NBS Source
I'm a manufacturer

"heat recovery systems"

1,829 results found

Sort by:

Showing 109-144 of 1294

Sponsored
Energy Efficient Design | Wood Burning Stove

Energy Efficient Design | Wood Burning Stove

Schiedel Chimney Systems

Schiedel offers a unique all-in-one system: a perfect union of wood burning stove & chimney, which is an ideal package when if you are a self-builder or renovating your home. Adding heat sources which are a permanent feature means that you need the best quality. So many times, a superb quality stove is installed but the remaining parts are usually cheap and liable to failure.
Sponsored
NIBE Ground Source & PV-T for large-scale project at the University of West London

NIBE Ground Source & PV-T for large-scale project at the University of West London

NIBE Energy Systems Ltd

University of West LondonLocated in the heart of England’s Capital, the University of West London (UWL) is committed to playing a leading role in tackling the global climate crisis by becoming net zero carbon by 2030. The University reported a 60% reduction in carbon emissions in 2021 compared to 2005. However, with a long way still to go before it is able to operate at net zero, UWL welcomed a £5 million award from the Government’s Public Sector Decarbonisation Scheme (PSDS) in 2021. With aspirations to retrofit its main sites in Ealing and Brentford, the funding unlocked a major opportunity to improve air quality around the borough whilst taking a big step towards meeting its net zero pledge by 2030.The SolutionUWL contracted Ameresco as principal contractor and designer, who partnered with NIBE Energy Systems and JKN Renewables, Ltd. The first and main challenge was to design a ground source heat pump (GSHP) system for the university without disrupting the main car park on the campus to reduce the impact on students. This, in turn, resulted in an innovative solution, combining a ground source heat pump system working with boreholes and solar PVT panels. The designed system not only supplies 222 kW of PV electricity generation but, crucially, acts as a collector system for the GSHP, capturing naturally occurring energy in the air to drive the heat pump process, and therefore reducing the number of boreholes required. The old gas boilers previously heating the campus were replaced with 584 solar PVT panels in combination with 34 169-meter boreholes to provide 900 kW of heating and hot water throughout the site. Further reducing disruption across the campus, JKN Renewables carried out an off-site build, with the pre-built PVT and plant room modules being delivered on time despite constraints caused by the COVID-19 pandemic. The heat pumps and solar PVT were supplied by NIBE Energy Systems, and JKN Renewables undertook the design, installation and commissioning of the system.The ResultsThis transformation really highlights the benefits of combining multiple technologies to deliver efficient, low-carbon solutions. Whilst the full capacity could have been delivered using boreholes, which would have been a less costly option, the University welcomed the installation of PVT as an innovative and space-saving option.The major project will save an estimated 500 tonnes of carbon each year, and 9,460 tonnes across the equipment’s lifetime. It will also save 3,116,738 kWh of gas-derived energy per year (equivalent to 70 heated homes) whilst improving local air quality.The project is thought to be one of the world’s largest PVT projects, and positions UWL as a leader in higher education for addressing the climate crisis. The project was recognised by the Energy Managers Association’s (EMA) Energy Management Awards, receiving the Highly Commended designation in the Decarbonisation Project Category.Testimonial“We have invested more than £150 million in our campus recently to create an inspiring social and learning environment for our students. But we know all this great work will be for nothing, unless we do our bit to tackle climate change. We have been taking a leading role in our community to tackle the global climate crisis… Recently, the university declared a climate emergency and pledged to become a zero net carbon institution by 2030. A big step to meeting this pledge, has been our decarbonisation program, that has seen the university harness the latest renewable technology to create our own energy and introduced energy saving measures across the campus. Backed by more than £5 million of Government funding, the project is the largest of its kind in the higher education sector, and really underlines our ambition to be one of the most sustainable universities in the UK.”Anthony WoodmanProfessor, deputy vice chancellor and provost for health of the University of West LondonAbout the installerJKN Renewables are specialists in low energy heating, cooling and hot water systems. They provide design, consultancy and installation services to both domestic and commercial sectors, with a range of experience in the renewable heating sector. They pride themselves on providing expert advice and quality installations of ground and air source heat pumps, underfloor heating and solar thermal.
Sponsored
Castle Park View, Bristol

Castle Park View, Bristol

Senior Architectural Systems Ltd

Castle Park View is the tallest residential building to have been built in the city of Bristol to date. At 26 storeys high, the residential tower block forms part of the wider Castle Park View scheme, which is also the largest Urban Green Space in the city.The development also features a main block and a 10-storey tower, creating in total 375 new one and two bedroom apartments. Senior’s slimline SF52 aluminium curtain wall system and patented low U-value PURe® aluminium windows and doors have been used across the scheme and were fabricated and installed by Denval, for architects Chapman Taylor and contractors Bouygues UK.Created following the extensive regeneration of a brownfield area and built on the former site of an ambulance station, sustainability is a key part of the design of the Castle Park View and the residential scheme has achieved a level four standard in the Code for Sustainable Homes certification.Both Senior’s thermally-efficient SF52 aluminium curtain wall system and Part L compliant PURe® aluminium windows and doors are highly durable and fully recyclable, making them the ideal choice for a modern development that is also striving to help reduce the energy bills of its residents. The thermal performance of the aluminium fenestration system complements the other sustainable features including the use of the UK’s largest water source heat pump, the nearby Castle Park Energy Centre, as the development’s main heat source.
Sponsored
Co-Operative, Birtley

Co-Operative, Birtley

Berry Systems

Berry Systems supply and installed safety barriers and balustrading to protect loading bays, warehouse racking, pedestrian walkways and the plant.The new Co-Operative Composite Distribution Centre in Birtley covers 25,600 sq metres (276,000 sq ft) and supplies a vast range of products from 3,500 lines to 262 Co-Operative stores in the North of England.Activity in the centre is extremely busy with hundreds of vehicle movements daily facilitated by 500+ members of staff. We won the contract to supply and install all the safety barriers, balustrades, loading bay barriers and racking protectors inside the warehouse, as well as the vehicle perimeter barriers and ramp barriers externally.All the products, with the exception of the galvanised spring steel barriers, were painted in high visibility yellow. The spring steel barriers are designed to absorb  impacts from HGVs and forklift trucks while retaining their own integrity and ongoing effectiveness. The Co-Op were determined to ensure their new development was as environmentally friendly as possible. Waste oil helps provide heating and the lighting system is solar controlled to eliminate wastage. It ensures a variable level of interior lighting to automatically complement exterior levels.
Sponsored
Endemol, Big Brother House

Endemol, Big Brother House

Roché Systems Ltd

Roché’s shutters were used throughout the Big Brother house to keep unwanted visitors out and housemates in, safely.Endemol, the production company behind the Big Brother reality TV series, needed a robust physical security solution that could be linked to the building management system and wouldn’t compromise the design of the set. An added challenge was that one of the shutters needed to be especially wide, at 7.8m.Roché provided the solution, installing a number of window and garden shutters, including the i95, as well a shutter for the famous Diary Room. Apart from providing physical security, these shutters also provide heat insulation and a level of soundproofing.
Sponsored
Tapillo Tap Hand Dryer

Tapillo Tap Hand Dryer

Heat Outdoors & Handy Dryers

The new ECO Tapillo Tap Hand Dryers have been designed with both style and function in mind.Both the Tapillo Single Air Tap Hand Dryer and the Tapillo 2 in 1 Air and Water Tap Hand Dryer are beautifully made from top quality 304 stainless steel and manufactured to an exacting high standard.Each dryer boasts an air temperature sensor to automatically reduce the heater power, saving energy and money. A 2x stage air filtration process also provides ultra clean sanitised air.
Sponsored
The Armadillo ECO Hand Dryer

The Armadillo ECO Hand Dryer

Heat Outdoors & Handy Dryers

Engineered for strength and reliability over a long lifespan, the Armadillo ECO is made with the most durable materials available and is capable of withstanding constant use.
Sponsored
How Hygienic are Hand Dryers

How Hygienic are Hand Dryers

Heat Outdoors & Handy Dryers

It has been debated over between paper towel and hand dryer industry giants for many years. Both sides of the argument have for some time been able to make viable scientific studies which prove one is better than the other at maintaining washroom hygiene and in a recent article in the Guardian newspaper, they further highlight this very impasse. But, are hand dryers really unhygienic? And who currently reigns supreme in the great paper towels vs hand dryer debate.
Sponsored
The Beaver ECO hand dryer

The Beaver ECO hand dryer

Heat Outdoors & Handy Dryers

A slimline powerhouse. The Beaver ECO provides impressive, high-speed drying power while keeping the washroom landscape uncluttered thanks to its ultra slimline design.At 99mm in depth, the Beaver ECO dryer is one of the world’s slimmest hand dryers, making it perfect for washrooms where floor space is scarce.
Sponsored
The facts about hand drying

The facts about hand drying

Heat Outdoors & Handy Dryers

Research highlights the importance of hand drying in infection control – and points to electric hand dryers as the best method of hand dryingWhile the benefits of washing your hands have been understood for more than a century, the benefits of hand drying are yet to become public knowledge. Equally, the best method of hand drying has historically divided opinion.
Sponsored
How to install a hand dryer

How to install a hand dryer

Heat Outdoors & Handy Dryers

If you’ve never fitted a hand dryer by yourself before, you’re in the right place. To make your hand dryer installation an absolute breeze, follow our simple six-step guide.
Sponsored
CO2 Heat Pumps Case Study

CO2 Heat Pumps Case Study

Catax (Innovation Funding)

Successful Funding Claim
Sponsored
wedi brings wellness to Hilton Heathrow T5

wedi brings wellness to Hilton Heathrow T5

Wedi Systems (UK) Ltd

The impressive wellness & luxury spa centre at Hilton Hotel London Heathrow T5 created by specialists Milk Leisure, specified wedi to construct & supply a series of bespoke steam rooms & wellness elements. Aroma rooms, salt & rasul treatment plus wellness benches with heated elements & an ice-fountain were all produced using wedi’s customised solutions service. All produced to the highest standards & pre-assembled in the wedi factory to ensure accuracy before delivering to site. The wedi system brings true wellness & peace-of-mind delivering a high quality fully waterproof installation ahead of schedule & supported by a system warranty
Sponsored
Cable duct sealing for D.L.R. - Koster Injection Systems

Cable duct sealing for D.L.R. - Koster Injection Systems

Koster Aquatecnic Ltd

Koster Aquatecnic were approached to design a bespoke system of sealing up the inside of long lengths of underground ducting. These ducts were carrying high voltage power cables and there was a need to prevent ground water entering and coming into contact with the cables.Using Koster`s range of acrylic injection gels, vast lengths of duct could be sealed without generating any additional heat or pressure.If you have a problem which requires a bespoke solution, please contact the Koster Technical team at technical@kosteruk.com.
Sponsored
Armadilla with Accoya cladding

Armadilla with Accoya cladding

Accoya

Accoya cladding supplied by International TimberArmadilla create luxury experiential garden buildings. They currently focus on two core markets, hospitality and education, providing a self-contained environment for the users. Armadilla offer a smaller ‘Pod’ or the larger ‘Wave’ design but both options are ‘eco smart’, meeting the sustainability ethos of Armadilla.The garden buildings meet industry-leading insulation standards, have low energy air source heat pump technology and mechanical ventilation heat recovery. The smaller design, The Pod, can run off a one 13 amp electricity source.By endorsing the concept of the ‘Circular Economy’, all elements of Armadilla products can be recycled, repaired or reused. This is why Accoya is the perfect material choice for the external cladding, with a 50 year warranty. Accoya is a new introduction for Armadilla, justifying their product as world-leading for its sustainability and durability.Armadilla were awarded the 2020 Queen’s Award for Enterprise in Innovation.
Sponsored
Kalwall Translucent Cladding - Metea Valley High School

Kalwall Translucent Cladding - Metea Valley High School

Kalwall

From the beginning, architects DLR Group designed Metea Valley High School in Aurora, Illinois, to light up education, both literally and figuratively. The sprawling campus with room for 3,000 students is broken down into a handful of more intimate, human-scale learning spaces, called “think tanks”, where interaction with faculty is encouraged. Two interior courtyards, open to the sky, offer fresh air during free periods. Shaped a bit like a bow tie, Metea combines three concepts – mind, in the midsection, and body and soul on either end – to offer students a truly 21st century school experience.Lighting up Metea in the literal sense comes largely from the extensive use of Kalwall translucent curtain wall throughout the school. Upon coming through the school’s main entrance, visitors are struck by the cheerful, airy, daylighted lobby. Controlled daylight also pours into the school’s innermost areas, traditionally a structure’s darkest, from the courtyards. Kalwall introduces daylight into the vast commons area that serves as the students’ lunchroom. In the gymnasium, Kalwall’s shadowless, glare-free light enhances ball handling in team events; sunlight does not glance off the shiny court surface. The diffuse-light-transmitting panels also prevent glare off computer screens, easing eyestrain. And in a dramatic demonstration of Kalwall’s superb flexibility, the design includes occasional, narrow, horizontal runs of clear glass – some serving as clerestories – adding visual interest as well as clear views to the outside.At 464,000 square feet, Metea could have been an energy-consumption nightmare, adding significantly to its $125 million total project cost. But innovations such as demand control ventilation, energy recovery wheels, and high efficiency boilers will save Indian Prairie School District 204, the state’s fifth largest, thousands of utility dollars every year and pay for themselves in just a few years. In fact, the building’s design is targeted to be 19 percent more efficient than ASHRAE 90.1 requires. Because translucent Kalwall admits so much controlled daylight, the school’s exterior light harvesting system, which monitors indoor light levels, can actually turn off electric lights in public spaces automatically when they are not needed. The harvesting system alone is expected to save the district over £16,000 a year in operational costs with a payback of under seven years.Illinois can get very cold in the winter and quite toasty in the summer. Highly insulating Kalwall helps there, too, keeping temperature extremes outside and lessening the need for and cost of heating and cooling. During the manufacturing process, standard 2-3/4” and optional 4” Kalwall sandwich panels can be infilled with various densities of specialized, translucent insulation. Architects and designers can achieve a thermal insulation value of up to R-20 (0.05 Btu/hr/ft²/F).At Metea Valley High School, DLR Group chose to include Verti-kal™, a unique design variation on the standard shoji or square grid layouts of Kalwall Translucent Systems. The panels incorporate internal, continuous supports to provide a vertical emphasis. As with all Kalwall translucent systems, Verti-kal distributes diffused daylight throughout the school, even on cloudy days, drastically reducing the amount of artificial lighting required and eliminating shadows and glare as well as stark contrasts of light and shade. Verti-Kal can be supplied in panels up to 5 ft. (1.5 m) wide and up to 12 ft. (3.6 m) high, minimizing the number of joints. The unique format creates an entirely different look while still utilizing the most highly insulating, diffuse-light-transmitting, structural composite technology.Any school system must concern itself with maintenance costs, and Kalwall excels there as well. The panels are vandal-resistant and self cleaning; dirt simply washes off with each rainfall. After dark, the diffuse, translucent properties of Kalwall contain interior lighting and prevent direct-beam light pollution. Instead, the exterior surface of the building simply glows beautifully, boosting Metea Valley High School’s aesthetics and welcoming both students and the surrounding community to a true masterpiece of daylighting.Photography: James Steinkamp
Sponsored
Pure Cars, Wakefield

Pure Cars, Wakefield

Senior Architectural Systems Ltd

When it comes to showcasing prestige cars from the likes of BMW, Maserti and Mercedes, it’s vital to find the perfect setting and at the new Pure Cars premises in Wakefield, the slimline SF52 aluminium curtain wall system has helped create a building as impressive as the stock inside.The flexibility of the SF52 curtain wall system has brought the vision of architects The Harris Partnership to life, from the crisp lines of the showroom’s entrance to the smooth curve of the main façade. The eye-catching building boasts a prime location on the approach to the city centre, with the slim sightlines of the curtain wall highlighting the cars on display and offering panoramic views of the surrounding areas for the enjoyment of staff and customers within.The thermal-efficiency of the SF52 system will also help to prevent heat loss from the extensively glazed building which is a flagship dealership for the Pure Cars brand which specialises in the sale of used luxury and prestige cars.With a proven track record of work across the retail sector, Senior has been involved in a number of other car showroom projects across the UK. Senior curtain walling and glazing systems have been designed to help specifers working in this market meet the required environmental requirements by creating high-visibility shop frontages that minimise solar gain to create a comfortable consumer experience.Senior Architectural Systems’ stylish SF52 aluminium curtain wall system has been used to great effect at a new luxury car showroom in Wakefield, creating an eye-catching and thermally-efficient façade that maximises the use of daylighting. The flagship Pure Cars showroom has been designed by The Harris Partnership, with Senior’s fenestration systems fabricated and installed by Vision Aluminium Systems for main contractor Glass Walls and Doors.
Sponsored
School Hand Dryers - Student's views

School Hand Dryers - Student's views

Heat Outdoors & Handy Dryers

Students are now, more than ever acutely aware of carbon footprints and energy efficiency. Installing a super energy efficient hand dryer not only saves your establishments money, it also shows your students that you care and are doing whatever you can to make a difference. 
Sponsored
True benefits of a quiet hand dryer

True benefits of a quiet hand dryer

Heat Outdoors & Handy Dryers

Nothing says sophistication in a washroom more than high performing hygienic quiet hand dryers, especially when they have a significantly lower sound output than customers’ might be used to. It’s surprising how simple ambience and a pleasant method to dry one’s hands after visiting the bathroom in a restaurant, bar or workplace can heighten the overall experience of the visit.
Sponsored
Tedworth House - Homes for Heroes

Tedworth House - Homes for Heroes

Ronacrete Ltd

RonaDeck Resin Bound Surfacing system has been laid to the paved areas surrounding Tedworth House in Tidworth, Wiltshire. The paths were laid as part of a Help for Heroes' project to transform the Grade 2 listed house into a Personnel Recovery and Assessment Centre (PRAC) for injured service personnel.
Sponsored
Basement Pumping System, Kent

Basement Pumping System, Kent

Newton Waterproofing Systems

Newton System 500 fulfils all Listed Building requirements in this Georgian Manor House. Newton Pumping Systems installed to manage waste water, including two Newton Titan pumps and battery backup systems.
Sponsored
Gaywood House, Bristol

Gaywood House, Bristol

K Systems Insulated Facades

Improving the thermal fabric performance and replicating the existing lookThe primary aim of the project was to improve the thermal fabric performance of the block and also to replicate the existing look. To achieve this, the client’s key requirements were two-fold. Firstly, to match the original external style as closely as possible in both colour and texture to satisfy the local authority’s requirements. The second key criteria was to ensure that all the systems used on the project were fully approved regarding fire performance, to meet the current regulations for buildings over the height of 18 meters in England. Delivering a robust, safe and aesthetic system solution to meet the project requirementsWe specified a combination of K Systems M VBriQ and K Systems M VBriQ+ to ensure we met the aesthetic planning requirements and comply with building regulations for resistance to fire in high-rise buildings. Our system incorporate mineral wool insulation which has an outstanding A1 non-combustible fire rating, which improves the thermal comfort and reduces heating costs for residents, whilst supporting Bristol City Council to meet their carbon emission targets.Our VBriQ acrylic brick slip finish was specified due to its lightweight characteristics and wide range of colours. Our Acrylic slips have a high UV resistance which will ensure the building maintains its appearance over time. Our VBriQ+ clay brick slip finish was specified for the ground floor and surrounding garage areas because of its robust and durable characteristics.Meeting the project deadlines and minimising disruptionsWe worked in collaboration with our approved installer Rateavon Ltd to ensure there was minimum disruption to the residents of Gaywood House. Our Technical team carried out regular site inspections to ensure the systems were installed to the highest standard with timely responses to technical detailing requests.
Sponsored
Smart door and window systems in the Brodick Isle of Arran ferry terminal

Smart door and window systems in the Brodick Isle of Arran ferry terminal

GEZE UK Limited

A new ferry terminal on Brodick Bay, created as a tourism and community gateway to the Scottish Isle of Arran, has been fitted from stem to stern with door and window systems supplied by GEZE.Maritime design and modern comfortThe ship-shaped terminal, designed by the renowned architectural firm Norr of Glasgow, is part of a £30 million investment which aims to update the harbour, get it ready for 21st century travel, and improve passenger comfort.Natural ventilation thanks to automated windowsThe generously sized lounge with its double height and large wall of windows on the western façade offers visitors a breathtaking view of Brodick Bay. The large windows, which are automatically opened and closed by 30 GEZE Slimchain chain drives, give the reception area at the main entrance to the building a bright and spacious feel. The uniquely slim and understated look of the Slimchain window drives integrates perfectly into the unique façade design of the Brodick ferry terminal.The Slimchain window drives were installed not only on the large windows in the lounge, but rather throughout the entire two-storey building – with the exception of the upper ventilation openings: Powerchain chain drives are used there. These especially powerful window drives were chosen to operate the larger windows, since they allow for large opening widths – which is important for quickly venting smoke in case of a fire.The window drives are connected to a GEZE MBZ 300 SHEV control panel for smoke and heat extraction drives, which is integrated into the building management system of the terminal. This makes it possible to easily control and monitor the complex natural ventilation system.Ventilation, smoke and heat extraction, and emergency exit protectionThe windows in the staircases are also equipped with Slimchain chain drives. If needed, the window systems also allow for natural smoke and heat extraction: In case of smoke and heat, the smoke extraction solutions open the windows and control fresh air openings, so that lifesaving escape routes remain smoke-free and safe to use in case of an emergency. In addition, GEZE OL Line manual fanlight openers provide supplementary natural ventilation.Door systems for accessible fire protection doorsBeneath the glazed western elevation are two automatic swing doors to either side. These are powered by GEZE Slimdrive EMD-F door systems, just like another door on the side façade of the building. The electro-mechanical swing door drives for single leaf fire and smoke protection doors are extremely versatile: They provide power assisted opening and can be initiated using the operating button with constant opening and closing speed. Integrated obstacle detection also identifies potential obstacles and stops the opening or closing process if needed. By doing so, Slimdrive EMD-F drives also ensure easy and safe access for people with mobility issues.Understated design and high access convenienceFrom the main entrance, a glazed corridor leads to a bi-parting sliding door powered by a GEZE Slimdrive SL NTsliding door system, which leads into the foyer of the main reception area. The Slimdrive door drive fulfils two key stipulations here at once: It is suitable for interior and exterior doors with high levels of footfall, and ideally suited for glass façades with high design standards – such as the Brodick ferry terminal – due to its low operator height of just 7 cm.
Sponsored
Heavily glazed building benefits from dual roller system

Heavily glazed building benefits from dual roller system

Yewdale Corporation Ltd

Standard Life Investments’ new £75m development at St Andrew Square in Edinburgh, as with many modern builds, it is fronted with lots of glass. It looks amazing and delivers plenty of natural light, but often requires robust shading solutions to protect people from the sun’s glare and heat. The fit-out company opted to use YewdaleDefiant® R20 systems with side channels throughout, and the YewdaleDefiant® R20M with double bracket. This allowed the installation of a dimout screen fabric and a blackout fabric, which can be easily switched between at the touch of a button. Read more...
Sponsored
Kings Cross Residential Acoustic Flooring System

Kings Cross Residential Acoustic Flooring System

Access Floors Distribution

Capella Development, Handyside, Kings Cross LondonDeveloper: ArgentMain contractor: Laing O’Rourke Architects: Chapman TaylorSub Contractor: InstaGroup120 newly built residential apartments received InstaCoustic's 'dry' cradle & batten system combining under floor heating & topped with Knauf GifaFloor FHB25.Original plans were to install a T&G chipboard to finish the acoustic floor system, however it was determined that there were deflection risks around the proposed large format tile finish.As a result, the chipboard was replaced by the high density, gypsum fibreboard Knauf GifaFloor FHB25. This resulted in:Quicker install & less use water than a wet screed systemImproved acoustic performanceImproved fire performanceImproved thermal efficiency resulting in reduced energy costs for the end userHigher loading performance, creating a solid substrate for the finish to be applied directly toReduction in overall embodied carbon & installation of a product that offers a high recycled contentLifetime guarantee of the buildingClick the link below to read the full case studyhttps://www.instacoustic.co.uk/case-study/kings-cross-london-n1c/
Sponsored
Cartcraigs, Glasgow

Cartcraigs, Glasgow

K Systems Insulated Facades

The Cartcraigs high-rise project located in the heart of Southside Glasgow was a rewarding project to be involved with allowing real transformation and change in several key areas.The tower block was originally built in the 1960’s with a grey cladding finish but due to decades of inclement Scottish weather, the building was weather-beaten, tired and dated. With its stature and prominent location, the building should have been an attractive living option in Southside Glasgow but instead was unappealing to potential residents, and in desperate need of modernisation.Rising fuel prices and the current poor thermal performance of the tower block, meant it was extremely difficult and expensive for tenants to heat their flats – so much so that many occupants were considered in a state of fuel poverty.In collaboration with MAST Architects and our approved installer PWM, we designed a façade solution that not only significantly improved the thermal performance of the building, but transformed Cartcraigs aesthetically creating a modern, fit-for-purpose living space.A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.Our ServiceDue to the scale of this project, the congested location and small site footprint, we had to work closely with our approved installer, main contractor, and local authority to ensure minimum disruption to both the residents of Cartcraigs and residents of the surrounding area.Delivery routes and schedules were agreed to ensure consideration for local residents throughout the project.As part of our service commitment, our Site Application Specialists carried out regular site visits to ensure our system was installed to the highest standard and in line with our specification.They were available throughout the duration of the project to provide technical guidance, installation support and ensure the highest levels of quality. This allowed the K Systems Technical & Logistics Teams to support the schedule of the project with timely delivery of materials to site and ensuring there were no delays during the installation and inspection processes.“In conjunction with the Architects we approached K Systems to design a system to comply with fire regulations and offer a solution to make the look of the building more aesthetically pleasing along with making it a point of interest within the Southside area. Great site support was provided by Ally along with Technical/Service support from Jim and Martin. The team at PWM look forward to working on our next project with K Systems.”Kevin Fox, PWM Projects ManagerTechnical Project DetailsThe original façade incorporated a 25mm cavity with reinforced concrete inner leaf shaped panels, which could be seen beneath the then grey façade panelling. Wheatley Group, the client, had requested a clean, crisp, and smooth finish that would also comply with Scottish Fire Regulations.After numerous design meetings taking into consideration client requirements, budgets, and timeframes, we put forward our industry-proven K Systems M Silicone EWI system. The system was designed using 160mm non-combustible mineral wool insulation to meet the 0.18 (W/m2K) U-value requirement, making it the perfect choice for the refurbishment to combat the heating issues faced by residents and futureproof the building as a viable living space for years to come.Bespoke technical detailing and rigorous adherence to our high-rise policy ensured a high performing system with an A2 non-combustible fire rating, complying with all safety regulations for buildings over 11m in Scotland. The 160mm insulated grey and white façade delivered a really attractive high-rise that will now better withstand the Scottish elements.The finish used was our high-performance thin coat render, Silicone TC15. The contemporary colours of grey and white were chosen from our wide range of colours which visually transformed the 17-storey building. Our polymer rich Silicone TC15 allows ease of application, and its hydrophobic properties will provide a clean, crisp and low-maintenance finish for years to come.Our specification included bespoke detailing to provide solutions for Cartcraig’s individual retrofit design challenges. We also commissioned wind load calculations and fixing pull-out tests to determine optimum fixing patterns to anchor the EWI system to the different substrates. Ultimately, a safe, thermally efficient and visually appealing result was achieved.“K Systems provided a great overall package from the inception of this project with design advice, through the technical stages, with assistance through specification and then with the provision of weekly reports and checks once the project got on site. Cartcraigs, being a high-rise block needed monitoring and adherence to the project specification, and having the K Systems team providing regular on site checks gave the design team the assurance that all requirements were being met.”David Locke, Mast Architects
Sponsored
Albion Works, Manchester

Albion Works, Manchester

K Systems Insulated Facades

BackgroundLocated in the Ancoats area of Manchester, the Albion Works strip and re-fit project was funded by the Building Safety Fund, a Government Fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.K Systems Approved Installer QFF Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.The original 60mm EPS system was stripped from the building and replaced with a safe, thermally efficient façade solution, which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Our ServiceK Systems provided support throughout the application process for this Building Safety Fund project. The Technical team offered on-site technical and installation support throughout the build process and supported QFF to ensure quality and reliability.We produced a bespoke specification and worked closely with Thomason Consulting and QFF Façades to agree and deliver specifics such as fire stopping and abutment details.From design advice through to installation, we offered a partnership approach which aided a smooth installation process with minimal disruption.Technical Project DetailsThe original sheathing boards were replaced, and the K Systems Exicco M drained cavity façade system was installed. This high performing drained cavity system was specified as a requirement for this steel frame residential building. 60mm mineral wool insulation was specified to retain the line of the existing façade.Fire safety with high rise buildings like Albion Works is of utmost importance and this solution generates high levels of fire resistance and non-combustibility (A2, s1-d0 rating), meaning the latest building regulations were complied with. Additionally, the thermal performance of the building improved with a U-value of 0.28 W/m²K being achieved. Residents will therefore enjoy reduced heating costs and better living conditions.For the finish, silicone thin coat render ensured that aesthetically Albion Works had a clean, crisp attractive appearance. This durable, low maintenance render transformed the outside of the building and will ensure a longlasting finish to the property.
Sponsored
St Edwards & Tollbrae Primary

St Edwards & Tollbrae Primary

Senior Architectural Systems Ltd

This new shared campus for two North Lanarkshire primary schools has been designed by leading architects Halliday Fraser Munro to reflect the individual identities of the two schools whilst uniting them in one single building.The layout of the new school building reflects the dual-nature of the campus, with two separate two-storey teaching wings set around a central courtyard. This open space and the surrounding linked buildings provide shared facilities including a gymnasium and dining hall. Constructed by main contractor and established supply chain partner, Morgan Sindall, the new modern school building benefits from several aluminium fenestration solutions from across Senior’s extensive range.The eye-catching main façade features Senior’s thermally-enhanced SF52 aluminium curtain wall system with integrated SPW501 aluminium commercial doors which provide safe and secure access. Throughout the building, Senior’s patented low U-value PURe® aluminium casement windows have been specified to help reduce heat loss and boost the overall energy-efficiency of the scheme. Senior’s fenestration systems were fabricated and installed by specialist contractor Linn-Tech.
Sponsored
Deakins Place, Nottingham

Deakins Place, Nottingham

Senior Architectural Systems Ltd

Our expertise in the student accommodation sector has led to our aluminium fenestration systems being used on this new riverside scheme in Nottingham, which has been designed by architects Maber and built by main contractor Bowmer & Kirkland.Managed by student housing provider Student Roost, the new Deakins Place development is located within close proximity of the University of Nottingham’s Jubilee campus and offers stunning views of the River Leen. These views have been perfectly framed by our patented low U-value PURe® aluminium windows which have been installed by specialist contractor HKL.Specified with flat casement vents, our thermally-efficient PURe® aluminium windows have been installed to each apartment to increase the flow of natural light and to reduce heat loss. The slim aluminium fames have been powder coated to provide additional protection from the elements and to complement the wider façade design which features a stunning mix of natural building materials and colour palettes.
Sponsored
Where (and where not) to install your hand dryer

Where (and where not) to install your hand dryer

Heat Outdoors & Handy Dryers

In theory, placing your hand dryer or towel dispenser in just the right location should be easy. In the simplest terms, it involves measuring the hand dryer height from the floor and planning the right hand dryer distance from the sink and other washroom features.
Sponsored
Dimplex Opti-myst completes conservatory renovation

Dimplex Opti-myst completes conservatory renovation

Glen Dimplex Heating and Ventilation

Kelly is a lifestyle writer whose popular blog, My Norfolk Home, covers home decor ideas & renovation inspiration. Kelly selected a Dimplex Grand Noir Opti-MystTM fire. The Grand Noir, is a beautiful electric stove, combining the classic feeling of a wood burning stove with modern electric functionality.
Sponsored
Lessons learned from coronavirus - washroom hygiene

Lessons learned from coronavirus - washroom hygiene

Heat Outdoors & Handy Dryers

The past few years have really thrust hygiene into the spotlight. From robust cleaning to hand hygiene, people have become increasingly aware of the role that cleanliness plays in managing infection transmission. ​Steve Levy looks forward to what this might mean throughout 2022.
Sponsored
The Perfect Hand Dryer For Your Pub & Restaurant

The Perfect Hand Dryer For Your Pub & Restaurant

Heat Outdoors & Handy Dryers

Every pub or restaurant hand dryer will have its own requirements. There will always be keys features that are needed to make sure that both your customers and your staff are not put off from coming to your establishment. Here at Handy Dryers we would be confident that each and every one of our products would be a perfect fit for your needs. We have picked out just a few that we feel will really make your place stand out from the crowd.
Sponsored
THERMOSLATE covers nearly 55% of the energy required to heat this house

THERMOSLATE covers nearly 55% of the energy required to heat this house

Cupa Pizarras

This family house, located in Chailland (France), has reduced up to 55% its annual energy bills thanks to THERMOSLATE. This solar collector in natural slate covers this family needs for hot water while enhancing the aesthetics and efficiency of their home. Five solar collectors over a total surface of 6.45 square meters, were more than enough to generate the energy required to cover the hot water needs of this family. The main component of the collectors is natural slate, extracted directly from our quarries and specially selected to ensure perfect fit and performance.
Sponsored
Movawall Systems Ltd - Showroom

Movawall Systems Ltd - Showroom

Movawall Systems Ltd

Take a look at the various systems on display at our showroom based in Clerkenwell, London - including a range of both solid and glass partitions.
Sponsored
Newton System 500 Controls River Thames

Newton System 500 Controls River Thames

Newton Waterproofing Systems

Newton System 500 provides a complete waterproofing solution for a boathouse situated on the River Thames, installed by Newton Specialist Basement Contractor Stonehouse. Newton Waterproofing Systems were contacted to provide a solution for a delightful boat house on the River Thames.The property originally had a wet dock but this had been back filled and capped with a concrete floor. The client wished to use the ground floor as a bedroom, but during a recent flood the water level had reached 500mm internally.Newton System 500 provided the ideal solution, as it works by redirecting the water, rather than trying to hold water back – which would be impossible under such pressurised conditions. Newton 508 Mesh was chosen for the walls, Newton 520 to the floor with a Newton Basedrain ring around the perimeter. Two Newton Titan Pro pump systems were used, which included a battery back up system.Newton System 500 was installed to this property by Newton Specialist Basement Contractor Stonehouse BasementsRather than holding water pressure back, therefore, it was accepted that the river would penetrate the structure and would be pumped out. The system is designed so that ingressing water is depressurised by the Basedrain and then moved around the Basedrain ring to the two Titan sump chambers. The chambers each had 40mm discharge lines exiting the structure. Both pump systems had non-return valves so if the river rose over the level of the pipe the pumps would still be effective.The full waterproofing system was installed in a little over a week. The major test came when the River Thames rose against the property to a depth of over one metre! The Newton System 500 waterproofing system coped with the water ingress as designed. At the height of the flooding, all three pumps in each sump chamber were operational. The system proved to be fully successful.

Showing 109-144 of 1294

Feedback