NBS Source
I'm a manufacturer

"refrigerator"

131 results found

Sort by:

Showing 1-9 of 9

Sponsored
HAUSER CB

HAUSER CB

Lindner Group

HAUSER is a traditional supplier of turnkey refrigeration systems, for example in the form of refrigerated shelves, counters and freezer cabinets. Besides its headquarters inLinz, Austria, the company also operates a plant in Budweis, Czech Republic. An office building was equipped with ceiling and floor systems from Lindner. In cooperation with the local partner Konstruktis Delta s. r. o., Lindner Plafotherm® DS 320 Type 1 metal ceilings with integrated heating and cooling functions were supplied. With regard to the floor systems, LIGNA and NORTEC raised floors were used.
Sponsored
Waitrose Distribution: Roma-3 mild steel grating fence in a galvanized finish was specified for the boundary demarcation.

Waitrose Distribution: Roma-3 mild steel grating fence in a galvanized finish was specified for the boundary demarcation.

Lang+Fulton

Waitrose’s Distribution Centre at Bracknell delivers to more than 60 stores, handling up to 150,000 cases of chilled products. The new warehouse was conceived to a ‘green’ design; generating 20% of renewable energy on site with waste heat and office cooling recycled from the refrigeration process, efficient lighting and low carbon emissions. In keeping with the concept of sourcing natural materials, a Roma-3 mild steel grating fence in a galvanized finish was specified for the boundary demarcation.
Sponsored
Permanently-fixed ladder system - companionway / ships ladder system- Aldi retail stores across the UK

Permanently-fixed ladder system - companionway / ships ladder system- Aldi retail stores across the UK

Safety Fabrications Limited

The Ascent Aluminium companionway / ships ladder system was specified to create a permanent safe access route to the roof of refrigeration units within Aldi stores for maintenance personnel. A companionway was chosen as it is deemed preferable to a vertical ladder where frequent access is required. The ladder designed in accordance with BS 4211:2005 + A1 2008 was manufactured in accordance with CE 1090 factory production control procedures. The ladders have been installed within around 700 stores across the UK.
Sponsored
Chilling under a white roof...

Chilling under a white roof...

RENOLIT Cramlington Ltd

Friesland Campina CHALLENGE An absolute must for refrigerated warehouses or dairy processing facilities is to try to keep the building as cool as possible and to avoid all causes of heat, in order to keep the cooling costs as low as possible. Some decisions can have detrimental effects though. Mechanical fixing of the roofing membrane for example, in case the wrong fastenings are used. Thermal bridging may cause cold – or in this case heat - penetrating through the flat roof fasteners resulting in higher energy bills. And, quite important as well, mechanical fixing will perforate the vapour control layer, which in the case of cool buildings sits uppermost on the insulation. The result being moisture-related damage to the insulation! Furthermore, it has also been proved that the darker the roofing membrane, the less the sunlight will be reflected, the more heat will be absorbed. Again resulting in escalating energy costs. Waterproofing a cool storage warehouse is definitely not easy! In this regard Friesland Campina were looking for a durable and ecological roof solution for their brand new refrigerated distribution centre in Maasdam. SOLUTION RENOLIT came up with the perfect answer: the RENOLIT ALKORBRIGHT cool roof membrane. Here’s why! RENOLIT ALKORBRIGHT is a completely white PVC membrane reflecting the sunlight up to 90%. Absolutely the highest solar reflectance rate ever. Thanks to this membrane, which prevents the interior from warming up, there will be no extra air conditioning expenses. In addition, an extra protective coating makes sure less dirt sticks to the roofing membrane. This layer will in turn help to maintain a durable reflection. 
Sponsored
Union Industries improves efficiency with double Eiger Door installation at Taj Foods

Union Industries improves efficiency with double Eiger Door installation at Taj Foods

Union Industries

Union Industries, the UK’s leading manufacturer of bespoke industrial doors, has helped food importer and distributer, Taj Foods, improve efficiency through the installation of high-speed freezer doors – the Eiger Door.Taj Foods, specialists in frozen exotic food and prepared meals, was established in 1980 and recently expanded its cold storage at its Sheffield warehouse to meet growing demand. The project undertaken by EJM refrigeration, involved improving its energy efficiency and carbon footprint with the installation of a new CO2 refrigeration system.The two Eiger Doors will enhance operational efficiency in the high-demand environment and will maintain consistent freezer temperatures, while ensuring unimpeded access to cold stores.Since its launch in 2002, the Eiger Door has been installed as a fast-access traffic door at major food retailers, 3PL cold storage and distribution, and frozen food manufacturers across the UK.The Eiger Door ensures that consistent temperatures can be maintained and features an innovative dehumidification system, which prevents snow and ice build-up on the door blade and frame. This feature tackles a consistent issue plaguing other door types, as the freezer encounters humid ambient air entering the cold store.Minimising downtime is also supported by the Eiger Door’s robust construction and its tried and tested crash-out and reset system. Due to the modest difference in size between Forklift Trucks and the door opening, as well as the busy nature of this freezer, this is of particular benefit at this depot when considering the long-term reliability of the Eiger Door.Rob Howe, Union Industries’ Technical Sales Engineer, said: “The installation of the Eiger Doors at Taj Foods showcases our commitment to providing cutting-edge solutions that prioritise efficiency and reliability.“Over the past 20 years, the Eiger Door has consistently proven to be a superior and effective innovation for cold storage access, overcoming challenges such as ice build-up and excessive energy use to maintain consistent temperatures.“We are confident that the Eiger Door will significantly contribute to Taj Foods’ operational success.”Anil Solanki, Managing Director at Taj Foods, said: “We were looking for a reliable door solution to fit in with the redevelopment of our Sheffield warehouse, and after reading about the success of the Eiger Door we approached Union Industries to assist us to improve operational efficiency as we doubled our capacity.“We believe that the advanced features of the Eiger Door will not only enhance the efficiency of our cold storage but also contribute to long-term reliability, minimising disruptions in our day-to-day operations.” 
Sponsored
Providing a robust leak detection solution to a global infrastructure provider

Providing a robust leak detection solution to a global infrastructure provider

Andel Ltd

A major global company selected Andel to install leak detection systems in multiple data centres, based on our approach, experience, quality and price. The end-user customer is one of the world’s leading digital infrastructure companies, providing a secure, sustainable, global collaboration platform to numerous industry-leading organisations in finance, manufacturing, retail, transportation, government, healthcare and education. The challengeThe data centres were built to the latest design specifications employing cutting-edge features and technologies. Mile upon mile of data network and power cable is installed under raised access floors where it can be organised and routed safely out of sight. The problem is that the same void, hidden from view, also contains water service pipes feeding air conditioning units, toilets and kitchens. A tailored, robust, hybrid solution needed to be installed meeting multiple requirements, primarily at low level, within the floor voids around the perimeter of the data halls with distance measuring systems monitoring CRAC units, plumbing and other plant. Additionally, a range of zonal systems provided early warning alarms and automatic isolation for water, refrigerant gas and oil leak detection.The solutionFloodline® HLD, Ranger® distance measuring system and a range of zonal senorsAndel’s Floodline® is a flexible, future-proof, zonal and distance measuring leak detection system. State-of-the-art, hybrid, Floodline® HLD multifunction control panels were installed in conjunction with Floodline Ranger® distance measuring systems and a range of zonal leak detection sensors including water, refrigerant gas and oil. Floodline® HLD control panel can monitor up to 224 zones using a combination of resistance-based and Modbus-enabled sensors.High-visibility Floodline Ranger® cable provides up to 1500 metres of continuous leak detection, detecting the presence of water and conductive liquid at any point along its entire length. Conductive-polymer technology construction makes the the sensor highly resistant to corrosion and abrasion. Sensor cable was strategically installed in floor voids to continually monitor the server halls, ensuring early leak detection through alarms and automatic valve shut-off systems.  The system triggers audio-visual alarms as well as sending onward communication to BMS. Resilient, sustainable, cost-effective, easy to install and maintain, Andel’s Floodline® is a flexible, future-proof, zonal and distance measuring leak detection system. Proactive approachPrior to installation, great care was given to ensure the customer was happy with all Andel’s Floodline® equipment and to demonstrate the superior build-quality and functionality and to allow the customer to see and handle the equipment first-hand. The customer was provided with all relevant technical specifications and user information. The project involved detailed assessment and planning for the five sites. Bespoke installation kits were manufactured in advance for each installation team. Andel put together mobile crews to visit each of the sites. The installation took 20 days from start to finish, meeting the deadline. The resultA successful leak detection installation that fulfills the customer’s brief, protecting priority servers and IT infrastructure in new major data centres. Installing Andel’s Floodline® leak detection systems now means the customer has:A cost-effective, reliable and low-maintenance leak detection system across five mission-critical sites.A bespoke, tailored solution for each site.Peace of mind with a leak detection system that will give early warning alarms and onward communication, allowing for evasive action to be taken to avoid any damage.A future-proof solution with a leak detection system where additional zones, sensors and upgrades can be added easily and cost effectively. What the customer said;We are delighted with the installation of the Ranger leak detection system across our sites. We feel at peace knowing our servers are protected with high quality systems providing realtime leak detection monitoring.Robert Gilbert, Project Manager
Sponsored
BRITA VIVREAU | Novotel Case Study

BRITA VIVREAU | Novotel Case Study

BRITA Vivreau Ltd

Being one of Accor’s preferred suppliers for water filtration, coupled with the heritage of the brand, it was no surprise that BRITA was the nominated partner for the water program at Novotel London Tower Bridge. Located at the heart of the British capital and metres from the world-famous Tower Bridge, this hotel boasts of its commitment to sustainability and making efforts to change the mindset of customers, so that sustainability becomes a key factor they actively seek out, when choosing a hotel.Under their commitment to sustainability, one of the key objectives of the hotel was to look for eco-friendly alternatives and removal of any single-use materials, driving a positive change towards hospitality. This is where BRITA stepped in, addressing some of the major environmental challenges currently faced by this sector and helping to create zero single-use plastic culture in hotels.Novotel London Tower Bridge embraced the versatile Top Pro – a champion water dispenser by BRITA, on every floor of their hotel, dispensing premium, filtered water on demand for staff and guests at the touch of a button. Expertly designed with an intuitive display, the Top Pro provides unlimited ambient, chilled still, semi-sparkling and sparkling water to cater to tastes of all customers. Guests are provided with glass bottles (BRITA Swing model) in their rooms, that they can refill themselves, and access on-demand filtered water on their respective floors when needed. In addition to the rooms, this hotel also   provides filtered water to its guests in the  bar and restaurant with the BRITA Top Pro, bringing great tasting still or sparkling water to complement customers’ food & beverage choices. This has encouraged the restaurant to advertise filtered water as a sustainable offering to its guests.This hotel has also provided BRITA's reusable Wave bottles to all of its staff, helping to educate and empower them to take sustainable actions. These initiatives have had a positive impact on the environmental footprint of the hotel, by significantly helping to manage single-use waste. The time and costs involved in the process of having to buy, store, refrigerate and transport bottles have been considerably reduced, thus leaving more time to focus on things that directly contribute to guest experience.Giada Melegoni, Front of House Operations Manager, Novotel London Tower BridgeSince 2022 we have been using the BRITA dispensers to cater to water requirements of our guests on each floor as well as our bar and restaurant. We used to purchase about 70,000 bottles per year for the rooms alone which we have now completely eliminated! Having a dispenser on every floor has not only had a huge impact on waste control and a predicted 30% cost-saving for our hotel, this initiative has generated such a positive response from our guests, improving our overall ‘eco-friendly’ score in our customer satisfaction surveys. Being sustainable in a hotel can come with certain challenges and uncertainties, but our recommendation would be to start by taking small steps. Customers are demanding higher sustainability measures from hospitality venues and by creating a hotel that reflects their values, you’re also helping empower their drive for sustainability. Partnering with BRITA and investing in a water program has been an easy way for us to limit the environmental footprint of our establishment.
Sponsored
Park Parade, Stroud

Park Parade, Stroud

K Systems Insulated Facades

BackgroundLocated in Stroud, the Park Parade, Park Road refurb project was part of a large refurbishment planned by Stroud District Council. The shopping area and sheltered accommodation scheme were given a complete revamp with internal and external work being completed.MD Group from Bristol were awarded the contract by Stroud District Council and were appointed as the main contractor. A new external wall insulation system was installed, along with an extensive refurbishment to the communal areas, external balconies and roofing. Our approved installer Elite Rendering Systems were contracted by MD Group to complete the exterior wall insulation.Alongside Elite, we transformed the premises aesthetically creating modern homes and commercial premises. The buildings were given a new lease of life, and together with Elite we delivered safe, stylish and energy efficient buildings that will help to reduce fuel bills for residents and help decarbonise the Council’s housing stock.Our ServiceOur Technical team were available to provide hands-on-guidance throughout the duration of the project. As part of our service commitment, our K Systems Site Technician regularly visited the project to inspect progress, offer support and ensure high levels of construction quality.As the ground floor of Park Parade is used for commercial premises, one challenging aspect of the project was the detailing and installing around complex interfaces such as air conditioning/refrigeration units. We transformed the outside of the properties with a durable, low maintenance solution that is fully compliant with fire regulations and fulfilled the Council’s criteria.The combination of finishes used not only delivered the desired contemporary aesthetic but provided an additional benefit of cost savings for the client. Residents of Park Parade, Park Road will enjoy reduced energy bills and better living conditions thanks to the U-value improvement.Technical Project DetailsFollowing design and site meetings with the K Systems Technical team, K Systems M (Mineral Wool) was specified by Bailey Partnership Architects and Stroud District Council. This system incorporates eco-friendly mineral wool insulation boards. As an A2-s1, d0 firerated solution, it is widely specified to provide thermal and aesthetic improvements to buildings, reducing energy usage and therefore energy costs.K Systems M, utilising non-combustible insulation, ensured the latest building safety regulations were met. Thanks to its exceptional properties, the thermal performance of the walls after installation has been significantly enhanced. A U-value of 0.27 W/m²K was achieved, which will help to reduce the residents fuel bills and reduce the level of condensation forming on the inside walls – two key objectives for the client.For the finish, high-performance Silkolitt+ silicone renders were supplied along with our lightweight synthetic brick slips (VBriQ). This combination improved the aesthetics of the buildings for its residents.Silkolitt+ silicone thin coat renders are available in a wide range of colours offering a contemporary finish. The excellent vapour permeability allows the building to breathe and prevents interstitial condensation. The flexibility of the finish provides resistance against cracking and increases the durability, ensuring a long-lasting finish to the properties. It is very user friendly, and its hydrophobic properties reduce maintenance requirements.Accredited by the BBA, the K Systems VBriQ brick slips provide top tier Cateogory 1 impact performance and are ideal for use on this project. This lightweight system is quick and simple to install and has high UV resistance while also allowing the original brick colour to be maintained. An extremely durable finish that will withstand the day-to-day demands placed Park Parade, Park Road.
Sponsored
Basildon & Thurrock University Hospital

Basildon & Thurrock University Hospital

Bauder Ltd

Basildon & Thurrock University HospitalBauder Total Roof System (BTRS) and LiquiTEC cold applied waterproofing systemSynopsisBasildon and Thurrock University Hospital’s existing roof was failing in multiple areas, and 80 rooflights needed replacing. The client wanted the refurbishment to make as little impact as possible on the departments directly below which included drug refrigeration, x-ray and ultrasound clinics, patient wards and operating theatres.Bauder Building BoardProject:Basildon & Thurrock University HospitalLocation:EssexProject Type:RefurbishmentRoof Area:900m²Specifier:NHSApproved Contractor:Breyer ConstructionProject challengesThe plant on the rooftop could not be turned off or raised and many of the AC units and boilers had to be left running due to the nature of the rooms below. Certain areas had to be repaired before others and detailing under and around the plant that could not be raised was almost an impossible task. When working around the plant, COSHH regulations had to be considered and adhered to.The result Coordinating with both the client and approved contractors was key in this project, and by using cold liquid applied waterproofing the contractors could ensure a watertight seal with quick application, allowing them to complete the remainder of the roof using reinforced bitumen membrane, and meet the tight project deadline of 12 weeks.System installedBauder Total Roof System (BTRS)Suitable for a variety of applications on both new build and refurbishment projects and can be used in warm, cold and inverted roof scenarios.1 Bauder K5KA top quality, heavy duty, torch-applied SBS elastomeric bitumen capping sheet. The product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUO 35A 3mm thick technically advanced self-adhesive elastomeric bitumen underlayer with DUO lap technology and glass lattice reinforcement.3 BauderPIR FA G16 Tapered (laid to falls)Tapered insulation is a lightweight, convenient, easy to install and cost-effective alternative method of providing falls to a roof instead of incorporating them into the structure.4 BauderTEC KSD FBSA technically advanced, self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder insulation adhesive.LiquiTEC Roof SystemThe Bauder LiquiTEC roof systems combine ease of application, fast cure and durability to provide a cold applied liquid waterproofing product second to none.1 LiquiDEK with reinforcement layerA cold applied liquid fast curing waterproofing resin, for use on the main roof area of the LiquiTEC Roof System. It is applied in 2 coats ‘wet-on-wet’, with a layer of Bauder 110g reinforcement fleece between them. The product is a PMMA based resin and requires the addition of catalyst to trigger curing. It is solvent, isocyanate and halogen free, minimizing its environmental impact.2 BauderTEC KSD DUOCarrier membrane & Vapour Barrier is a technically advanced self-adhesive elastomeric bitumen vapour barrier with patented “DUO” lap technology. The product features an aluminium foil facing for vapour impermeability.AdvocacyBreyer Roofing’s Contracts Manager for the project, Kerry Cutts:“The main challenge was working around the hospital’s requirements. For example, we provided a weekly plan for the areas we were working in and the rooflights / plant affected. Where possible, we worked out of hours while doing rooflight replacements to minimise any issues. We also worked closely with Bauder to vary the specification when we had to work around live plant. The communication between Bauder and Breyer Roofing was exemplary throughout and I was pleased this completed project was nominated for a national award."

Showing 1-9 of 9

Feedback