NBS Source
I'm a manufacturer

"school"

2,720 results found

Sort by:

Showing 37-72 of 965

Sponsored
Stokeminster School

Stokeminster School

Marley Ltd

A combination of product quality, technical support, and aesthetic appeal has seen Marley’s Acme Double Camber Clay Plain Tiles specified for a major roof replacement project at Stoke Minster school in Stoke-on-Trent.
Sponsored
Cobham Free School

Cobham Free School

ROCKWOOL Ltd

The new Cobham Free School comes following the refurbishment of an existing 1990s office building into state-of-the-art teaching facilities, the school opened its doors to senior pupils in September 2020. To meet the required performance for education buildings, Southern Industrial Roofing worked with ROCKWOOL to design a robust acoustic and non-combustible insulation specification.
Sponsored
Kingsgate School

Kingsgate School

LSA Projects Ltd

Project: Kingsgate Primary SchoolProduct: Shiluvit by Oranit in White Washed Nordic PineArchitect: Maccreanor LavingtonInstaller: Lacunar LtdKingsgate Primary School, London (2018) Photos by Michael Whitestone PhotographySpecification:
Shiluvit 7-501White Washed Nordic Pine
20 x 45mm Blades with 40mm Gaps
Quantity:
1300m2LSA Projects Ltd are delighted to share with you a new award winning Oranit installation at Kingsgate Primary School in London.The £18 million, 5000m2 school has created over 420 new primary school places at the purpose built facility which is comprised of two connected two storey teaching blocks with generous picture windows throughout for an abundance of natural light.The site also has ample external space including running tracks, a science garden, and covered playing spaces in addition to being part of a community development project linking the site to a neighbouring park developed from unused green space in the area.The saw-toothed roof and external appearance of school was designed to reflect its industrial past and the cool tone light brickwork and generous windows bring the design up-to-date with current trends and the requirements of a modern building.Inside the school there is a consistent airy and neutral palette with white walls and ceiling interspersed with pale wood feature walls and stairways in addition to the white washed Nordic Pine Shiluvit panels.Oranit Shiluvit panels were chosen in part for the ceilings of the spaces due to their impressive acoustic power; the configuration chosen which included LSA Black High Density Acoustic mineral wool achieves an overall rating of Class A for acoustic absorption making it perfect for ensuring minimal reverberation across the spaces helping to keep a calm atmosphere.Nordic Pine timber was chosen for its depth of texture as well as its PEFC Certification, the timber was then white washed for a clean and bright appearance.
Sponsored
Essential School Lockers at St Peter's

Essential School Lockers at St Peter's

Helmsman

St Peter’s Church of England School places a strong emphasis on the community of its students by offering everyone the chance to achieve their full potential through focused, ambitious, planned, and flexible options. Through education, wisdom, and compassion, the school aims to improve students’ moral character and promote a feeling of community.Here at Helmsman, we supplied and installed 175 four-compartment laminate metal lockers. The specification of the essential school lockers was 1775mm high, 300mm wide, and 450mm deep. The school requested for the fabrication of the lockers to have slopping tops. Sloping tops are a common choice for school lockers because they reduce dust buildup and allow for storage without setting a risk to students’ safety if something falls off.With the essential school lockers were requested to have a metal body coated in our standard metal colour of ‘Ice’. Whereas the doors were laminate, powder coated in Blue Galaxy, Electric Blue, and Ozone. The lockers were completed with oval laminated number plates above the Camlocks, the school also requested for the locks to have master keys. Camlock is a great lock and ideal for schools as students are guaranteed that their belongings are secure and safe.Laminate Metal lockers are a great option for school lockers since they are trendy and popular. Additionally, the material is able to hold up better to scratches, marks, and blemishes over the long term.
Sponsored
Thames Park School

Thames Park School

Stofix UK ltd

Thames Park School was one of the country’s first schools to be built through the Department for Education’s Modern Methods of Construction. Using off site building techniques, the objective was to reduce construction times compared to traditional build and also reduce the carbon footprints of their schools.
Sponsored
St Benedict's School

St Benedict's School

TRC Windows

St Benedict's School in Ealing, West London holds the distinction of being the only the third Passivhaus certified school in the UK. We were naturally delighted to be part of the construction team for such an exciting project. Architects van Heyningen and Haward were commissioned to design two new Passivhaus buildings for the independent Catholic school - a sixth form centre and a primary building. We were appointed to design, manufacture and install 78 Passivhaus-certified aluminium clad windows, with a Uw rating of just 0.79. We also provided thermally-efficient timber aluminium curtain walling, plus Reynaers CS 86-Hi high-insulation aluminium doors.
Sponsored
Crestwood High School

Crestwood High School

Twinfix Limited

Twinfix is delighted to announce that its Multi-Link-Panel Non-Fragile Roofing System has been chosen for the replacement of Crestwood Community School’s old glazed roof. The new 1087 square meter roofing system and the gable end spanning 207 square metres, are now glazed with 25mm multi-wall polycarbonate, providing numerous benefits to the school and its students.The Multi-Link-Panel Non-Fragile Roofing System is a robust and durable solution, designed to withstand harsh weather conditions and high-traffic areas. The system’s non-fragile design is engineered to be shatterproof and resistant to damage, ensuring the safety of those below in the event of an impact.The new roofing system at Crestwood Community School provides excellent thermal insulation, creating a more comfortable learning environment for students and teachers. The polycarbonate glazing also allows for natural light to filter through, reducing the need for artificial lighting during the day and further reducing energy costs.“We are delighted that our Multi-Link-Panel Non-Fragile Roofing System has been chosen for Crestwood Community School’s roof replacement,” said Vicky Evans, Director at Twinfix. “The system’s non-fragile design and excellent thermal insulation make it an ideal solution for schools. We are proud to have provided Crestwood Community School with a high-quality roofing system that will enhance the safety and comfort of its students and staff.”Twinfix is committed to providing high-quality, innovative roofing solutions that meet the needs of its customers. The Multi-Link-Panel Non-Fragile Roofing System is just one of the many products in Twinfix’s range of roofing solutions designed to enhance safety, comfort, and energy efficiency in commercial and public buildings.
Sponsored
Auchmuty High School

Auchmuty High School

Allgood Ltd

Designed by Fife Council Property Services, the newbuilding constructed at Auchmuty High School inGlenrothes, Scotland, sees the new development replacethe old high school with better learning facilities andadvanced learning equipment.Allgood provided Fife Council with a complete accesscontrol and ironmongery solution, which makes the majorityof the school keyless.Allgood Trio created an advanced access control package,containing proximity readers and access control handlesets, that provide traceable audit throughout the buildingand in addition to the ability to control access to variousareas. The package also included software which allowsthe deletion of a card if it is lost or stolen, providing a betteralternative to the expensive process of replacing lost keys.Allgood Trio also supplied and installed the automatic doorset solution, which satisfied Fife Council’s requirement forthe doors to automatically drive open and remain open inthe event of the fire alarm being activated, providing smokeventilation through the main central core area of the school.The solution also allowed staff to control the main entrancedoors and pupil entrances during specific times. (i.e.granting pupils access during school; start, finish and breaktimes and being locked outside these time periods).The whole package provided by Allgood Trio was deliveredon time and within the clients budget, including theinstallation of both access control and automatic doorsetsby Allgood Trio engineers.
Sponsored
Llwnderw School

Llwnderw School

Marley Ltd

Western Red Cedar Shingles with FRT Exterior® Fire Retardant Treatment (AA Rating) provided the Welsh Primary School in Swansea with feature cladding to the curved external walls, in order to create what the architect described as a ‘cedar shell’.
Sponsored
Hampton School

Hampton School

SE Controls

A new sixth form study and careers centre at Hampton School in South West London is using a combined ventilation and smoke clearance system from SE Controls to help provide a comfortable learning environment with enhanced fire safety for students and staff.
Sponsored
Calderbridge Primary School

Calderbridge Primary School

Tobermore

A visually appealing and functional hard landscaping solution was achieved at Calderbridge Primary School in Lanarkshire thanks to Tobermore’s Textured Flags which offer a beautiful granular surface finish, and Pedesta block paving which provides a vibrant and hard-wearing finish.
Sponsored
Oaks Park Secondary School

Oaks Park Secondary School

Vertedge Ltd

Oaks Park Secondary School, invited Lazylawn East London to tender for around 1000m2 of artificial grass to be installed in the school recreational areas. Due to past experience with artificial lawn installations at the school, with the perimeter of the artificial grass lifting and secured with nails, the school was seeking a more secure and safer perimeter finish for this project. Lazylawn East London proposed VertEdge and the contract was won by Lazylawn last London. VertEdge was used throughout the installation providing a completely safe and secure perimeter finish without the use of mechanical fixings.
Sponsored
OBAN HIGH SCHOOL, ARGYLL

OBAN HIGH SCHOOL, ARGYLL

Tata Steel

Part of the Scottish Schools for the Future (SSF) programme, the design for Oban High School and neighbouring Campbeltown Grammar school was made possible using a package of high-performance cladding and roofing products from Tata Steel, that both fulfilled the design ambitions and were capable of withstanding the physically challenging climate to which the buildings will be exposed.
Sponsored
Wall Protection - Nottingham Free School

Wall Protection - Nottingham Free School

Gradus

The school underwent a complete refurbishment in September 2015 and chose to use a very pale blue paint scheme throughout most of the building. Within 3 months the areas within the school that see heavy traffic, including corridors and the dining hall had begun to show signs of scuffing and wear, due to the pupils knocking against the walls with their bags. The site manager at the school was concerned by the level of damage and began to consider wall protection products to combat the problem. Gradus supplied and fitted the school with wall protection solutions to prevent further damage.
Sponsored
Sevenoaks Boarding School

Sevenoaks Boarding School

Warmup plc

The ChallengeFounded in 1432, Sevenoaks boarding school is one of the oldest and most prestigious in the country with some of the buildings dating from the 17th Century. The client requested an easy-to-use, energy-efficient underfloor heating solution in rooms of different uses across the school that would have a negligible impact on floor heights. The installation of the system would also have to be considerate of the historic nature of the building.The SolutionDue to the need for a low floor build-up and with a project featuring a mix of floor finishes, our Foil Heater was the ideal choice for an easy-to-use and quick to install underfloor heating system. The Foil Heater is perfect for use with the school’s carpeted and wooden floor finishes and was installed in conjunction the Dual Overlay System when fitted with the carpeted flooring for a stable subfloor solution that can handle heavier load areas. Warmup’s StickyMat System was installed throughout the school’s bathrooms, which can be fitted directly within the layer of tile adhesive or levelling compound, therefore having little-to-no effect on floor heights. Our Tempo Thermostat was installed for accurate floor heat control alongside overall control by a Building Management System.The ResultThe beautiful and historic Sevenoaks Boarding School has now been given a 21st Century update with a responsive Warmup heating solution that didn’t substantially raise floor heights. The staff and pupils can now enjoy radiant warmth throughout the year, leading to better comfort levels and therefore a happier space in which to study and work.
Sponsored
Style Offers Expert Partitioning Advice to School - Highcliffe School

Style Offers Expert Partitioning Advice to School - Highcliffe School

Style - Moveable Partition Specialists

Highcliffe School in Dorset originally requested a visit from Style’s service and repair team, to offer advice regarding a moveable wall that was no longer functioning. Having carried out extensive inspection and testing, Style’s technicians concluded that it was beyond repair and that the best solution would be to install a new, Stylefold 120 modern folding wall system. A key benefit of the Stylefold system is its ease of operation, offering maximum flexibility for the school to use the wall on a day-to-day basis to divide the main hall from the canteen service desk and newly installed chiller.
Sponsored
John Taylor High School in Staffordshire Add External Dining Area Canopy

John Taylor High School in Staffordshire Add External Dining Area Canopy

A&S Landscape – School Canopy Manufacturer

Often a challenge during the course of a busy school day, many schools experience pressure on facilities such as dining room areas.
Sponsored
Burntwood School, London

Burntwood School, London

AluK (GB) Ltd

Allford Hall Monaghan Morris (AHMM) specified AluK curtain walling and window systems for the Burntwood School project, a series of new educational buildings which will serve up to 2000 pupils and over 200 staff. The scheme, developed by the architects AHMM working in close partnership with Lend Lease, Wandsworth Borough Council and Burntwood School, will see 85% of the school rebuilt.
Sponsored
Douay Martyrs Catholic School

Douay Martyrs Catholic School

TRC Windows

TRC been appointed by Morgan Sindall Construction to design, supply and install double glazed, factory finished heritage casement windows to match the already existing windows at the school.Douay Martyrs Catholic School is another of many UK schools to benefit from the Government financed window replacement scheme.The listed school in Uxbridge, Greater London, has had 105 high spec Heritage Casement Windows installed as part of the Department of Educations bid to refresh and revitalize schools across the UK.We were tasked to design, supply and install the heritage windows whilst making sure to maintain the heritage look and feel of the already existing windows throughout the building.We have a huge amount of experience and expertise in restoring and breathing new life into schools, hospitals and other significant public buildings, with Douay Martyrs Catholic School being one of six school projects that TRC has completed since the ease of 2021’s COVID restrictions.Heritage Casement windows are one of the most popular window styles in the UK. They’re easy to use and allow for optimum airflow for great temperature control. The challenge is that listed buildings are required by law to maintain the original look as much as possible.The windows installed had to comply with the following specification requirements:16mm Slim light Krypton filled Heritage sealed units of Ug=1.5w/m²K24mm Solid BarGlazed using Heritage PuttySapele Hardwood
Sponsored
Brynseng School, Oslo, Norway

Brynseng School, Oslo, Norway

Rockfon

Rockfon Samson is ideal for high activity level areas and is installed in the corridor ceilings at Brynseng School.
Sponsored
Kingsmill SEN School Canopies

Kingsmill SEN School Canopies

Twinfix Limited

Situated in the heart of the community of Driffield, Kingsmill School is a SEN school which caters for pupils aged 2-19 years. Situated across two sites, the main school site houses Early Years through to Key Stage 4. The school was completed in May 2017 and has been purpose built to meet the needs of its pupils. Alongside eleven new classrooms, the main site also has a new hydrotherapy pool, rebound room, sensory therapy room and sensory rooms.Students aged 16-19 are based at The Kings Mill Student Centre which is based at Driffield Secondary School approximately a mile away from the main site. This comprises three classrooms and a combined common room and food technology area.When the school decided to utilise its outdoor space to provide a safe environment for pupils to learn and play undercover, Twinfix were approached by Main Contractor Hobson Porter to design, manufacture & install four classroom canopies..The free-standing mono-pitch canopies all comprise our innovative Multi-Link-Panel Non-Fragile (NF) roofing system, glazed with 16mm multiwall polycarbonate. The roof is non-fragile in accordance with the HSE’s test for fragility ACR[M]001:2019, an important factor when installing canopies where children may try and access the roof. Each canopy has an aluminium frame, powder-coated to RAL 5015 sky blue to match the school’s building and logo. Other features Twinfix incorporated into the design of canopies are anti-climb guttering and post-protectors, which provided further elements of safety for the students.Being a one-stop shop for designing, manufacturing and installing such outdoor structures we are proud to offer a seamless service to any school or other education establishment looking for a canopy or walkway. We are really pleased that the staff at Kingsmill School are delighted with the latest additions to their school and we know they are planning to use it for all sorts of fun and healthy outdoor learning/playing experiences for their children.
Sponsored
Fairford School

Fairford School

Metrotile UK Ltd

Fairford School was refurbished in 2008 and required a roofing system that could offer unsurpassed durability complimenting the honey coloured brick walls.Metrotile’s .900mm Slate profile in Bronze was specified, as it is the only system that could meet all of the project’s demands. The school’s new Metrotile Slate roof delivered on all counts including performance, durability, low whole-life cost and aesthetics. As Fairford is situated in a rural setting, the aesthetics of the building’s roof needed to compliment the natural surroundings.
Sponsored
Latymer Upper School

Latymer Upper School

Concept Cubicle Systems

Latymer Upper School is a long-standing independent public school in Hammersmith, Central London. We updated their tired existing washrooms to a modern standard. Read the full case study here.
Sponsored
Ivydale Primary School, Southwark

Ivydale Primary School, Southwark

Cellecta Ltd

Ivydale Primary School is an expansion of the campus. Combating increasing demand for primary schools within the UK, it introduced a two-storey cross-laminated timber framed building on a second site nearby; this includes an amphitheatre. This extension has doubled the school’s capacity to accommodate key stage two children in a four-form entry primary school. Taking inspiration from the children’s illustration ‘The Fox in the Forest’ by Julia Woolf, this development won a regional RIBA London Award in 2018. Southwark Borough Council ensured the remodelled building was energy efficient, applying the London Plan’s energy hierarchy: ‘Be Lean, Be Clean, Be Green’.Cellecta’s HEXATHERM XCHiP was specified by Hawkins\Brown due to its high-performance thermal insulation with a P5 moisture-resistant tongue and groove chipboard to produce a high compressive strength, interlocking floorboard.Galliford Try was supplied 1,000m² of Cellecta products to develop this school in Southwark.
Sponsored
Hand Dryer Case Study (Secondary School) - Gladesmore Community School, Tottenham, London

Hand Dryer Case Study (Secondary School) - Gladesmore Community School, Tottenham, London

Dryflow

The challengeBoth male and female student washrooms were to be fully refurbished in the main building as they were tired looking and the busiest in a school with 1200+ students. The old hand dryers were loud and slow to dry the hands. The washrooms were opposite classrooms, so noise was an issue. New hand dryers needed to be energy efficient, cost effective, robust, reliable, attractive and with quick drying times.“They are quieter than the old hand dryers so neighbouring rooms have benefited. Since installation we feel they have encouraged more usage as a result, so contributing to improved hygiene by users in the premises.”Alexis O’Brien - Premises Manager, Gladesmore Community SchoolAbout Gladesmore Community SchoolGladesmore is an 11-16, mixed school with approximately 1,250 pupils. It is situated in the urban area of South Tottenham, adjacent to Markfield Park which backs onto the River Lea. It has repeatedly been judged to be an ‘Outstanding School’ in all aspects by Ofsted Inspectors.The solutionProviding a quick dry time yet Quiet Mark approved low noise volume, this vandal resistant hand dryer has 4 settings to maximise energy efficiency and minimise running costs.Model: Dryflow ViperDry time range: 15 - 20 secondsRated power: 600W - 2000W (4 settings available)Guarantee length: 3 yearsThe results“The hand dryers are robust while still looking attractive. They dry hands just as quick as a more expensive brand but at more than half the cost.The quick drying time has also helped to alleviate congestion at peak rush periods during break times.The ability to easily adjust the temperature and speed with no special tools is useful and can be done in under one minute.”Alexis O’Brien - Premises Manager, Gladesmore Community SchoolEstimated annual savings using new high-speed hand dryers compared to previous units+:Cost Savings: £196Electricity savings: 1,634 kW/hCarbon Savings: 882kg/CO2Estimated annual savings using new high-speed hand dryers compared to if paper towels were used+**:Cost Savings: £9,856Carbon Savings: 11,592kg/CO2(+Dryflow Viper running at its most energy efficient setting based on 12p per kW/h and 1kW = 0.54kg/CO2; **Based on 3 paper towels used per dry, 0.6p per paper towel, 22.5gms/CO2 per dry)
Sponsored
Montserrat Convent school

Montserrat Convent school

Saint-Gobain Ecophon

Col.legi Montserrat in Barcelona is one of the most innovative schools in Spain. The school has departed from the traditional system of silence and listening to explanations and encouraging discussions. The means? Acoustic quality and low frequency absorption.
Sponsored
Bleasdale School in Lancashire Install Three Bright and Colourful Playground Canopies

Bleasdale School in Lancashire Install Three Bright and Colourful Playground Canopies

A&S Landscape – School Canopy Manufacturer

The pupils at Bleasdale School were lucky enough to go to school every day in an area of outstanding natural beauty. This made outdoor play one of the best parts of the day, unless it rained or it was too hot! The staff decided the best way to tackle this was to look at adding some protection to their outdoor areas.
Sponsored
Newton Primary School Derbyshire

Newton Primary School Derbyshire

Broxap Ltd

Sunshine Gym have provided a brand new outdoor gym at Newton Primary School in Derbyshire.Newton Primary School decided upon the Primary School Outdoor Fitness Package which provided a pre-determined mixture of equipment specially selected by our experts to encourage fitness within primary schools. The equipment can be used by eight pupils simultaneously. Inclusive of both multi and single user equipment this package can be used as a gentle cardiovascular workout. It features two pieces of multi-user equipment, and these ‘dual’ units promote social interaction whilst still allowing the pupils to exercise at their own pace.The equipment was installed on grass saver matting. This additional safety surface, over time, will encourage the grass to grow through and be mowed. Thus allowing it blend with the natural surroundings.This specific outdoor fitness package is to be used by children under 140cm. This makes it perfect for the KS1 & KS2 pupils, and they can use it for small classes for PE pupils or even as an after school fitness initiative.
Sponsored
Bow School, Tower Hamlets, London

Bow School, Tower Hamlets, London

Siniat

Bow School is a £30m campus in Tower Hamlets - an area with one of the fastest growing school populations in the country. Located close to the Blackwall Tunnel, the site suffered from air and noise pollution. It was also subject to a 20% budget cut at a late stage in the design phase. The new school campus accommodates 1,600 pupils in a state of the art building which includes rooftop sports pitches, a fitness studio, theatre, dining pavilion, open classrooms and areas of open circulation
Sponsored
Benenden School, Cranbrook

Benenden School, Cranbrook

Stone Cladding Systems

Architect: Guy Hollaway Architects Main Contractor: Buxton Building Contractors Installer: Colorminium Stone: Jura Beige Guy Hollaway Architects designed the competition-winning scheme for the new concert hall at Benenden School near Cranbrook in Kent. The project, completed in 2021, delivered a new combined concert hall; school hall and music department. The new school hall has a capacity of 750. The Concert Hall includes a 150 seat recital hall and digital media suites. This development, the largest in the school’s history, achieves the combination of brick and natural stone, in the form of Aztec Rainscreen with stunning success. The honed Jura Limestone angled soffits give the windows a superiority as well as realising more light into the building. Areas of the large panel 1200x450mm rainscreen achieve a modern look on this prestigious development.
Sponsored
Wolverhampton Girls' High School

Wolverhampton Girls' High School

Sto Ltd

StoVentec Glass rainscreen cladding was specified for a new two-storey science block which has been built at Wolverhampton Girl’s High School, following its successful use on the school’s new sixth-form building, completed in 2018.
Sponsored
The Buckingham School, Buckingham

The Buckingham School, Buckingham

Broxap Ltd

A new outdoor dining area has been created for The Buckingham School thanks to a series of robust and comfortable picnic tables from Broxap.
Sponsored
The Kingsbrook School, Aylesbury

The Kingsbrook School, Aylesbury

Broxap Ltd

As a single source supplier, Broxap created a series of inspiring outdoor areas at The Kingsbrook School ranging from outdoor dining areas to an outdoor gym.
Sponsored
University of Birmingham School, Birmingham

University of Birmingham School, Birmingham

Technal

The University of Birmingham School was the first academy free secondary school to be assigned to a particular university. This is a new model of education, bringing together the best of university research and teaching best practice in secondary education. Technal aluminium windows were specified for this project in a 210mm high module to achieve the required available air flow and light transmission. Aluminium Commercial Doors were specified to achieve robustness and increased thermal insulation. Aluminium Curtain Walling was also used to deliver more natural light into the project without sacrificing weather performance, thermal insulation and ease of fabrication. 
Sponsored
Judge Business School

Judge Business School

InterLace

Cambridge Judge Business School was founded on the Grade II Old Addenbrooke’s Hospital site originally constructed in the mid-eighteenth century, in the historic centre of Cambridge. This new Centre reflects the evolving culture of the University through the changing requirements for learning environments.InterLace designed, manufactured and installed electric and hand-operated roller blinds to provide user controlled and automated shading in teaching and lecture spaces.
Sponsored
Badminton School, Bristol

Badminton School, Bristol

DYNAMIK Sports Flooring

A historical reputation for excellence in academia and sport, Badminton School enhanced and maintained this reputation with a new sports hall. Clare Elsley, Assistant Director of Sports at the school, and former England International Netball player, insisted that the performance of the floor enabled the school to use the facility for multi-sport. The DYNAMIK sprung system provides high levels of shock absorption and comfort which benefits teaching staff and students alike. This system replicates that of a DYNAMIK sprung wooden floor, however has all the benefits of having a synthetic playing surface which keeps future maintenance to a minimum.

Showing 37-72 of 965

Feedback