NBS Source
I'm a manufacturer

"shower fittings and controls"

5,696 results found

Sort by:

Showing 1333-1351 of 1351

Sponsored
Royal Blackburn Hospital

Royal Blackburn Hospital

Record U.K. Limited

record uk has installed 5 STA 20 sliding doors at the front and rear entrances, which are ideally suited to handle the large volume of traffic the hospital receives. These doors have been customised with aluminium frames manufactured in blue polyester powder coat, to complement the look and style of this modern building. There are also 40 DFA 127 swing operators fitted throughout the hospital to enhance new or existing doors quickly and economically. On other entrances/corridors within the hospital where space is limited so excludes the use of sliding doors, record FTA 20 folding doors can be found.
Sponsored
Ampersand, London

Ampersand, London

Planet

Darling Associates and McLaren Group approached Planet Partitioning to undertake the internal atrium glazing and fire-rated glass doors for their fit-out of Ampersand, London. Planet was specified to design, manufacture and install all the glass partitioning for an internal atrium, balustrades and fire-rated and non–fire rated lift lobby doors. For the atrium, Planet Partitioning used full-height frameless 15.5mm low-iron toughened laminated glass. This highly curved atrium needed glass rising from the door plate to create a fluid feel, complementing the central spiral staircase. Planet then installed steel framework to support the atrium glazing.
Sponsored
FC Liverpool´s Football Academy

FC Liverpool´s Football Academy

Polytan Sports Surfaces (UK) Ltd.

The management of the Liverpool FC Academy have been relying on synthetic pitches since 1998. In 2009, further advances in product quality inspired them to fit out the academy’s training ground with Polytan LigaTurf RS+ – the world’s leading synthetic turf system with FIFA Recommended 2 Star certification. John Owens, a former manager of the Liverpool FC Academy, expressed his delight at this decision: “The LigaTurf 240 RS+ is even better than the tried-and-tested, high-performance LigaTurf 240 synthetic turf. The first time we played a match on it, we knew that the pitch was exactly what we required.”
Sponsored
Royal Institute of Chartered Surveyors HQ

Royal Institute of Chartered Surveyors HQ

Planet

When the Royal Institution of Chartered Surveyors (RICS) were looking to move into their new Head Office, just off Princess Street in the heart of Edinburgh, Michael Laird Architects asked Planet Partitioning to put together a specification for the Category B fit-out of the existing building. Working closely with Souness & Boyne, Planet Partitioning used p100 frameless double glazing system throughout to create meeting rooms and offices with high acoustic performance, in a simple grey design. The eight-week job also involved installing minimal framework double glazed doors throughout the offices, to complement the p100 double glazed partitions.
Sponsored
PwC, Manchester

PwC, Manchester

SAS International Ltd

SAS International delivered standard and bespoke SAS metal ceiling systems to PwC, Manchester. Across the main workspaces, SAS330 was installed presenting a pristine and uniform aesthetic which contributes to the open-plan design. For the communal area, bespoke hexagonal SAS600 rafts were designed and manufactured to protect the specified lights. SAS810 Tricell was installed in the break-out area contributing to the sleek and intelligent design. Further floors were completed in early 2019 which introduced SAS330 Mesh in 12 meeting rooms. This striking people-centric office space has won the Fit Out of Workplace Award at the BCO Awards.
Sponsored
Premium Plus roller blinds in 8ème Art

Premium Plus roller blinds in 8ème Art

Bandalux Industrial SA

The project is located in a strategic and symbolic place in Marseille. It is close to representative buildings such as the Unité d'Habitation, designed by Le Corbusier.It has 676 housing units, 90 units for elderly people and the Renault concession with its garage and offices.Our Premium Plus roller shades are crank-operated and have double brackets to reduce the space between each system.Polyscreen® 365 fabric fits perfectly with the system, providing thermal efficiency and visual comfort as well as aesthetic value. Also, our products helped achieve HQE Certification for offices and services.Pyramides d’Argent, 1st prize in the “Directional building” category. (2019)
Sponsored
Lancaster Castle

Lancaster Castle

Anderson, GEC Ltd

GEC Anderson stainless steel worktops and units were recently specified within the heart of historic Lancaster Castle.Until 2011, the castle was used as a working prison and courtroom but an ongoing modernisation program is now underway. Educational and visitor facilities to this important legacy make the historical facts available to everyone. Building Design Partnership were employed to deal with this work and GEC Anderson worked with main contractor, Manchester and Cheshire Construction. A continuous stainless steel worktop with integral sinks and stainless steel supports was supplied and installed by GEC Anderson. The unit was tailored to fit within the original, angled, stone wall.
Sponsored
Fusion Student Accommodation, Sheffield

Fusion Student Accommodation, Sheffield

Senior Architectural Systems Ltd

Delivered at a cost of £46.5 Million the scheme comprises four 6-17 storey accommodation blocks housing 864 student units. Acoustic performance was key for the glazing in noisy roadside areas and lower levels. The solution was Senior’s energy efficient SPW600e windows fitted with acoustic energy efficient insulated glass units to achieve a sound reduction index (RW) rating of 43.   A light and welcoming space, was created in communal spaces using Senior’s thermally enhanced SF52 fully capped two-storey aluminium curtain walling, whilst perimeter capped silicone glazed SF52 was chosen for the link bridge between accommodation blocks. 
Sponsored
Secondary Glazing receives a warm reception in top London PR office

Secondary Glazing receives a warm reception in top London PR office

Selectaglaze Ltd

Premier PR, located in a 19th Century former warehouse had had thermal and acoustic secondary glazing installed by Selectaglaze to help produce a more amenable working environment for office staff. Selectaglaze installed 115 windows across the ground, first, second and third floors. A wide range of products were combined for the specification, the majority of which were two and three pane horizontal sliders. The Series 30 lift-out unit was specified for one particular opening to allow easy access for cleaning. Another primary window was fitted with a single side hung casement, designed to suit the existing fenestration.
Sponsored
33 King William Street, London

33 King William Street, London

The Outdoor Deck Company Ltd

The Outdoor Deck Company were specified to install high grade FSC Iroko timber decking to the large roof terrace area creating a stunning relaxation space. All decking and paving was installed on the Buzon pedestal support system and the wooden decking area was fitted with anti-slip strips to create an instant non-slip surface. The curved contrast between the paving and decking creates a soft visual appearance and takes you to different areas around the gardens. The entrance steps and risers made from Iroko premium grade hardwood include non-slip strips along the front edge of the steps.
Sponsored
The Core, Science Central

The Core, Science Central

Sotech Ltd

Sotech supplied Optima FC secret fix rainscreen panels andoised in Regency Gold 2 finish. The project won awards such as CEEQUAL 'Excellent' award, for being an incredible example of sustainable building, and the legacy sustainability award, from the 2015 constructing excellence in the North East (CENE) awards. The building include horizontal and vertical fins spanning out from each floor, created so that the gold anodised fins on the mid points of the panels hang over the floor creating a picture frame effect. We also saved precious site installation time by fitting the fins onto the panels at our manufacturing facility.
Sponsored
Arts University, Bournemouth

Arts University, Bournemouth

Senior Architectural Systems Ltd

Sustainability and design were the major focus for this new £24 student accommodation project which achieved a ‘Very Good’ BREEAM rating. Senior’s highly thermally efficient glazing package was chosen to meet the scheme’s sustainability criteria and budget. This included thermally enhanced SPW600 windows fitted with a Louvre Guard System in bedrooms and kitchens and with smoke vents in corridors for additional safety and security. With their innovative thermal break offering exceptional thermal efficiency, PURe® Commercial Doors were installed at the security office whist PURe® SLIDE Lift & Slide doors were specified for the large communal area.
Sponsored
Akoya House

Akoya House

IOBAC

An award-winning case study from Forbo Flooring Systems – their Allura Flex LVT was specified by design and fit out company, Oktra to transform an office building into a stylish and modern workspace.The project was installed adhesive free by The Commercial Flooring Company Ltd using IOBAC MagTabs to help achieve client Akoya’s sustainability requirements.And for property owner Brunswick, now part of Feldberg Capital, adhesive-free installation means that their raised flooring asset will be protected from contamination for longer term usage.The project recently won Oktra “Best Commercial Renovation / Redevelopment UK” in the UK Property Awards.
Sponsored
50 Jermyn Street, London

50 Jermyn Street, London

Washroom Washroom Ltd

The standout design feature of the new washrooms is the innovative new Dolphin Alavo integrated consumable unit and bespoke sloping white Corian trough vanities. Designed to save time, water, energy, soap, space and money, the modular system, which fits neatly behind a mirror, significantly reduces the client’s cleaning burden. Washroom's full height Alto Kristalla glass toilet cubicles, back painted in a bright white to match the Corian vanities were also installed. Manufactured with 6mm glass to create a striking, high specification finish, Alto Kristalla toilet cubicles feature a unique rebated edge design for a flush façade.
Sponsored
Bradford Town Hall

Bradford Town Hall

Architectural Street Furnishings part of WB White Foundry

ASF were approached by Bradford Metropolitan Borough Council to manufacture railings to design drawings that they had completed. Firstly the drawings required turning form design drawings into working documents, so ASF produced a full set of cut drawings and GA's as well 3D models for approval purposes. The panels were individually hand made and hand polished and fitted to site by a third party (also identified by ASF). Polishing was carried out to 2k standards which dramatically decreases the risk of discoloration. The outcome is a great looking but extremely robust and long lasting, design led utilitarian railing for a busy city centre area
Sponsored
Nile Street - London

Nile Street - London

Buzon UK Ltd

Buzon UK were commissioned alongside The Outdoor Deck Company to refurbish the external terraces of several top floor apartments located on Nile Street, moments from Old Street, London. The brand new GRAD invisible fixing clip system was supplied and installed by the Outdoor Deck Company, their first ever GRAD installation in the UK. Buzon UK supplied and installed PB pedestals, which were placed under each rail to support the GRAD ThermoAsh deck boards. The GRAD system can either be fitted onto conventional timber joists, or mounted onto the bespoke support rail system.
Sponsored
Acrovyn by Design helps to create a calm environment in a new Neonatal Unit

Acrovyn by Design helps to create a calm environment in a new Neonatal Unit

Construction Specialties (UK) Ltd

A new SuRNICC unit at Glan Clwyd Hospital provides care for premature and sick newborn babies. The design follows the latest neonatal healthcare standards and principles of family-centred care. In clinical areas the Acrovyn impact protection range was specified. Graphics depicting trees and butterflies, incorporated into Acrovyn by Design, were fitted in cot rooms, waiting and play areas, to brighten the environment. Acrovyn Sheet was used on door faces and frames, whilst crashrails and corner guards protect corridor walls from impact damage. The comprehensive wall protection scheme ensures the interior remains attractive, damage free and easy to maintain.
Sponsored
Lomax + Wood New Build in Berkshire, Timber Sash Windows

Lomax + Wood New Build in Berkshire, Timber Sash Windows

Lomax + Wood Limited

An exceptional Berkshire new build has been enhanced by incorporating made-to-order timber windows and doors from Lomax + Wood Limited. The main window used is the timber spring balanced sash window. A key feature for the developer was that Lomax + Wood offers a complete service from design all the way through to installation.Lomax + Wood designed, supplied and fitted their made-to-order timber spring balances sash windows which helped create the period appearance for this amazing new build project within the constituency of Windsor.Part Q compliant43 made-to-order timber Spring Sash Windows Concealed Spring4 Bifolding Doorsets3 French Doorsets1 Entrance doorConcealed SpringsRal 9010Ovolo MouldThe Lomax + Wood high-performance timber windows and doors are manufactured from engineered knot-free timber for strength, stability and durability. The factory finished paint system is spray applied and micro-porous, which allows the timber to breathe. All the frames are supplied factory finished, with all ironmongery including espagnolette locking. The timber windows and doors are double or triple glazed internally for security; all are tested independently to achieve PAS 24:2016, BS 6375 Part 1, 2 and 3.Lomax + Wood are committed to sourcing from sustainable sources; to this end, we have worked hard to achieve FSC® Chain of Custody which is deemed by many to be an environmental gold standard. This work was undertaken in partnership with BM TRADA who are also considered to be a mark of quality in our industry. FSC® Chain of Custody is not the same as a timber window and door supplier providing FSC® documents for the timber alone. The Lomax + Wood FSC® Chain of Custody ensures the timber is FSC® from the source through to installation, if Lomax + Wood site fitting is specified, which is within the scope of our certification.Lomax + Wood are able to provide a made-to-order timber window and door solution to architects, private customers, developers and builders across the UK and our website demonstrates the vary varied styles and projects that we have been involved with.Lomax + Wood can provide made-to-order timber windows and doors, including composite aluminium clad with a supply only or supply and fit option. Timber windows and doors are available with specialised double, triple or single glazing to meet performance and conservation are requirements. Contact us today to learn how we can help you with your project or so we can provide you with a quotation.
Sponsored
The Shard

The Shard

Rapid Access Ltd

The Shard, 31 St Thomas Street, London SE1 9RYThe Shard is not simply an iconic building but represents a new approach to expanding the urban landscape. Offices, residences, and public spaces alike are all taken skyward.The Shard, an iconic skyscraper in London, represents one of the city's most prestigious architectural landmarks. Ensuring efficient utility access solutions within such a complex and monumental structure was a significant challenge. This case study highlights the successful collaboration between The Shard and Rapid Access Ltd, a leading supplier of FlipFix Access Panels that utilize the fast fitting FlipFix Clamps for secure and quick installation.Challenges:1. Utility Access Complexity: The Shard's unique architectural design made access to utility systems, including plumbing, electrical, HVAC, and telecommunications, particularly complex.2. Architectural Significance: The project demanded a high level of architectural integrity and minimal disruption to the building's aesthetics during the installation of access panels.3. Efficient Installation: With a building of this magnitude, an efficient and rapid installation process was crucial to minimize downtime and disturbance to occupants.Solution:Rapid Access Ltd, known for their expertise in access solutions, was chosen to address the specific requirements of The Shard. The solution included the installation of FlipFix Access Panels, which leverage the fast fitting FlipFix Clamps, designed to meet the following key criteria:1. FlipFix Access Panels: Rapid Access Ltd provided access panels that integrated seamlessly into the complex architecture of The Shard while offering secure access to utility systems.2. FlipFix Clamps: The use of FlipFix Clamps ensured quick and reliable installation, minimizing disruption and maintaining architectural integrity.3. Efficiency and Security: The access panels and FlipFix Clamps facilitated efficient access to utility systems while ensuring the security and safety of the building.Implementation:The installation of FlipFix Access Panels utilizing FlipFix Clamps by Rapid Access Ltd was executed with precision and expertise. The unique design of FlipFix Clamps enabled swift and secure installation, minimizing downtime and ensuring the structural integrity of The Shard.Conclusion:The collaboration between The Shard and Rapid Access Ltd demonstrated the successful integration of utility access solutions into a complex and iconic skyscraper. The installation of FlipFix Access Panels, using the fast fitting FlipFix Clamps, not only met functional needs but also contributed to the overall success of The Shard, ensuring efficiency and architectural harmony. This case study underscores the importance of selecting the right access solutions provider for complex architectural projects.

Showing 1333-1351 of 1351

Feedback