NBS Source
I'm a manufacturer

"glass door"

4,755 results found

Sort by:

Showing 217-252 of 552

Sponsored
Retractable Glass Roof at The Hawk's Nest

Retractable Glass Roof at The Hawk's Nest

Breezefree Ltd

The largest SolaGlide retractable glass roof in the UK is the talk of the town! Installed by Breezefree at The Hawk's Nest in London’s Shepherd’s Bush.Working with the team at Birdhouse London, we were presented with the challenge of transforming their outdoor space at The Hawk’s Nest into a flexible all-year space, whatever the weather. Challenges included satisfying the requirements of TfL due to the tube line running immediately above, as well as the venue’s request to have a space to trade in during construction work.The result is a chic hospitality space with a sliding roof that offers options for open airiness or full enclosure from the elements. The roof also offers significant soundproofing, reducing impact on neighbours on their most lively nights. The transformation means that the venue can offer their delicious cocktails, and pizzas that have to be tasted to be believed, underneath an elevated and stylish roof that will help draw diners and revellers for years to come.
Sponsored
Poole timber window and door replacement

Poole timber window and door replacement

Mumford & Wood Ltd

Timber patio doors. Door replacement and window replacement
Sponsored
Barry's Boot Camp, Victoria

Barry's Boot Camp, Victoria

Washroom Washroom Ltd

This is the fourth branch the luxury gym brand has opened in London and the second we’ve delivered eye-catching luxury shower and changing rooms for. We manufactured our Luminoso glass shower cubicles with bespoke saloon style cubicle doors specifically for Barry’s Boot Camp to create a sleek contemporary finish without external door pull handles. The unique cubicles were completed with black finish ironmongery to complement the black tiles around the showers. We also designed and installed bespoke Corian vanity units and grooming shelves, which were manufactured in the dark grey and heavily veined ‘Cosmos Prima’ colour, adding to the industrial-chic style of the changing area. 
Sponsored
Aston Martin F1

Aston Martin F1

Komfort Partitioning Ltd

Background & BuildingA brand new headquarters for the Aston Martin Racing Formula 1 team, based at Silverstone Race Track. A state of the art building solely designed to build, run and service Aston Martin’s Formula 1 racing vehicles. Built by the side of the historic Silverstone Grand Prix racing track in Northamptonshire.The Brief in BriefThe project requirements demanded good DB ratings, full height doors, privacy for Mission Control with Smart Glass and privacy to Exec area with blinds. An Atrium to flood light into the ‘street’ below. Plus offices, meeting rooms, a Mission Control racing hub, a large Atrium screen over indoor areas, open plan design offices, breakout and communal areas.Komfort’s SolutionPrior to the start of the project we had numerous pre-start meetings with the design team and H&S visits with our external advisors to ensure the project would run smoothly from the start.To achieve a system and design the client desired, Komfort built mock-up sample office onsite during the design stage to highlight the design elements such as acoustic double glazed glass in Polar 100 and our deflection head system. We also supplied samples of our blinds, with the system in situ to demonstrate the operating fixtures and fittings. All samples were supplied in the clients choice of colour including matt black blinds to match the trackwork.The double glazed full length Atrium required teams working on both sides of the glass, installation from the office side and safety (fall arrest) from the street side. The atrium glazing over the machine shop area required glass lifting equipment, to ensure the fire rated glass could be sealed properly from both sides.The client made numerous changes to the design during installation, which had to be accommodated. The final project involved 800 sqm of glass and 50+ Sonik doors throughout the building site. It was a challenge and one that Komfort rose to admirably.The end resultModern open plan offices with a selection of meeting rooms. Large executive offices with blinds/locks for privacy. A large full length atrium from the offices above to the workshops and indoor street below. All areas of the racing team on 1 floor (design office, HR, Exec offices, Mission Control, finance etc).
Sponsored
Mono M311 Glass Balustrades for Park Brow Primary School

Mono M311 Glass Balustrades for Park Brow Primary School

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixThrough the early design stages of this impressive project, Delta Balustrades worked closely with the Liverpool based architects to develop the specification, design and technical details of the balustrade system.As one of the main features of the building, the Mono balustrade system to stairs, atriums, and external terraces with its minimalistic and subtle appearance, transformed the architect’s vision into reality.To meet requirements for buildings designed for children a lower handrail at 600mm above pitch line was required to the stair balustrades and the glass infill panels were required to extend to 1500mm above FFL and stair pitch line.On site close cooperation with the main contractor was necessary to conceal the baluster fixings below the finished floor level in line with the architect’s specification. Externally, this required an early fix of the balustrades without the glass infills, to enable the contractor to complete the waterproofing in view of subsequent trades progressing.
Sponsored
Premier Vision Door

Premier Vision Door

Martec Engineering Group Ltd

Premier Vision Communal Entrance Doors
Sponsored
Yorkshire Water Security Shutters

Yorkshire Water Security Shutters

Hart Door Systems Ltd

Hart Door Systems has worked with a number of UK water companies to improve site security and efficiency. In particular the need to secure remote and often unstaffed but vitally important sites. Water sites have particular needs which require reliable and secure doors and the engineering expertise that Hart offer.The challenge This Yorkshire Water had 3 existing un-secure horizontal doors. These manual operation doors had fallen into disrepair and presented a security risk. Automatic doors were required to provide efficiency and security. The solution The Hart solution was to install its roller shutters, fitted in a customised way to suit the environment and to ensure security, ease of installation and minimum disruption. One of the things Hart has significant experience in is fitting doors that add security features but without the need for additional structural works. Disruption was further minimised by working in collaboration with the main construction contractor, scheduling the work to fit in with not only the day to day operations, but other work happening concurrently.Because of Hart’s experience on sites such, existing vital operations were worked around – which continued during the removal of the old doors and installation of the new. The success Several more SR rated doors are planned at the same site, so that the company can replicate the success and the improved security that has been provided.Hart has gained invaluable experience working with various water companies installing high specification SR rated security shutters. These doors meet an established set of standards to prevent unauthorised access and have been tested and shown to minimise the threat of certain intruder attacks.For those sites that need constant access by people and / or traffic, the Speedor brand of doors can provide additional high speed operation. Speedor and SR doors can be used in combination to give complete flexibility and the best of both worlds.
Sponsored
John Radcliffe Hospital

John Radcliffe Hospital

Specialist Door Solutions

The JR provides acute medical and surgical services including trauma, intensive care and cardiothoracic services. It is situated in Headington, about three miles east of Oxford city centre. It is the largest of the Trust’s hospitals, covering around 66 acres.SDS was pleased to work with Mclaughlin and Harvey Contractors and to have been specified by Lewis Hickey Architects.The new extension to the existing Emergency Department was designed to provide better use of space, more diagnostic equipment and improved dignity and privacy for patients as well as improved turnaround times for ambulances.Facilities include an extra nine bays for the immediate care of seriously ill patients, including a paediatric resuscitation room and an isolation room. An additional CT scanner with control room, as well as a nurses’ bay and improved bereavement and relatives’ rooms, will also be provided in the new area.Dfendoor doors were used throughout this scheme, where impact resistant doors were key to maintaining fire door and infection control compliance throughout the busy area . A wide range of SDS colours were used from midnight blue through to lupin – also our range of wall protection products were used in matching colours to create a very impressive finish throughout.
Sponsored
Santander Unity Place MK

Santander Unity Place MK

Planet

Working through our Midlands contracting office, Planet provided smoke sealed extended height PURE20XL glazing to floors 2 to 7 of the building’s internal atrium. 6.7m high Schueco Jansen Viss screens were placed on ground level, while PURE20XL was also utilised along with rebated 1.5 leaf IsoPro doors (Rw 36 dB).Extended 3.3m LOFT100 screens (Rw 47 dB) with back-painted glass above transom level were placed in the 300-capacity auditorium with double IsoPro doors. Finally, banded LOFT20 partitions and matching IsoTec acoustic doors (Rw 38 dB) and double glazed LOFT54 (Rw 45 dB) with IsoPro doors were installed for the client’s meeting rooms and phone booths respectively.The Unity Place development is a great example of a people-first workplace design that hopes to be a catalyst for the regular return to the office for many of Santander’s staff. The building is set to achieve a BREEAM Excellent rating for sustainable performance, aided by Planet’s EPD documentation for our LOFT and IsoPro solutions.
Sponsored
Fire Door Safety Maintained at West Lothian Schools with Yeoman Shield Fire Door Services

Fire Door Safety Maintained at West Lothian Schools with Yeoman Shield Fire Door Services

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

West Lothian Council schools, Deans Community High School and Armadale Academy, are maintained by Bellrock Group under a contractual PPP3 project agreement. Taking on this maintenance management for the two school buildings places the Bellrock management team as the Responsible Person when it comes to compliance to fire safety maintenance which incorporates fire rated doors.With this in mind, Martin Igoe, Senior FM for Bellrock, engaged with Yeoman Shield Fire Door Services when it came to assessing and protecting the condition of the schools’ fire doors with an impact protection system.As a brand name of Harrison Thompson & Co. Ltd. who are a registered FIRAS Warringtonfire (a UKAS accredited scheme for fire door and passive fire resisting products installation) company, Yeoman Shield Fire Door Team were able to undertake a conformity survey of the doors in both schools.This consisted of an assessment of the condition of the fire doors, noting remedial work required to improve the doors functionality, replacement of doors where required as well as noting advisory door protection products that could improve the look, condition and extend the life cycle of the doors by solving impact damage problems.After an itemised quotation for the work had been raised and accepted, Yeoman Shield directly employed fixing operatives carried out the work simultaneously at both school sites simultaneously in accordance to Bellrock’ s programme.Remedial work to both frame and fire doors, replacement doors as well as Yeoman Shield Fire Rated Protection products which were Door Protection Panels, Door Edge Protectors and PVCu clad Glazing Beads were fitted by the accredited teams following best practice guidance.Martin Igoe commented “Having previously used Yeoman Shield on school projects in Aberdeenshire I was more than happy to again collaborate with Yeoman Shield for the Deans Community High School and Armadale Academy.“Their door protection products are great; not only have Yeoman shield re-certified the old fire doors for conformity, they have also extended the life of the doors by fitting a hard-wearing cladding to each. This makes them more durable for the rigours of school life, they look amazing and are so easy to clean.Further phases of the fire door work have been scheduled for later in the year.
Sponsored
Radisson Hotel, County Sligo

Radisson Hotel, County Sligo

Pilkington United Kingdom Limited

County Sligo has been blessed with a brand-new luxury hotel, the internationally renowned Radisson SAS Hotel, where the comfort of guests and staff is of paramount importance. Every precaution has also been taken to ensure the safety of residents including the installation of high quality, clear view fire-resistant glass products, Pilkington Pyrostop® and Pilkington Pyrodur®, which have been fitted extensively throughout the entire hotel.Pilkington Pyrodur® is a laminated glass with a special interlayer, developed for the optimum combination of minimum thickness, integrity fire resistance and impact performance. In a fire, the glass forms an opaque barrier to exclude flames and hot gases as well as blocking the sight of the fire, hence reducing panic. In addition to its integrity performance Pilkington Pyrodur® reduces the transfer of radiant heat significantly.Jackie Corcorran of main contractor, J J Rhatigan & Co. Galway was closely involved in the specification of the specialised glass alongside White Bros. Joinery Sligo & Jim Walsh of Greaney Glass Galway. 160 m2 of 10 mm Pilkington Pyrodur® with a 30-minute integrity rating was installed within the corridors of the building. In other areas where there is a slightly greater risk of fire, such as the kitchen area, internal doors and function room screens, were fitted with 21 mm Pilkington Pyrostop®, which provides 60 minutes fire integrity and insulation.Specialist glass & glazing contractors, Greaney Glass, were responsible for installing the fire-resistant glass and Ivan Greaney, Managing Director, comments: “For such a prestigious project it was imperative we used a fire-resistant glass we could trust. There could be hundreds of people within the hotel at any one time so we needed to use materials that would provide maximum protection under the most extreme circumstances. As Pilkington Pyrostop® and Pilkington Pyrodur® are backed by a full suite of impact and fire performance tests, we had no doubts that this was the ideal glass for this project.”Pilkington Pyrostop® and Pilkington Pyrodur® provide excellent levels of protection and have been tested and assessed to BS and EN standards. Not only do they offer excellent fire-resistance they also fully comply with impact safety tests and permit safe breakage in the manner of a laminated glass. In addition, they provide acoustic improvement over standard fire-resistant glass, an important consideration in the hotel that offers a peaceful and relaxing retreat for guests.
Sponsored
Sauna & Steam Suite within a Home Gym

Sauna & Steam Suite within a Home Gym

Sauna360 Ltd

At Sauna360 we were honoured to be asked by a top London architect to co-operate in the installation of a sauna and steam room in a new gym and wellness suite at his Surrey home.The client had seen our design for a large sauna in a Mayfair mansion and the brief was to replicate this to more compact size to create an intimate family cabin.Sauna: The sauna was lined in special cut Blond Aspen contrasting delicate thin wall panelling, with close fitting bench boards and subtly angled furniture. The full width, low iron glass fascia gives a great feeling of space and excellent viewpoint of those still working out in the gym!Steam Room:The steam room was designed to be more discreet and twinned with a matching luxury bathroom. Our proposal was to decorate the room using beautiful Siminetti natural shell mosaic tiles throughout. These tiles with interesting random surface are nonetheless super thin and therefore perfect to suit the many contours usual in steam room design and are both durable and efficient.To complete, we included a matching door to the bathroom with back painted glass and door lock for discretion.The result: a stunning, statement installation in manageable size for regular home use!
Sponsored
Hospital - Revolving Door Main Entrance

Hospital - Revolving Door Main Entrance

FAAC Entrance Solutions UK

The hospital needed to ensure good accessibility and create demarcation areas for staff and visitors. We provided various systems including automatic revolving doors and sliding doors, an automatic revolving door with a diameter of 5.4 meters, and various swing door operators for the automation of both wooden single-action doors and fire-resistant doors. We installed swing door operators and sliding door operators which ensure convenient, comfortable and safe access between the departments. In addition to the benefits of comfort and energy-savings, the solution provides safe escape routes and easy access for both able-bodied and disabled people.
Sponsored
Bespoke Windows and Door Replacement in Buckinghamshire

Bespoke Windows and Door Replacement in Buckinghamshire

The Sash Window Workshop

The Sash Window Workshop to replace several traditional timber windows and a back door in a property in Buckinghamshire.The enquiry was assigned to our sales surveyor who arranged a visit to assess the windows and door, answered any questions and provided them with a quotation for the work.A couple of meetings were held with the customer to discuss and review the details of the quotation and an order was placed for a timber back door and 21 replacement casement windows, comprising of a mixture of single, double and bay windows.The door and windows were manufactured in Accoya, which comes with a 50 year anti-rot guarantee alongside The Sash Window Workshop’s 20 year joinery guarantee.Internally the windows and door were painted in a standard white, with a bespoke green paint applied externally.The installation was carried out by The Sash Window Workshop over 2 weeks, with our site manager visiting the property to check that the installation was progressing smoothly.After the work was completed, the couple commented that they were very happy with their new windows and door.
Sponsored
Vista V512 Glass Balustrades for University of Liverpool's Central Teaching Laboratory

Vista V512 Glass Balustrades for University of Liverpool's Central Teaching Laboratory

Delta Balustrades Ltd

Vista V512 Glass BalustradesVista 512 point fixed, glass infill balustrade system enhanced the dynamic and innovative design of the £13m University of Liverpool, Central Teaching Laboratory.The three storey, high quality and contemporary learning facilities was designed for a wide range of users, including those from other universities and the private sector.
Sponsored
Flush Glazed Acoustic Movable Wall With Access Door Panel

Flush Glazed Acoustic Movable Wall With Access Door Panel

ModernGlide Ltd

Perfect for office spaces, our MG600 glass office partitions and movable glass walls offer several benefits to your workspace and your employees.The advantages of glass acoustic walls include excellent light flow in offices, low-cost installation, flexibility in the work environment, and the simple fact that they look classy and classy. Not only that, but they also provide excellent sound insulation, enabling privacy between clients or important internal meetings.These flush glazed movable acoustic wall panels are constructed from an aluminum frame with flush tempered glass panels mounted on either side of the panel for a flush glass look. They work especially well in office spaces, impressing everyone who sees them, be it stakeholders, important clients or business partners.Additionally, you can choose to tint the aluminum frame according to your own design or branding needs. These panels maintain the spaciousness of the room's proportions while maximizing light and clear sightlines. Really great office aesthetic.
Sponsored
Lusail Light Rail Depot

Lusail Light Rail Depot

Jewers Doors Ltd

Jewers Doors’ local reseller; Rumaillah Warehouse Equipment WLL, have recently completed the installation of 30 sets of Swift-SEW automatic bi-folding doors for the new Lusail Light Rail Transit (LRT) depot complex in Qatar. The scheme is expected to open in 2020 and will provide an efficient transportation system for the people living in, and commuting to the new Lusail City, where the new 80,000 seat Lusail Stadium will host the 2022 FIFA World Cup Final.
Sponsored
Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Rutland

About the project:Dublin Doors are a distributor of door leafs to door manufacturers throughout Ireland. Since Brexit, the market in Ireland requires the EN 1634-1 fire testing standard, as opposed to the previously accepted the British Standard BS 476. A customer of Dublin Doors wanted an overhead concealed door closer combined with 44mm thick doors, and it had to pass the EN fire testing standard.The specification of the doors was: (A) 44mm PB hardwood lipped all round door (B) 38mm PB core faced with 3mm mdf, routed with 2mm decorative groove in the faceDublin Doors were very aware that EN testing is widely considered to be more onerous than BS testing. The inclusion of a drop seal was also a point of concern - many companies have found that using drop seals to control smoke can appear to make the fire test harder to pass, with some experiencing prolonged flaming at the threshold. Rutland was able to help by providing its concealed closer ITS.11204, which can be used in 44mm fire doors – one of only a handful of concealed closers on the market that can do this. Rutland was also able to tap into its network of experts and consultants to discuss possible options, to help Dublin Doors to arrive at a combination that met the specification, and was most likely to succeed in the test. Dublin Doors were also required to write a Pre-Test Verification (PTV) before the test – a requirement at many test labs now. Rutland used its expertise in compliance to help complete this specification.The outcome:The results were excellent, with both doors lasting 49 and 51 minutes respectively in the fire test, for what was a 30-minute FD30 doorset, the more onerous European standard EN 1634-1 to achieve – E30. In our experience of fire testing, this is an excellent result for a 44mm solid timber door, and the Rutland team were just as pleased as Dublin Doors that the door, along with its concealed closer, passed with flying colours.
Sponsored
Capturing Traditional Charm on Front Entrance Doors - CO7200C & LP400 DURATIQUE Door Handle and Letter Plate in Devon

Capturing Traditional Charm on Front Entrance Doors - CO7200C & LP400 DURATIQUE Door Handle and Letter Plate in Devon

Coastal Group

This property in Devon isn't far from the coast. The owner wanted to keep a traditional look and feel to their property but without the issues that typically come with Black Antique hardware made from malleable iron.With this in mind, our CO7200C DURATIQUE Door Handle and LP400 DURATIQUE Letter Plate were fitted to this Solidor 'cottage style' door.Made from Stainless Steel, our DURATIQUE Hardware Range provides a traditional antique look and feel but with modern, high quality performance and durability. The stainless steel base prevents corrosion and the screw holes and handle centres are CNC machined for consistency.
Sponsored
Accoya windows and doors in New Zealand

Accoya windows and doors in New Zealand

Accoya

This home built by Wok Stehr and his team in Howick was designed by Daniel Marshall Architects. The home incorporates stunning Accoya windows and doors that are large and some are raking and meet at obtuse angles. Accoya with benefits of outstanding durability and stability is able to withstand such design, making it possible to meet the requirements of the build.
Sponsored
Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixThe Birkenhead Community Fire Station was completed in 2013, as part of the North West Fire PFI scheme, a framework of 16 fire stations across North West England. The client’s main objectives were to provide a safe and healthy environment with improved facilities for firefighters and other personnel.Following demolition of the existing fire station, the design and construction of this multi-appliance station, led by Balfour Beatty Construction, included community orientated facilities, training facilities, rest rooms, additional office space and two communal staircases. At early design stages, Delta Balustrades worked closely with Balfour Beatty to meet the client’s objectives of creating well designed facilities to a high architectural standard. The Orbis system was chosen as a cost-effective, high-quality tubular balustrade solution for both staircases.The main stair boasted a brushed stainless steel finish with unique Banjo glass fixings. Savings were made on the rear stairs by selecting powder coated uprights and D type glass fixings.
Sponsored
Armsgate - Timber Windows and Doors

Armsgate - Timber Windows and Doors

Gowercroft Joinery Limited

Traditional Windows and Doors for a Historic Pub Renovation and Executive Housing DevelopmentThe Melbourne Arms, a cherished historic pub near Derby, underwent a remarkable transformation into a prestigious executive housing development. To preserve the charm and character of the old English pub, bespoke traditional windows and doors were essential.Restoring the Melbourne ArmsThe Melbourne Arms, a listed building with a rich 228-year history, had fallen into disrepair until Stanton Developments acquired it in 2018. They embarked on a comprehensive restoration of the pub and the creation of five additional houses on the site. Unsuitable extensions were removed, allowing the pub to be transformed into two linked detached four-bedroom family homes. The restoration honoured the original features, including the iconic stacked chimneys and distinctive inglenook fireplace."From the double-height skirting to the reinstated upstairs fireplace, we feel privileged and proud to have renovated this historically significant building," expressed Andy Turner, Stanton Developments.Creating an Enclave of HousesIn addition to the pub restoration, Stanton Developments built five new properties on the site, forming an enclave that harmoniously complemented the landmark pub. Each house was individually designed while respecting the aesthetics of the original structure and blending seamlessly within the local conservation area. The houses were named after former proprietors and notable figures associated with the property's history.Award-winning architect Matthew Montague designed the properties, adding his touch of excellence to Stanton Developments' vision.Gowercroft's ContributionGowercroft, known for their expertise in traditional windows and doors, was selected to provide the windows and doors for the Armsgate Development. The focus was on combining historic styling with modern performance, using the finest materials. Accoya® Windows from the Hardwick Range, featuring flush casement windows, and a selection of Accoya® doors from the Melbourne Range were chosen.To maintain individuality, each house had subtly different front door designs and colours, tailored to the specific property. Elaborate ironmongery and Accoya surrounds distinguished the larger properties, setting them apart.Attention to DetailPreserving the authenticity of the original window design was crucial for the plot that once housed the pub. Gowercroft crafted traditional Georgian bar windows, while also introducing unique triangular-shaped windows that added a touch of originality to the development.The combination of Stanton Developments' commitment to historic restoration and Gowercroft's expertise in traditional windows and doors resulted in a remarkable housing development that seamlessly merged the past with the present.
Sponsored
Northwick Golf Club Driving Range

Northwick Golf Club Driving Range

Jewers Doors Ltd

Jewers Doors were approached by Charles Mador Chartered Architects to design and supply a series of doors to secure the five teaching bays on the two-tier 60-bay driving range at Northwick Park Golf Club and Clubhouse
Sponsored
Timber Floating Corner Bifold Doors

Timber Floating Corner Bifold Doors

Gowercroft Joinery Limited

Chestnut Way in Repton, Derbyshire, underwent a remarkable architectural restyle, which included the installation of a complete external joinery package featuring floating corner bifold doors. These doors, crafted from Accoya wood, create a captivating and seamless transition between indoor and outdoor spaces without the need for a supporting post.Gowercroft Products used from the Classic Range:Tutbury Bifolding Door - MoreMelbourne Timber Door - moreHardwick Timber Flush Casement Window - moreThe Concept of Floating Corner Bifold Doors:Floating corner bifold doors are a stunning architectural feature that adds a touch of awe-inspiring elegance to any home. The absence of a corner support beam creates an illusion of a wide open corner, offering uninterrupted views and a unique living experience. Lesley Shaw-Wall, the homeowner, recognized the transformative potential of a floating corner patio room in completing the overall renovation of her property in Repton.Unmatched Design and Functionality:Typically, open corners require additional support, but with a floating corner, integral steel beams hidden within the structure provide the necessary stability. The result is an expansive corner opening, perfect for alfresco dining and creating an airy living space. The floating corner at Chestnut Way showcases the ingenuity of architectural design, enhancing the perceived spaciousness of a relatively small sitting room even when the doors are closed.Craftsmanship and Testimonial:Gowercroft's floating bifold doors at Chestnut Way were meticulously handcrafted from Accoya wood, finished in pristine white paint. Lesley Shaw-Wall expresses her satisfaction with the windows and doors, noting the impressive standard of joinery and recommending Gowercroft without hesitation.Additional Enhancements:The external joinery package at Chestnut Way included a walnut-stained Accoya front door from the Melbourne range. Flanked by winglights, this stylish entrance creates a grand impression and allows more light into the entrance hall. Furthermore, the property was fitted with wooden flush casement windows, taken from the classic Hardwick range. These tall, understated windows complement the unique architectural elements of the house, providing ample natural light without detracting from its distinctive charm.Invest in Accoya Windows and Doors:Gowercroft's commitment to quality is evident in their use of Accoya wood, a durable and weather-resistant timber. Accoya is guaranteed for 50 years in normal applications and can be maintained through Gowercroft's TimbaCare program for a lifetime of maintenance-free service. The Chestnut Way package, finished in white paint with sleek chrome ironmongery, harmoniously blends with the modern, uncluttered style of the interior.Elevate your architectural designs with Gowercroft's floating corner bifold doors and premium joinery solutions. Experience the seamless fusion of indoor and outdoor spaces, exceptional craftsmanship, and timeless elegance.
Sponsored
Duo D411 Glass Balustrades for Royton Health and Wellbeing Centre

Duo D411 Glass Balustrades for Royton Health and Wellbeing Centre

Delta Balustrades Ltd

Duo D411 Glass Infill Top FixOrbis OS230 Perforated Infill Side FixThis project included a high spec balustrade to feature stair including extra height glass to waiting areas. The choice of DelamereX gave a natural hardwood look along with durability and low maintenance. An additional three staff staircase balustrade and handrails in standard HiBuild finish and perforated infill panels were also included.Throughout the project, close liaising was needed with the Architect to ensure all necessary design requirements were adhered to and approved. Delta Balustrades installation of the feature stair and balustrades was phased to synchronize with the onsite program.
Sponsored
Accoya curved folding sliding doors

Accoya curved folding sliding doors

Accoya

Designed and Manufactured by Simplicity Timber Solutions Accoya was chosen as the ideal wood for these curved folding sliding doors in a project called The Hermitage. Accoya was selected due to its aesthetic appearance and ability not to shrink or swell during seasonal weather changes. Keep a look out as The Hermitage project is set to be featured in the December 2016 issue of Grand Designs.
Sponsored
National College for High Speed Rail

National College for High Speed Rail

Jewers Doors Ltd

National College for High Speed Rail opened its doors to students in September 2018 following the installation of Jewers' Swift-SEW high speed, automatic bi-folding doors which completed the external structure of the workshops at both Birmingham and Doncaster.
Sponsored
Dorma Varitrans HSW single glazed acoustic moveable wall- Metropolitan Gaming, London

Dorma Varitrans HSW single glazed acoustic moveable wall- Metropolitan Gaming, London

Style - Moveable Partition Specialists

At Metropolitan Gaming in Mayfair, London, Style worked with architects, Whitebox, and contractors, Modufit Interiors, to create the facility to section off part of the main gaming area for a private VIP lounge. A glass HSW (Horizontal Sliding Wall) was installed, giving staff the ability to rapidly divide the room into two, sectioning off a VIP gaming area to create a unique experience for clients. The moveable wall neatly divides the VIP area away from the main public gaming room, with a lockable full height intermediate door for ease of access. The bronze opaque textured glass allows light to flow through the entire area but offers the level of privacy required for a private room. Decorative transom bars bonded onto the glass add perfectly to the opulent room design.Metropolitan Gaming boasts a wealth of experience in both gaming and hospitality. It is committed to bringing a new perspective to the casino experience and is continually innovating to deliver a unique and authentic experience for its guests in each of its individual locations. “This manually operated, glass moveable wall offers a truly chic, yet practical solution for Metropolitan Gaming”, said Michael Porter, Style’s group sales director.“When not in use, customers enjoy a large open plan gaming area in this very exclusive Mayfair venue. But when a separate VIP lounge is required, away from the public areas, it can be moved into position in a matter of minutes.”According to Mark Cowley, who heads up the glass division at Style, demand for non-acoustic glass moveable walls is growing particularly quickly, with shop frontages, banks, restaurants, reception areas, residential homes, winter gardens, airports and sports stadia/arenas all using these to create flexible space.A new section of the Style website is dedicated to glass partitioning solutions with updated literature ensuring architects, contractors and end-user customers have access to all of the information they need to reach informed decisions.
Sponsored
Entrance Matting at Manchester Metropolitan University

Entrance Matting at Manchester Metropolitan University

INTRAsystems

Combining the former Mayble Tylecoate and Grosvenor buildings, MMU’s new Arts and Humanities hub uses INTRAflex XT entrance matting for a classic aesthetic.With the listed portico and the internal glass vestibule providing some shelter from the elements, the architect specified a primary entrance matting system with INTRAlux Elite fibre inserts in Anthracite 607. This fibre has an exceptional tuft count to provide 5.4l/m2 of absorption, combined with the highest Class 33 Wear Rating. To enhance performance with this simple primary entrance matting system, the specification provides a substantial walk-off area.With 19,550mm wide entrance matting, entry through the main portico doors offers nearly 10,000mm of walk-off in either direction. While the adjacent pass doors are protected by entrance matting that measures 3629mm front-to-back.
Sponsored
Mono Glass Balustrades for 'The Ark', St George's Primary School

Mono Glass Balustrades for 'The Ark', St George's Primary School

Delta Balustrades Ltd

Mono M310/M311 Glass InfillSt George’s junior school is an independent Roman Catholic school with a high standard of facilities. Construction of ‘The Ark’ provided a new early years teaching block, which includes modern classrooms, a dedicated IT suite, a new assembly room and outdoor learning areas. The two-storey building has a staircase at each end and Delta Balustrades’ Mono™ system was specified with powder-coated steel balusters and 11.5mm toughened and laminated glass infill panels. The Mono™ system handrails were provided in oak to offer a warmer finish in the primary school environment and each staircase features a dual handrail with one handrail mounted at a 600mm height for the children and the other in parallel at 900mm for the teachers. The Ark features an outdoor teaching area at first floor level with a balcony accessed from the internal classrooms. Once again, Delta Balustrades’ Mono™ system was specified with powder coated balusters to match the grey of the window casings. The 11.5mm toughened and laminated glass infill panels have no handrails but have been installed at a height of 1500mm to provide additional edge protection. A further small triangular balcony at the side of the building has been specified with the same system as the main first floor balcony. At ground level, the building features steps and ramps and a combination of Mono™ balusters and Orbis™ handrails with a Sigma stainless steel finish have been used to provide guarding, with 10mm toughened glass infill panels.Finally, the stone steps leading to the nursery classrooms were specified with an Orbis™ handrail.
Sponsored
SIEGENIA barrier-free thresholds for lift & slide doors for high-end prefab housing

SIEGENIA barrier-free thresholds for lift & slide doors for high-end prefab housing

Siegenia-Aubi Ltd

SIEGENIA's ECO PASS SKY axxent threshold is paving the way for WeberHaus.As a premium provider of prefabricated houses, WeberHaus relies on high-quality solutions. The "German Dream Home" silver prize-winning luxury villa in the "World of Living" exhibition park in Rheinau-Linx bears witness to this: its extraordinary building architecture is underlined by its exclusive furnishings and equipment, in which eleven lift and slide elements along with the hardware technology from SIEGENIA bring light and spaciousness into the building. The six elements on the ground floor with the ECO PASS SKY axxent level threshold, in particular, provide room comfort.Daily added value for the residents"The interest in large-scale elements with a passage as level as possible, convenient operation and elegant design is distinctly increasing, even among younger home owners", reported Christoph Scheuring, PORTAL product manager at SIEGENIA. WeberHaus has been meeting these expectations recently with the Premium solution for the passage from the inside to the outside: the level threshold ECO PASS SKY axxent lowers the height of the threshold, including the running rail, to 0 mm without any incline.The additional benefits of such a solution for the producer of prefabricated houses, which has been relying on SIEGENIA for large-scale elements for a number of years now, is obvious: "The ease of use achieved by the reduction of the difference in level between the inside and outside to zero generates a daily added value for the residents," explained Daniel Eckstein, head of construction planning at WeberHaus.A solution with an elegant appearance awarded the Red Dot prizeThe elegant design of ECO PASS SKY axxent is also a persuasive argument for home owners. This begins with the optical adaptation of the threshold to the frame material. Moreover, the design of the fixed sash is optically appealing: by saving on the profiles, the portion of glass is maximised to such an extent that the glass is flush with the floor surface. And last but not least, the outside appearance is harmonious. There the elegant design of the grille for the threshold drainage flows seamlessly into the drainage gutter. The threshold therefore won the renowned Design Award „Red Dot: Best of the Best 2020“ for its trailblazing design. ECO PASS SKY axxent can also be convincing in terms of security with burglar resistance up to RC3.Technically mature, ECO PASS SKY axxent also exhibits its strengths with regard to sill installation. SIEGENIA cooperates with the drainage specialist Gutjahr to guarantee a specialised high-quality solution, both for design harmonisation of the threshold and drainage gutter. From the perspective of Daniel Eckstein, this is an advantage: "Beside the attractive, uniform, appearance, this allows us to achieve an optimum coordination of the drainage system and the connecting system with regard to the designing of the exterior area."Motorised operation for ease of use The motorisation of large-scale elements and their integration in Smart Home systems will play an ever increasing part in the future according to the estimation of the WeberHaus expert. „The motorised drive of lift and slide doors is a significant feature in the view of home owners: large window elements are heavy and consequently can only be moved with the application of force. Whereas, they can be really difficult to stop during the sliding process“, explained Daniel Eckstein. He therefore had one of the particularly large elements of the villa equipped with the motorised drive DRIVE axxent HSA smart from SIEGENIA. The fully automatic, partially concealed drive system has an elegant appearance and is convincing due to its concealed lift drive and its flat, discreet control knob. Operation is convenient: the sash can be opened and closed either by using the control knob, per radio remote control or via the SIEGENIA Comfort app.
Sponsored
Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS200 Vertical Bar Infill Side FixThe main NHS hospital for Blackpool and the Fylde Coast, Blackpool Victoria Hospital has undergone a £16.4 million upgrade to create a new main entrance and a multi-storey car park.The new entrance includes a pharmacy, retail units, café, main reception, waiting area and office accommodation. Featuring extensive curtain walling, the new main entrance has been designed to maximise natural light and provide a feeling of openness. The use of glass for the balustrades helped to enhance this design style throughout the main feature areas and voids, using Delta Balustrades’ Orbis system.Delta Balustrades also supplied the balustrades and handrails for the main and rear staircases in the new multi-storey car park. Delta Balustrades calculated the loadings for all areas of the hospital installation and specified multiple fixing details for the atrium to accommodate variations in floor levels and construction.
Sponsored
New Windows and Doors in a Country House in Gloucestershire

New Windows and Doors in a Country House in Gloucestershire

The Sash Window Workshop

The Sash Window Workshop were contacted by a couple who were looking to undertake a large project to transform a property in Gloucestershire into an elegant family home.The new wooden windows and doors had to deliver elegance and the traditional look and appearance that the customer wanted from both the inside and outside. They also needed to meet modern window performance standards, with double glazed windows and doors.They arranged to visit the workshop to have a look at how the windows and doors are manufactured and were delighted with the quality, thought and workmanship that goes into all the windows and doors they manufacture. The customer therefore decided to place an order for all the new timber windows and doors.After the work was completed, they commented that they are so pleased and happy with the end result. The customer also noted that the sash windows and doors were instrumental in the transformation of the building into a beautiful family home.
Sponsored
Eurofold Doors at Mustard Tree Manchester

Eurofold Doors at Mustard Tree Manchester

Bolton Gate Company

Mustard Tree, one of Greater Manchester’s most loved and respected charities for the homeless and disadvantaged operates from a large warehouse in the city which was in a dilapidated state. £1.6 million was raised to refurbish it and OMI Architects were appointed to design the upgrade which included replacing the external folding doors which were manufactured by Bolton Gate Company and despite being over sixty years old, were still operable and providing security. OMI specified new doors of the same type and Bolton Gate were chosen to install three new doors to the main entrance which were powder coated yellow.
Sponsored
Accoya windows and doors in Paros Greece

Accoya windows and doors in Paros Greece

Accoya

Accoya® wood has been used in a distinctive residence in Paros, a popular Greek Island in the Aegean Sea. Atlas Wood, joinery manufacturer from Greece supplied 92 windows and doors to complete this project. Accoya wood was specified for the project because of its exceptional stability, class 1 durability and extended coating maintenance cycles required for this all year round warm Mediterranean climate.
Sponsored
ENSURING LONGEVITY: ESSENTIAL CARE FOR YOUR EXTERNAL DOOR HARDWARE

ENSURING LONGEVITY: ESSENTIAL CARE FOR YOUR EXTERNAL DOOR HARDWARE

ASH Door Furniture & Entrance Specialists Ltd

External door hardware face constant environmental challenges, enduring exposure to pollution, corrosive salt air in coastal regions, and the relentless elements. Unlike their internal counterparts, external hardware requires special attention to maintain optimal functionality and appearance.PROACTIVE MEASURES FOR LONGEVITY:ortunately, these issues can be easily avoided with a proactive approach to care and maintenance. Implementing regular tender loving care (TLC) with the right products can make a significant difference in preventing complications and ensuring customer satisfaction.HOW TO MITIGATE COMMON ISSUES:TEA STAINING AND FLASH RUST ON HARDWARETea staining, a common cosmetic issue on the surface of stainless steel, doesn’t compromise structural integrity but can affect the hardware’s aesthetics. To address this concern:Regular Cleaning: Tea staining can be avoided with routine cleaning. Use a soft cloth and mild soapy water to gently clean the hardware.Proper Drying: After cleaning, ensure thorough drying with a clean, soft cloth to prevent residue accumulation.Correct Cleaning Technique: Rub or wipe the hardware in the direction of the brush or polish lines to maintain its appearance.By incorporating these simple yet effective practices into your hardware maintenance routine, you can extend the lifespan of your external door hardware, promoting customer satisfaction and minimizing the need for costly call-backs. Remember, a little care goes a long way in preserving the integrity and aesthetics of your hardware.

Showing 217-252 of 552

Feedback