NBS Source
I'm a manufacturer

"smoke heat exhaust and ventilation systems"

2,849 results found

Sort by:

Showing 253-288 of 339

Sponsored
Albion Works, Manchester

Albion Works, Manchester

K Systems Insulated Facades

BackgroundLocated in the Ancoats area of Manchester, the Albion Works strip and re-fit project was funded by the Building Safety Fund, a Government Fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.K Systems Approved Installer QFF Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.The original 60mm EPS system was stripped from the building and replaced with a safe, thermally efficient façade solution, which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Our ServiceK Systems provided support throughout the application process for this Building Safety Fund project. The Technical team offered on-site technical and installation support throughout the build process and supported QFF to ensure quality and reliability.We produced a bespoke specification and worked closely with Thomason Consulting and QFF Façades to agree and deliver specifics such as fire stopping and abutment details.From design advice through to installation, we offered a partnership approach which aided a smooth installation process with minimal disruption.Technical Project DetailsThe original sheathing boards were replaced, and the K Systems Exicco M drained cavity façade system was installed. This high performing drained cavity system was specified as a requirement for this steel frame residential building. 60mm mineral wool insulation was specified to retain the line of the existing façade.Fire safety with high rise buildings like Albion Works is of utmost importance and this solution generates high levels of fire resistance and non-combustibility (A2, s1-d0 rating), meaning the latest building regulations were complied with. Additionally, the thermal performance of the building improved with a U-value of 0.28 W/m²K being achieved. Residents will therefore enjoy reduced heating costs and better living conditions.For the finish, silicone thin coat render ensured that aesthetically Albion Works had a clean, crisp attractive appearance. This durable, low maintenance render transformed the outside of the building and will ensure a longlasting finish to the property.
Sponsored
St Edwards & Tollbrae Primary

St Edwards & Tollbrae Primary

Senior Architectural Systems Ltd

This new shared campus for two North Lanarkshire primary schools has been designed by leading architects Halliday Fraser Munro to reflect the individual identities of the two schools whilst uniting them in one single building.The layout of the new school building reflects the dual-nature of the campus, with two separate two-storey teaching wings set around a central courtyard. This open space and the surrounding linked buildings provide shared facilities including a gymnasium and dining hall. Constructed by main contractor and established supply chain partner, Morgan Sindall, the new modern school building benefits from several aluminium fenestration solutions from across Senior’s extensive range.The eye-catching main façade features Senior’s thermally-enhanced SF52 aluminium curtain wall system with integrated SPW501 aluminium commercial doors which provide safe and secure access. Throughout the building, Senior’s patented low U-value PURe® aluminium casement windows have been specified to help reduce heat loss and boost the overall energy-efficiency of the scheme. Senior’s fenestration systems were fabricated and installed by specialist contractor Linn-Tech.
Sponsored
Deakins Place, Nottingham

Deakins Place, Nottingham

Senior Architectural Systems Ltd

Our expertise in the student accommodation sector has led to our aluminium fenestration systems being used on this new riverside scheme in Nottingham, which has been designed by architects Maber and built by main contractor Bowmer & Kirkland.Managed by student housing provider Student Roost, the new Deakins Place development is located within close proximity of the University of Nottingham’s Jubilee campus and offers stunning views of the River Leen. These views have been perfectly framed by our patented low U-value PURe® aluminium windows which have been installed by specialist contractor HKL.Specified with flat casement vents, our thermally-efficient PURe® aluminium windows have been installed to each apartment to increase the flow of natural light and to reduce heat loss. The slim aluminium fames have been powder coated to provide additional protection from the elements and to complement the wider façade design which features a stunning mix of natural building materials and colour palettes.
Sponsored
School Hand Dryers - Student's views

School Hand Dryers - Student's views

Heat Outdoors & Handy Dryers

Students are now, more than ever acutely aware of carbon footprints and energy efficiency. Installing a super energy efficient hand dryer not only saves your establishments money, it also shows your students that you care and are doing whatever you can to make a difference. 
Sponsored
True benefits of a quiet hand dryer

True benefits of a quiet hand dryer

Heat Outdoors & Handy Dryers

Nothing says sophistication in a washroom more than high performing hygienic quiet hand dryers, especially when they have a significantly lower sound output than customers’ might be used to. It’s surprising how simple ambience and a pleasant method to dry one’s hands after visiting the bathroom in a restaurant, bar or workplace can heighten the overall experience of the visit.
Sponsored
Cambridge Street

Cambridge Street

SE Controls

One of Manchester’s latest high rise residential developments, Cambridge Street, is using smoke control systems from SE Controls to provide a safe environment for residents, by ensuring escape routes are kept clear of smoke in the event of a fire.
Sponsored
The Landmark

The Landmark

SE Controls

An iconic and popular residential development in the West Midlands, The Landmark at Brierley Hill, is using smoke control systems from SE Controls to ensure escape routes are kept free of smoke in the event of a fire, allowing residents to exit the building safely.
Sponsored
Movawall Systems Ltd - Showroom

Movawall Systems Ltd - Showroom

Movawall Systems Ltd

Take a look at the various systems on display at our showroom based in Clerkenwell, London - including a range of both solid and glass partitions.
Sponsored
Newton System 500 Controls River Thames

Newton System 500 Controls River Thames

Newton Waterproofing Systems

Newton System 500 provides a complete waterproofing solution for a boathouse situated on the River Thames, installed by Newton Specialist Basement Contractor Stonehouse. Newton Waterproofing Systems were contacted to provide a solution for a delightful boat house on the River Thames.The property originally had a wet dock but this had been back filled and capped with a concrete floor. The client wished to use the ground floor as a bedroom, but during a recent flood the water level had reached 500mm internally.Newton System 500 provided the ideal solution, as it works by redirecting the water, rather than trying to hold water back – which would be impossible under such pressurised conditions. Newton 508 Mesh was chosen for the walls, Newton 520 to the floor with a Newton Basedrain ring around the perimeter. Two Newton Titan Pro pump systems were used, which included a battery back up system.Newton System 500 was installed to this property by Newton Specialist Basement Contractor Stonehouse BasementsRather than holding water pressure back, therefore, it was accepted that the river would penetrate the structure and would be pumped out. The system is designed so that ingressing water is depressurised by the Basedrain and then moved around the Basedrain ring to the two Titan sump chambers. The chambers each had 40mm discharge lines exiting the structure. Both pump systems had non-return valves so if the river rose over the level of the pipe the pumps would still be effective.The full waterproofing system was installed in a little over a week. The major test came when the River Thames rose against the property to a depth of over one metre! The Newton System 500 waterproofing system coped with the water ingress as designed. At the height of the flooding, all three pumps in each sump chamber were operational. The system proved to be fully successful.
Sponsored
Bolands Quay, Dublin

Bolands Quay, Dublin

Colt International Ltd

Coltshaft smoke extract systems to commercial and residential staircases
Sponsored
The Curve, Manchester

The Curve, Manchester

K Systems Insulated Facades

BackgroundOccupying a prominent position on the Kingsway, The Curve development is a portfolio of 27 apartments. The key requirement for Cube Homes was to offer residents high quality, low carbon, affordable and sustainable apartments.After extensive planning, K Systems specified a direct fix system with mineral wool insulation and a silicone render finish. Our Direct Fix system for steel frame structures is KIWA BDA certified and provided the ideal solution for these newly constructed mid-rise apartments.Our team designed a façade solution that delivered modern, thermally efficient and aesthetically pleasing homes, meeting the client’s requirements.Our ServiceDue to the number of fixings and the curvature of the property, this was a technical project which required bespoke detailing.In collaboration with Bowker Sadler Architects and our approved installer Profac, we designed a comprehensive specification and were on-site when required, offering Profac technical and installation support throughout the build.The Direct Fix system specified is a cost-efficient solution for steel frame structures, with fewer components for a simpler and faster install. Direct Fix generates exceptional insulation and with a silicone render finish provides high levels of fire rating (A2,s1-d0), allowing Cube Homes to deliver safe and thermally efficient homes.Technical Project DetailsThe EWI needed to be line and level with the ground floor brickwork. To achieve this specific requirement, 300mm mineral wool (which is deeper than available mineral wool) was specified for the project. This meant 110mm and 190mm boards were combined to achieve the required 300mm.This thicker mineral wool meant that the curved elevation on the building was difficult to achieve. The insulation was facetted around the curve and carefully installed by Profac to create a seamless façade. The 300mm mineral wool resulted in a low U-value of circa 0.10 W/m²K, meaning heating costs for the apartments will be minimal and carbon usage will be reduced to a minimum standard.For the finish, silicone render (TC 15) was specified to create a striking curved elevation. Silicone TC incorporates the benefits of silicone technology to provide a water repellent finish with a fresh and modern appearance. The silicone allows water vapour to pass freely through the render whilst allowing the finish to remain weather resistant, making it the ideal solution for a low maintenance, long-term finish.
Sponsored
Walkways Community Centre, Belfast

Walkways Community Centre, Belfast

K Systems Insulated Facades

BackgroundBelfast City Council designed Walkways Community Centre with the local community in mind, providing them with places to both work and play. In this £1.37m project, the original portable modular building was demolished and replaced with a new 575 square metre build. The two storeys include a creche and soft play area, a 250sqm sports hall and a series of multipurpose rooms for meetings and courses aimed at the local people. Main contractor, McKelvey Construction led the project and worked alongside Michael Whitley Architects to design and deliver the most appropriate solution for Belfast City Council and the local community. K Systems provided on-site technical support and installation guidance throughout the build which resulted in delivery of a modern, aesthetically pleasing facility that achieved the target U-value of 0.18W/m ² K. Our ServiceHaving originally specified rainscreen cladding, K Systems technical team worked with the architect to design a bespoke engineered system with the drained cavity to suit the metsec frame. Regular site visits from our team ensured support was available throughout the build. The Centre is located on a busy street with limited surrounding space, so we had to manage a very congested, condensed site with deliveries planned and arranged by appointment only. We worked closely with McKelvey Construction to manage such challenges and ensure that local access for residents was uninterrupted, as well as ensuring the overall safety of the site area. From design advice through to installation, we offered a partnership approach which ensured a smooth installation process with minimal disruption, and the delivery of a fantastic community centre for the local area to enjoy. Technical Project Details Originally rainscreen cladding was specified for the Walkways project. However during the construction process, due to spiralling material costs and budget restraints, this was deemed too expensive so alternative solutions had to be sourced. It was decided an external insulation system would be used and a ventilated cavity system was required, as this provides a secondary defence in commercial buildings like Walkways. The K Systems Exicco E drained cavity façade system was specified as it ticked all the boxes. Exicco provides excellent protection and can offer an excellent fire rating of up to A2-s1,d0, providing high levels of fire resistance and non-combustibility. The drained cavity behind the insulation in the Exicco system will ensure that any interstitial moisture will escape without detriment to the performance of the system. As EWI was not originally specified for the project, no metsec frame had been designed. This is a crucial element for the Exicco system, which meant a bespoke metsec frame had to be designed specifically to suit our system. The Exicco E system for Walkways used Expanded Polystyrene (EPS) insulation boards that were mechanically fixed and attached to 12mm BBA Approved sheathing boards to create a 25mm drained cavity. EPS boards are extremely light-weight and the system offers a great fire rating of B-s1,d0. It is a high performing, economical system that generates high levels of thermal performance and ensured the target U-value of 0.18W/m ² K. was achieved. For the finish, Silkolitt+ silicone renders ensured a clean, crisp contemporary finish that offers protection to the exterior of the community centre. The flexibility of this finish provides resistance against cracking and increases the durability, ensuring a long-lasting finish for Walkways. 
Sponsored
Triton Systems Specified For Underground Car Park Upgrade

Triton Systems Specified For Underground Car Park Upgrade

Triton Systems

Triton Systems supplied waterproofing systems specified by waterproofing design specialists, Ink Technical Services, for the upgrade to a below ground car park in North London. BS 8102 (2009) recommends the involvement of a waterproofing specialist at the design stage of any below ground waterproofing project. Involving an expert at this stage also minimises the risk of system failure in the future.
Sponsored
The Lexicon Bracknell - Louvre Wall & Louvre Doors

The Lexicon Bracknell - Louvre Wall & Louvre Doors

Duco Ventilation & Sun Control NV

The bulk of the project, spread over seven large blocks, used DucoWall Basic to provide plant screening. One element, where higher level glazing needs privacy screening from the walkways below, DucoWall Classic W 50Z is installed inverted so that the areas gain maximum light without sacrificing privacy. Another challenge was to incorporate louvre doors into the plant screening areas without interrupting the aesthetic appearance. Here again a standard DucoDoor solution provided exactly what was required. The DucoDoor can use the full range of DucoWall blades to provide a beautiful and uniform result.
Sponsored
AC Ventilation using cast iron vents

AC Ventilation using cast iron vents

Cast Iron Air Brick Company

Here is an email we received after a client installed the conservation cowled cast iron air vents to a London property in September 2022)...We recently did a project on an old coach house in a listed building. They wanted a/c but we couldn’t route water for the h2o unit and couldn’t have two big white plastic vents on the outside of the building.The solution was to combine your products, a pair of CON6 cast iron conservation vents. The clients are ecstatic. I thought I’d share as I’m sure a lot more people in old houses will be looking for a/c going forward.Sally Estad, Elstad Interiors, Chicago USA ( working on a property in Wimbledon, UK)
Sponsored
Metal pipe boxing in the round

Metal pipe boxing in the round

Pendock

Metal pipe boxing from the Pendock Profiles range is concealing heating pipework, electrical cabling and ventilation ducting at Phoenix Point in Thamesmead as part of a refurbishment and upgrade programme of homes at the striking, cylindrical high rise building.Originally built in 2008 on the site of a boiler house used for a community heating scheme, the 8 storey, circular building provides a mix of one and 2 bedroom flats. The Pendock aluminium boxing is used extensively in the refurbishment and is located below the walkway on each tier, following the form of the structure to conceal building services, as well as acting as a mounting point for lighting.
Sponsored
New Gorbals Housing Association

New Gorbals Housing Association

Senior Architectural Systems Ltd

The new office development for the New Gorbals Housing Association in Glasgow features a variety of aluminium fenestration solutions. Together these have helped create a light and airy workspace and an impressive centrepiece for the wider regeneration of the area.Located on Crown Street, the new commercial office building is complemented by a new civic piazza and has been designed by Page & Park Architects. Flexibility and adaptability were key focuses for the overall design, with the incorporation of daylighting and natural ventilation strategies to boost wellbeing, and large glazed facades to better connect the building with the local community.The welcoming main entrance has been created using Senior’s slimline and thermally-enhanced SF52 aluminium curtain wall system and SPW501 aluminium commercial doors. The fenestration package also includes Senior’s SPW600e aluminium windows which were used throughout. The ground floor glazing has been recessed to provide privacy to the internal work spaces whilst complementing the overall ‘open’ design of the scheme. In contrast, the first-floor glazing protrudes slightly to maximise views of the surrounding city. Senior’s products were fabricated and installed by Scottech for main contractor CCG.The office environment includes both large areas for group work and smaller, more private booths and is centred around a large timber-clad atrium. The use of internal and external glazed partitions and windows helps balance the space, providing links with both the other areas of the building and the outside. The fenestration package has also been designed to provide those using the building with multiple aspect views and daylighting, whilst avoiding overheating and glare from the summer sun. To further complement the overall façade design which features dark grey zinc cladding, and to boost the durability of the aluminium frames, the windows, doors and curtain wall systems were powder coated.
Sponsored
Canada Gardens, London

Canada Gardens, London

Colt International Ltd

Residential Development wit Colt Smoke Control and Corridor Cooling System
Sponsored
Nottingham Trent University, Health and Allied Professions Centre

Nottingham Trent University, Health and Allied Professions Centre

Senior Architectural Systems Ltd

The new purpose-built Health & Allied Professions (HAP) Centre forms part of Nottingham Trent University’s vibrant Clifton Campus and features an array of innovative resources and amenities, including mock hospital wards, specialist equipment and creative teaching spaces, to assist students in their study of nursing, paramedicine and healthcare.The impressive building has been designed by architects Pick Everard and incorporates a number of sustainable features to achieve an ‘excellent’ BREEAM rating. Senior’s fenestration systems, which offer cradle-to-cradle recyclability, were the ideal choice and the building’s striking main façade features both Senior’s thermally-enhanced SF52 aluminium curtain wall system and integrated SPW600 aluminium windows. Senior’s products were fabricated and installed by supply chain partner Logic Aluminium Systems for main contractor Henry Brothers Ltd.As well as a creating a welcoming gateway to the University’s Clifton Campus, the new two-storey building has been designed to provide both visual interest and maximise the use of daylighting. The use of Senior’s slimline SF52 aluminium curtain wall systems floods the main atrium with natural light and provides each of the rooms with extensive views of the campus and surrounding areas. Ventilation is provided by Senior’s robust SPW600 aluminium windows which have been seamlessly incorporated into the curtain wall.The interior features of the new HAP Centre are just as impressive, with flexible teaching and study areas interspersed with state-of-the-art facilities including a virtual reality wall, which enables students to practice emergency medical responses in ‘real life’ settings, and mock hospital wards and domestic flat settings which feature robotically controlled mannequins that allow a range of patient symptoms, illnesses, and scenarios to be simulated and studied.
Sponsored
Lower Steenberg’s Yard, Newcastle

Lower Steenberg’s Yard, Newcastle

Senior Architectural Systems Ltd

Created as part of the wider regeneration of the former industrial area of Ouseburn Valley, Lower Steenberg’s Yard is a four-storey development comprising ground floor commercial office space and 28 residential apartments on the floors above. Benefiting from stunning riverside views of the Ouseburn, a small tributary of the River Tyne, the scheme has been designed by Xsite Architecture and constructed by Esh Construction for developers PfP igloo.The architectural style of Lower Steenberg’s Yard has been informed by both the neighbouring Victorian-era industrial buildings and Scandinavian design elements, with the latter inspired by Mr Richard Steenberg, the Danish industrialist who established a number of businesses in the area throughout the 1850s. As a result, clean lines and the extensive use of natural light are key features of the scheme. This has been achieved to great effect using Senior’s slimline aluminium fenestration systems which have been fabricated and installed by Crown Doors and Shutters.Each of the apartments feature Senior’s low U-value PURe® aluminium windows, specified as triple-glazed tilt and turn style units to provide safe and secure ventilation and ease of maintenance. Senior’s thermally-efficient PURe® SLIDE and PURe® FOLD patio doors have also been installed to provide access to private terraces which overlook the river. As well as helping to maximise the use of natural light, Senior’s fully Part L compliant PURe® aluminium windows and doors will also help improve energy efficiency, reduce fuel costs and contribute to lowering the overall carbon footprint of the building.The ground floor retail units also benefit from Senior’s PURe® casement aluminium windows, with further daylighting achieved through the use of Senior’s slim profile SF52 aluminium curtain wall system to the main entrances. Senior’s robust SPW501 commercial doors have also been installed to provide safe and secure access.
Sponsored
Waverley Court

Waverley Court

Langley Waterproofing Systems Ltd

Our purposeAs one of the UK’s leading housing associations, the Guinness Partnership prides itself on providing high quality homes that meet or exceed current Standards. It is therefore committed to a continuous programme of maintenance and asset management across its 60,000 homes estate.As part of that process, the 13-storey 1980s-built Waverley Court in Crewe was due for refurbishment, including new windows and heating for the 95 flats therein. An initial survey highlighted that the 1200m2 roof was failing and in need of upgrade to maintain its weathertightness.Our in-depth roof report also identified that the insulation was below current standards. Safety on the roof for maintenance was also an issue: the existing handrail was originally erected as a temporary fixture, penetrating the waterproofing and providing inadequate rooftop security for working at height.Our solutionThe existing waterproofing had perished beyond useability. We advised complete strip of the existing back to the concrete deck, and building up a new thermally-efficient roof to meet current standards required under the Part L of current Building Regulations.Our TA-25 W Flat Roofing System for warm roofs was installed by Approved Contractor Everlast as sub-contractor to the principle contractor, Wates. To address the poor falls on the roof, the insulation was tapered to the perimeter. We achieved an overall roof U value of 0.17W/m2K, exceeding the current Regulatory requirement of 0.18W/m2K. In line with Safe2Torch guidelines, our self-adhesive system was used to detail around roof penetrations for extractor fans and similar plant.We highlighted and designed bridging details to maintain the fire integrity around compartment walls to comply with Part B3 of Building Regulations.We designed a new, permanent and safe handrail system. This is fixed to the brick façade of Waverley Court, avoiding any penetration of the roof fabric and thus maintaining its integrity and watertightness, whilst minimising maintenance requirements.“Langley’s expertise and attention to detail has enabled us to deliver on our ambition of providing homes that people want to live in. Langley’s performance has helped us provide a dry, warm, safe living environment that exceeds current Regulatory requirement. The independent insurance-backed guarantee covering design, materials and workmanship adds value to our long-term estate asset management.”
Sponsored
Lessons learned from coronavirus - washroom hygiene

Lessons learned from coronavirus - washroom hygiene

Heat Outdoors & Handy Dryers

The past few years have really thrust hygiene into the spotlight. From robust cleaning to hand hygiene, people have become increasingly aware of the role that cleanliness plays in managing infection transmission. ​Steve Levy looks forward to what this might mean throughout 2022.
Sponsored
The Perfect Hand Dryer For Your Pub & Restaurant

The Perfect Hand Dryer For Your Pub & Restaurant

Heat Outdoors & Handy Dryers

Every pub or restaurant hand dryer will have its own requirements. There will always be keys features that are needed to make sure that both your customers and your staff are not put off from coming to your establishment. Here at Handy Dryers we would be confident that each and every one of our products would be a perfect fit for your needs. We have picked out just a few that we feel will really make your place stand out from the crowd.
Sponsored
Where (and where not) to install your hand dryer

Where (and where not) to install your hand dryer

Heat Outdoors & Handy Dryers

In theory, placing your hand dryer or towel dispenser in just the right location should be easy. In the simplest terms, it involves measuring the hand dryer height from the floor and planning the right hand dryer distance from the sink and other washroom features.
Sponsored
THERMOSLATE covers nearly 55% of the energy required to heat this house

THERMOSLATE covers nearly 55% of the energy required to heat this house

Cupa Pizarras

This family house, located in Chailland (France), has reduced up to 55% its annual energy bills thanks to THERMOSLATE. This solar collector in natural slate covers this family needs for hot water while enhancing the aesthetics and efficiency of their home. Five solar collectors over a total surface of 6.45 square meters, were more than enough to generate the energy required to cover the hot water needs of this family. The main component of the collectors is natural slate, extracted directly from our quarries and specially selected to ensure perfect fit and performance.
Sponsored
Mid Cheshire Hospitals NHS Foundation Trust

Mid Cheshire Hospitals NHS Foundation Trust

CONTOUR HEATING PRODUCTS LIMITED

The refurbishment of children's wards at Leighton Hospital by the Estates Management Team at Mid Cheshire Hospitals aimed to alleviate the distress often associated with hospital visits for young patients. Recognizing the anxiety induced by unfamiliar surroundings, the team prioritized transforming clinical spaces into welcoming environments conducive to children's wellbeing and recovery.Employing an innovative approach, large format prints of wildlife in forest and jungle settings adorned the walls behind beds, accompanied by soft natural colours on walls, panels, and fixtures. The use of RAL Green 6019 on the DeepClean LST radiator guards contributed to the soothing ambiance, seamlessly blending with the floor covering and complementing the blue panelling behind the wall-mounted washbasins. This thoughtful design choice aimed to create a calming and tranquil atmosphere for children during their recuperation.Furthermore, the choice of RAL White 9003 for the guards in the ward corridors maintained a clean and hygienic environment. The DeepClean guards, featuring a patented drop-down front panel for easy access and a BioCote anti-microbial coating, played a crucial role in upholding hygiene standards in critical care areas.To further enhance the natural theme, Contour supplied a column casing finished in RAL Brown 1019, harmonizing with the jungle and forest-inspired décor. This comprehensive refurbishment initiative demonstrates a commitment to not only aesthetics but also the holistic wellbeing of young patients undergoing treatment at Leighton Hospital.
Sponsored
Mandarin Oriental Hotel, Hyde Park

Mandarin Oriental Hotel, Hyde Park

Roché Systems Ltd

THE PROJECTAs part of it’s recent £100 million pound renovation, Roché Awnings were tasked with providing a shading solution which was in keeping with the hotels iconic features, whilst covering the width of their ground floor terrace. The terrace being the location for the hotel’s east smoking terrace, central loggia door entrance and private outdoor dining area.THE SOLUTIONThe challenge was to choose an awning which blended in with the style of the Edwardian building. Originally designed to incorporate the Markilux 730 drop arm awnings, we advised the hotel to choose the Markilux 3300 awnings due to it’s unique design. The awnings were mounted to the buildings stone facade and sit inconspicuously below the hotel’s balustrade. The helped the awning merge beautifully into the architecture of the building.Roché coupled Markilux 3300 full cassette patio awnings to achieve widths of close to 10 and 13 metres, along with a smaller width of close to 3 metres. The awning was installed green fabric, traffic white cassette and uniform awning projection. The positioning provided full protection for the open terrace area.
Sponsored
Birmingham Royal Ballet

Birmingham Royal Ballet

LSA Projects Ltd

Architect: Austin-Smith:LordInstaller: Lacunar LtdProduct: Gustafs Panel SystemOver 400m2 of Gustafs Panel System was installed to the walls of the Birmingham Royal Ballet during their £2.7m refurbishment in 2015. Acoustic panels were installed to two ballet rehearsal studios as well as the new informal performance space.In addition to the visual refurbishment of the space; the regeneration project aimed to improve the facility by upgrading the lighting, heating and ventilation, and accessibility, as well as improving administration and welfare areas.A mix of of SM5 and SM8 mini slotted acoustic perforations as well as nano acoustic perforations were used on the Birch, Oak, and White laminate faced panels. Slotted perforation styles give an elegant and dramatic finish to the panels whilst Nano perforations are almost invisible on the face of the panel, all three options provide up to Class B acoustic performance.
Sponsored
Avanti Fields School, Leicester

Avanti Fields School, Leicester

Senior Architectural Systems Ltd

With a proven track record of providing a robust and compliant solution to the education sector, our PURe® aluminium windows have been extensively used for this new build school in Leicester.The new Avanti Fields School has been designed by architects Maber and provides a full range of facilities for nursery, primary and secondary education. Part of the Avanti Fields School Trust, the new school is one of 14 Avanti schools across the UK. The ethos of the Hindu faith school is one that promotes both spiritual and educational growth, and is open to children of all faiths and none. The inclusive nature of the school is also reflected in the design of the building, with an integrated sports hall and a light, bright interior.The school has been built by BAM Construction, with our PURe® aluminium windows installed by supply chain partner Red Systems. The use of our PURe® aluminium windows has not only ensured compliance with Part L of the Building Regulations but has provided the school with a low maintenance solution for preventing heat loss and reducing energy bills.The safe and secure style of the PURe® aluminium windows makes them ideally suited for use in the education sector, boosting daylighting and creating a comfortable learning environment.
Sponsored
Redrock, Stockport

Redrock, Stockport

Berry Systems

Berry Systems helped our client Wates become car park compliant by designing, manufacturing and installing our vehicle restraint systems. A combination of our RB1, Barrier Rail profile and a Bespoke Rectangular Hollow Section system was utilised to fulfil the client’s requirements and exceed their expectations.Redrock is a new leisure facility located in the centre of Stockport which has a 360 space multi-storey car park.Popular restaurants and a cinema now feature in the location to help provide localswith a safe, secure and modern leisure facility where they can relax. Berry Systems were keen to get involved in such a project and help contribute to the development ongoing in the area. Using our expertise of the car parking industry, we designed, manufactured and installed a system that met their requirements exactly.The RHS (Rectangular Hollow Section) System we specified on the project was made bespoke and suited more to their aesthetic needs. We combined the vehicle restraint systems with handrail and mesh to provide additional pedestrian protection. Cladding rails were also created and supplied to support the exterior cladding that was specified on the project. Throughout this project, our client took advantage of our consultancy services to work together to create a solution that was compliant, safe, stylish and  satisfied both parties.
Sponsored
Case Study - Proteus Pro-System® - Emma House

Case Study - Proteus Pro-System® - Emma House

Proteus Waterproofing

Emma House, Romford, a residential apartment block built in 2007, needed a new waterproof membrane for the entire roof area after the single ply membrane, installed just 10 years earlier, had failed. The specification by our clients asked for a cold applied system to be used during the refurbishment to minimise disruption to residents, while providing a permanent waterproofing solution.The ChallengeCore samples taken of the roof build-up showed there had been extensive water penetration which required urgent remedial action. Impossible to repair, the complete roof system had to be stripped back to the roof deck by Proteus Waterproofing’s approved contractor. The approved contractor installed a new Proteus Pro-System® BUR (built up roof system) incorporating Proteus Pro-Therm insulation, to provide a new seamless roof – an area of some 150 square metres – offering a 20 year guarantee.Why Proteus Pro-System® was specifiedProteus Pro-System® was installed using no heat, providing a seamless waterproofing membrane on completion. Proteus Pro-System® is a high performance, seamless and cold-applied waterproofing membrane for flat and pitched roofs. It cures to provide completely seamless waterproof protection and has excellent thermal and UV stability, making it suitable for use in all climates.Proteus Pro-System® does not brittle, deteriorate or discolour with age. It uses atmospheric moisture to trigger its cure process and unlike conventional polyurethane systems can cure under water, without gassing or foaming. It also becomes resistant to rain damage and may therefore be applied in relatively poor weather, without any subsequent loss of performance or durability – making it ideal for Emma House.About Emma HouseEmma House consists of 14 one-bedroom and 19 two-bedroom apartments just minutes away from the centre of the market town of Romford, which offers shops, services and a wealth of bars and restaurants. When first built in 2010, Emma House offered young professionals an opportunity for affordable housing close to London and has remained at the forefront of the property market in Romford ever since.
Sponsored
BISF Housing, Motherwell

BISF Housing, Motherwell

K Systems Insulated Facades

BackgroundThe BISF (British Iron and Steel Federation) constructed the Newarthill properties in the 1940’s, utilising steel-framed walls that were initially coated in cement render and vertical steel panels.In previous renovations overseen by the Local Authority, the upper level of the building was clad in PVC weatherboard, while the lowest floor had its exterior re-rendered. The building is characterised by its non-traditional construction style.The houses had extremely poor thermal performance and the flats were difficult and expensive to heat, especially with the rising fuel prices and current cost of living crisis, meaning some residents were in a state of fuel poverty.North Lanarkshire Council required an EWI solution that would achieve the following three key objectives:- Improve the thermal performance of the property portfolio- Specify a system that would achieve a U-value of 0.17 W/m²K and would involve as little technical detailing around the property as possible- Ensure the properties had a modern and aesthetically pleasing look as the current exterior was tired and datedUnderstanding and appreciating K System’s expertise in this sector and innate ability to deliver best-in-class refurbishments, North Lanarkshire Council appointed the partnership of K Systems and Ailsa Building Contractors to tackle the low rise refurbishment project.Our ServiceAs the Newarthill development was already occupied, a key element of this project was to deliver the refurbishment with minimal disruption to current residents and / or neighbouring houses.This is one of K Systems strengths, ensuring jobs are delivered in a timely fashion, without delay, without disruption, and with full disclosure of each phase given to residents throughout the project to build rapport, trust, and confidence.On this particular low rise refurbishment, which had limited access points for all traffic in and out surrounding its immediate vicinity, K Systems had to work closely with the contractor, main contractor, and local authority to ensure they were working in harmony to negate any unnecessary commotion.K Systems’ technical team also carried out regular site visits to make sure the system was installed to the highest standard, in line with specification, and to ensure all involved parties were delivering to time and budget.The refurbishment of the properties is a great example of K Systems’ unparalleled ability to deliver constructional excellence that not only meets but exceeds the expectations of its customers.Technical Project DetailsOn initial scope, the K Systems team identified that a major challenge for this project was going to be the technical detailing between the timber frame sheeted ply at the top storey and precast concrete slab at the bottom. Several U-value calculations were completed by the experienced K Systems team to support the Council’s request of minimal detailing around the property and the target U-value.To meet these requirements, the K Systems P EWI system was specified, which utilises phenolic foam insulation boards. This insulation is lightweight and has a high thermal performance, allowing for thinner sections of insulation to achieve optimal thermal efficiency - perfect for this project, achieving the target U-value of 0.17 W/m²K , up from 0.32 W/m²K.It is a suitable solution for buildings that are restricted in expanding their footprint due to pavements or nearby properties, and can be easily installed on masonry structures, as well as non-traditional structures - an ideal solution for the Newarthill properties.Addressing the request for a modernised aesthetic, a dash render finish was specified. This render is extremely robust, hard-wearing, and low maintenance, ensuring the properties’ refreshed exterior would remain for years to come. The dash render was also complementary to the existing local property portfolio which was something the Council wanted to achieve.This refurb completely transformed cold, weathered, distressed housing in a Scotland suburb into warm, comfortable, aesthetically pleasing homes that met the exact requirements of North Lanarkshire Council and reduced the energy bills for residents due to improved thermal performance.
Sponsored
Airports flying high with Schlüter-Systems

Airports flying high with Schlüter-Systems

Schlüter-Systems Ltd

From two of the world’s biggest and busiest transportation hubs at London Heathrow and London Gatwick to other international airports at Bristol, Liverpool and Dublin, specialist products from Schlüter-Systems are ensuring that each is able to cope with the millions of pairs of feet and the millions of trolley and suitcase wheels that pass through their doors each year with flying colours.
Sponsored
The Willows, EnerPHit Retrofit

The Willows, EnerPHit Retrofit

PARTEL

This1970s dwelling in South Dublin’s suburbs was transformed and renovated to a modern detached, energy-efficient home and office. The ultimate aim of this project was to design a taller building, radically reduce the building’s energy consumption, maintain the structural integrity of the building fabric, increase thermal comfort for the occupants, and reduce carbon emissions.A suite of passive strategies was implemented to meet the requirements of the EnerPHit standard. The project incorporated superior airtightness, green thermal bridging solutions, blockwork insulation on the external structure, triple-glazed windows, and mechanical ventilation with heat recovery to attain an A3 energy efficiency rating.Creating an airtight and insulated building envelope is the cornerstone of a Deep Energy Retrofit. Partel’s IZOPERM PLUS phA certified airtight product system delivered maximum airtightness in The Willows project
Sponsored
Bishop Auckland, Durham

Bishop Auckland, Durham

K Systems Insulated Facades

The Bishop Auckland refurbishment project, is a stellar example of K Systems ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Durham Homes commissioned K Systems to refurbish its residential development of 120 terraced houses. The primary aim of this project was to improve the thermal performance rating of each home. The challenge for K Systems was to provide a suitable EWI solution whilst retaining the character of the homes by replicating the existing brick and stone walls.Due to this unique mix of required finishes, we were presented with an extremely complex project that required careful attention of several aesthetic and design considerations.Having a good reputation for matching systems with finishes to deliver clients’ visions, we worked in collaboration with our approved installer Westdale Group, to scope out the project and specification in fine detail, with particular focus on insulating properties and aesthetic.These poorly insulated brick and stone terraced houses were given a thermal upgrade to enhance occupier comfort. An attractive brick render finish was used over insulation to provide an aesthetic finish that is in keeping with the current street scene.This satisfied the client’s requirements whilst providing a total revamp for the properties, which has resulted in energy efficient and aesthetically pleasing homes for the client and residents.Our ServiceWe worked in collaboration with Durham Homes and approved installer Westdale Group to upgrade these poorly insulated brick and stone terraced houses and deliver a total revamp of the properties, resulting in thermally efficient homes.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Our Application Specialists visited the site regularly throughout the project working in collaboration with the approved contractor to ensure correct installation and detailing.As a result, we delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Durham Homes, and the residents of the newly improved homes.Joe Rogers at Westdale Group, said:“To deliver such a large project (120 houses), it requires multiple teams to work seamlessly together and have absolute trust in the other’s skill, vision, and judgement. That’s exactly what we had with K Systems on this Bishop Auckland project. The team’s innate understanding of pairing systems with finishes for optimal performance is second to none and together we delivered a best-in-class refurbishment which was an absolute pleasure.”Technical Project DetailsEffective demand planning and technical detailing ensured that the Durham Homes project was completed on time in March 2022.Having comprehensively assessed the project requirements, taking into consideration thermal u-value target, aesthetics and cost, our K Systems E BrickRend EWI system was specified. This high-performing system is lightweight utilising expanded polystyrene (EPS) panels that are enhanced with graphite to further enhance thermal performance.The E BrickRend system has a fire performance rating of B2-s1,d0. It’s low moisture absorption and resistance to mould growth ensures a high level of durability.The system was specifically tailored to meet the thermal performance criteria of the project. Utilising 90mm EPS panels, the target U-value of 0.30W/m2K was achieved, delivering the benefits of improved thermal comfort and lower heating costs for residents, whilst helping the local authority achieve it’s environmental carbon reduction targets.Several finish options were considered to meet the client’s requirement of replicating the existing brick/stone appearance of the properties whilst remaining within the project budget.K Systems specified BrickRend, a bespoke, specially formulated polymer render which was colour-matched to the existing masonry. It was then down to the skill of our approved installer to apply pigments to tint and shade the render surface and simulate the appearance of real stonework. The surface is then sealed to provide a long-term durability. A dash render finish was applied to the rear of the Bishop Auckland properties.This particular finish didn’t just ‘fit the bill’ at the time of delivery, but is an economic, durable, lightweight solution, easily applied, with an increased bond strength compared to sand and cement, which will protect the insulation and structural fabric of the homes from environmental deterioration in years to come.This customised finish and attention to detail is a perfect example of how K Systems works with all clients to fulfil any specific design criteria and go above and beyond the standard requirements to deliver superior quality.
Sponsored
ABP Southampton

ABP Southampton

Berry Systems

Supply and installed Wire Rope vehicle restraint system for our client Morgan Sindall on behalf of Associated British Ports in Southampton. Brisafe Wire Rope solution was installed that is affixed to the structural columns of the car park to assemble the unique system with zero footprint, maximising the car park space.

Showing 253-288 of 339

Feedback