NBS Source
I'm a manufacturer

"fire protection for building frames"

11,303 results found

Sort by:

Showing 181-216 of 1922

Sponsored
Lancaster Fire Station

Lancaster Fire Station

Stone Cladding Systems

Architect: Frank Shaw AssociatesMain Contractor:  John Turner Construction GroupInstaller: Cubic FacadesLancaster Community Fire and Ambulance station was the first purpose built integrated fire and ambulance station in Lancashire. Designed by Frank Shaw Associates the project involved the construction of a new appliance bay while the facility remained fully active. Accommodating 2 fire engines, 7 ambulances and the North West Blood Bikes team. The bays are clad in Aztec Rainscreen faced with Peakmoor Sandstone in keeping with the area.Completed in September 2018 the stations Aztec cladding was fixed by Cubic Facades and has had excellent reviews including a commendation at the Lancaster & District Design Awards 2019.
Sponsored
Coastal Protection - Aberavon

Coastal Protection - Aberavon

Geofabrics Ltd

In 2019/20 works were undertaken to prolong the life of the promenade structure and adjacent shoreline at Aberavon. The implementation of the Shoreline Management Plan has served to protect residential and commercial properties from coastal erosion. Geofabrics HPS11C is a thick needlepunched non-woven geotextile manufactured from 100% virgin polypropylene high tenacity fibres containing 1% active carbon black. The main function of HPS11C is to prevent loss of the sub-soil from below the rock armour. With challenging low particle size subsoils, the HPS11C was ideal with its combined filtration and permeability characteristics.
Sponsored
Kingston University, STEM Building

Kingston University, STEM Building

Allgood Ltd

Allgood doorsets are helping to provide exceptional fire safetyat the new state of the art science, technology, engineeringand maths (STEM) facilities at Kingston University, London.The University, which has roots going back more than 100years and has approximately 19,500 enrolled students, beganconstruction of new science and technology facilities in thesummer of 2016.Replacing the former teaching rooms on the second andthird floors of the main building, the new chemistry andpharmaceutics laboratories are providing students at theUniversity with a modern environment, packed with the lateststate-of-the-art equipment.As with any science laboratory, the consideration of safety wasof paramount importance when it came to specifying elementssuch as the doors, due to the use of flammable, toxic anddangerous chemicals.Additionally, because of the amount of traffic through theSTEM department and thus the doors’ regularity of use, theuniversity felt that reliability and durability were integral when itcame to the ironmongery.As such, Allgood supplied 15 doorsets with traditional exposedlippings. The exposed lippings provide extra protection tothe door faces and ensure they can be easily repaired andreplaced if necessary. Along with the doorsets, Alite levers,latches, surface maglocks and hinges were installed, providingthe laboratories with fire protection for up to 30 minutes.The Alite ironmongery range developed specifically for usein busy commercial environments was ideal for the KingstonUniversity STEM environment – providing a robust and hardwearing ironmongery solution.
Sponsored
Wall Protection - The Halcon Centre

Wall Protection - The Halcon Centre

Gradus

Located near Taunton, Somerset, the Halcon Centre provides short breaks, with 24-hour professional care, for up to 18 adults who are physically disabled or have sensory loss. SureProtect Design® bespoke wall cladding was installed in the main corridor at the centre featuring a row of imitation panels, that have been designed to look hand-drawn with a marker pen to offer the homely feel the centre was looking for. In addition, the Halcon Centre further increased the corridor walls’ protection by installing Gradus’s CGH5090 High Impact PVC-u Corner Guards and WGS200 Wall Guards, both in colour Gravel.
Sponsored
The Whiteley, London

The Whiteley, London

OBEX Protection Ltd

Location: The Whiteley, LondonMain Contractor: Laing O'RourkeDesigned by Foster + Partners, the new Whiteley will deliver 139 world-class, modern residences, 20 new shops, cafes and restaurants, a central public courtyard, a cinema, a gym and London’s flagship Six Senses hotel and spa with 110 rooms, as well as its social wellness club, all set behind a retained and restored Grade II-listed façade.OBEX were selected to supply the CORTEX ‘Fire Rated’ products, not only to ensure compliance with the latest regulations, but to give peace of mind that the required performance standards would be met.World-class Modern Residence: 139New Shops, Cafes & Restaurants: 20Room Hotel & Spa: 110
Sponsored
Wall Protection - St Ninians, East Renfrewshire

Wall Protection - St Ninians, East Renfrewshire

Gradus

We supplied and fitted a combination of Wall Protection solutions at St Ninian’s High School in East Renfrewshire, reducing the impact of scuffs and scrapes in the school’s corridors, improving its internal appearance and enhancing the environment. “We were looking for a way to deal with wear and tear and how to keep the school in pristine condition, particularly after the refurbishment of certain areas,” explains Anne O’Neill, Business Support Manager at St Ninian’s. “It was clear that a new approach was needed, so we contacted Gradus about their wall protection solutions.”
Sponsored
Wetguard Modular protection at Wood Boutique Hotel, Austria

Wetguard Modular protection at Wood Boutique Hotel, Austria

SIGA Cover AG

In this wooden building in the center of Vienna, the walls, ceilings and floors are made from solid wood(CLT). The construction protection covering and sealing for the individual elements were achieved with the SIGA products Wetguard and Rissan.
Sponsored
Park East

Park East

Keyfix

IntroductionThe Keyfix Non-Combustible Cavity Tray has been installed as part of a major housing project , Park East in South East London, helping to improve efficiency onsite, and to exceed building regulations.OverviewPark East is a £95 million development in Erith, designed by ECD Architects and developed by Wates Group. The project comprises 320 new homes, of which 20% are for private sale, 24% for Shared Ownership, and 56% for rent in order to accommodate a mixed tenure community. The modern, stylish homes are in close proximity to the local amenities and parks, with excellent transport links to London.Working alongside brickwork contractor Lee Marley Brickwork, Keyfix supplied 3,772m of its Non-Combustible Cavity Tray (NCCT), 3,528 units of corners, and 20,774 units of its Non-combustible Weep Vents to this project. Keyfix’s sister company Keystone Lintels supplied 890m of its Non-Combustible Cavity Tray Lintel, which was powder coated as per the client’s request.Challenge The main challenge faced on this project was the brevity of the programme, which ran from November 2020 to November 2021. As the project was time sensitive, the main contractor required an accredited solution which could be supplied in line with the tight-build programme. Keyfix’s NCCT presented the ideal solution to this challenge.SolutionKeyfix was able to meet the client’s objectives by providing products in accordance with their tight-build programme. To ensure the maximum efficiency of installation, Keyfix designed various types of bespoke units including preformed corners and pier units to assist Lee Marley brickwork in keeping to its the fast-paced build programme. Due to the scale of the project, the products were prefabricated, allowing the brickwork to be conducted swiftly. Despite the bespoke nature of the products, the first delivery was made just two months after the initial enquiry in September.Duncan Marley, Contracts Director at Lee Marley Brickwork commented: “On the Park East development we required various bespoke products and Keyfix were able to provide a quick turnaround on those. The Keyfix NCCT also helped us to save time significantly because the system is so quick to install. Keyfix also provided us with a scheduled breakdown of components which was a great help.”The Keyfix NCCT was specified due to its ‘one-piece system’ which allows for a very simple and efficient installation. The system is self-supporting as it doesn’t require fixing back to the internal frame, therefore saving valuable time. Additionally, the adjustability of the perp joint allows for the cavity trays to be shunted to match the brick coursing on site, ensuring consistency in the brickwork formation.The NCCT was also chosen due to its A1 fire rating. It is made from non-combustible Grade 304 stainless steel which will never contribute to fire loading in the building. This fully compliant system ensures that the Park East buildings will be future-proofed against the implementation of tighter regulations.The non-combustible nature of the product makes it an effective solution to provide DPC protection over lintels, masonry supports, soffit systems and other elements in the cavity such as fire barriers. Additionally, the fact that the Keyfix NCCT does not rely on tape or mastics to form its watertight joints negates the prevalent cause of product failure and creates a more robust system altogether.In addition to providing NCCTs, Keyfix identified where it could offer technical support, and provided a full technical review of architects drawings, a comprehensive mark-up, and a scheduled breakdown of component location. The team also attended design meetings to ensure that the products were being used correctly, as well as hosting a Tool Box Talk prior to the first install to ensure the system was installed properly.Commenting on the NCCT, Kieran Coyle of Keyfix stated, “The Keyfix Non-Combustible Cavity Tray is an A1 fire rated system, ensuring our customers peace of mind as their buildings are future-proofed and safeguarded against fire, as well as our on-site benefits.”The Keyfix Non-Combustible Cavity Tray has played an important part in the creation of a safe new-build development for future tenants to enjoy.
Sponsored
Wall Protection - Bitterne Park School

Wall Protection - Bitterne Park School

Gradus

Gradus has supplied and fitted a range of wall protection solutions as part of the £16m newly built Bitterne Park School in Southampton. The new school includes 80 new teaching classrooms, a purpose-built assembly hall/theatre, a new dining space with a fully fitted kitchen and purpose built fully fitted classrooms to house the students as part of their Food and Nutrition studies.
Sponsored
Profab Access Ahead of the Curve with Fire Testing

Profab Access Ahead of the Curve with Fire Testing

Profab Access Ltd

Profab Access Ltd, part of the Access 360 portfolio, is prioritising fire safety in buildings with the introduction of fire testing for both sides of its 4000 Series riser door range. Established in 2001, Profab Access Ltd is a leading UK manufacturer of wall and ceiling access panels and riser doors. The company employs a team of 71 and operates from a 46,000 sq. ft. manufacturing and distribution facility in Atherstone, Warwickshire. All aspects of the design and manufacturing process are carried out onsite.
Sponsored
The Restoration of Westminster Fire Station

The Restoration of Westminster Fire Station

Lime Green Products Ltd

The Westminster Fire Station restoration and regeneration was all about creating an experience for those that live there, with sustainable and natural materials,” says Jennifer Benningfield, experienced architect and founding principal of Openstudio Architects.v “We needed to find a reliable supplier of sustainable and natural materials, which were suitable to tie in with the heritage structure. “The challenge was sourcing the right materials that were compatible with the fabric of the existing buildings. Working with Lime Green, we managed to develop a solution that matched the original building’s beautiful aesthetic and historic character. “As a key supplier of lime-based products, their flexibility and reliability helped to make our job easier – and we received a lot of praise for the high-quality and beautiful new courtyard building. The lime mortar is an integral part of the brickwork and proves that it is appropriate for contemporary, as well as historical, structures,” praises Jennifer. About the project Using a team of specialists, Openstudio Architects supported the site team in using old and traditional construction techniques to refurbish and develop buildings in a contemporary way, with beautiful results. “There were two phases to the Westminster Fire Station project,” explains Jennifer. “The first involved refurbishing the existing building, the Grade II Listed Edwardian Fire Station built in 1906 and decommissioned in 2014, to create a restaurant and bespoke housing. “The second involved developing the site further by adding a new residential building to the rear of the site surrounding a garden courtyard, which is where we used Lime Green’s mortar.” Supporting the local community “The project was situated on a very constrained and challenging site,” continues Jennifer. “With its central location, the construction works undoubtedly had an impact on those living and working in the local area, which is why we wanted to ensure the community were completely happy with the project. “As we wanted to make sure the new build tied in with the older fire station, there were inevitably challenges that we didn’t anticipate along the way. However, most importantly, we needed to ensure we sourced the right materials, which were compatible with the existing building, both in terms of performance and appearance. Selecting the right materials “We wanted to work with natural materials, which would age well and ensure robust construction that has longevity and sustainability,” says Jennifer. “We chose specific products, including handmade Danish bricks and handmade glazed bricks to give depth and texture to the new building. We wanted to ensure use mortar that had a texture and a grain to it, so it would work with the nuances of the bricks, as well as being a colour match. “Finding the right colour mortar to match the pale Danish bricks was key. These bricks were handmade, so we needed the mortar that integrated with the historic Edwardian building to create a seamless whole. “When planning the project, we recognised the importance of lime products, because of the material’s sturdiness and robustness. This means it doesn’t wear with structural movements and changes in the seasons. “That’s why Lime Green was the perfect fit for the project. With an extensive colour range, the team was able to colour-match the mortar with the materials of the new building perfectly. The consistency between the samples Lime Green gave us and the final product delivered was incredible, which was important given the scrutiny by Westminster City Council over the project and the appearance of the new building. “The flexibility of the products also helped us to minimise the amount of movement joints, as it accommodated movement in a much more forgiving way than other products, such as modern cement mortars. “We really enjoyed working with the Lime Green team – they were easy to work with, responsive and very supportive of the project. As we couldn’t store a huge amount of supplies on site, Lime Green was very accommodating in delivering exactly what we needed, at the right time. “The best part was that we were able to develop a solution with Lime Green that supported the original building’s beautiful aesthetic and historic character, with a new building that pays similar attention to detail.” A sustainable, natural and beautiful finish “People love the building, and neighbours even call it ‘the golden citadel’. It’s widely recognised in the local community for its high-quality, beautiful finish,” continues Jennifer. “One of the Fire Station’s previous residents – who had moved out during construction – has moved back after the restoration works and loves the development. That was the icing on the cake for us, it really felt as though our vision had materialised – enhancing people’s experience of new buildings made with sustainable and natural materials that stand the test of time. “The Westminster Fire Station development truly looks beautiful, and the quality of the natural and sustainable products used has a huge role to play in that. Lime Green’s product quality and customer service is outstanding. We’re already working with Lime Green on another project, and we can’t wait to see the finished result,” concludes Jennifer. “It was a pleasure to see our Hydraulic Lime Mortar used on this new development project. We’ve loved working with Openstudio Architects on Westminster Fire Station, and we’re glad to be working with them on their next project,” comments Simon Ayres, co-founder and managing director, Lime Green Products. For more information about the Westminster Fire Station project and the products used, visit Lime Green or call 01952 728 611.
Sponsored
Wall Protection & Matting - Proton Beam Therapy Centre

Wall Protection & Matting - Proton Beam Therapy Centre

Gradus

Gradus has supplied and installed a range of bespoke wall protection solutions throughout the ground-breaking new Proton Beam Therapy Centre at The Christie NHS Foundation Trust in Manchester. Gradus supplied and installed its SureProtect Pure® hygienic wall cladding in White and Iceberg shades. Specially designed to create an impermeable barrier to moisture and bacteria it features a smooth, easy-to-clean surface to ensure a hygienic solution that meets ‘Health Building Note 00-09: Infection control in the built environment’
Sponsored
Fire Rated Roof Hatch - Killeen, Texas

Fire Rated Roof Hatch - Killeen, Texas

Surespan

Surespan designed and manufactured several fire-rated roof hatches for the Killeen ISD East/West Ward Elementary School, in Killeen Texas.  The Project:Huckabee is the architect behind the East/West Ward Elementary School, tasked with replacing two 60-year-old campuses, by combining them into one new holistic learning environment. The planning behind the architecture focuses on efficiency, function and ease of wayfinding. From simple to navigate corridors, modernised classrooms and glazing to illuminate the interior with natural light. East/West Ward Elementary School blends district design standards with innovative thinking to achieve spacial efficiency and maintain equitability.Product:Surespan designed and manufactured five 35.5-inch x 35.5-inch Fire Rated Roof Hatch with an integral guard hand railing attached. These hatches are thermally broken and have been designed and tested with 4-hour fire resistance for integrity to EN 1634-1:2014.  Features:These hatches are using environmentally friendly materials such as non-combustible minerals and fireboard cladding to achieve a top-performing thermal efficiency. All the hatches were finished in a light grey polyester powder-coated finish for an aesthetically pleasing solution. The coating is set to last many years, just like the durable masonry veneer that is featured in the building, helping to maintain the space for years to come. 
Sponsored
Darlington Fire Station

Darlington Fire Station

Ronacrete Ltd

MJF Group completed the coating of Darlington Fire Station using RonaFloor HB200. The bays were completed using dark grey with the borders in brick red. Before the application of RonaFloor HB200, they were required to install a damp proof membrane and opted for our RonaFloor Epoxy DPM which can be applied to substrate with an RH of up to 97%.
Sponsored
FIREFLY™ PHOENIX UPGRADES FIRE PROTECTION WITHIN RAF MANSTON HISTORY MUSEUM

FIREFLY™ PHOENIX UPGRADES FIRE PROTECTION WITHIN RAF MANSTON HISTORY MUSEUM

FIREFLY™ TBA

FIREFLY™ Phoenix has been employed at the iconic RAF Manston History Museum, located near Ramsgate in Kent, during the refurbishment of a single storey structure
Sponsored
Type 100SE - Radiation Protection

Type 100SE - Radiation Protection

London Wall Design Ltd

As business evolves and requirements change in our fast-paced world, London Wall Design continue to bring ground breaking, intuitive products to the industry and pride ourselves in being able to create unique and bespoke systems for all our clients, whatever the application. One of our latest projects which has been installed and tested has made us particularly proud and set a new standard in acoustic movable walls.The requirements on this project were clear and simple with very specific needs for one of the leading pharmaceutical companies and we were going to tackle it head on. A movable acoustic wall with radiation protection for a research and testing environment needing to maximise flexibility while still offering the safety and protection required in a radiology environment.Our Type 100SE semi-electrically operated movable wall was developed and tailor-made for this requirement; with X-Ray protection and specialised seals to ensure the ground-breaking radiation protection and acoustic levels would be achieved. Each wall weighed in the region of circa 6 tons and the top hung system was fitted with our Type “K“ track which allows for remote and varied stacking locations. The walls varied in width and height but were all finished in Rigato Formica laminate with aluminium protective edge trims. The vision panels in the pass doors were fitted with Med-X type single glazed glass between two layers of 4mm thick toughened glass.
Sponsored
Fire Rated Decking and Class A substructure

Fire Rated Decking and Class A substructure

Wallbarn Ltd

Refurbishment of terrace with Class A fire rated non-combustible decking system. Exadeck porcelain decking boards were fitted to Wallbarn aluminium rail substructure with Class A MetalPad EX adjustable height pedestals. Retro-fitting of entire terrace to comply with fire regulations Approved Doc B and BS 8579.
Sponsored
The Met Building

The Met Building

RYNO

This reimagined building in Fitzrovia, which puts people, wellness, and sustainability first, is another project we are particularly proud of and here’s why.The Met Building is 12 storeys high and one of a few such examples in London’s West End. Its design was inspired by one of New York’s landmark buildings, Lever House, one of Manhattan’s leading examples, which inspired decades of US corporate architecture.While the building’s interiors are crafted to appeal to corporates and creatives, the Tower has been designed to put people first, offering breathtaking views across London, and focusing on efficiency and productivity.The whole roof terrace of the Met Building’s Podium was built over the top of the existing roof and on a huge network of steels that are designed to direct the load away from the roof below.The system used on the roof terrace is our TerraSmart® Rail Paving System finished in our Porcelain Paving Range. This system features super-strong, 100% recyclable aluminium joists, overlapping to create a lattice framework that delivers maximum support for the porcelain paving above. In addition to complementing the overall aesthetics of the entire project, the system is fully non-combustible (Class A1 fire-rated) and, as such, in perfect harmony with the focus on the wellness and safety of all the building’s occupants. The porcelain pavers were inspired by nature and feature the performance of high-quality ceramics and environmentally conscious manufacturing that aligns with the project’s focus on sustainability.And to top it all, the entire solution installed is backed by our RYNO® IGNO® 30-year system warranty and 60-year design life.In total, the RYNO® TerraSmart® Rail Paving System was installed on 3 terraces at the Met Building, all built on the existing steel frame, and the planters that add to the outdoor experience have been integrated into the design and placed directly on top of the RYNO paving system.We are proud to have collaborated very closely with Vert Projects (the Main Contractor) and The Landscape Partnership (the Landscape Architect) in delivering this great design.
Sponsored
Depot Boijmans Van Beuningen - Pyroguard Protect & Attackguard

Depot Boijmans Van Beuningen - Pyroguard Protect & Attackguard

Pyroguard UK Ltd

Pyroguard’s fire safety glass was recently specified for The Netherlands’ Depot Boijmans Van Beuningen, the world’s first publicly accessible art storage facility. A stunning ovoid shaped building standing 40 m tall, with reflective mirrors covering its surface, the depot receives anywhere from 150,000 to 250,000 visitors a year.
Sponsored
New Headquarters for Dorset Fire Service

New Headquarters for Dorset Fire Service

HAG Ltd. - The Door Specialists

HAG was honoured to be chosen to install industrial doors on the new headquarters for the Dorset Fire Service, designed by Prince Charles. The £3 million building included grand neo-classical design and a mock balcony, which meant HAG had to be particularly careful in the design and planning of the installation. The specification was to match the styling of the three-storey fire station while still providing the high levels of security and ease of use required for the situation. Our industrial Q Doors perfectly balanced the stunning aesthetics with the structural integrity and functionality required for this prestigious contract.
Sponsored
Erith and East Ham Fire Station

Erith and East Ham Fire Station

Langley Waterproofing Systems Ltd

The purpose: Energy savings of £¼million over 20 years at just two of its sites are predicted to be achieved by London Fire Brigade through effective roof refurbishment using our Roofing Solutions. The brigade identified that the roofs at Erith and East Ham Fire Stations were in need of refurbishment. Numerous intermediate repairs had already been undertaken. An efficient solution was needed to help London Fire Brigade optimise best value in its asset management and reduce its requirement for planned- or unplanned- maintenance.London Fire Brigade therefore turned to Currie & Brown construction management consultants to oversee the design and execution of the refurbishment projects under a contract management framework agreement in place between the two organisations. We was called in to assess the roofs and advise on a course of action. Data driven roof condition reports from surveys were taken across the two premises. We highlighted that the roofs were beyond economical repair and needed new waterproofing and insulation- a U value of 5.00W/m2K was discovered in one roof area, against the Regulatory threshold of 0.35W/m2K and best practice 0.18W/m2K. Our solution: We advised that in the main, overlaying of the existing roof covering with CP-20 Paracoat Cold Polyurea Liquid System (warm roof) application was the most-efficient and cost-effective solution.The over-laying using the CP-20 system satisfies London Fire Brigade’s policy of preference for flame-free, with no roof replacement needed this minimised waste to landfill.Our Approved Contractor CWG Group won the contracts to undertake the upgrading, working to Langley’s detailed individual specifications for each site.At East Ham Fire Station, four main roof areas plus a separate ancillary building were addressed.LangGuard free-standing safety rail was installed around the perimeter of roofs 1 and 4.The final touch for the field roof area was provided with Paracoat Fast SF slip-inhibiting finish to agreed walkway areas.At Erith Fire Station, the refurbishment involved upgrading two roof areas including a rooftop tank room and adjoining canopy of corrugated PVC over the Station building, and a separate stores roof.
Sponsored
D-marc - demarcation a Collective Protection Solution

D-marc - demarcation a Collective Protection Solution

Safety Fabrications Limited

D-marc 105TM demarcation system – a collective protection demarcation solution. The doctrine “prevention is better than cure” is one that rings true in so many instances. Common sense tells us that it much better to prevent a fall than it is to arrest the fall once it has occurred. The Working at Height Regulations (WAHR’s) 2005 reinforce this argument. Whilst in many instances it is not always practical to remove the risk of a fall; rainwater outlets will always require cleaning, rooftop plant will require regular maintenance etc.. there are a number of ways to protect the worker from the immediate hazard the fall presents. The simplest way and that which much closely echo’s the doctrine “prevention is better than cure” is to keep the worker away from the fall hazard. The most effective way of achieving this and that which is advocated by the WAHR’s is through the provision of a Collective Protection solution. A collective protection solution is one which will “collectively protect all those who access the area”. In a rooftop situation where the hazard is a fall from the roof edge, Collective protection can be achieved by raising the parapet or through the installation of a full perimeter guardrail. Alternatively the worker can be kept a safe distance from the roof edge through the installation of a demarcation system. –Health and Safety in Roofwork HSG 33 states that “where work is not done at the edge, demarcation barriers can be provided at a safe distance from the edge (usually at least 2 meters), e.g. work on an air conditioning unit in the middle of a roof.”.      An example of where The D-marc demarcation system has recently been specified and installed at Crown Woods College, Eltham to provide safe access to rooftop mounted plant. The client was looking for a solution that would;Provide a collective protection solutionNot penetrate the existing roof covering and therefore not compromise the roofs waterproofing or air-tightness.Be lightweight so as not to require an additional support structure.Provide easily identifiable access routes ensuring no exposure to fall hazardsBe low maintenance and ideally have good environmental credentials.  D-marc was able to meet all these criteria and has the additional benefit of giving the customer the piece of mind that whilst it does not rely upon any means of mechanical fixing to the roof structure, it is tested to withstand wind speeds in excess of 105 mph. Such testing is a requirement of BS6399-2 Code of Practice for Wind loads which states that all components that form a building are required to withstand a 1 in 50 year wind speed.   D-marc was used extensively on the project as part of the collective protection demarcation system to create clearly defined safe access routes across the roof to theplaces requiring regular maintenance work. Having created the safe routes to the places of work, the D-marc was then used to demarcate the safe working zones upon the roof top. To ensure a complete collective protection solution was provided in isolated areas where it was not possible to keep the worker away from the fall hazard a guardrail was used. The easy to install, non penetrating D-marc system creates a clearlydefined access route and a safe working zone for all those undertaking regular rooftop maintenance works.
Sponsored
Tough, heavy duty asphalt for fire station

Tough, heavy duty asphalt for fire station

Tarmac

The new, purpose-built Community Fire and Police Station on a two acre site in Prescot required a durable surface for the main yard area, car park and access road. This was a large site, incorporated three fire engine bays, a practice drill tower and community meeting rooms. Having replaced two local fire stations it was expected to be a busy station used by a range of vehicles. With each fire engine weighing up to 13 tonnes and using power-assisted steering the new surface would be subject to extreme turning forces. It would need to offer long-term durability and loss of aggregate due to surface abrasion. After considering the options, Tarmac’s ULTIPHALT HD was chosen, a tough, high performance 10mm asphalt with advanced modified binder. ULTIPHALT HD has been proven to deliver enhanced resistance in challenging environments like container ports and distribution centres. The modified binder enhances durability but also helps to maintain workability and aid compaction, even in low temperatures.
Sponsored
Long Melford Fire Station

Long Melford Fire Station

Jewers Doors Ltd

Suffolk Fire and Rescue Service recently commissioned Norwich-based Cooks Industrial Doors to replace failing vehicle access doors at Long Melford Fire Station in rural Suffolk. As a major reseller and installer, Cooks contacted Jewers Doors to design and manufacture state-of-the-art sliding-folding doors which would replicate the style of the original doors.
Sponsored
Concrete Basement Gas Protection

Concrete Basement Gas Protection

Newton Waterproofing Systems

Leafy Windlesham in Surrey was the location for this 5-bedroom, £15,000,000 mansion by Searchfield Homes, complete with a 4-metre deep basement containing a swimming pool and spa pool, all of which needed to be protected from water ingress and ground gases.
Sponsored
Oval Village, London

Oval Village, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley HomesOval Village is a mixed-use development in Kennington, London SE11, built on the site of the Oval Gasworks. The 2ha site overlooks the Oval Cricket Ground and will be redeveloped with 738 new homes, offices, retail and leisure facilities.This is another landmark project where the OBEX CORTEX 0500FR Class B Membrane and the 0771FR Class B Paste Adhesive were specified - critical to the installation achieving the required performance standards and fire-classification.New Homes: 1309Acres: 8Office Space: 12798 sq.mRetail Space: 2525 sq.m
Sponsored
HPS geotextile protection in Landfill

HPS geotextile protection in Landfill

Geofabrics Ltd

Geofabrics HPS17 is installed as the protection geotextile at Erin Landfill Site, a former colliery near Chesterfield. The geotextile formed part of a large cell measuring approximately 40,000m². The site also involved installation of 1000m of deep water drainage, 118,000m² of impermeable membrane, 1000m of fully-welded leachate pipework and 14,000 tonnes of drainage stone. Geofabrics HPS17 is a thick needle punched non-woven geotextile manufactured from 100% virgin polypropylene high tenacity fibres containing 1% active carbon black.
Sponsored
Lymm Fire Station Changing Place

Lymm Fire Station Changing Place

Innova Care Concepts

Lymm Fire Station was completely unique project; it was new-build station that doubled up as an educational centre. It had all kinds of different environments and scenarios built-in to give visitors the ability to learn what to do in various emergency situations. As such, they wanted to include a Changing Place facility in the new building. We’ve been working with the Changing Places campaign for a long time, and we were able to design a fully-compliant facility complete with a wall-mounted X-Y hoist system. Read all about it on our website.
Sponsored
Humberside Fire and Rescue Service

Humberside Fire and Rescue Service

Paxton Access Ltd

PaxLock Pro, Net2 and Entry Provide Robust, Wireless Access ControlHumberside Fire and Rescue Service is responsible for the fire and rescue service across the East Riding of Yorkshire, Kingston upon Hull, and North and North East Lincolnshire, serving a population of almost one million people. Providing a professional and skilled emergency response service; 24 hours a day, 365 days a year, Humberside Fire and Rescue Service also offer a range of other services and functions, including assistance with animal rescue, dangerous chemical spillages, local and wide area flooding, road traffic collisions, aircraft and railway incidents.RequirementThe Fire and Rescue Service required an access control solution that could secure multiple sites on a single system. The system needed to be robust and reliable, to maintain the security of the premises whilst allowing ease of entry and exit when responding to an emergency. Flexible access permissions across 12 of the fire stations in the region were also essential.Humberside Fire and Rescue Service worked with Delta Security Systems Ltd to recommend an access control solution that could meet their requirements. Based in Hull, Delta Security Systems supply electronic security systems for domestic and commercial use. They recommended Paxton’s flagship access control system; Net2, with PaxLock Pro; wireless access control in a door handle, and Entry; IP video door entry.Type of sitePublic Sector; Emergency Response LocationHull, UK Number of sites/doors/users12 sites260 doors300+ users Solution requiredManage and control access to all fire stations in the regionFlexible access permissions for short term site accessPin and token authentication for increased site security ResultRead in/read out access control providing fullaudit trail of who is on siteSecure fully manned and on-call stations withcentralised access managementRobust, multi-site access control solutionCentral management with remote access capabilities Paxton products usedPaxLock ProNet2 Plus ControllersNet2Air BridgeNet2 SoftwareEntry Standard panelEntry Standard MonitorP50 ReadersKP75 Readers
Sponsored
Coedcae Industrial Estate, Technical Fire Damage Specification

Coedcae Industrial Estate, Technical Fire Damage Specification

Garland UK

A busy recycling centre in Coedcae Industrial Estate, Pontyclun South Wales, suffered from a crippling fire that destroyed one-third of the building leaving the rest in severe disrepair from fire damage.Garland Technical Manager, Dale Thomas, was instructed by long-term partner Cushman Wakefield to assess the extent of the damage and secure the optimum waterproofing system to get the warehouse unit returned to its former glory as a hive of activity for the local area.Dale conducted a thorough condition survey and supplied a detailed written report to the client, highlighting the severity of the building damage and the poor condition of the existing roof sections and walls. Approximately 2,000 sqm were either damaged beyond repair or had fallen into a state of disrepair, meaning that a full refurbishment of all roof and wall sections was required before the optimum waterproofing system could be implemented.
Sponsored
Wood Wharf B2, Canary Wharf

Wood Wharf B2, Canary Wharf

OBEX Protection Ltd

Location: Canary Wharf, LondonMain Contractor: Canary Wharf Contractors LtdWood Wharf B2 is a modular construction project located on the edge of Blackwall Basin, Canary Wharf.All 279 serviced apartments were manufactured at their specialist construction site, fitted with kitchens and bathrooms and even furniture — before being transported to the site and craned into position.OBEX supplied fire-classified membranes that have been developed specifically for modular construction, including the 0400FR Class B Modular Roofing Membrane, as well as the 0223FR Class A2/W2 Breather Membrane.Storeys: 21Apartments: 279OBEX Fire-Rated products required: 4
Sponsored
Platform Lift for Fire Station

Platform Lift for Fire Station

CIBES Lift UK

This colourful Cibes A5000 platform lift is installed in an old fire station in Falun, Sweden.
Sponsored
Strategic Partnership with Willmott Dixon

Strategic Partnership with Willmott Dixon

Fire & Acoustic Seals Ltd

We’ve been a strategic partner with Willmott Dixon for several years now, ever since our Fire Door FoamTM was mandated on their ‘Yellow Book platform’.  The online manual exists to enable their staff and supply chain partners to use verified products on their projects. To meet their careful criteria we had to demonstrate the foam’s high-performance fire-stopping capabilities when installed between different substrates and timber fire doorsets.  As such a safety-critical component, we also had to provide its third-party test certification from Certifire, IFC and Warringtonfire to assure them of its credentials.Ryan Atkinson, Senior Strategic Buyer at Willmott Dixon comments“Fire and Acoustic Seals Fire Door FoamTM is now listed on our ‘Yellow Book platform’ – Willmott Dixon’s online guide to preferred materials, site installation and workmanship best practice. The foam went through our rigorous diligence checks to ensure it meets the set criteria required to become a specified product in the guide and to become a key component of the Willmott Dixon standard kit of parts. This product represented a rounded view of quality, cost and time which are some of the key factors we consider when selecting products for our ‘Brand Standard’.”Our Fire Door FoamTM has since been used on many Willmott Dixon projects across the UK. One of these is the high-profile Perry Barr Residential Scheme in Birmingham which will provide 1,400 much needed new homes in the city when complete.Ashley Devonport, Senior Quality Manager at Willmott Dixon comments“Fire and Acoustic Seals Fire Door FoamTM has been used to seal the gaps between the door and substrates on the apartments, risers, and communal areas on the prestigious Perry Barr Residential Scheme. This product is mandated on our Yellow Book platform and was selected for its excellent fire-proofing properties and independent test evidence. Julian and the team also provided excellent product training and speedy technical support when needed.”Contact the team for more information about Fire Door FoamTM. 0121 521 2179 | sales@fireandacousticseals.co.uk 
Sponsored
Guernsey Airport Fire Station

Guernsey Airport Fire Station

HAG Ltd. - The Door Specialists

Guernsey Airport Fire Station are a service specialising in the prevention of plane fires, located within proximity to the airfield to allow quick action in the event of an emergency. The work was implemented for G4S Secure Solutions (Guernsey) LTD on behalf of the state of Guernsey fire service at Guernsey Airport. HAG Ltd was enlisted to help the installation of 4 electrically operated Q Doors. Originally using sectional overhead doors, they instead switched to a product which had thermal properties and ease of operation.
Sponsored
The Biggest Hydropower Stored Plant in Europe Trusts MSA for its Fall Protection

The Biggest Hydropower Stored Plant in Europe Trusts MSA for its Fall Protection

MSA Safety (Latchways) – Fall Protection

750 metres deep inside a Welsh mountain lies the biggest stored power plant in Europe. With its remote location and harsh operating environment, Engie First Hydro contacted the Latchways team at MSA Safety to provide the complete solution for all its operational and maintenance fall protection needs. 7 million cubic meters of water are pumped through the giant turbines to generate power and then reversed as pumps to return the water to the reservoir. This tough working environment presents unique safety challenges for the electrical & mechanical operational and maintenance teams when working at height.
Sponsored
The Landmark Offices, Manchester

The Landmark Offices, Manchester

Knauf Insulation Ltd

Landmark is a 180,000 sq ft prime office development located in Manchester’s premier business district. Partially built off-site, it has been designed to achieve the highest sustainability standards – a BREEAM rating of ‘excellent’ and an Energy Performance Certificate rating of A so the thermal performance of its insulation was hugely important.Building regulations in England and Wales ban the use of combustible materials on all buildings over 18m. With 14 floors and a roof height of 27m, the architect, Squire and Partners, specified non-combustible insulation with Euroclass A1 reaction to fire classification.With this in mind, external wall sub-contractor FK Group consulted the Knauf Insulation Technical Support Team for advice about which insulation to use. The team conducted 3D U-value calculations and determined that Rocksilk® RainScreen Slab in thicknesses of 50mm, 100mm and 150mm would achieve the desired U-value.Rocksilk® RainScreen SlabRocksilk® RainScreen Slab is manufactured from Rock Mineral Wool and has a thermal conductivity of 0.034W/mK. It is BBA certified for use over 18m and has the best possible Euroclass A1 reaction to fire classification, meaning it met the required specification for fire safety.FK Group also sought advice about what to do if the Rocksilk® RainScreen Slab was exposed to rainwater during installation. There is a common misconception that the thermal performance of Mineral Wool will be permanently compromised if it gets wet, but this simply isn’t the case. Rocksilk® RainScreen Slab has been developed for external applications – its fibre matrix promotes water run-off, and it contains moisture-repellent additives in the binder. This ensures it can withstand higher levels of exposure to moisture during installation. Knauf Insulation also provided advice on the storage of insulation on site to protect the insulation from prolonged exposure to rainwater prior to use.Offsite constructionLandmark was built using an offsite construction method. Decorative concrete rainscreen panels were manufactured by Techrete in Hull. Rocksilk® RainScreen Slab was fitted offsite before the entire panel was transported to Manchester and craned into position on the concrete frame.The Knauf Insulation Specification Team provided further support by carrying out visits to both the Techrete manufacturing facility and the construction site to check the insulation was being installed correctly.SustainabilityAs well as its thermal and fire performance, Rocksilk® RainScreen Slab offers considerable sustainability credentials. It is manufactured with ECOSE® Technology, Knauf Insulation's unique bio-based binder that contains no added formaldehyde or phenol. ECOSE® Technology is made from natural raw materials that are rapidly renewable and is 70% less energy-intensive to manufacture than traditional binder, so it is more environmentally-friendly.Products made with ECOSE® Technology are soft to touch and easy to handle. They generate low levels of dust and VOCs and have been awarded the Eurofins Gold Certificate for Indoor Air Comfort. This is beneficial when insulation is being installed offsite in an enclosed industrial environment.Enhancing the St Peter’s Square heritageMurray Levinson partner at Squire and Partners said “Landmark is an important project for Squire & Partners, representing our first completed new build project in Manchester. When we were approached to design Landmark, we recognised an opportunity to extend the cluster of prime office buildings of the adjacent St Peter’s Square southwards. Our design concept aligned itself with the new developments, whilst creating a building which enhanced its specific site heritage and context.“A priority for both ourselves and the client was to create a building with exceptional sustainability and wellbeing credentials, and we are proud to have achieved BREEAM Excellent and EPC A ratings,” added Levinson.Thanks to its thermal performance, fire safety and environmental credentials, Rocksilk® RainScreen Slab will contribute to Landmark achieving the world's foremost environmental assessment method and rating system for buildings. All of which means this will truly be a landmark building both visually and in terms of sustainability.For further information about how our insulation can contribute to BREEAM, see below.https://www.knaufinsulation.co.uk/all-downloads?search=BREEAM

Showing 181-216 of 1922

Feedback