NBS Source
I'm a manufacturer

"sanitary appliances and fittings"

6,225 results found

Sort by:

Showing 217-229 of 229

Sponsored
Sun Life

Sun Life

Planet

Based in Bristol, Sun Life offers straightforward life cover, insurance and savings for the over 50s. Taking an old soap and vinegar warehouse, the company chose Interaction to both run and design this ambitious CAT B fit-out. Planet Partitioning were bought on-board to design, manufacture and install the internal partitioning needed to create the corridors, offices and meeting rooms. To stay true to the building’s industrial history, LOFT20 was used throughout.The partitioning was used to section a varied choice of spaces, for both working and downtime, for a flexible working environment, fit for a modern company.To create a unique feature, faceted glass panels where used to create the illusion of curved walls. This was the first time the LOFT20 system had been installed in this manner and the result, with the bands applied, was seamless.
Sponsored
Withersworldwide

Withersworldwide

Optima

We were happy to work with KKS and ISG on the design and creation of these new spaces. A range of glass partitions for agile working achieved a stunning interior, fit for purpose. Also the design created a BREEAM excellent rating proving it’s sustainability credentials.
Sponsored
Coverys

Coverys

Optima

At Coverys new headquarters, a stunning array of design elements make this fit-out an undeniable success. Employees work in peace and quiet whenever needed due to the acoustic laminated glass in the Revolution 54 Plus partitions and Edge Affinity doors.
Sponsored
GEC ANDERSON SELECTED TO CATER FOR SUSTAINABLE LAMBETH COMMUNITY PROJECT

GEC ANDERSON SELECTED TO CATER FOR SUSTAINABLE LAMBETH COMMUNITY PROJECT

Anderson, GEC Ltd

A highly sustainable Education & Visitor Centre is nearing completion alongside a historic landmark in a south London park, with the fit out including the installation of stainless steel sinks, work-surfaces and shelving units, supplied and installed by sector specialist, GEC Anderson. 
Sponsored
New Tipperary Museum of Hidden History protects its exhibits with MEDITE CLEAR

New Tipperary Museum of Hidden History protects its exhibits with MEDITE CLEAR

MEDITE SMARTPLY

The newly refurbished Tipperary Museum of Hidden History has put the wellbeing of both its artefacts and guests first by extensively using MEDITE CLEAR in its brand-new interior fit-out, an MDF panel manufactured with zero-added formaldehyde.
Sponsored
A complete KEUCO bathroom in a designer hotel

A complete KEUCO bathroom in a designer hotel

KEUCO

The custom-made KEUCO washbasin board with truffle-coloured glass has a cleaning-friendly finish and offers ample space for setting things down. With their slender exteriors, the EDITION 400 two-handle fittings look like sculptures soaring over the ceramic washbasins. The continuous LED lighting of the matching light mirror extends over the complete wash area, brightening the room. And for a closer look, the illuminated iLook_move LED cosmetic mirror offers the guest five-fold magnification. The flexible swiveling arm means the mirror can be adjusted to any position.Linearly arranged KEUCO accessories can be found around the WC that perfectly match the symmetry of the room. The toilet paper is found under the cover of the COLLECTION MOLL toilet paper holder. The matching chrome-plated brush set with its easily removable insert is extremely easy to maintain.Awaiting the guests in the showers are the minimalist IXMO fittings from KEUCO. The suites and rooms feature combinations of shower head and hand shower or the innovative IXMO SOLO shower fitting, which combines single-lever mixer and hose connection in only one module. With its motto "less can do more", IXMO from KEUCO combines multiple functions in the smallest of spaces, and features a designer look. All in all an enticing choice of interiors, which makes a stay at Le Méridien Munich an unforgettable experience.
Sponsored
New Teaching Lab Sinks Make The Grade

New Teaching Lab Sinks Make The Grade

Anderson, GEC Ltd

A large number of Decimetric modular stainless steel sinks, from GEC Anderson, were specified for the Environmental Science Laboratory at The University of Liverpools new Central Teaching Laboratories (CTL) for the Faculty of Science and Engineering. The specification called for a high performance and durable solution that was easy to maintain.Decimetric sinks provide a flexible and versatile framework of sizes in 100mm x 100mm increments so as to enable versatility and easy specification. This particular project required large double sink bowls (400 x 400 x 250m deep) set in 1400 x 600mm tops. Each sink was fitted with GEC Anderson V220 Sand Traps to collect solids and to prevent blockages.The bulk of the sinktops were installed on the first floor Environmental Science Laboratory situated in the East Wing. They run the full length of the windowed wall and provide washing facilities for 170 individual work stations.The client demanded high specification of internal fittings and a high concentration of laboratory fittings which would endure heavy usage during their life time. Hard wearing and highly functional, the professional grade brushed satin stainless steel tops provide a long life with very low maintenance. Torsten Bauszus from ADP LLP Architects said, GECA were chosen for their ability to provide modular, professional grade stainless steel tops with no joints at the sink which will make them very easy to clean and maintain.
Sponsored
New Traditional Windows and Doors in South West London

New Traditional Windows and Doors in South West London

The Sash Window Workshop

At The Sash Window Workshop we have been replacing and renovating timber windows and doors for various properties across London and the South for over 25 years.We were approached by an interior contracting company who were looking to replace the timber windows and doors for a property in South West London.The company requested new windows and doors which fitted the following specification:New traditional windows to match the existing style and be period appropriate;The highest possible thermal and acoustic performance;The maximum amount of light transmission possible through the glass;Bespoke window ironmongery;Painted internally to meet the customer’s specific paint colour requirements.Upon receiving the request for a quotation, one of our trained surveyors met with the architect for the project to discuss their requirements and advise how we could help. In total they required over 20 new sash windows and timber casement windows, and 4 new external wooden doors.As all of the new windows and doors that we manufacture are bespoke, we were able to ensure that their replacement windows and doors exactly matched the original designs, meaning that they fitted in with the surrounding properties and retained the aesthetic look and feel of the property.Due to the location of the property, all the new windows had to be carried up through the property by our experienced installers to be fitted.Both the customer and contractors were very happy with the work carried out, which helped transform the property into a beautiful home.
Sponsored
Wall Protection - Countess of Chester Hospital

Wall Protection - Countess of Chester Hospital

Gradus

Gradus has supplied and installed a range of bespoke wall protection solutions throughout the new Same Day Emergency Care building at the Countess of Chester Hospital. Fitted by the Gradus Contracts Team, the system includes wall guards, corner guards and combination handrails.
Sponsored
Brighton & Sussex University

Brighton & Sussex University

Cyclepods Ltd

Brighton and Sussex University approached us to provide cycle parking in the brand new Northfield student accommodation campus. The limited space required an innovative solution which had to suit the conservation area, provide security for bicycles and fit the ecological ethos of the University.
Sponsored
Southampton Solent University

Southampton Solent University

DYNAMIK Sports Flooring

This large project installed DYNAMIK Komfort Elite in their Performance Sports Hall, Fitness Studios and Multi-Use Sports Hall. Complementing the floor they chose DYNAMIK Solid and Acoustic (Perforated) Sports Wall panels in Galiano Oak CPL wood-effect finish.
Sponsored
IKO Armourplan PVC - Iconic Bristol landmark takes shape

IKO Armourplan PVC - Iconic Bristol landmark takes shape

AccuRoof

Modern materials were employed in the quest to recreate part of Bristol’s heritage. SIG Design & Technology supplied IKO’s Armourplan PSG single ply membrane because it fitted the bill perfectly as the roof covering was ideal for replicating the original seamed lead roof.
Sponsored
Hillside School

Hillside School

Boyco (UK) Ltd

We were commissioned to supply and install cloakroom fittings and a bespoke ‘classpack’ package for a four-classroom extension at Hillside School in the north-east of Scotland... all to seriously tight deadlines.Portlethen is one of Aberdeen’s fastest-growing commuter towns and, within two years of completion, the local primary school needed space for more pupils... quickly. What’s more, the four-classroom extension had to be completed while the existing school and nursery operated as normal.Boyco were approached to simply provide fixed furniture and equipment but, instead, proposed a fully managed, supply and installation service that would ease the pressure on main contractor Bancon Construction. Our end-to-end package included the design, manufacture and installation of a bespoke system of cloakroom fittings, teacher walls, kitchen units and height-adjustable worktops.Challenging lead times were made more difficult by the coronavirus pandemic and new construction site rules. However, we put together a plan of works for accelerated manufacture and installed the systems in just two weeks at the end of 2020. The extension was handed over to the client in January 2021.“It was satisfying that even in the midst of a global pandemic, the Council and its partners could work together to ensure the completion of the project,” said Cllr Gillian Owen, chair of Aberdeenshire Council’s Education and Children’s Services Committee.Throughout, we liaised directly with the architect and the end client, combining our skills and experience to provide a fully-managed service designed to take the pressure off the main contractor. “Hassle-free” was how they described it. The project contributed to a portfolio of successful supply-and-fit projects in Scotland. “I will be recommending that Bancon Construction use Boyco on future projects,” said site manager Colin Smith.The service from Boyco couldn’t be faulted - from the drawings and delivery schedule to the quality of fittings, and an installation team who worked diligently without fuss to get the work completed on time.Colin Smith, Site Manager, Bancon Construction

Showing 217-229 of 229

Feedback