.The client was delighted with the finished result, not only in terms of practically and the acoustic improvements but aesthetically too. The colours chosen along with the custom printing reflects the business looking smart, clean and contemporary and resolves the reverberation issues that they were originally facing.
Sponsored
Battersea Power Station, London

Battersea Power Station, London

Coopers Fire Ltd

Coopers Fire proudly installed multiple fire and smoke curtains in this iconic building in London.Coopers Fire was approached in 2013 to support multiple Architects and Fire Engineers to work through the difficult interface designs on the historic Battersea building that posed multiple challenges in incorporating smoke and fire strategies whilst maintaining the legacy build design.This was a great opportunity to once again put forward the innovative solutions that have attracted Architects to Coopers Fire on many occasions previously.These challenges followed with the introduction of bespoke curtain systems stretching the designs beyond the norm. There was also a need to carry out support testing to validate their capability and to offer comfort to the stakeholders.Coopers Fire offered continual support to the key stakeholders including the Architect and Fire Engineer community, giving them confidence in ongoing collaboration with Coopers Fire for future projects.The Coopers Fire product design and interfacing, complete with valid specifications, went a long way to assist a Contractors partnership decision in supplying and installing the finished product whilst enabling live design changes with the aligned Architect engaged on the project.The project required FireMaster® Concertina curtains 25m width and 12m in height of straight sections, with an integrity rating of 30 minutes.The Coopers Fire Concertina product portfolio allowed for 12m width and 8m height of straight length sections so the product needed re-designing and bespoke engineering to suit the requirements of the project.A specimen of the engineered solution was tested at an accredited fire testing lab. The specimen achieved 66 minutes integrity rating, without failure.The combined engineering design, testing and fire test data allowed Coopers Fire to meet the requirements of supplying a 25m wide and 12m high FireMaster® Open Concertina fire curtain.One major challenge of the large Concertina products was installation. The 12m drop Concertina fire curtains were installed successfully on site using a combination of scaffolding and mobile platforms and at some points with minimal headspace to work within.The Concertinas were so long that onsite redesign and engineering were required to ensure the bottom tray engaged perfectly with the headbox.The Concertina retaining guides were also so long they required onsite welding. A further four levels below the curtain drop, meant that total installation height was higher than 12 metres from the ground spanning over the voids either side of the bridge below.The Coopers Fire production and installation teams collaborated to manufacture the individual parts of the Concertina fabric off site to ensure the programme of installation was kept on time.Coopers Fire installed:47 x Vertical fire curtains7 x Concertina curtains32 x Vertical smoke curtainsThe team used for the Concertina installation specialise in this product and were able to overcome onsite challenges to ensure the huge Concertina fire curtains operated as expected and deployed effectively.
Sponsored
Mono Glass Balustrades for Southport Community Fire Station

Mono Glass Balustrades for Southport Community Fire Station

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixOrbis OS211 Glass Infill Top Fix As part of the North West Fire PFI scheme, the Southport Community Fire Station provided improved facilities for Merseyside Fire and Rescue Service and the North West Ambulance Service.The client’s main objectives were to create well designed facilities to a high architectural standard and provide a safe and healthy environment. Designed and built by Balfour Beatty Construction, this new 6 bay station included community-orientated facilities, training facilities, rest rooms, additional office space and two staircases.In line with the client’s vision, Delta Balustrades were appointed by Balfour Beatty to design, supply and install handrails and balustrades to both staircases and an external balcony area. Combining a minimalistic look and feel with a high quality stainless steel finish, the Mono system with clear glass infill panels was chosen for the main staircase. For the rear stair and external areas, the Orbis system with powder coated uprights was chosen.
Sponsored
McDonald Road Fire Station

McDonald Road Fire Station

Taylor Maxwell

Refurbished and remodelled in 2021 to become the headquarters for the Scottish Fire and Rescue Service in Edinburgh, was the McDonald Road Fire Station. We were pleased to work with Robertson Construction, Smith Scott Mullan Associates and HSR Building Services to supply Argeton terracotta and Corium brick cladding to complete the project.
Sponsored
Bespoke Joinery Manufacturer uses Fire Door Foam and Intumescent Sealant on Crawley Town Hall

Bespoke Joinery Manufacturer uses Fire Door Foam and Intumescent Sealant on Crawley Town Hall

Fire & Acoustic Seals Ltd

WJL Contracts have been providing high-quality, bespoke joinery solutions to some of the largest contractors in UK construction for over forty years. Known for their expertise and design flair, their fire-rated doorsets and panels have been installed in prestigious building projects spanning the education, entertainment, and commercial sectors. They also offer a full installation service which ensures that their fire-rated and acoustic products are installed competently, setting them apart from a lot of other joinery manufacturers. One of these projects was for Crawley Town Hall in West Sussex on behalf of Kier construction. They successfully delivered bespoke joinery and acoustic panelling doors, an elliptical ceiling, a feature wall, mirrors and kitchenettes. The team overcame significant challenges to hit the deadline including managing the installation of 2700 large 2.7m doors.Fire and Acoustic Seals Fire Door FoamTM and Intumescent Acrylic Sealant were used to install all fire-rated doorsets to guarantee their compliance. Joel Mayer, Buyer & Commercial Manager at WJL comments“We’ve been using Fire and Acoustic Seals’ own-label Fire Door FoamTM and Intumescent Acrylic Sealant on our large construction projects for many years. Our team particularly like the Fire Door FoamTM because they think the quality is excellent compared to others on the market, it’s quick and easy to install and it’s backed up by specific fire door test evidence.We also love the service we get from the team at Fire and Acoustic Seals which is why we’ve continued to work with them for over a decade. They’re incredibly reliable and have a fast turnaround service which ensures our onsite team are never without the products they need when they need them. This is really important to us as we are constantly working to tight deadlines.” For more details about this and other WJL projects visit https://wjlcontracts.co.uk/portfolioContact our team for more information about Fire Door FoamTM and Intumescent Acrylic Sealant.0121 521 2179 | sales@fireandacousticseals.co.uk 
Sponsored
HOTEL RUSSELL, LONDON, UK

HOTEL RUSSELL, LONDON, UK

Coopers Fire Ltd

Fire separation between floors reinstated with FireMaster® Fire Curtains

Showing 73-108 of 522

Feedback