NBS Source
I'm a manufacturer

"shower fittings and controls"

5,679 results found

Sort by:

Showing 217-252 of 1332

Sponsored
Axholme Leisure Centre

Axholme Leisure Centre

Gerflor Flooring UK Limited

Design-led flooring solutions for the customer-facing areas was decided upon, with Gerflor’s Taralay Impression Control fitting the brief by combining the specification qualities of performance and slip resistance along with aesthetics. Installed within the reception, corridors and cafeteria areas, it also unified and enhanced the décor of these hard working, communal spaces. A simple to maintain surface was also an important characteristic for the multi-function fitness studio flooring enabling it to be quickly cleaned. Meeting this brief was Gerflor’s Taraflex® Comfort in wood-effect design ‘Oak’: “Being a multi-use space, we needed a hardwearing surface but not a clinical feel or look.
Sponsored
Weston House, High Holborn

Weston House, High Holborn

Washroom Washroom Ltd

Washroom Washroom designed, manufactured and installed new superloo washroom facilities on each floor along with new staff shower and changing areas in the lower basement of this office. The washrooms feature full height Alto gloss laminate cubicles, bespoke Corian vanities and Concerto duct panels in toughened back-painted glass. In the new basement staff shower facility Washroom installed its Luminoso glass cubicles, back-painted in black, bespoke benching and Tempo solid grade laminate Z style lockers.
Sponsored
Changing Places Facilities

Changing Places Facilities

Pressalit Limited

Pressalit products, including our 3000 shower & changing table, feature in many Changing Places toilets throughout the world.
Sponsored
MEDITE TRICOYA EXTREME brings a splash of style and substance to a residential property in Prestwick

MEDITE TRICOYA EXTREME brings a splash of style and substance to a residential property in Prestwick

MEDITE SMARTPLY

A residential property in Prestwick, Scotland, has recently had its bath and shower room upgraded with MEDITE TRICOYA EXTREME (MTX).
Sponsored
HIACE Single Leaf Hatch - Residential Home Floor Access

HIACE Single Leaf Hatch - Residential Home Floor Access

Surespan

ProjectSurespan designed and manufactured a single leaf hatch that was installed in a residential home in Solihull, for access to an underground level gym.ProductThe HIACE external single leaf access hatch to fit a structural opening 1200 x 3400. The pan-type door was recessed for 40mm paving slabs infill with an EPDM unbroken seal to help prevent the ingress of dirt and moisture. The floor hatch was fitted with a retractable safety grid operated by a 24v actuator. FeaturesRated at pedestrian loading, operated by two 24v DC Actuators. 40mm paving slabs infill. Retractable safety grid Supplied with a Zen-controlled 240vAC/24vDC electrical supply, and transformer.
Sponsored
Improve your sales with a leading brand

Improve your sales with a leading brand

BROEN-LAB

BROEN-LAB is a renowned supplier of laboratory solutions and emergency shower systems. Work with us and make your offering even more compelling.
Sponsored
Intercontinental Hotel, Park Lane London

Intercontinental Hotel, Park Lane London

Wedi Systems (UK) Ltd

HLM, the architectural practice had a very high-end, designer lead project at Park Lane London, which required bespoke components mixed together with standard products forming a warrantied bathroom solution for the client. 15 types of different bespoke XPS shower trays were created for this project and used across the 460 rooms spread over 3 phases.240 bespoke XPS niches were installed and in 210 cases substructure sets were used to reach the required 100mm installation height thus allow for a straightforward replacement of old baths with showers without having to modify the existing pipework.In all bathrooms, wedi XPS building boards were used in 12.5mm thickness for walls and 10mm thickness for floors.RESULT: Thanks to the sub-contractor Milk Leisure, an Approved Partner of a leading manufacturer of XPS shower/bathroom systems, the client received a 100% waterproof bathroom with a 15 year manufacturer’s warranty on the whole installation. 
Sponsored
Microconcrete Installation to walls and furniture

Microconcrete Installation to walls and furniture

LIVING CONCRETE LTD

Project: Large scale MicroConcrete installation to all the internal walls, bathroom sinks & shower and furniture in a private house Client: Private Client Materials: Ivory colour MicroConcrete coating was hand trowelled in layers to a final thickness between 2 and 3mm and wax polished to achieve a satin finish This large scale, special project showcased innovative ways MicroConcrete can be applied to interior walls, bathroom sinks & shower and furniture without a need for joins or breaks. Its smooth finish makes it ideal for a modern, minimalist design that can be easily combined with materials like wood and ceramic.
Sponsored
Bespoke drainage solutions for a high end spa and wellness retreat

Bespoke drainage solutions for a high end spa and wellness retreat

BLÜCHER UK Ltd

Our customer required a solution where the floor drains and channels could withstand the variance of temperature in the spa, and support footfall from the public, whilst maintaining an luxurious appearance in line with the environment. Alongside the drains for the changing room showers, using a bespoke design, BLÜCHER created a circular channel to surround the ice fountain, and an arched channel in grade 304 stainless steel with an infill grating to accompany the experience showers. Our infill gratings were the perfect choice for this spa setting, allowing a flawless finish of the chosen floor type against the drainage, completing the aesthetic appeal of the room
Sponsored
A wet-room adaptation bestowing independence

A wet-room adaptation bestowing independence

CareSpaces by Wealden Rehab

A man with a prosthetic limb faced difficulties in his small, impractical bathroom after a leg injury. Collaborating with an Occupational Therapist, Care Spaces redesigned the space, ensuring approval from both the therapist and the user. They revamped the bathroom into a functional wet room, addressing accessibility issues. Key features included a level-access shower, shower seat, non-slip flooring, safety grab rails, an accessible toilet, and basin. The transformed space now meets the user's needs, enabling independent living. Notably, the adaptation benefits the user's son, who has a disability, ensuring a lasting solution for the family.
Sponsored
Boom Cycle, Hammersmith

Boom Cycle, Hammersmith

Washroom Washroom Ltd

As part of this refurbishment, we installed our toughened glass Luminoso shower cubicles, specified in a striking blue to complement Boom Cycle’s brand identity and high energy interior design. The full height shower cubicles were manufactured using 10mm clear float toughened glass for the doors, pilasters and division panels and are set on a stainless steel tubular headrail with matching stainless steel pedestal feet. Each cubicle was finished with double swing hinges, which are self-closing from 25 degrees, stainless steel clothes hooks and a stainless steel pull handle towel rail to the outside.
Sponsored
Bushey Grove Health Suite

Bushey Grove Health Suite

Sauna360 Ltd

The existing Bushey Grove health suite was a stark, clinical looking area with gloomy sauna and steam plus a difficult to maintain whirlpool spa with all the plant two floors below. TyloHelo's design concept was to open up the space with glass frontage and dividing walls between thermal rooms and create more comfortable relaxation areas. The design was contemporary with large format tiles in warm, natural colours. The thermal suite comprised a Finnish Salt sauna, Salt inhalation steam room, Herbal sauna, Bucket shower, Feature shower, Ice feature and three heated benches.
Sponsored
The Westbury Mayfair, London

The Westbury Mayfair, London

Vimar SpA

Westbury Mayfair is one of London's true icons: it was the first 5-star hotel opened by the US chain Westbury in the British capital, in 1955. Just a 15-minute walk to Buckingham Palace, it is a stone's throw from the stores on Oxford Street, one of the world's most famous shopping streets. After the careful restoration works, renewing the charm of the whole hotel, all the rooms and suites have been fitted with Eikon Evo cover plates and control devices.
Sponsored
Heathrow Approach

Heathrow Approach

Washroom Washroom Ltd

We installed new male and female washrooms on four levels and created a new staff shower and changing area in the basement of this recently refurbished office. Our full height, flush front Alto toilet cubicles and Concerto duct panels were finished in the same dark walnut straight grain real wood veneer. The integrated duct panel system is easy-to-clean and allows ease of access for future repairs or maintenance. The crisp white Zodiac stone vanities complete the high specification design. The staff shower and changing area features white Zodiac stone vanities plus our bespoke locker system.
Sponsored
4 Kingdom Street, London

4 Kingdom Street, London

Washroom Washroom Ltd

Washroom's off-site service allowed the design to be carefully fine-tuned prior to installation on site for this prestigious office refurbishment project. Washroom's full height Alto toilet cubicle doors were specified with a real wood veneer finish, stained to match the solid Douglas fir timber panelling in the reception area. The bespoke polished cast concrete vanity units feature integral waste bins and Tego hinged mirror units above. For the new staff shower and changing room area Washroom's full height Alto FENIX shower cubicles were installed along with Z style Forza SGL lockers.
Sponsored
Baker Street, London

Baker Street, London

Washroom Washroom Ltd

Together with its in-house joinery division Washroom delivered a new basement shower and changing area, plus kitchenettes and storage for this redeveloped office. Forte SGL shower cubicles with satin anodised aluminium pedestal legs and 'D’ shaped headrail, were specified in dark grey. The spacious cubicles include a bespoke fold-down bench for extra convenience. Washroom installed bespoke white Corian solid surface vanity units complete with inset wastebin in the superloos. The team also crafted a bespoke oak staircase which runs on every level of the building and installed new oak slatted wall panels throughout to complete the design.
Sponsored
Promat delivers ‘wheel of assurance’ for fire rated glazing

Promat delivers ‘wheel of assurance’ for fire rated glazing

Promat UK

Promat UK is providing architects with a 360 degree ‘wheel of assurance’ for SYSTEMGLAS® fire resistant glazing systems. Guidance is offered at every stage of the project, the system is manufactured in-house, it is fitted by a network of approved installers and a certificate of conformity is issued upon completion by a Promat specialist. Promat can provide this assurance because it is in complete control of the design and manufacture process, and it has in-depth knowledge of the installation requirements. This means supply chain risks, such as product substitution or poor installation, can be eliminated.
Sponsored
Chelsea Sports Centre

Chelsea Sports Centre

Washroom Washroom Ltd

Behind the façade of the iconic Grade II Listed Old Chelsea Town Hall, sits Chelsea Sports Centre. As part of a refurbishment of the showers and changing room areas, Washroom installed its flush front glass iLockers, back-painted in dark grey, together with Forte changing cubicles, manufactured from grey solid grade laminate (SGL), complete with unique Perspex integral roof to let in light while providing complete privacy for users and matching Forte toilet and shower cubicles. Washroom also manufactured bespoke ‘Black Quartz’ Corian vanity units and make-up shelves and installed its Legato benching to complete the design.
Sponsored
25 Bedford Street

25 Bedford Street

Washroom Washroom Ltd

Here we installed new washrooms on two levels of this Covent Garden office and created a new staff shower and changing area. The new washroom design includes our full height Alto Kristalla glass cubicles. The rebated edge design offers an attractive flush front façade together with the contrasting wood veneer-faced pilasters and back-painted glass cubicle doors. We also installed natural stone vanities as well as our Concerto integrated duct panel system and modesty screens, both faced in toughened, back-painted glass. The shower and changing area features our exceptionally durable Forza lockers and matching benching.
Sponsored
55 Bishopsgate, London

55 Bishopsgate, London

Washroom Washroom Ltd

We’ve designed and installed a sleek new staff shower area and co-ordinating washrooms for an office in the heart of the City. We installed our highly engineered SGL floor-to-ceiling Marcato shower cubicles in grey with white pilasters to create an attractive striped effect finish. We also installed our Forza SGL lockers in a bespoke Z style. The washrooms, which feature our full height Alto Kristalla glass toilet cubicles, utlise the same colour palette. Our glass faced Concerto integrated duct panel system, bespoke Corian trough style vanity units and Tego storage solution complete the design.
Sponsored
Fixed utilitarian access system, permanently-fixed vertical ladder system, multi-stage with mid-height platform and anti-climb guard

Fixed utilitarian access system, permanently-fixed vertical ladder system, multi-stage with mid-height platform and anti-climb guard

Safety Fabrications Limited

The Ascent Aluminium fixed ladder access system was specified to create a permanent safe access route to the roof for maintenance personnel. As the overall height exceeds 10m the ladder was required to be broken with a mid-height rest platform ensuring no single ladder length exceed 6m. Hoops were provided throughout for fall protection, an anti-climb plate was fitted at the base. The ladder was designed in accordance with BS 4211:2005+A1 2008 and the ladder was manufactured in accordance with CE 1090 factory production control procedures.
Sponsored
Make your vision come true in every detail

Make your vision come true in every detail

BROEN-LAB

BROEN-LAB produce world-class laboratory systems and emergency shower systems for the pharma, educational, food and beverage and industrial sectors. Our solutions are designed to secure maximum flow, flexibility and safety in modern work environments.
Sponsored
Laneside Caravan Park

Laneside Caravan Park

Concept Cubicle Systems

Expecting a busy summer in 2021 and beyond, Laneside Caravan Park decided that they wanted to double the number of toilets and showers while also raising standards to ‘health spa levels’.Read the full case study on our website.
Sponsored
The Langley Hotel

The Langley Hotel

Sauna360 Ltd

Sauna360 have completed their installation of extensive thermal features at the prestigious 5 star Langley Hotel in Iver, Buckinghamshire. This comprised of two beautiful Hammam, Steam rooms, Saunas, Heated Loungers, feature showers and ice features.
Sponsored
KEUCO accessories for international guests in the Hilton hotel at Munich airport

KEUCO accessories for international guests in the Hilton hotel at Munich airport

KEUCO

Pure luxury in the newly constructed building between the terminals  The 5-star Hilton Munich Airport hotel is situated like an oasis of tranquillity between terminal 1 and 2 at Munich Airport.The hotel enjoys a high occupancy rate and had an annex constructed to increase the number of exclusive rooms. Completed in 2016, only the finest of materials and finishes were used in the new building, to establish a very special atmosphere. With the abstract silhouette of the Alps and the wooden furniture, for example, the charm of the state capital of Bavaria is reflected in the premium interior furnishings. Select designer creations can be found in the sleeping areas, and naturally also the bathrooms. The interior architects JOI-Design, with proprietors Peter Joehnk and Corinna Kretschmar-Joehnk, were responsible for the concept design for the hotel rooms. Entering the bathrooms, the brilliant chrome finishes of the KEUCO accessories and the iLook_move cosmetic mirror immediately catch the eye. Gleaming luxuriously, the KEUCO products jump out at you from among the more unobtrusive colour schemes of the tiles and interiors. Designed by the renowned Tesseraux+Partner design agency in Potsdam, the iLook_move cosmetic mirror shines particularly with its extraordinarily clever and durable hinge design.The mirror can be arranged optimally vertically, horizontally and in angle of inclination. The rugged wall mounting and the premium quality and workmanship will make it an indispensable companion in the hotel bathroom for many years to come.Individually adapted PLAN grab bars from KEUCO grace the glass doors of the shower partition and the drawer of the washbasin cabinet and can also be used as a towel holder. Another PLAN grab bar in the shower provides guests with a sense of security. With its strong design, KEUCO's EDITION 11 shower basket hangs beside it in harmonious combination. Its striking yet discreet language of form lends the shower basket a unique aesthetic.
Sponsored
Turnmills, Clerkenwell, EC1

Turnmills, Clerkenwell, EC1

Premcrete

In Clerkenwell, McLaren constructed a new office building with a basement to provide a total 97,000 sq ft of office space. McLaren utilized the existing basement structure which meant the exterior of the structure wasn't accessible. This meant that it was appropriate to use a cavity drain system. FIS worked closely with Henry Construction Projects and Veretec to provide a complete waterproofing service. Designing a system to fit around the existing structure was the challenge. FIS were able to advise on the correct installation process and provide regular quality control checks. Images courtesy of turnmillec1.co.uk.
Sponsored
Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Stannah Lifts

Five Xtralifts and two sets of Xtralift duplexes will support access-for-all to 153 apartments ranged over five and seven floors, in two distinct blocks. To match the heavy duty demand of this environment, the nine 8-person lifts are fitted with higher-grade stainless steel lift cars and Dewhurst push-button controls. Eight are traction, without motor rooms, and one is hydraulic, with a motor room. All the lifts have been installed with a range of options, with a mix of vandal-resistant categories 1 and 2. Two models are equipped as firefighter lifts.
Sponsored
Schwimmbad Berlin

Schwimmbad Berlin

Wedi Systems (UK) Ltd

Projects Information: Type: Public Swimming Pool Room: Shower area for women/men, shower Location: Berlin Kaulsdorf Construction company: Heidrich Fliesen, Zernitz-Lohm Project Description: 50m pool Non-swimmer pool with slide 2 sauna cubicles 95°C, steam bath, samarium 4 water wheelchairs, no lift, but flat, rounded Disabled parking spaces Products/Systems used: wedi Building Boards in different thicknesses wedi 610 Adhesive and Sealing Material wedi Tools Reinforcement Tape Special production (8 units each) with Fundo Requirements: Very short assembly times on site Support from AD + AWT in setup/instruction Very short drying times Water-tight material Quick processing
Sponsored
Z Lockers at Meadows Business Park, Camberley

Z Lockers at Meadows Business Park, Camberley

Helmsman

Meadows Business Park is undergoing a major repositioning, providing modern working for a post covid-19 world. With 3 refurbished buildings positioned in landscaped grounds, providing workspaces, offices, central café, gym, cycle storage and showers. Located next to Blackwater Railway station, tenants of Meadows Business Park can enjoy pop up shops, street food markets, walks around the 100 acre shepherds meadow and even Peloton bikes, as well as a range of classes in the gym.As part of the refurbishment of these buildings, we worked alongside OD Interiors to manufacture and install the lockers and bench seating for the cycle storage and shower areas. As part of the project, we provided 22 wet specification Laminate Z Lockers for the male changing rooms, 22 wet specification Laminate Z Lockers for the female changing rooms and bench seating for both changing areas and the cycle storeroom.The stunning Laminate Z Lockers were manufactured with an aluminium body, stainless steel door frame and Abet Laminate doors. The colours chosen were Mountain Oak and Ice White from Abet’s range of laminate colours. We work with a variety of suppliers of laminate, allowing us to offer a large selection of colours and finishes, from carbon-neutral options, wood effect styles, through to bright pops of colour.In each changing room, 13 of the 22 Z Lockers were fitted with seat stands, with the remaining 9 lockers fitted to stands. The frames for the stands and seat stands are powder coated in RAL colour white, with the seat slats in Mountain Oak laminate to match the locker doors. To keep the project slick and uniform, the end panels, infills and the cladding to hide the stands are in the Ice White laminate, also matching the doors.The locks chosen for the project were the Digilock Versa Keypad locks. These are a great choice for both assigned, or shared use, and so were perfect for the shared changing rooms at Meadow Business Centre. Plus, they look great as a contrasting matt black colour against the light doors of the Z Lockers.It was great to work alongside OD Interiors again on this project and look forward to some more exciting projects in the future.If you are looking for Z Lockers, or have a similar project you need help with. Our sales team can help. Give us a call on 01284 530427 or click here to get a quote.
Sponsored
Enhancing Autonomy And Safety At FAEMA Mental Health With Valiryo

Enhancing Autonomy And Safety At FAEMA Mental Health With Valiryo

ehanddryers

In an ongoing commitment to prioritize the well-being and independence of individuals in supervised housing, FAEMA Mental Health sought innovative solutions to address the challenges faced by residents during their daily routines. Among these challenges was the task of drying off after showering, which posed safety concerns and hindered autonomy for many residents. This collaboration aimed to transform the drying experience, ensuring not only safety but also comfort and empowerment for residents.CHALLENGEFAEMA Mental Health, an association dedicated to the well-being and autonomy of its residents in supervised housing, faced a recurring challenge: safety and autonomy during the drying process after showering. Many residents, due to their health condition, experienced difficulties using traditional towels, raising concerns about safety and quality of life in these environments.SOLUTIONIn response to this concern, FAEMA reached out to Valiryo Technologies in search of an effective and safe solution. The installation of Valiryo body dryer was presented as the ideal solution to address these challenges. Valiryo not only offers efficient drying but also minimizes the risk of falls and injuries by eliminating the need for unnatural movements associated with towel use. Additionally, its innovative design and ease of use make it an accessible option for all residents, regardless of their mobility or physical abilities.RESULTSThe implementation of Valiryo in FAEMA's supervised housing has yielded positive and tangible results. Residents now experience a greater sense of safety and autonomy during the drying process, contributing to their overall well-being. Additionally:Residents are satisfied and enjoy a more comfortable and enjoyable shower experience.A significant reduction in the risk of falls and injuries during the drying process has been observed.Bathroom space has been optimized, reducing towel usage and promoting more sustainable practices.An increase in personal care participation has been observed, as some residents who previously avoided showering now do so to enjoy the drying process with Valiryo.Residents feel more relaxed and enjoy greater comfort, without the need for exertion during drying.Future of Our Collaboration: We are currently in the process of expanding our collaboration with FAEMA Mental Health to implement more units of Valiryo in all their supervised housing. Our goal is to ensure that all residents can benefit from this innovative solution, thus reclaiming their privacy and autonomy in the drying process after showering.At Valiryo Technologies, we are committed to continuing to work closely with organizations like FAEMA to improve the quality of life for people with special needs, offering practical and innovative solutions that promote safety, comfort, and autonomy.View Valiryo Body Dryer.
Sponsored
New Horizons for record uk

New Horizons for record uk

Record U.K. Limited

record uk installed a 3 wing all-glass revolving door with a stainless steel frame to provide an attractive and impressive entrance to Horizons House in Aberdeen, a development of prestigious serviced office suites built by Waterloo Quay properties. The revolving door complemented the modern and attractive interior and prevented through draft which otherwise may have posed a problem with the entrance opening directly into the reception area. This revolving door was fitted with a fully automatic in-ground electric mechanism and microprocessor control unit. Safety features are also built in and activated by infrared detectors and overload detection.
Sponsored
Manchester New Square

Manchester New Square

NorDan UK Ltd

Manchester New Square is a highly innovative urban project in Manchester City Centre. What makes Manchester New Square particularly interesting is that it has been constructed using off-site manufacturing and that is why NorDan were the perfect supplier for this development. As we own all of our factories, we have complete control over production schedules and we can cope with the tight, demanding schedules that off-site manufacturing requires. Our product also comes as a full set, complete with ironmongery and glass, so that they can be fitted straight into the concrete panels and moved onto site.
Sponsored
Netherwood Hotel, Cumbria

Netherwood Hotel, Cumbria

Sauna360 Ltd

Helo was commissioned to provide a new health suite for Netherwood Hotel in Cumbria including Herbal Sauna, Aroma Steam Room, Salt Inhalation, Feature Shower and Ice Feature. The conversion of the old tiled pool to three wellness tubs of varying temperatures completed the project.
Sponsored
Sevenoaks Boarding School

Sevenoaks Boarding School

Warmup plc

The ChallengeFounded in 1432, Sevenoaks boarding school is one of the oldest and most prestigious in the country with some of the buildings dating from the 17th Century. The client requested an easy-to-use, energy-efficient underfloor heating solution in rooms of different uses across the school that would have a negligible impact on floor heights. The installation of the system would also have to be considerate of the historic nature of the building.The SolutionDue to the need for a low floor build-up and with a project featuring a mix of floor finishes, our Foil Heater was the ideal choice for an easy-to-use and quick to install underfloor heating system. The Foil Heater is perfect for use with the school’s carpeted and wooden floor finishes and was installed in conjunction the Dual Overlay System when fitted with the carpeted flooring for a stable subfloor solution that can handle heavier load areas. Warmup’s StickyMat System was installed throughout the school’s bathrooms, which can be fitted directly within the layer of tile adhesive or levelling compound, therefore having little-to-no effect on floor heights. Our Tempo Thermostat was installed for accurate floor heat control alongside overall control by a Building Management System.The ResultThe beautiful and historic Sevenoaks Boarding School has now been given a 21st Century update with a responsive Warmup heating solution that didn’t substantially raise floor heights. The staff and pupils can now enjoy radiant warmth throughout the year, leading to better comfort levels and therefore a happier space in which to study and work.
Sponsored
Sixty London Wall

Sixty London Wall

Profab Access Ltd

Located within the epicentre of central London, Sixty London Wall delivers high quality Grade A office accommodation combined with superior retail opportunities, all housed within a visually striking contemporary development that stands apart from neighbouring buildings.Delivering 325,000 sq. ft of premium office space over 10 floors, the extensively renovated property offers collaborative working areas, bolstered by first class end of journey facilities for commuters, including 380 cycle spaces and lockers and 38 showers and changing rooms.As part of the construction process, almost 500 Profab Access high quality riser doors and access panels have been installed throughout the entire building by specialist carpentry, joinery and fit-out contractors, JJ Sweeney.Specified in a range of sizes and configurations for installation throughout the communal areas and washrooms on every floor, Profab Access’ robust and resilient INTEGRA 4000 Series and VISION 8000 Series fire-rated Riser Doors provide concealed access to mechanical and electrical services.
Sponsored
Knaresborough Leisure Centre install hygienic drainage solution

Knaresborough Leisure Centre install hygienic drainage solution

BLÜCHER UK Ltd

BLÜCHER UK were pleased to supply some bespoke channels and shower drains for a brand new leisure centre opening in the New Year.With a big range of activities and services available, including swimming pools, showers, saunas, steam rooms and communal areas, the installed drainage system needed to be robust, efficient, and visually aesthetic.Offering a contemporary timeless design, with an exceptional flow rate, BLÜCHER channels were the best option. Minimal downtime and maintenance were required by the customer due to the high usage of the leisure centre, with a further focus on retaining a hygienic atmosphere.Working alongside contractors ISG and GHBS, BLÜCHERs stainless steel drainage solution has provided Knaresborough Leisure Centre with a fully functional drainage system, ensuring they can meet the demands of their customers while preserving a safe and hygienic environment.

Showing 217-252 of 1332

Feedback