NBS Source
I'm a manufacturer

"joint sealants and fillers"

1,234 results found

Sort by:

Showing 181-206 of 206

Sponsored
London Brick Wall Panels at Battersea Café

London Brick Wall Panels at Battersea Café

Vtec Group

London Brick Multi and White wall panels were specified in the design for a new café at Battersea. Chosen for their natural textures and features, the panels help create real atmosphere. Produced from original walls, Vtec panels contain in excess of 50% natural pigments, oxides and minerals. They're lightweight enough to be used almost on any type of structure, as well as being strong and highly durable - perfect for high traffic areas. Panels were installed either side of Arches, mounted on false walls. Large panel size achieved wall coverage quickly and easily with concealed joints for a seamless finish.
Sponsored
STYLE’S PARTNERSHIP WITH SUNESIS GROWS

STYLE’S PARTNERSHIP WITH SUNESIS GROWS

Style - Moveable Partition Specialists

Since 2010, Sunesis has successfully delivered 18,000+ school places with every project receiving high customer satisfaction scores. A joint venture between Lungfish Architects and Willmott Dixon, Sunesis offers school buildings using a tried and tested process. Clients choose a building model that best meets their needs, adapting it their specific requirements. Flexible space is an important part of the personalisation process, and on the Keynes2 range of Primary schools, Sunesis customers benefit from the very best partitioning solution thanks to the partnership with Style, which is providing a DORMA Variflex moveable wall with a superb 55dB Rw acoustic rating.
Sponsored
CBRE, Manchester

CBRE, Manchester

SAS International Ltd

SAS International collaborated with architects TP Bennett to deliver metal ceiling solutions to meet CBRE’s unique demands on this CAT B fit-out. SAS330i LED noggin lights were selected to provide a seamless butt-joint solution between panels and gridwork. This effect ensures there are no gaps between light and ceiling. Manufactured from extruded aluminum profiles, each light was polyester powder-coated at SAS’s factory to ensure flawless colour consistency across the space. Delivering a complex fit-out on time and to specification, SAS delivered a striking feature ceiling that has transformed the office space for the client.
Sponsored
Concrete Reception Desk at Goat Yard, London

Concrete Reception Desk at Goat Yard, London

LIVING CONCRETE LTD

Goat Yard, formerly a Victorian Warehouse building named Albion House, underwent comprehensive refurbishment to offer grade A office accommodation, totalling 30,484 sq ft. Refurbished by West 1, a leading high-end office fit-out Contractors, the building boasts a newly reconfigured reception area. The Living Concrete team were commissioned to cast and install a custom-build concrete reception desk.Spanning 3m long, the single cast was made offsite, without any joints and finished in Mist Pitted finish to resemble a real, cast in-situ concrete. Laminated grey joinery and black Forbo rubber-lined worktop completed the look.
Sponsored
Expanded SYSTEMGLAS® range offers additional applications

Expanded SYSTEMGLAS® range offers additional applications

Promat UK

The SYSTEMGLAS® fire resistant, butt-jointed glazing system range from Promat has been expanded with a host of new configurations and additional performance capabilities to meet the growing demand from architects for assured fire protection. Detailed in the new 2019 SYSTEMGLAS® Specifiers Guide, the new options supplement an already expansive product range of fire-resistant glazing screens offering protection of between 30 and 120 minutes. The range’s four systems provide framing options in steel, timber and two which utilise the fire-resistant calcium silicate PROMATECT® H to allow for over-cladding or concealment for a virtually ‘frameless’ effect.
Sponsored
Palmer Park Reading

Palmer Park Reading

CLD Physical Security Systems

In 2016, Reading Borough Council and the British Cycling invested over £350,000, in a joint funded scheme, into the Palmer Park Sports Stadium.This investment was set to fund the renovations to the Velodrome track fencing, lighting and other improvements to the cycle track in order to improve visitor experiences.After the restoration, Palmer Park’s velodrome track was officially reopened to the public on March 11th 2017 by the Mayor of Reading, Mohammed Ayub and representatives from the British Cycling.The BriefThe brief for this project was set out by the specific requirements both clients wanted for the Safety Velodrome Fencing.Increase the safety and security of the perimeter fencing around the track.Must be specified by the British Cycling adhering to appropriate standards.
Sponsored
Manchester Airport – Terminal 2

Manchester Airport – Terminal 2

Inpro

Architect: Pascall + Watson Ltd.London, UKContractor: Laing O’RourkeDartford, UKInstaller: EKSPANSheffield. UKThe ProjectA £1 billion expansion of Terminal 2 that will be 150 percent larger than the original to boost passenger capacity and provide gate and tarmac space for the largest jets now in operation. The new terminal will feature 32 new shops and food and beverage outlets.Unique ChallengeArchitects were concerned about thermal movement creating a 20mm difference in floor heights across the slabs or sections of the terminal. This would present a trip hazard for pedestrians transiting the terminal, which could potentially be present over weeks or even months during the hottest or coldest times of the year.Solution ProvidedInpro® product designers created a project-specific “glide plate” floor joint. This custom solution had to move in three directions while simultaneously addressing the rigorous heavy-duty loads encountered in this major transportation hub. The new solution was presented as a 3D-printed prototype model only days after the idea was discussed with the architects. The new system can withstand the extreme movements and the additional loading present in airport concourses, from wheeled luggage up to passenger transport vehicles and maintenance equipment.The new 300HD system easily accepts the flexible Fireline® 520 fire barrier, which recently passed testing for all the European standards.Inpro® Products Used• 300HD Glide Plate floor-joint system• 811 Series cover plate system• Fireline® 520 fire barrier
Sponsored
Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Alumasc Water Management Solutions

Alumasc Rooflights provided an ideal solution to allowing natural daylight into the building from above. The unique kerb design incorporates both security and waterproofing to create a reliable, safe and secure rooflight, allowing horizontal termination of the waterproof membrane. This makes water penetration virtually impossible. The domed glazing is moulded from Marlon FSX Longlife, premium quality solid polycarbonate, which has an impact resistance up to 200 times that of glass.Technically sophisticated, Harmer AV high-performance aluminium roof outlets are chosen for this project as they guarantee a trouble-free performance and are especially suited to flat roofing applications featuring continuous membranes.Harmer AV roof outlets combine innovative product design with full industry compliance to meet the needs of rainwater drainage in any construction project, with the ability to drain up to 40% more roof area than conventional gravity outlets. Further to this, their lightweight, durable, non-corrodible design means that they will do so for up to 40 years.GX Pressed Aluminium Gutters are robust box section gutters designed for traditional wet jointing on site. They’re especially suited to applications where maximum capacity gutters are required. For the very large drainage area of the campus roof, they were perfect.Designed to fully accommodate thermal movement at every joint, they are lightweight, durable and noncorrodible, and, upholding the environmental prerequisites of this project, they are 100% recyclable.Finally, Heritage Circular Pipes are available in 4 pipe diameters and 3 pipe lengths, together with a complete range of fittings. Can be factory finished to replicate cast iron or with BBA certificated powder coatings in a range of colours.
Sponsored
BBC DIY SOS - F. Ball products support BBC’s DIY SOS: The Big Build

BBC DIY SOS - F. Ball products support BBC’s DIY SOS: The Big Build

Ball, F and Co Ltd

F. Ball products have been used to install floorcoverings, as part of a life-changing residential refurbishment. Contractors began by priming the concrete subfloor using Stopgap P131 general purpose primer, before applying Stopgap Fast-Track 30 floor smoothing underlayment to level the rooms. Styccobond F73 PLUS heavy duty adhesive provided the high bond strength needed to secure Tarkett Primo Safe-t vinyl sheet and LVT. Plywood sheets were firmly affixed to the existing floorboard subfloor, and Stopgap 500 Micro was used to smooth over screwheads and the joints between panels. Contractors then installed LVT, again using Styccobond F73 PLUS adhesive.
Sponsored
Pendock gets fit with Virgin Active

Pendock gets fit with Virgin Active

Pendock

Laminated column casings from the Pendock Radius range are providing a splash of colour, while also concealing structural steelwork at the Virgin Active gym in Islington, London.The 450mm diameter column casings are manufactured from ply/MDF and are each finished with a highly durable high-pressure laminate (HPL) in bright yellow and scarlet to provide an eye-catching solution that integrates with the gym’s contemporary design.Manufactured in ‘quadrants’, each column casing section incorporates a contrasting black shadow gap feature joint, as well as black header and skirting collars. The casings are also used to surface mount large mirrors, while the HPL finish is resistant to scuffs and damage, making it ideal for high-traffic environments
Sponsored
Sage

Sage

Komfort Partitioning Ltd

To make the space work for the acoustic and aesthetic requirements, Ryder specified Komfort’s frameless partitioning systems.Komfort’s single and double glazed partitioning systems with 25mm deflection were specified by Ryder in all the meeting rooms on multiple floors. Komfort’s manufacturing team MIG welded together each of the 90-degree corners to create a unique and bespoke design for this project. This helped install speed and resulted in a seamless and high-end appearance by ensuring no separation once glazed.In an aluminium frame, our partitioning creates the appearance of frameless glass with our patented bubble joint. Our systems are designed to balance aesthetics, elegance and durability in any working environment and offer market-leading performance.
Sponsored
Improving Leicester City Centre’s Infrastructure with Essential Road Repairs

Improving Leicester City Centre’s Infrastructure with Essential Road Repairs

HMS Decorative Surfacing Limited

Leicester, nestled in the heart of England, has long been celebrated for its historical significance, being the final resting place of King Richard III and boasting a cultural heritage that spans centuries. While its historical charm and cultural heritage continue to draw tourists from around the globe, the city is also a bustling business centre. Beyond the medieval landmarks and archaeological treasures, Leicester also attracts thousands of commuters daily and relies heavily on a well-maintained and efficient transportation network.Recognising the crucial role that roads play in connecting the city’s historical landmarks, thriving businesses, and residential neighbourhoods, Leicester City Council has undertaken a comprehensive initiative of essential road repairs.The council partnered with HMS, a well-known surfacing contractor with over 30 years of expertise in repairing road surfaces all over the country. This collaboration signified a crucial step in the city’s journey to improve its roads and ensure a safe and successful commute to and from the city. PROJECT SCOPEPermanent joint or crack and pothole repairsHAPAS/BBA-approved specialist materialVarious roads in and around the city centre:Catherine Steet with the junction of Ulverscroft Road, including the roundaboutWatermead WayRedhill Way flyover and roundaboutPalmerston WayGlenfrith WayGroby Road, A50Traffic management OBJECTIVESExtend the road surface life in and around Leicester city centre with permanent road repairs that will last for a minimum of 10 years.Reduce the disruption to residents, commuters, and businesses with no costly road resurfacing works.Improving road safety and minimise vehicle wear and tear for all road users.RESULTS16,000 linear metres of joint and crack repairs.Circa 50 pothole repairs with 5 tonnes of HAPAS/BBA-approved specialist material.Completed in just 11 nights. Minimal disruption to residents, businesses, and commuters.Permanent road repairs increase the longevity of the road surface by 10 years or more, reducing the need for resurfacing work.HMS’s In-house traffic management to minimise disruption, reduce project costs, and ensure on-the-job flexibility – which is how we completed it in record time.These accomplishments stand as a testament to the strategic planning and seamless execution of Leicester City’s road repairs. IMPLEMENTATION#1. Traffic Management for Seamless RepairsHMS not only worked nights to ensure minimal disruption to drivers, but also our in-house traffic management ensured a flexible, but well-thought-out plan to minimise disruptions during surface repairs. This flexibility reduced costs for Leicester City Council and ensured the project was finished ahead of schedule. #2. Overbanding to Address Road Joint and CracksOverbanding is used as a targeted solution to address joints and cracks that may have started to appear on road surfaces. The technique involves applying a durable material over the damaged areas creating a seamless and protective layer that enhances the structural integrity of the road.By HMS addressing joints and cracks using this technique, Leicester City Council is proactively preventing further road surface deterioration, reducing the likelihood of more extensive and costly repairs in the future. #3. Pothole Repairs with HAPAS/BBA-Approved MaterialsHMS filled potholes that had appeared on the road surface with materials approved by the Highway Authorities Product Approval Scheme (HAPAS) and the British Board of Agrément (BBA). This ensures that the repairs meet rigorous standards for quality, durability, and safety. 4.      Hot-applied Sealing for LongevityHot-applied material was laid by HMS to create a weather-resistant barrier on the repaired surfaces. It protects against water infiltration, freeze-thaw cycles, and other environmental factors that can compromise the integrity of the road. The application extends the lifespan of the repairs and road surface, contributing to the overall resilience of Leicester’s road infrastructure and reducing road resurfacing costs. 5.      Quality Assurance“Leicester City Council regularly inspects the quality and effectiveness of the road surface repairs and we are very pleased with the quality of workmanship from HMS. The team have worked efficiently to ensure minimal disruption to road users and has completed all road repairs in a timely manner.” Jamie Long, Senior Highways Engineer, Highways Maintenance Team at Leicester City CouncilThe collaboration between Leicester City Council and HMS has resulted in safer roads for residents, commuters, business owners, and tourists who travel in and out of the City Centre. By employing HMS, the project was completed in just 11 nights, meaning minimal disruption to road users. In total, 16,000 linear metres and circa 50 potholes (5 tonne) were repaired, using HAPAS/BBA-approved materials. “The work that HMS has completed not only ensured the safety of our roads but also the longevity of our roads. These road repairs have a lifespan in excess of 10 years, reducing the costly exercise of undergoing road resurfacing works, not to mention the heavy disruptions to road users.”Jamie Long, Highways Engineer, Highways Maintenance Team at Leicester City Council
Sponsored
Grand Designs: Green Roof Project

Grand Designs: Green Roof Project

Polyroof Products Ltd

The Protec System was used to waterproof the domed green roof areas of this striking, sustainable house development which was featured on Chanel 4’s Grand Designs. With an ambitious vision and a tight budget, Robert and Milla Gaukroger set about transforming a dated 1980’s house overlooking Lake Windermere into a state-of-the-art, eco-conscious home. Since the house lay in beautiful hillside surroundings, in order to blend into this setting, the domed roofs of the house were to be covered with a wildflower meadow mix to provide a green roof construction.The SolutionThe Protec System was chosen as a waterproofing membrane for the roofs as it is ideally suited for green roof applications. Lightweight, flexible and highly durable, the system can easily accommodate structural expansion movements and is tough enough to resist root penetration. The Protec system was applied to over 350m2 of domed roof to provide a long-lasting waterproofing membrane.The key reasons why Eastleigh chose Protec are the same reasons that has seen it become one of the fastest growing cold-applied liquid roofing systems in both the new build and refurbishment markets. Combined with the timber cladding to the verticals of the building, the finished aesthetics of the development blended seamlessly with the surrounding areas.A warm roof build-up that can be made waterproof at multiple stages:For larger projects the Protec system can be made temporarily waterproof at two stages prior to the application of the full waterproofing system. The first stage is upon installation of the sealed, aluminium-faced vapour barrier.The second phase follows the reinforcing of the foil-faced insulation board joints with Protec resin and taping mat. This enables a much more controlled approach to the installation with a greatly reduced chance of rain causing disruption and damage during the works.Highly flexible membrane:Regardless of the size of the roof, Protec forms a homegenous membrane, without a single joint or seam and without the need for any expansion joints.RapidCure technology for quick installation:The application of Protec as a liquid, through to the curing process where a solid, tough membrane that can be walked over, takes only 30 – 60 minutes. This enables large sections of the roof to be fully completed in a short space of time.Installing the Roofing SystemsThe Protec System provided waterproofing to all flat roof areas as well as the extensive parapet wall sections. The roof areas were made up of two designs: the Protec Warm Roof System (approx 7,500m2) and Protec applied to concrete as part of an inverted roof design (approx 1,000m2).The roof installation was carried out with a planned, phased approach that was synchronised to the wider construction schedule. For the warm roof areas, the first stage was to fill the troughs of the structural metal roof deck with acoustic insulation infills that will dampen external noise within the leisure centre. Next, the crowns of the deck were primed ready to receive the self-adhesive vapour barrier.The use of a high-performance aluminium vapour barrier not only eliminates the risk of condensation within the roof, but also provides temporary waterproofing protection, which is extremely useful on larger works such as this.The Polyroof RES Insulation boards, which comprised of a two layer system totalling 170mm to achieve a U-Value of 0.14 W/m2K, were bonded using high-performance PU adhesive to the vapour barrier. Following the wind uplift calculations it was determined that mechanical fixings were not required for this application – making for an extremely rapid installation. As you can probably imagine, fixing through 170mm of insulation into the crowns of the metal deck can be a tricky and time-consuming task.A key advantage of using a tongue and groove insulation system is that the finished surface of the roof is smooth and level without any unsightly board steps that can also lead to standing water issues. The insulation board joints were sealed using Protec resin with Polymat Taping Mat 450 which, in addition to providing additional strength to the joints, also creates a temporarily waterproof layer.For the inverted roof sections, Protec was applied directly to the primed concrete/screed surface. The membrane was inspected by Polyroof Technical Services, signed off and then covered with inverted roof components. An interesting fact when using Protec in inverted roof situations is its incredible durability performance – as tested by the BBA, Protec “can provide an effective barrier to the transmission of liquid water and water vapour for the design life of the roof in which it is incorporated”.Monitoring and CompletionThroughout the duration of the contract, Polyroof Technical Services carried out regular site visits that were reported back to Interserve as part of Polyroof’s free-of-charge contract monitoring service. This enabled the client to keep up-to-date with the progress of the roof installation in detail and also provided peace of mind that the original specification was being closely followed and implemented.Polyroof worked closely with the Roofline Group during the installation, enabling the challenges were identified and solved in an efficient and coordinated manner – saving the client time and money.
Sponsored
The Danish Living Room, London Design Fair

The Danish Living Room, London Design Fair

Junckers Ltd

When the Trade Council of Denmark exhibited a real world Danish Living Room at London Design Fair. The stand featured a curated mix of Danish brands to highlight Denmark’s strong heritage within quality design. Facilitated by the Embassy of Denmark in London and sponsored by Junckers, whose Hexparket flooring formed the backdrop to a host of iconic and promising contemporary Danish brands. Made in solid wood, the hexagonal design showcases Junckers’ long-standing tradition for quality and craftsmanship with a contemporary take on the classic parquet floor. The joint stand presented furniture, lighting, homeware, kitchen, TV and sound. Other brands included Fritz Hansen, Overgaard & Dyrman, Spekva, LOP Furniture, Arttiles, Møbel & Rum and Made by Toft. 
Sponsored
Green facade covers like an envelope

Green facade covers like an envelope

RENOLIT Cramlington Ltd

Roof and facade cover... CHALLENGE For the design of a youth centre a Belgian architect wanted to have a fully homogeneous and waterproof cover for the roof and the facade. This envelope technique needed to be combined with a more ecological and aesthetically pleasing green wall design. SOLUTION For the waterproofing of the roof surface a standard RENOLIT ALKORPLAN roofing membrane was used. For the facades the architects opted for a RENOLIT ALKORSOLAR fixing system as the base to attach the final greenwall system. As the roof and the wall covering (waterproofing) are the same material there were no jointing issues. The whole building has been covered with RENOLIT ALKORPLAN roofing membrane. The facade details were similarly accomplished as standard roof details and RENOLIT ALKORSOLAR profiles were used to fix the rain water pipes from the roof.
Sponsored
GEC Anderson Worktops Just The Tonic For GMC HQ

GEC Anderson Worktops Just The Tonic For GMC HQ

Anderson, GEC Ltd

The General Medical Council protects patients and improves medical eduction and practice in the UK by setting and upholding standards for students and doctors.GEC Anderson were employed to supply and install new worktops within its HQ building, located on London’s Euston Road. The project was undertaken by Carmelcrest who asked GEC Anderson to provide the new 5m worktop within the Pantry Kitchen. Access to the room was fairly restricted and, as it was on one of the upper floors of the tower, it was necessary to supply it in two sections. A clamp-joint was used to provide the near seamless and hygienic join. Two sinks were included at one end of the worktop whilst the other end provides the clear, plain, work surface required within the busy kitchen space.
Sponsored
Garfield Center San Fransisco

Garfield Center San Fransisco

Trespa UK Ltd

New Clubhouse Fits in Perfectly with Historic City Pool to Create a New CenterSpread across 3 acres in the Mission District of San Francisco is Garfield Square Park. A popular recreation hub for the community, the park includes a historically significant indoor swimming pool with its much loved culturally significant murals, clubhouse, basketball courts, and courtyard with BBQ facilities and splash pad. The pool and clubhouse had served the community for decades and were in need of updates to not only meet current code but also changing needs. The joint venture of PTA/TEF Design of San Francisco won the commission in 2016 and was tasked by the City of San Francisco with renovating the historic indoor pool and unifying it with a newly designed clubhouse and lobby.
Sponsored
GreenCoat PLX Pural Metallic Dark Silver - Private Residence, Killearn

GreenCoat PLX Pural Metallic Dark Silver - Private Residence, Killearn

Metal Solutions Limited

GreenCoat PLX Pural BT from steel manufacturer SSAB. Highly durable GreenCoat products feature a bio-based coating whereby a substantial portion of Swedish rapeseed oil replaces the dependency on fossil fuel oils. A patented solution reducing the environmental footprint making GreenCoat the market’s greenest steel for roofs and façades. This formable steel can be worked at temperatures below -15°C and is backed up by a 50-year technical guarantee. GreenLine® colour matched rainwater goods are made from GreenCoat RWS and offer the perfect finish to any project large or small. Easy to install using rubber sealed connection joints. GreenLine® rainwater goods are offered with a 30-year guarantee.
Sponsored
Cherrywood, Ireland’s largest urban development

Cherrywood, Ireland’s largest urban development

Sto Ltd

More than 20,000m² of Sto’s external wall insulation system has been specified for two residential schemes at Cherrywood, Ireland’s largest urban development driven forward by real estate group Hines and its joint venture partners, APG Asset Management over the past seven years.Located on a 360-hectare site to the south of Dublin, Cherrywood is expected to serve a population of 25,000 people, offering more than 7,700 new homes, six schools, three parks and leisure facilities.Henry J Lyons Architects selected the StoTherm Mineral insulation system for apartment blocks forming part of the first and second phase of the residential construction. Now complete, the first scheme comprises 431 homes divided into two equally-sized blocks. The second consists of 520 units spread across three blocks and is due to be completed in Summer 2023. Sto installation work was carried out by applicators Platt Reilly.Consisting of mineral fibre insulation boards, the StoTherm Mineral system provides a high level of thermal performance and fire protection. It has been installed onto lightweight steel frames using Sto-Rotofix Plus. Thanks to a unique spiral design, these fixings help to create a seamless façade across all the blocks as well as a cavity behind the insulation board allowing any excess moisture to drain. Using the Sto-Rotofix-Plus, any unevenness in the substrate can be easily rectified by adjusting the insulation boards after they have been installed. This means there is no need for unsightly expansion joints and a smooth surface can be created ready for applying the render.All the apartment blocks will be finished with the StoSilco silicone resin render to provide high levels of water repellence and resistance to algae and fungus growth. 
Sponsored
Circle Square, Manchester

Circle Square, Manchester

Kawneer UK Ltd

Installed by Kawneer’s approved specialist subcontractor FK Group, the £25.3 million project, designed by FCB Studios, was the first to use Kawneer’s newly enhanced AA®110 Curtain Wall system that features a bespoke expansion joint, which allows a building movement tolerance of +/- 15 mm. Creating a sense of scale and vibrancy, the white profiled terracotta ceramic façades contrast the earthy tones of the perimeter buildings in a modern interpretation of the grand Victorian warehouses nearby. The high-performance Curtain Wall was accompanied by AA®720 Side Hung Open-In Windows to deliver a high level of thermal performance throughout. Using passive principles, the high insulation building fabric coupled with solar control glazing, address the energy requirements for heating and cooling.
Sponsored
WilkinsonEyre makes Vandersanden the educated choice for Queen Mary University

WilkinsonEyre makes Vandersanden the educated choice for Queen Mary University

Vandersanden Brick

Award-winning global practice, WilkinsonEyre, specified bricks and brick slips from innovation-led manufacturer, Vandersanden, to emphasise the horizontal volumes and architectural context of the contemporary, new Graduate Centre at Queen Mary University in London. Zero®, a new brick system from Vandersanden, offers a contemporary joint-free appearance and was WilkinsonEyre’s material of choice for the external walls of this 80m-long, seven-storey ground-scraper. Instead of being pointed up to the face of the bricks, the mortar is set well back, with rainwater draining behind. The use of brick draws attention to the horizontality of the building’s volumes and blends with neighbouring buildings...To find out more about the bricks used in this project or to see the wide range of high-quality bricks available from Vandersanden, click on the 'View more' link
Sponsored
Junckers solid oak floor for award-winning college campus

Junckers solid oak floor for award-winning college campus

Junckers Ltd

Riverside Campus at City of Glasgow College has won a multitude of architectural awards for its outstanding design. Home to the world-leading Maritime College, the building features a grand atrium where Junckers 22mm Oak Harmony finished in Ultramatt lacquer was specified for the expansive staircase and walkway. Designed in a joint venture between Reiach and Hall Architects and Michael Laird Architects, the building is BREEAM ‘Excellent’ with many innovative on-site energy generation measures. Junckers solid hardwood flooring is made from renewable, sustainable forests and the entire manufacturing process is powered by Junckers’ own on-site power plant, which uses the residual wood of the forested timber. The Oak Harmony floor adds natural warmth to the large, open space and provides a hard-wearing surface for a busy college environment.
Sponsored
Portobello Staircase

Portobello Staircase

Lazenby

This jaw dropping project featured Lazenby Light Natural polished concrete floors and cast in situ stairs. The concrete flows from the entrance hallways throughout the ground floor and up the feature staircase to the first floor landing.This 4 week phased project saw the polished concrete floor installed first. The formwork and reinforcement for the staircase was then fixed and built off the floor. Once the stairs had been cast the brass balustrades and handrails were retrofitted to the concrete.This self-supporting concrete architectural feature staircase involved discussions with external engineers who then designed the reinforcement. The complex angles, joins to other structural elements and the sleek elegance was meticulously planned and executed. The polished concrete floor joints carefully designed to enhance the creative charm of this project.Photography by David Butler
Sponsored
John Lewis goes shopping for Pendock column casings

John Lewis goes shopping for Pendock column casings

Pendock

A combination of bespoke and standard column casings from the Pendock Radius range are being used to conceal structural supports at two John Lewis stores in Liverpool and Manchester’s Trafford Centre.At its Manchester store, a series of square pre-formed plywood column casings finished in durable white laminate, are located throughout each floor with many of the casings in the clothing retail areas are bespoke manufactured and incorporate full height mirrors, which are mounted to the flat surface.Square column casings also feature in the multi-storey Liverpool shop and are also manufactured from pre-formed plywood with a white laminate and aluminium feature joints. In addition, circular column casings, manufactured from laminated preformed plywood, are installed in product display areas, such as menswear.
Sponsored
GREAT ORMOND STREET HOSPITAL – Zayed Centre for Research into Rare Disease in Children - London

GREAT ORMOND STREET HOSPITAL – Zayed Centre for Research into Rare Disease in Children - London

Stratum Resin Flooring Limited

Pure Design – Bolidtop 525Colour – S 6500-N800m2Architect – Stanton WilliamsMain Contractor - SkanskaInstallation dates – 2019Challenge Zayed Centre of Research into Rare Disease in Children is a building where those who work within it play a crucial part in our society. Stratum helped create a healthy and fresh environment in the specialist research laboratories based at the world-renowned Great Ormond Street Hospital. The space would be heavily used and the nature of the work in the labs required the floor to be hygienic, seamless, easy to clean and with high resistance to chemicals. The design of the building allows the public to see through the windows into the laboratories from street level, meaning aesthetics were equally as important in product selection as functional properties. Stratum installed 800m2 of Pure Design – Bolidtop 525 with integrated skirting throughout. Solution-      Joint free makes for a very hygienic solution, with integrated joint free skirting adding to this.-      Close co-ordination with the contractor, enabled the structure to be sufficiently progressed early in the programme. This allowed the resin to be installed early and fully protected in ample time for the lab benches to be installed over.-      Electrical Floor Bokes, seamless skirting.Result-      The resin flooring installed here is an excellent addition to this multi-award winning building.  “The Bolidt resin provides the perfect seamless floor finish in the main laboratory spaces within the Zayed Centre for Research. These are most visible laboratory spaces within the building, both internally and from the public realm, and a choice of floor finish was important. As well as giving the right visual appearance it provides the functional properties required for these hard working spaces. Pre-installation samples of the resin flooring were tested by the client user team and passed on all technical requirements. The resin floor is used in both dry and wet areas of the laboratory and is easy to maintain. Stratum provided a great overall service, both with pre-installation queries and during the installation itself”. Kalpesh Intwala | Associate Director | Stanton Williams
Sponsored
Lidl Doncaster | Lidl Tiling | Sopro RS 648 Vibration Slurry | compact-vibration floor tiling | Core PIC Ltd

Lidl Doncaster | Lidl Tiling | Sopro RS 648 Vibration Slurry | compact-vibration floor tiling | Core PIC Ltd

SMET Building Products Ltd

Sopro RS 648 Vibration Slurry was selected for the LIDL method of tiling which consists of compact-vibration floor tile fixing, in the new LIDL store in Bently, Doncaster. Smet Supported Partner, Core PIC Ltd, selected the superior quality German-made, RS 648 Vibration Slurry for its flexibility as a bonding slurry in the installation of stone and ceramic tiles, making it ideal for using in vibrated floor systems (or indeed conventional methods). The tiling was carried on on behalf of main contractor PDR Construction.In preparing the floor to LIDL spec, the floor screed is placed and struck off to required levels and pre-compacted using a straight edge. The bonding layer, namely Sopro RS 648 vibration slurry, is applied to prepared and pre-compacted floor screed and ceramic tiles are immediately placed with tightly butted joints to LIDL spec.After installation of a vibratable area (10 – 20 m², depending on situation/ambient conditions and resultant setting behaviour of floor screed), a surface vibrator is passed over floor covering and tiles vibrated into the adhesive bed. When sufficiently set, hardened and bonded joints were grouted with Sopro FL 526 Flexible Tile grout.Sopro RS 648 Vibration Slurry is a one-component, fibre-reinforced, polymer-modified, trass-bearing, cementitious bonding and contact slurry. Applied as flexible bonding slurry for installation of stone and ceramic coverings using vibrated floor system or conventional methods. It’s ideal for slurry application technique. Sopro RS 648 is particularly suitable for laying tiles with low water absorption (fully vitrified stoneware). For laying large-format units (30 cm × 60 cm) using vibrated floor system. It can also be used as slurry-applied bonding layer on substrates and on bedding adhesive.Sopro FL 526 Flexible Tile Grout is a flexible, trass-bearing, cementitious tile grout, meeting CG2 WA requirements to DIN EN 13 888. Suitable for grouting ceramic, fully vitrified stoneware, natural and cast stone coverings and glass block assemblies. Rapid set for low-suction tiles, with specially tailored joint-filling properties and first-rate washability (removability). Particularly suitable for balconies, patios and in conjunction with floor heating systems (UFH).The product’s special properties and SMET’s superior technical backup, are key factors in choosing Sopro RS 648 Vibration Slurry and Sopro FL 526 Flexible Tile Grout. Smet Building Products Ltd is committed to delivering high-quality products to the construction of LIDL stores.For more info on our range of SMET Professional Tiling Products.PDR built the new LoF (Lidl of the future) store in Bentley Doncaster. The 23,000 sq/ft store with its striking design will help to increase Lidl’s market share and see their profits continue to rise in the UK. The Bentley store will be PDR’s 10th new build store for Lidl.Related DownloadsTDS Sopro RS 648 Vibration SlurryTDS Sopro FL 526 – Flexible Tile GroutSmet Professional Tiling Systems Brochure

Showing 181-206 of 206

Feedback