NBS Source
I'm a manufacturer

"locker"

556 results found

Sort by:

Showing 145-150 of 150

Sponsored
Barking Wharf, East London

Barking Wharf, East London

The Safety Letterbox Company

THE PROJECTAPO Barking is an exciting location located on the banks of the River Roding and opposite Abbey Park , Barking, East London – offering a brand new ‘living’ style and completely flexible membership. This new residential development provides London renters with access to thoughtfully designed Build to Rent apartments and a bucket list of services and amenities that take the hassle out of everyday life.Their mission is to create a living network that listens and responds to the everyday needs of its members. ‘Life admin’ is made easier – for example all utility costs are wrapped up in one simple monthly payment, myRENZbox digital parcel lockers take in deliveries 24/7 and their mailboxes enable the secure and easy delivery of all mail in one location.THE PRODUCTSLB installed 126 no. myRENZbox parcelboxes in various sizes , arranged in one large system which look suitably impressive within the reception area in matt white. The customised process was created specifically for them to suit their exact needs and resulted in a future proofed solution to cope with the growth of e-commerce and parcel volumes. H1 model mailboxes were installed in a postal area to ensure both mail and parcels were considered and a suitable and aesthetic solution provided.PROJECT DETAILSProject Type: BTRProduct: myRENZbox parcel boxesInstallation: FreestandingDetail: Both Mailboxes and Intelligent Parcel solutions installed
Sponsored
Allerthorpe Golf Club

Allerthorpe Golf Club

Excelsior Panelling Systems Ltd

The ProjectHaving been closed for 4 years, Allerthorpe Golf Club has recently undergone a massive transformation.Purchased by Park Leisure, the Golf club has been transformed beyond recognition and is keenly awaiting official opening in September 2018.  The Challenge The members have waited an extended period of time for the facility to be reopened and expectations were high.Creating the right environment and finish internally is of high importance and needs to be befitting of Park Leisure and of a standard expected by its members.Symms Revill Architects specified the project, and the full spectrum of Excelsior products were required on the scheme.Z section lockers, complimentary bench seating including cubicles and wall panelling.  The Solution Engaged by main contractor Speller Metcalfe, Excelsior worked closely with both Speller Metcalfe and Symms Revill to get the specification and design just right for this prestigious Golf Club.The Architects design, coupled with Excelsior’s ability to adapt and produce bespoke products has resulted in a first-class finish for the club and its members.SpecificationProduct Range: 12mm Solid Grade Laminate, Formica Delano OakDoors: 12mm Solid Grade Laminate, Formica Delano OakPilaster: 12mm Solid Grade Laminate, Formica Delano OakPartition: 12mm Solid Grade Laminate, Polyrey Beige NatureIronmongery: SBAA Semi Bright Anodised Aluminium
Sponsored
One Great Cumberland Place

One Great Cumberland Place

INTRAsystems

Making an ImpactOne Great Cumberland Place is 5,511m2 of high-grade office and retail space, over 8 floors behind an Art Deco façade. Each of the three entrances receives hundreds of pounding feet every day. The design ambitions here were to maintain and enhance the historic elements; the curved draft lobby, original hardwood, brass details, and marble floors.Water and dirt collection was the major challenge for all entrances. But, in particular, a dedicated entrance leading to 121 bicycle lockers housed in the basement!We’ve worked with Allford Hall Monaghan Morris (AHMM) on several projects, so they knew INTRAsystems’ premium Entrance Matting products would be up to the task.Combination inserts deliver with efficiencyIn a busy location with so much coming and going, performance, serviceability and longevity were key. AHMM opted for alternating inserts of INTRAlux® Ultimate 907 Anthracite fibres and Ribbed Rubber.This premium Entrance Mattting combination can withstand heavy wear from tyres, and remove more debris than fibre alone while the INTRAlux® Ultimate inserts offer market-leading moisture absorbency.The Unbeatable Duo of Durability and Luxury in Entrance MattingThe innovative composition of our Ultimate fibre draws off three times more moisture than traditional fibres. And the 900g/m2 density enables faster moisture evaporation, even in busy areas.INTRAflex XT is a popular design choice for outstanding performance, consistency, and adaptability. This open construction variant easily draws off debris and water brought in from the busy London streets while the tough aluminium frame comes with a 10-year warranty and a choice of three finishes. The black anodised finish chosen here is stylish and inconspicuous.Hidden Depths in the Challenging Cycle CorridorThe cycle entrance corridor is 7m x 2.2m, especially designed to welcome heavy bicycle traffic heading down to the subterranean lockers.Wall to wall Entrance Matting runs along the stretch with our unique INTRAmatting Waterlogic drainable system mounted underneath. This 80mm deep tray sits on a screed base and holds up to 75 litres of water per m², perfect to collect water run-off or direct water contact.Its a great hack for this location, since the doors are open to the elements for longer to allow riders to enter and exit the building. The engineered gradient helps to collect dirt and contain or divert water into an optional drainage outlet.Easy Entrance Matting MaintenanceDesigned for extreme performance and built to withstand pretty much anything. We’re so confident in Waterlogic’s durability, we provide a 15-year warranty. What’s above the tray is equally industrious. The heavy-duty INTRAflex XT system is removable to aid maintenance. Facilities teams can clear debris without special tools or training, saving time and money for a busy property.A sensitive and Robust OutcomeAHMM maintained key architectural features of the Art Deco façade in their design scheme. Features like the curved draft lobby, wooden detailing, brass thresholds, and marble floors and motifs.INTRAsystems’ products enabled the installers, LW Flooring, to sensitively and precisely work around them. The entrances contain engineering secrets that deliver exceptional performance to perfectly complement this beautiful building.
Sponsored
Harper Collins Publishers Bike Hangars

Harper Collins Publishers Bike Hangars

Falco UK Ltd

These are the latest secure FalcoPod bike hangars installed this month at the new Harper Collins Publishers editorial office and distribution at Robroyston in Glasgow, which is currently the largest logistics development project in Scotland.Falco manufactured, supplied and installed a series of ten secure FalcoPod Bike Hangars, a 12m FalcoQuarter waiting shelter run and a secure FalcoLok-500 refuse store.Each FalcoPod bike hangar provides secure cycle parking for up to six bikes each, providing a total of 60 secure cycle parking spaces for employee use. Each bike hangar has been supplied with instructional signage, powder coated in a Harper Collins blue RAL colour and Harper Collins branding graphics.Installed outside the main entrance, each secure bike hangar takes up no more room than a single car parking space and is capable of accommodating all types of cycles - from road and mountain bikes to bikes with a child seat on the back or storage basket on the front.A 12m waiting and smoking shelter has been installed next to the bike hangars, made up of a series of three 4m FalcoQuarter shelters, one starter section and two add-on sections. The modular nature of the FalcoQuarter allows additional shelters bays to be added or removed in the future.A secure 5m x 4m FalcoLok-500 refuse store has also been installed next to the waiting shelter, clad in sustainable hardwood slats and fitted with double doors and a secure access system.FalcoPod Bike Hangar The FalcoPod bike hangar, as shown here at Harper Collins Publications, is a robust on-street cycle parking solution designed to meet the needs of cyclists who don’t have access to private cycle parking facilities. The improved innovative shape means that users no longer have to remove some baskets or child seats when storing their bike!Falco design is both evolutionary and innovative by nature and the new FalcoPod is no exception. This is the third generation of ‘bike hangar’ type product building on the pedigree of the original street locker the ‘Midi Bike Box’ with some great new features over existing products as follows:Size - fits in half a car parking space and houses 6 bikes, with covered weather protection.Family inclusive – with an ergonomically improved design, the additional space/height (55% more) means there is no need to remove child seats or baskets from the back or front of bikes.Bike security - the six place FalcoSound bike rack has three locking points including the ability to use a ‘D’ lock through the rear wheel and frame.Easy access - single door with integral lock and gas strut for assisted lifting.The effective bike hangar has already been successfully rolled out to the London Borough of Waltham Forest, Brent, Camden, Westminster and Merton Councils. Bike Hangar Management and MaintenanceThrough our ‘Falco Rentals’ team, Falco now offers local authorities and private companies a fully managed bike hangar service dealing with key management and public payments as well as a regular planned maintenance service to support the council with its ongoing public service maintenance obligations.This service is not just restricted to bike hangars though, we are able to provide a rental service for any cycle parking facility, from cycle hubs and bike stores through to individual cycle lockers, the Falco Rentals system is both flexible and simple to use.For more information about the FalcoPod Bike Hangar, the FalcoPod Bike Hangar service or your cycle parking scheme, please contact our helpful sales team on 01538 380080. 
Sponsored
Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Falco UK Ltd

Falco recently took to the design, manufacture, supply and installation of a bespoke cycle hub based on the traditional FalcoLok-500 design. Installed at Anson House, south Westminster, in view of the River Thames, the new cycle hub has been coupled with the FalcoVert-Pro cycle rack to provide secure accommodate for up to 24 bikes.Installed on behalf of Westminster City Council, the new cycle hub features electrogalvanised perforated sheet cladding, powder coated in a Jet Black RAL colour, along with a secure access system.The whole shelter is a bespoke contemporary design of the classic FalcoLok-500 shelter, which features clean lines through the glass cladding and supported by stainless steel glass clamps. The steelwork is hot dip galvanised to BS EN ISO 1461 and also meets UK structural design laws with EN 1090 accreditation. Rainwater is collected via innovative integral gutters as part of the roof system and a bespoke bund ensure that the cycle hub is weather proof!The cycle hub was commisioned to help reduce congestion and provide greater cycling accessibility for residents of Anson House.The FalcoVert-Pro as shown here at Anson House, is a space saving cycle rack design ideal for highly popular densities such as stations, cycle hubs, shopping centres, high streets and car parks etc. Bicycles are parked semi vertically with both front and rear wheels located in a custom designed trough.Falco cycle hubs can also incorporate a world of features including; smart LED lighting, green sedum roofs, CCTV and Help Point facilities as well as numerous other cost-effective features for the cyclist such as lock holders, helmet lockers, seating and bike repair facilities. For more information about the FalcoHub cycle store, a demonstration of the FalcoSmart app-based lock, the FalcoPod bike hangar or any other Falco product, then please speak to one of our friendly customer service staff on (01538) 380080.
Sponsored
Conquest Hospital, St Leonards-on-Sea

Conquest Hospital, St Leonards-on-Sea

Rapid Ramp Limited

PROJECT BACKGROUND:As pressure continues to build on the UK’s health service, Conquest Hospital's Emergency Department urgently needed to transform their current staff welfare area with additional space, achievable with a modular extension.The design included a canteen space, toilets, shower rooms, storage areas and lockers for NHS staff.REQUIREMENT:External developments included an accompanying ramp to overcome the exterior door threshold. The works needed to be achieved within a quick turnaround time and with minimal disruption to the daily running of the department.SITE SURVEY & DRAWINGS:We responded rapidly with a site survey soon after the initial enquiry.This project benefitted from the Lidar scanning technology used by our site surveyors.The machine scanned and plotted the heights and widths of the objects in view, including different floor levels.Our in-house designer then created a 3D visual of the ramp on top of the lidar model, ensuring to draw around any obstructions.The final 3D & 2D drawings were after given to the client with their quotation.END RESULT:Once the extension was near completion, the ramp was fitted in an L shape configuration within a day, minimizing disruption.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder Coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURES INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.

Showing 145-150 of 150

Feedback