NBS Source
I'm a manufacturer

"fire protection"

3,193 results found

Sort by:

Showing 325-360 of 429

Sponsored
Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixThe Birkenhead Community Fire Station was completed in 2013, as part of the North West Fire PFI scheme, a framework of 16 fire stations across North West England. The client’s main objectives were to provide a safe and healthy environment with improved facilities for firefighters and other personnel.Following demolition of the existing fire station, the design and construction of this multi-appliance station, led by Balfour Beatty Construction, included community orientated facilities, training facilities, rest rooms, additional office space and two communal staircases. At early design stages, Delta Balustrades worked closely with Balfour Beatty to meet the client’s objectives of creating well designed facilities to a high architectural standard. The Orbis system was chosen as a cost-effective, high-quality tubular balustrade solution for both staircases.The main stair boasted a brushed stainless steel finish with unique Banjo glass fixings. Savings were made on the rear stairs by selecting powder coated uprights and D type glass fixings.
Sponsored
Cambridge Road

Cambridge Road

The Safety Letterbox Company

THE PROJECTThe Building a Safer Future Charter has been created to promote an urgent and positive culture and behaviour change in the safety of the built environment. It is about putting people’s safety first in how we plan for, design, build, maintain, and look after the safety of the buildings we live, work or play in and protect those that use them.THE PRODUCTSLB’s 2 hour Fire-rated mailboxes were used on this project at Cambridge Road, London for a large Housing Association and arranged on a radius, providing an interesting yet highly functional arrangement of 2-hour integrity only fully tested mailboxes. The Fire-rated range from SLB is tested at Exova Warrington and exceeds 2 hours in temperatures beyond that of molten lava without distortion, flame or deterioration. This system was polyester powder coated in a burnt orange RAL colour, powder used conforms to London Underground specifications.This arrangement is also comprised of manual parcelboxes positioned underneath with a manual locking option.
Sponsored
The Office Group (TOG + Fora)

The Office Group (TOG + Fora)

Radii

This work at Holborn’s Chancery House  — The Office Group’s largest location to date spanning 127,000 sq ft — focused on a design that accommodates multiple working zones and breakout spaces, enhances wellbeing and offers an abundance of natural light.Radii’s design department provided multiple bespoke solutions for this fit out, working on four of the building’s nine floors.For glazed fronts, our elegant Parallel 50 (Rw 45 dB) double glazed partitions in emulated satin stainless steel finish — a reference to the historic London Silver Vaults that are located at the base of Chancery House — were utilised along with wraparound framing and a custom blade detail to create an eye-catching visual effect.On the Ground floor, single glazed Linear 59 partitions (Rw 39 dB) with a bespoke pocket sliding door into drywall was installed for platform lift access.Finally, E30 fire rated double doors were placed on the Lower Ground Floor to provide fire route protection.
Sponsored
The Castings

The Castings

illbruck – a brand of Tremco CPG UK Ltd

Project: The Castings, Piccadilly EastLocation: Heyrod Street, ManchesterVCL membrane system supplier: ADA FastfixSystem used: illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer, illbruck TF448 High Performance Bonding Tape, ME322 Internal Tape 100illbruck, a part of CPG UK, have celebrated the successful installation of their new A2 fire classified vapour control layer within an exciting new residential development in the heart of Manchester.The projectThe Castings, Piccadilly East is on a 0.7-acre site in the Manchester Piccadilly regeneration area and includes four stepped building elements rising to 25-storeys high. The development will consist of 352 build-to-rent (BTR) apartments, including a mix of studio, 1, 2, and 3 bed units, alongside roof terrace gardens, retail and amenity space, and a public square. The project was designed with a focus on sustainability, to deliver low energy consumption with highly efficient building fabric.ADA Fastfix, a leading supplier into the construction industry, were approached to find an airtight vapour control membrane which would ensure high levels of thermal performance and energy efficiency in the building. As a ‘relevant building’ according to Building Regulations Approved Document B, the installed membrane needed to be a fire classified solution; an A2 fire classified solution was requested to provide enhanced fire safety for the building and its occupants.The solutionADA Fastfix selected illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer due to its enhanced reaction to fire classification of A2-s1, d0 to EN 13501-1, excellent product performance, and the accompanying technical support from the illbruck team. illbruck ME060 A2-Membrane uses advanced technology to combine reinforced glass fibre with an aluminium and laminated coating, providing long lasting strength and durability. The special coating also improves thermal performance by reflecting up to 95% of heat.  Its airtight and vapour-tight properties, which can be used to comply with Passivhaus, helps improve energy efficiency whilst protecting the building fabric from moisture vapour and condensation.The applicationOver 6,000m2 of illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer was attached to the Steel Frame Structure using TF448 50mm high performance tape. The lap joints and window details were then sealed with ME322 70mm tape. This system can be used on the internal structure of a timber frame or lightweight steel structure to manage air and moisture flow, as well as enhance the building’s thermal performance, energy efficiency, and fire safety. Alongside providing high performance products, the illbruck team also helped the client with detailed drawings, technical service and application guidance, and on-site support – to ensure a smooth installation process and great finished result.Project overviewScott Hurry, Area Sales Manager at CPG UK, said, “illbruck ME060 A2-Membrane was the ideal choice for this fabric first build due to its enhanced reaction to fire classification as well as helping to improve thermal performance in the building. This is the first major installation of our new ME060 A2 fire classified membrane - we’re delighted to work with ADA Fastfix to see our products installed in this development, where our membrane will be helping to protect the building and its residents for years to come.”
Sponsored
Hospital Corridor Walls Protected by Yeoman Shield

Hospital Corridor Walls Protected by Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

A busy access corridor linking one wing to another at a major Yorkshire Hospital now benefits from a wall protection system supplied and installed by Yeoman Shield.The heavy footfall, wheeled equipment and bed trolleys continually traversing the path between two busy wings was starting to take its toll on the walls and corners of the corridor in the form of marking, denting and scratching.Keen to maintain the high smart standards as well as lifecycle and sustainability of the property, the hospital choose a protection system from Yeoman Shield to overcome such damage.200mm Protection Rail was fitted “flat-back” to the wall on one side of the access way with FalmouthEx Wall Protection Panels installed below the rail.Rubber stop ends/returns (new to the Yeoman Shield range) were applied to the rail as added defence against heavily laden trolleys and carts that may come into contact.The opposing wall was also offered protection by the same Yeoman Shield 200mm Protection Rail this time installed on 60mm “stand-off” allowing the system to become a supportive rail for those who require it. The rail was again finished with the durable hardwearing rubber accessories.Matching 75 x 75 mm Corner Protection Angles were put on vulnerable corners on both sides of the walkway completing a comprehensive wall protection system that will help to reduce the time and money spent on redecoration and repair over the lifecycle of the building.More information on Yeoman Shield’s cost-effective wall & door protection systems can be found at www.yeomanshield.com or by calling 0113 279 5854.
Sponsored
Aungier Street Student Accommodation

Aungier Street Student Accommodation

Profab Access Ltd

Profab Access rises to the top at Aungier Street Student AccommodationSituated in the heart of Dublin just a short walk or cycle from Trinity College, Royal College of Surgeons Ireland and University College Dublin, Scape Aungier Street is a new state-of-the-art student accommodation complex.Offering a diverse range of high quality accommodation options, from en suite rooms in shared apartments, through to large and premium studios, the latest Scape development features communal study spaces, large open plan kitchens and gym areas to offer students all of the amenities they require.As part of the construction process, which was managed by John Paul Construction, 226 Profab Access 4000 Series Riser Doors were specified for installation by AE Doors throughout every part of the building, including the communal areas and individual bedrooms.The 4000 Series Riser Doors offer the highest standards of fire safety, supplied with comprehensive CERTIFIRE bi-directional certification from third party accredited testing, Warrington Fire.This means the riser doors are fire tested from both sides to two hours, providing the specifiers, contractors and ultimately the students residing within the building with confidence the critical fire integrity products offer the highest standard and most up to date evidence for fire safety performance.The 4000 Series is the only riser door in the UK to be independently bi-directionally fire tested and certified by an accredited third party to ensure legal compliance.The steel riser doors feature a slimline construction that doesn’t compromise on quality or functionality, offering aesthetics without compromise. Providing clean and concealed access to the riser shafts, the unobtrusive doors were specified with a central key cylinder lock and hinges on one side.This significantly streamlined the installation process for the team at AE Doors and reduced the risk of damage to the doors upon installation, particularly in the student bedrooms and bathrooms where access was restricted.Pat Woods, Technical Sales at AE Doors, said: “Given the nature of this development we knew the quality and durability of the riser doors was paramount to ensure their longevity and continued efficiency.“We have supplied and installed Profab Access’ riser doors for over two years and continue to be extremely impressed with the quality of construction, so we knew the 4000 Series would be the ideal choice for this project.“The products are extremely easy to install and as they are manufactured in the UK, they are available with impressive lead times. This meant we could ensure the development of the project was kept on track, ready for its opening this autumn.”In the event of a fire, the doors will maintain their frame and integrity for up to two hours, preventing the spread of fire throughout the property for this period of time.The riser doors are 35dB acoustic rated, smoke sealed and airtight to Part L, whilst also featuring intumescent smoke seals that enable occupants to safely exit the building. By specifying the CERTIFIRE bi-directionally fire tested 4000 Series Riser Doors, the development is actively future proofed as the comprehensive testing certification provides a complete and transparent audit trail of due diligence that evidences the products are not only fit for purpose, but meet the duty of care required to ensure legal compliance.Marcus Parnham, Commercial Director at Profab Access, said: “Scape provides students across Ireland, the UK and Australia with contemporary accommodation that offers the highest standards in quality, safety and functionality.“The specification of our 4000 Series bi-directionally fire tested riser doors throughout all areas of the new Aungier Street development is a further reflection of this commitment, ensuring the building features the highest levels of riser shaft fire protection currently available on the Irish and UK markets.” The 4000 Series Riser Doors were supplied with a high quality powder-coated matt surface, which were finished on-site in a range of bold colours to reflect the contemporary interior design scheme.Profab Access’ diverse portfolio of riser doors and access panels are supported by a wide range of BIM Level 2 and CAD files to aid the specification process and streamline the initial design stages.Manufactured at Profab Access’ Atherstone headquarters in accordance with ISO 9001, the 4000 Series Riser Doors can be specified and installed in a range of configurations to meet each project’s specific measurements and requirements.For further information on Profab Access and its range of access panels, riser doors and steel doors, call +44(0)1827 719051 or visit https://www.profabaccess.com.
Sponsored
Double action fire rated doors for Harrods, London

Double action fire rated doors for Harrods, London

Dortek Ltd

Arguably the most famous department store in the world, Harrods of Knightsbridge is a huge retail concern with over 5000 staff members working in over 70,000 square meters of retail space split into 300 plus departments over seven floors.When Harrods decided to redesign their staff food court they required double action doors that were aesthetically pleasing, had a high hygienic rating and were easy to use and they also needed a double action door with a 120 minute Fire Rating.SolutionDortek Installed Polyethylene doors that could be used as personnel doors. They also allow easy movement of trolleys and kitchen equipment between the three distinctive kitchen areas. Dortek also installed double-action 2-hour fire rated GRP doors into a 2530mm wide structural opening to enable staff to bring in large pieces of kitchen equipment when necessary.
Sponsored
SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

Firechief Global

The Wilberforce Trust is a charity dedicated to helping and empowering those with sight and hearing loss and impairment in the York and North Yorkshire area to live fulfilling and independent lives. The Trust had tenants in community based supported housing and family homes around York but wanted to deliver an innovative ‘extra care’ housing scheme designed especially for people with a visual impairment and other disabilities; the first of its kind in the area.Wilberforce House offers 30 one-bed, open-plan purpose-built, self-contained apartments along with a Living & Learning Zone – providing education and leisure activities – a courtyard cafe and offices for the Trust itself, all set in four acres of accessible landscaped gardens, including a large sensory garden. The apartments utilise smart home and assistive technology personalised to their lifestyle needs.A consultant was employed to review the development’s plans with regard to fire safety. His report included recommendations for additional fire safety measures including the ability for cooker hobs to be switched off by an alarm, as kitchen fires are a significant risk with 50% of all accidental house fires starting in the kitchen. WHY THE FIRECHIEF KITCHEN STOVE GUARD? The initial solution proposed was costly as it meant hob alarms would need to be hard wired into each apartment’s fuse board. Damian Pocknell, Head of Housing, Facilities & IT at the Wilberforce Trust recalled having seen and read about the Firechief Kitchen Stove Guard and realised that this would be much more cost effective. The fire consultant agreed and subsequently signed off on the Kitchen Stove Guard as the approved solution.  
Sponsored
Lymm Fire Station Changing Place

Lymm Fire Station Changing Place

Innova Care Concepts

Lymm Fire Station was completely unique project; it was new-build station that doubled up as an educational centre. It had all kinds of different environments and scenarios built-in to give visitors the ability to learn what to do in various emergency situations. As such, they wanted to include a Changing Place facility in the new building. We’ve been working with the Changing Places campaign for a long time, and we were able to design a fully-compliant facility complete with a wall-mounted X-Y hoist system. Read all about it on our website.
Sponsored
School achieves aesthetic fire performance with MEDITE PREMIER FR

School achieves aesthetic fire performance with MEDITE PREMIER FR

MEDITE SMARTPLY

A state-of-the-art sports and learning centre in Cambridge features a dramatic space-defining acoustic based on the use of MEDITE PREMIER FR fire rated panels from MEDITE SMARTPLY.
Sponsored
Koster Flooring Systems - Protection to Concrete bund

Koster Flooring Systems - Protection to Concrete bund

Koster Aquatecnic Ltd

Koster Epoxy flooring systems were installed to the concrete bund of a chemical plant in Wales. There was a need to prevent chemical spillages entering the concrete so they could be cleaned in a safe manner. Koster Aquatecnic worked with the engineers and client to design a system which could be installed and offer the most suitable level of protection. The cleaned surface was prepared with Koster Polysil TG500 and Koster NB1 Grey. Koster SL Premium was used to provide a strong level surface to accept the Koster LF-VL on the floor and Koster EM-VS on the up-stands.
Sponsored
XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal

XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal

Glazing Vision Ltd

XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal Case Study
Sponsored
Busy Service Corridor Protected by Yeoman Shield

Busy Service Corridor Protected by Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

A busy service corridor in a medical education and research facility, has recently been refurbished with the help of products from Yeoman Shield’s heavy duty range.Wanting to protect vulnerable walls and corners throughout the heavily used service corridor, the facilities management invested in a complete Yeoman Shield heavy duty wall protection system installed by their directly employed fixing operatives.A striking and durable protective finish to the corridor walls was achieved with Yeoman Shield Chequer Plate Wall Panels. The panels were paired with heavy duty Rubber E-Fender running at the top and the bottom of the chequer plate at such levels to absorb impact from the most frequently occurring and heaviest of blows from footfall, trolleys and motorised carts.Yeoman Shield HD75 heavy duty Rubber Protection Angles were fitted full height to vulnerable corners protecting the structure.Designed specifically to protect areas in a building that experiences heavier footfall such as warehouses, storage and service facilities, the heavy duty protection products, when installed, keep areas damage free, providing an easy clean hygienic surface whilst putting an end to frequent costly re-pair and re-painting, offering long term savings on maintenance budgets.
Sponsored
The Paddocks

The Paddocks

Lignacite Ltd

Nestled in a secluded location, the village of Lavenham has been a picturesque place to live since its mediaeval origins. But with housing supply limited within the bounds of the existing village, in 2016 residents voted for a new development to go ahead – providing it was in-keeping with their historic homes.The designs of The Paddocks’ 25 new properties therefore draw on influences from the Tudor and Regency homes and cottages already lining the streets of the village, reflecting their style and materials. Ranging from two to four-bedrooms, each home has been gifted its own individuality, with traditional finishes, such as rendering and weatherboarding linking them back to the original properties. Attention to the quality and scale of landscaping around the site has also been factored in to mirror the countryside that embraces the site.However, while the new homes certainly have similar characteristics to the houses already in the village, they do not share their energy inefficiency. Beneath the traditional finishes are contemporary homes with ambitions to keep carbon emissions to a minimum. To do this, Hartog Hutton decided to take a two-pronged approach to reducing CO2 emissions: by installing solar panels and electric car charging points, and by using thermally insulative fabrics, including blockwork.For the structural foundations, the housebuilder therefore turned to Lignacite’s 100mm and 140mm Lignacrete blocks, which are designed for high-strength uses. With an A1 fire rating, Hartog Hutton could also ensure that future residents would have an additional layer of fire protection.Lignacite Ash GP blocks then form the bulk of the buildings. With strong and durable characteristics, these blocks are ideal for all kinds of applications. More importantly, they also have great thermal insulation of 0.298 m2K/W (for 1400mm blocks at 3% moisture), which satisfies all the latest requirements of the Building Regulations Approved Document L.The remainder of each structure uses Lignacite’s Fibo 850/950, which forms the substrate for the weatherboarding and rendering. They provide an excellent surface for these finishes while also adding to the overall thermal insulation of the property. A final advantage is that these blocks are extremely lightweight and can be put into place one-handed.
Sponsored
Wall Protection & Matting - The Christie, Proton Beam Therapy Center

Wall Protection & Matting - The Christie, Proton Beam Therapy Center

Gradus

The Christie was seeking a solution that would provide it with all the benefits of wall protection in terms of reducing lifecycle costs, while being as invisible as possible, creating a less institutional and more relaxing environment for its patients. To make this vision a reality, Gradus worked closely with the hospital throughout the process. Having worked with The Christie before, we were thrilled to continue our relationship on this prestigious and rigorous ProCure 21+ project. The project was an excellent example of our supply-and-fit service, highlighting how we work closely with clients and supply chain partners to deliver the project on time and exactly to specification
Sponsored
The devil is in the detail...

The devil is in the detail...

GEZE UK Limited

Richard Richardson-Derry of GEZE UK looks at how a properly fitted fire door with the appropriate components can give occupants vital time to escape in the event of a fire.Despite what most people believe, toxic smoke is the cause of the most deaths in fires, as opposed to the fire itself. So what constitutes a fire door?The BWF Fire Door Alliance states the term usually refers to a fire door leaf which is the main component installed into a fire-rated frame, along with ‘essential ironmongery’ to make the door perform correctly in the event of a fire.However therein is the challenge – when not required to be a fire door it must still perform everyday functions of providing safety, security, privacy, separating different areas and reducing noise in a building.When an architect specifies door products, it is imperative that as well as achieving the everyday design requirements, factors relating to fire resistance are also a key consideration in order to achieve regulatory compliance.Under the spotlightApart from the frame and door leaf, a fire door includes a door closer, smoke seals, hinges, push pads or handles, signage, and maybe a vision panel. Each and every component must be fit for purpose; should any component fail then the whole fire door assembly could fail. And any item that is badly fitted or wrongly specified could contribute to the spread of fire.For each part of the fire door there are standards that must be adhered to.The door and frame should be installed securely and plumb and true with a maximum gap of 3 mm to all sides for a fire door with smoke protection (for a general fire door the gap can be up to 10 mm).The door closer is an important part of the fire door assembly and it is critical to specify a suitable unit and ensure minimum size EN 3 is used.All doors must be fitted with intumescent seals – they play a major role in fire safety as they will expand to around 10 times their volume when significant heat is applied.Hinges are a critical part of a door, carrying its weight and allowing free movement of the door leaf but also helping to keep the door straight during a fire episode. There should be three hinges in a fire door up to 2,100 mm high. For doors over 2,100 mm high, exceeding 150 kg, or over 100 mm wide there should be four. All hinges for fire doors should be made of steel or stainless steel and have a melting point of no less than 800°C.All relevant push pads, handles and kick plates must have the required test data and standards and should have a melting point of at least 800°C. Locks need to comply with BS EN 12209 and lever handles with BS EN 1906.Signage on a fire door is required, such as ‘Fire Door Keep Shut’ or ‘Fire Door Keep Locked’. They need to conform to BS 5499: ISO 7010.Vision panels can be introduced to a door specification for reasons of safety, aesthetics, or to allow transfer of light, however the relevant seals must still be used so as not to compromise the integrity of the fire door and only suitable fire tested glass should be used.Specifying a closer for a fire doorThere are four main types of closer – surface mounted with link arm, surface mounted with guide rail, concealed, and floor mounted closer. All should be tested, approved and certificated to harmonised standard EN 1154, BS EN 1634-1 and have Certifire or similarly approved testing. In addition, a closer should be CE marked or hold the new UKCA (UK Conformity Assessed) certificate (effective fromJanuary 2023).There is also the application to consider: which closer is best suited to the door type, size, location and intended use of the door? Another consideration is the best fitting arrangement, and again this is dependent on door type, size, location and use.There are several different configurations for a variety of applications that also need to be taken into account including fitting configurations, using brackets, mounting plates or spindle extensions to overcome specific site details. All should be specified in accordance with test evidence.Another consideration is being able to adjust the closer. The correct adjustment of the closing force is needed to ensure it meets the requirements for access under Part M and BS 8300 with Part B of the Building Regulations for fire as well. Correct adjustment refers to electro hold open, back check, closing speed, and latch action to ensure the door opens and closes safely and securely.All door closers complying with EN 1154 will have a six figure classification which should be marked on the door closer.The power of door closers according to the EN 1154 standard are rated from one to nine, for example a size three door closer has a closing force of 18 Nm (Newton Metres), where Nm is the closing force exerted by the door one metre from the hinge point. It should be noted that the minimum size allowed for any door closer on a fire door is size three.In summary, while all the component parts of a fire door must be thoroughly tested and conform to all relevant standards, the most important aspect is that they must work together as a doorset.Richard Richardson-Derry is national specification manager for GEZE UK
Sponsored
COMMUNAL ENTRANCE DOORS AND SCREENS

COMMUNAL ENTRANCE DOORS AND SCREENS

Premier Security & Fire Consultants Ltd

Construction company Mulalley instructed Premier Security & Fire Consultants to design, fabricate and install these main entrance doors and screens at their project at Aspen Gardens, Hammersmith.Premier utilized our LPS1175 SR2 certification to create the steel and glass installations, all achieving Secured by Design accreditation. For more information about Premier, go to our website premier-ssl.com or call us on 0208 559 8295.
Sponsored
BAML signs-up to use the FireDNA Monitoring System

BAML signs-up to use the FireDNA Monitoring System

Fire DNA Ltd

Asset management firm, BAML has signed-up to use FireDNA’s Fire Door and Doorset Monitoring Software and Mobile App.With the introduction of Regulation 10 back in January 2023 which requires the owners of buildings over 11 metres to carry out quarterly inspections on all fire doors. The FireDNA software and Mobile App allows users to undertake on-the-spot audits and inspections, capturing the data in real time; the data is then stored and managed through the FireDNA cloud.The programme is being rolled-out in 10 developments across London, managed by BAML, including Embassy Gardens in Nine Elms, Wardian London’s iconic two towers in Canary Wharf, Royal Wharf in the Royal Docks area and the Brentford town centre regeneration project adjacent to the River Brent.“We are delighted to be awarded this contract and look forward to working in partnership with BAML.” said Tony Millen, FireDNA’s Operations Director. “Across the 10 developments, our FireDNA Inspection Partners will inspect, tag and monitor 25,000 Fire Doors using our Mobile App, making the inspection process efficient and compliance easier.”(About BAML – BAML is a property management organisation providing customer-focused services to residents in more than 11,000 homes across London. This includes managing the planned maintenance, capital expenditure programmes and financial accounting and onsite services).
Sponsored
Acrovyn provides wall protection solution at Bristol Royal Infirmary

Acrovyn provides wall protection solution at Bristol Royal Infirmary

Construction Specialties (UK) Ltd

CS provided a comprehensive wall protection package for the King Edward Building, Bristol Royal Infirmary. The scheme included: impact resistant, textured Acrovyn Sheet, a range of Acrovyn Corner Protectors in circulation areas, and Acrovyn bed head protectors in the hospital’s wards. In addition, custom printed Acrovyn by Design wall mural was installed at the entrance to a new multi-faith sanctuary space. Installed by the company’s in-house installation team, Conspec Contracts, durable Acrovyn products will protect the facility from the effects of impact damage and wear & tear, ensuring the interior is easy to clean and maintain for years to come.
Sponsored
Rubio Monocoat - Your Partner in Wood Protection

Rubio Monocoat - Your Partner in Wood Protection

Rubio Monocoat UK

It’s time to change the way we finish and protect our interior and exterior wood forever. We are now live on NBS - a platform, which enables architects and specifiers to easily find the products that are perfect for the projects they're working on.Rubio Monocoat provide environmentally friendly interior and exterior oils for wood preservation. With 0% VOCs and the environmental credentials to back it up, we really are the future of wood staining and protection.Who are Rubio Monocoat?Born and based in Belgium, we have expanded over the globe and into the UK and Ireland. In 2000, the company started with the development of an oil, based on a revolutionary technology called molecular bonding, conducted by Dr. George Barrell. This innovative technology has played a huge part in the success of our products.Molecular Bonding is the process of the oil adhering with the fibres of the wood. Within a couple of minutes, the oil has bonded with the upper microns in the wood, meaning no film formation or saturation. The innovative technology means wood is protected in just one single layer.The environmental credentialsRubio Monocoat products contain no VOCs (volatile organic compounds) or harmful chemicals that emit into the air or come into contact with your skin. Three years before the introduction of the first VOC regulations, we decided to set a high bar and go for a 0% VOC label. As a company, we are dedicated to looking for environmentally friendly solutions and strive with the utmost care to provide products with high quality and standards.Rubio Monocoat is the first in the wood treatment sector to get the Eurofins Indoor Air Comfort Gold label. Eurofins Indoor Air Comfort Gold is a sign of our focus on quality and contribution to a healthy indoor environment. The label combines the most relevant emission specifications and requirements in one certification. The Indoor Air Comfort Gold label shows compliance with specifications on VOC emissions set out globally. As well as having these incredible certificates to our name, our products are also food safe and toy friendly. We also have the M1 Emission Class for Building Material certification and are EPD (Environmental Product Declaration) certified, meaning we are transparent with the information surrounding the life-cycle and environmental impact of our products. Why are Rubio Monocoat launching on NBS?At Rubio Monocoat, we know architects could benefit from everything our oils have to offer from staining and protecting cladding, to refreshing interior wood panelling. It’s an industry we have only just touched the surface of, but with our environmental credentials, efficient application process and high quality finish, we know we’d be a great addition to any wooden project.With NBS, architects are able to browse our environmentally friendly interior and exterior products, read case studies from all over the world and locate all our certifications, literature on safety, and technical data sheets. It's also the perfect place to keep up with projects from around the globe to find inspiration. This is a huge step for Rubio Monocoat into a market that we've always highly valued and we look forward to providing architects and specifiers with expert advice on our 0% VOC products. Are you interested in a workshop near you?We’re looking to hold workshops for architects and specifiers who want to learn everything about what Rubio Monocoat can offer them and their projects. These will involve demos and the chance to get hands-on. If you’re interested, please register here, making sure to state the town you’d like us to come to: https://form.jotform.com/221983606853363You can contact our Business Development Manager Derek at consult@rubiomonocoat.com for more information or a demonstration on our products, and see us live on NBS now: https://nbs.fyi/gwuq8i
Sponsored
Dubai Metro Insulated Shutters

Dubai Metro Insulated Shutters

Hart Door Systems Ltd

AboutThe Dubai Metro Red Line, at 52.1 km (32.4 mi), is the world’s longest driverless single metro line. The planning of the metro was in response to a rapidly growing population and severe traffic congestion to relieve motor traffic and provide infrastructure for development.Project/doors200 Insulated Roller Shutters, both fire rated and non-fire ratedThe ChallengeThe Hart contract to manufacture over 200 industrial roller shutters to Dubai Metro, one of the most advanced urban rail systems in the world, was secured through the Al-Futtaim Group, who in turn were awarded by Chadwick Technology Group. Hart not only manufactured the doors but provided training to JT Metro JV, Dubai Metro Project.The SolutionManufacture over 200 Insulated Roller Shutters, both fire rated and non-fire rated for the Jebel Ali, Rashidiya and Al Qusais train depots. The shutters are designed to work in very sophisticated and complex systems including depot protection when driver-less trains are in operation.The SuccessThis was Harts largest export order to date and came on the back of large orders for Hart products for Heathrow’s T5 and the international railway terminal at St. Pancras. Once again Hart successfully delivered on a large scale project due to the engineering knowledge and project management experience.The ReviewYou have shown a high level of technical competence and professionalism in dealing firstly with the lengthy approval process, mainly due to the critical importance of the shutters for the automated operation of the Metro system, and secondly with the various site issues that invariably arrive on a project of this scale and fast track nature. Peter W. Mansell, Project Director, Chadwick SEC
Sponsored
11-12 Wellington Place

11-12 Wellington Place

Planet

Planet’s northern contracting team joined Wates and architects tp bennett to work on the Cat A fit out of 11 & 12 Wellington Place, manufacturing and installing 40 pairs of double leaf FireTec Ei60 fire rated doors with bronze handles across over 250,000 sq ft of grade A office space on Levels 1 to 10. These doors were installed to be ‘future proofed’ to facilitate any future automation requirements once sub-let to tenants.Manufactured using an ultra-slim precision engineered framework, the durability of the FireTec system suits high foot traffic areas while providing fire route protection and acoustic performance up to 39dB Rw.The multi-award-winning 11 & 12 Wellington Place achieved a BREEAM ‘Outstanding’ sustainability rating and is the first UK building outside of London to attain a NABERS Design for Performance rating of 5* or above.Wates handed over the completed shell and core works to clients MEPC in early 2023, with the building already securing several high-profile companies as tenants.
Sponsored
Wall Protection - Institute of Veterinary Science - University of Liverpool, Leahurst Campus

Wall Protection - Institute of Veterinary Science - University of Liverpool, Leahurst Campus

Gradus

Gradus has supplied a variety of wall protection systems as part of a refurbishment project at the University of Liverpool’s Small Animal Teaching Hospital based at the Leahurst Campus in the Wirral. The Small Animal Teaching Hospital is part of the University of Liverpool’s Institute of Veterinary Science and employs over 350 staff, including over 100 veterinary surgeons and 280 students. The facility is one of the largest and most innovative veterinary hospitals in Europe, teaching students the very latest theory and techniques.
Sponsored
Manchester Airport Fire Engine Workshop Floor uses FasTop TG69

Manchester Airport Fire Engine Workshop Floor uses FasTop TG69

Sherwin-Williams

​​This project at Manchester Airport has now been completed by Monarch Resin Floors. The previous floor was a twenty year old tile and resin cementitious screed which was decaying and water damaged. Due to the level of decay and disrepair, the floor was dug out by a third party and re-concreted ready for the resin. Monarch installed 9mm thick FasTop TG69  polyurethane screed in 3 different colours to help the fire engines to see the tyre lines when they were reversing. White line marking was also installed.The total area was about 600m2 and included six bays and six fire tenders.
Sponsored
TekTherm™ AK-FR A2 Fire Rated Thermal Break

TekTherm™ AK-FR A2 Fire Rated Thermal Break

Thermal Breaks Ltd

TekTherm™ AK-FR A2 Fire Rated Thermal Break
Sponsored
The Exchange Student Accommodation, Hotham Street, Liverpool

The Exchange Student Accommodation, Hotham Street, Liverpool

URSA UK LTD

An 11-storey student accommodation facility on Liverpool’s Hotham Street marks the second phase of an exciting redevelopment project for the city. Cladding contractor, BAK UK, has specified URSA’s Façade N35 slab across the vast new build structure.URSA has supplied over 1000m2 of URSA Façade N35 slab to cladding contractor as part of a £35m student accommodation project in Liverpool.Under the scheme, 500 student homes are to be created in a multi-storey environment on the site of the former Odeon cinema on London Road/Hotham Street. A swimming pool, gym and two landscaped gardens also form part of the ambitious city centre development set for occupation later this year.As appropriate for a prestige, high-rise residential and multi-occupancy building, superior materials have been specified throughout including URSA Façade N35 slab.The scheme has been halted for several years due to issues surrounding development funding. Now under new ownership, the design and construction have been scrutinised and it appears that a combustible insulation may have been used in the original cladding system. This has since been replaced and new work completed using URSA’s specialist product.  Ian Claydon, Technical Manager at URSA commented: “As with many high rise buildings developed only a handful of years ago, unsuitable products have been installed that don’t offer the necessary levels of protection to ensure the safety of occupants.”Rainscreen cladding is a lightweight, non-load bearing system attached to the outside of a building using a bracket and rail system. The cladding system provides protection from wind and rain, improves the thermal performance and limits solar gains.  Ian added “URSA Façade N35 is totally non-combustible, Euroclass A1, so doesn’t add any fire load to the building or prejudice the overall fire performance of the wall. The presence of the ventilated cavity behind the cladding system means that cavity barriers are required to prevent the spread of fire and/or smoke. This is a unique and highly effective product that we are seeing specified increasingly across UK and European sites.”    
Sponsored
Oscar Iso-Mount Type1 achieves 90-minute fire rating

Oscar Iso-Mount Type1 achieves 90-minute fire rating

Oscar Acoustics

Oscar Acoustics achieved a 90-minute fire rating at BRE Group’s testing facility for its Iso-Mount Type1 acoustic ceiling hanger. Iso-Mount Type1 significantly reduces transmission of noise from the floor above with minimum ceiling height loss. The mount was tested to BS EN 1365-2:2014 Fire Resistance Tests for Loadbearing Elements at BRE Group’s laboratory in Watford in December 2018. Iso-Mount Type1 can be specified for projects ranging from house conversion to flats, both new build and renovation, as well as shops, restaurants and other commercial soundproofing applications.
Sponsored
Auckland Art Gallery - Interzinc 42, Intergard 251, Interthane 990, Interchar 963 - Infrastructure - Architecture

Auckland Art Gallery - Interzinc 42, Intergard 251, Interthane 990, Interchar 963 - Infrastructure - Architecture

International®, brand of AkzoNobel

Our coatings look after the world’s most iconic and acclaimed buildings. Among them is the Auckland Art Gallery Toi o Tāmaki. Since its redevelopment in 2011, the principal public gallery in Auckland, New Zealand has won 23 awards and counting, including the prestigious World Architecture Festival's 2013 World Building of the Year. The redevelopment plan aimed at restoring and preserving heritage elements and sensitively combining them with 21st-century design. This included earthquake-proofing and heritage restoration of the 1887 and 1916 components of the main building and the addition of new, contemporary elements that increased display space by 50 per cent. One of the most distinctive features of the new building is its roof design, which forms a series of fine ‘tree-like’ canopies that define and cover the forecourt, atrium and gallery areas.Our coatings complemented this architectural challenge of blending old with new. A coatings system comprising of Interzinc 42, Intergard 251 and Interthane 990 was used to protect structural steel, while Interchar 963 was used to provide essential protection from the effects of fire.
Sponsored
Restoring a historical fire damaged home to its previous beauty

Restoring a historical fire damaged home to its previous beauty

Lime Green Products Ltd

Using Solo Onecoat Lime Plaster to restore walls in a fire damaged home
Sponsored
Fire Rated Access Panel Trust Pilot Review

Fire Rated Access Panel Trust Pilot Review

Trade Access Panels

Customer ordered our fire rated FlipFix panel. We dispatched the same day and the customer received their access panels the following day. Customer comments:-"Easy to order and delivery was quicker than expected which was a bonus for us as we were able to complete the job earlier than planned."
Sponsored
Promat delivers ‘wheel of assurance’ for fire rated glazing

Promat delivers ‘wheel of assurance’ for fire rated glazing

Promat UK

Promat UK is providing architects with a 360 degree ‘wheel of assurance’ for SYSTEMGLAS® fire resistant glazing systems. Guidance is offered at every stage of the project, the system is manufactured in-house, it is fitted by a network of approved installers and a certificate of conformity is issued upon completion by a Promat specialist. Promat can provide this assurance because it is in complete control of the design and manufacture process, and it has in-depth knowledge of the installation requirements. This means supply chain risks, such as product substitution or poor installation, can be eliminated.
Sponsored
Dyed Veneer Firescreens Partitions and Fire Doors in Office Refurbishment.

Dyed Veneer Firescreens Partitions and Fire Doors in Office Refurbishment.

Forza Doors Limited

Split over basement, ground and three upper floors, the Charles Doll Building on Grape Street, London, offers a contemporary and functional specification in this stunning office refurbishment. The development mixes industrial elements with a crisp modern aesthetic by carefully combining characterful architectural features, including vaulted ceilings with exposed brick and steelwork.Named after its architect Charles Fitzroy Doll, the building is clad in decorative thé-au-lait (“tea with milk”) terracotta – Doll's use of grand façades is understood to have resulted in the expression, ‘all dolled up’. The first floor has been fitted out to a high standard with office furniture from Vitra, providing the perfect space for those who want to move in and get straight to work.The lobby mixes vibrate contemporary wall art with industrial light fittings and brickwork. Forza’s in-house CAD team planned the bespoke black oak Firescreen partition wall to match the architect's design. As a market leading passive fire product, this Firescreen provides both integrity from Smoke and Fire and insulation from heat. This is important because in a fire emergency heat has been shown to ignite secondary fires to items, such as curtains or carpets, that are near the other side of non-insulated partitions.Via the Thinking Space Design & Build, Forza Doors supplied twenty FD30 Fire Doors with stained frames and skirting boards to match throughout the five floors of The Charles Doll Building. Chosen to match the steelwork throughout the development, the dark satin finish of the doors was selected from Forza’s Creato range of dyed veneers. This ‘Illunis’ finish is one of twelve fashionable choices in the range. Dyed veneers are an increasingly popular choice with designers as they offer cost savings over stained veneers without compromising quality.The Doors with glass vision panels, required to allow light through to the stairwells, feature our flush and quirk bead. A minimalist design option where one side of the doors is completely flush right up to the glass vision panel and the other side has a very simple elegant bead detailing.
Sponsored
Smart fire prevention system installed in Liverpool new build student accommodation

Smart fire prevention system installed in Liverpool new build student accommodation

Firechief Global

Bowline in Renshaw Street, Liverpool is a new development; a combination of student accommodation and apart-hotel rooms. Liverpool City Council approved the demolition of the existing Renshaw Hall building and the construction of the hotel and an 11-storey block of student accommodation; 49 clusters totalling 357 bedrooms with shared kitchen/lounge; and 47 self contained studios. The students communal facilities include a sky lounge, private dining room, fitness studio, karaoke room, and cinema room.Multiple residents in a building means more food being cooked and a higher risk of kitchen cooking fires. The Firechief Kitchen Stove Guard was fitted in all kitchen areas to help keep all the residents in the building safer. A fire on an induction hob can start in just 1.5 to 2 minutes and a fire on a traditional electric hob within 6 minutes.
Sponsored
A Flame-Free Solution to Reduce the Potential Fire Risk

A Flame-Free Solution to Reduce the Potential Fire Risk

Iko Ireland

The project was to refurbish the roof and improve the drainage and insulation and bring it up to current building control standards. A thermographic survey of the roof was carried out by IKO, which confirmed that it was sound enough to have an overlay of IKO UXPL bituminous membrane rather than stripping it back and rebuilding. IKO UPXL was primarily chosen by the client for the 30 year guarantee. One section of the roof to be repaired was on top of dormers. Flame-free IKO UPXL membranes were used because of the potential fire risk of the abutting pitched tiled roof.
Sponsored
LPS1175 SR2 GATES AND FENCING

LPS1175 SR2 GATES AND FENCING

Premier Security & Fire Consultants Ltd

Premier Security & Fire fabricated and installed three Secured by Design steel security gates and fencing for instructing clients MDP Communications Services at their project in King’s Cross, North London.Premier’s gates have been tested by the BRE (Building Research Establishment) achieving LPS1175 SR2 security status and sit alongside our dual-certified LPS products in a portfolio of more than 250 designs, including communal entrance doors, screens and curtain walling.Check out our website for more information. www.premier-ssl.com
Sponsored
Octavia House School Fire Doorsets

Octavia House School Fire Doorsets

Ahmarra Door Solutions Ltd

Ahmarra manufactured Q-Mark certified FD30 fire doorsets for Octavia House School, an independent specialist therapeutic school in Great Baddow, Essex. Selected from our Education Range, the pre-hung doorsets were manufactured from sustainably sourced FSC® certified timber and supplied with fully compatible ironmongery. The client chose colourful Formica F6901 Vibrant Green, F8820 Leaf Green, F4177 Lime and F8755 Lemon high pressure laminate facings, in line with the Octavia brand’s colour scheme.

Showing 325-360 of 429

Feedback