NBS Source
I'm a manufacturer

"fire escape equipment"

4,420 results found

Sort by:

Showing 181-216 of 459

Sponsored
Clement Windows supply fire rated steel doors and screens to historic Surrey school

Clement Windows supply fire rated steel doors and screens to historic Surrey school

Clement Windows Group

City of London Freemens first opened in Brixton in 1854 for ‘the maintenance and the religious and virtuous education of orphans of Freemen of the City of London’. Paid for by the Corporation of London both boys and girls were enrolled from the outset making it the one of the oldest co-educational independent schools.In 1926 the school moved to Ashtead Park in Surrey. The Grade II* listed Main House at Ashtead Park had been the home of Sir Robert Howard, Chancellor of the Exchequer during the 17th century.In 2016 an ambitious development project was commenced, due to span the next decade. The modernisation of the Main House, now the Sixth Form Centre, involved a redesign of the building and the new layout required fire screens to ensure the building met with current Building Regulations. Clement Windows Group supplied the internal fire rated doors and screens at the top of the adjacent internal stairs which are access controlled and linked into the main fire control of the building.
Sponsored
Hospital Installs Yeoman Shield to Help Maintain Fire Doors

Hospital Installs Yeoman Shield to Help Maintain Fire Doors

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Stockport NHS Trust runs both community NHS services and Stepping Hill Hospital, which serves people across the areas of Stockport and the High Peak.With the responsibility of the safety and comfort of so many patients and staff, it is important that the trust maintain a high-quality standard within the built environment.When fire doors in the ground floor corridor of the hospital were identified as having minor damage to edges and panels, the trust engaged with Yeoman Shield to provide a solution to stop the damage from becoming a major concern. Left unchecked this type of impairment can lead to the non-conformity and malfunction of a fire door.Yeoman Shield supplied and installed fire rated FD30 Door Edge Protectors to the leading and hinged edges of double swing door sets along the corridor.Door faces were fitted with Yeoman Shield 2mm thick FalmouthEx protection panels, to guard against impact damage mainly caused by the movement of wheeled and motorised trolleys.Now that the hospital’s fire doors have Yeoman Shield protection fitted, the life cycle of the doors will be extended, avoiding the costly task of replacing them.Yeoman Shield door protection products have been fully fire tested to the current standards required.For fire test and product information on the complete range of wall and door protection go to www.yeomanshield.com or call 0113 279 5854.
Sponsored
Fire rated timber loft ladder - Profiline F30 / F30 Plus / F60

Fire rated timber loft ladder - Profiline F30 / F30 Plus / F60

Premier Loft Ladders Ltd

The Profiline F30/F30 Plus/F60 is a fire resistant 3-part folding wooden ladder. It’s a ready to fit unit with a trapdoor and hatch box with an all-round rubber seal. The F30 is fire resistant tested from the underside, the F30 Plus from above and below and the F60 from below. It is simple to use and when folded away sits on top of the trapdoor. Supplied complete with a handrail, rubber feet and white cover strips to fix onto the hatch box edges. It has a turn latch locking mechanism operated by a wooden pole.
Sponsored
SMARTPLY MAX FR B provides enhanced fire protection and style at Stoneybatter office building

SMARTPLY MAX FR B provides enhanced fire protection and style at Stoneybatter office building

MEDITE SMARTPLY

SMARTPLY MAX FR B was specified and installed at a new multi-purpose building to provide both enhanced fire protection and a unique, textured aesthetic.
Sponsored
SMART FIRE PREVENTION SYSTEM INSTALLED IN NEW BUILD RESIDENTIAL SCHEME

SMART FIRE PREVENTION SYSTEM INSTALLED IN NEW BUILD RESIDENTIAL SCHEME

Firechief Global

Market Quarter Rugby is a new residential scheme, providing 360 apartments for private rental. The development comprises a mix of 175 one-bed and 185-two bed apartments, across four blocks, which benefit from their proximity to the local train station and local town centre. The scheme completes the regeneration of the former Cattle Market site which has stood derelict since its closure in 2008.The Firechief Kitchen Stove Guard was chosen to be installed as standard in all 360 apartment kitchens as a more cost-effective solution to a fire suppression system.
Sponsored
Agrivaal

Agrivaal

SE Controls

The new energy efficient Agrivaal building in Pretoria’s Tshwane Central Business District is using advanced natural ventilation and smoke control solutions from SE Controls Africa to maintain a comfortable indoor environment while improving safety by ensuring escape routes are smoke free in the event of a fire.
Sponsored
PPL Training installs the latest in adaptive evacuation lighting at fire safety training sites across England

PPL Training installs the latest in adaptive evacuation lighting at fire safety training sites across England

Eaton Electric

Comprehensive training facilities that show the most innovative technologies for fire safety, particularly safe evacuation.
Sponsored
PYROSEC® 19 combines security, fire and safety for new hospital

PYROSEC® 19 combines security, fire and safety for new hospital

Promat UK

Promat UK has worked with Doorset Technology to help deliver a safe environment for a specialist healthcare facility. The new Ribblemere Unit at the Chorley and South Ribble District General Hospital, provides vitally important care for women experiencing severe mental health in the perinatal period. PYROSEC® 19 was chosen for its outstanding performance characteristics. It is a modified toughened, fire/physical attack resistant glass. With full transparency, the dual purpose nature of the glass makes it ideal for use in public sector environments, such as hospitals, social and mental health facilities, as well as police stations and custodial buildings.
Sponsored
London City Island - Wall Recessed Mailboxes & Fire Rated Mailboxes

London City Island - Wall Recessed Mailboxes & Fire Rated Mailboxes

The Safety Letterbox Company

THE PROJECTLondon City Island is a high-end residential and commercial neighbourhood development that takes inspiration from the very best of global metropolitan communities; combining bold architecture and pioneering urban design.The development is located in an extremely well-connected site between the financial might of Canary Wharf and trendy East London. London City Island is home to 1600 residential properties, 20,000 square metres of commercial office space, cafes, shops, restaurants and cultural facilities; offering something for everyone. We are once again delighted to be involved within this vibrant new and exciting site.THE PRODUCTThe London City Island development is split over a number of differences phases and blocks, with each development having a slightly different requirement and specification for mailboxes. A number of different mailbox models were used on the project, to match the different design finishes of each phase of the development.Our horizontal fire rated 2 mailboxes were used on two phases where there was a specific requirement for a post box to meet a Class 0 Part 22 1 hour integrity only fire rating. The first bank of mailboxes are wall recessed and fitted with a surrounding trim to provide the mailboxes with a clean finish from the mailbox to the installation wall. This bank of mailboxes were assembled into a configuration of 9 high x 9 wide prior to despatch, allowing easy installation once on site. The mailboxes have been finished in a non-standard colour (D2525-Y2217 matt) and engraved on the inward-sprung flap with an apartment number in a contrasting jet black colour.The second bank of fire rated 2 mailboxes also conformed to Part 22 fire rating standards. This bank was configured into a bank of 4 high x 6 wide mailboxes, finished in a standard colour chosen from the RAL colour chart and engraved in a contrasting white engraving on the inward-sprung flap.The third bank of mailboxes is located in a dedicated mailroom, wall recessed to maximise room for residents and mail delivery personnel to use the mailboxes. As is common practice with all wall recessed mailboxes, these banks of post boxes have also been fitted with a surrounding trim, ensuring the highest finish quality is achieved on the development.Also used on the project were the MODA mailboxes in the horizontal orientation with a width of 260mm. The MODA mailbox is popular with clients requiring a versatile and attractive product particularly useful for multi-coloured and multi-sized arrangements. This phase of the London City Island development shows how the MODA mailbox can be used in a more straightforward manner with a classic bank of wall recessed mailboxes finish in a single colour. Each mailbox has been engraving on the opening flap, infilled in a contrasting silver colour finish.All mailboxes on this development are in front / out front, allowing for mail to delivered and retrieved through the front face.
Sponsored
Isotec 200 loft ladder offers superb thermal insulation and 60 minutes fire rating

Isotec 200 loft ladder offers superb thermal insulation and 60 minutes fire rating

Premier Loft Ladders Ltd

The high strength Isotec 200 loft ladder offers superb thermal insulation with a U-value of 0.17 W/m2K and a class 4 certified airtight seal. In addition, it offers 60 minutes fire and heat protection (tested according to EN 1634-1, EN1363-1, ÖNORM 3860). The Isotec 200 loft ladder is ideally suited for energy efficient, low-carbon buildings where fire protection is needed.
Sponsored
Valhall Oilfield BP - Interzone 1000, Chartek 7, Interzinc 52  - Fire Protection

Valhall Oilfield BP - Interzone 1000, Chartek 7, Interzinc 52 - Fire Protection

International®, brand of AkzoNobel

Our high-performance coatings systems, designed to stand up to the rigors of offshore environments, were chosen to protect the new platform. The two key areas for us were passive fire protection (PFP) and the ability to provide systems that were approved to the NORSOK M-501 standard. The aim of the standard is to obtain a coating system which ensures optimal protection of the installation, with minimum need for maintenance over a fifteen year period. Chartek is the world’s most complete range of epoxy intumescent PFP coatings and the first choice for the oil and gas industry worldwide. With an in-service track record of over 45 years, Chartek provides safety, durability and efficiency through proven, economical and easy-to-apply solutions, successfully meeting project and customer requirements in the most severe environments. Its combination of both corrosion and fire protection is unbeatable and vital for the Valhall BP oilfield. Chartek was the first jet-fire rated epoxy PFP coating that passed the corrosion performance requirements without a topcoat as set out in the NORSOK standard, demonstrating global technical leadership.  
Sponsored
The Fire Basket

The Fire Basket

SureSet Resin Systems

This Case Study is about a family run busy in Bristol wanting to re-new the floor outside the shop and also include their company logo.
Sponsored
SMART FIRE PREVENTION SYSTEM INSTALLED IN NEW RESIDENTIAL DEVELOPMENT IN EARLSFIELD, LONDON

SMART FIRE PREVENTION SYSTEM INSTALLED IN NEW RESIDENTIAL DEVELOPMENT IN EARLSFIELD, LONDON

Firechief Global

Garratt Mills is a transformed historic former gunpowder mill which has been developed into a new residential accommodation and a cultural hub located along the River Wandle in Earlsfield, London. The height of the buildings varies from two to eight storeys and houses a variety of 315 co-living homes, amenity spaces and roof terraces. The yard is a publicly accessible landscaped area surrounded by a café and flexible co-working space.Fire safety protection was considered to be of particular importance in the living accommodation and so the Firechief Kitchen Stove Guard was chosen to be installed as standard in all 315 of the apartment kitchens.
Sponsored
SMARTPLY MAX FR B boosts fire protection at new affordable homes development in Hove

SMARTPLY MAX FR B boosts fire protection at new affordable homes development in Hove

MEDITE SMARTPLY

SMARTPLY MAX FR B has been specified and installed to provide enhanced fire protection at a new residential development at School Road, Hove in East Sussex. Built by PMC Construction, the affordable 104-home development is on the site of a former Westerman Industrial Works complex originating from the 1950’s.   The extensive project included the building of 21 town houses, and seven residential blocks. Block A features nine flats in a four to five storey structure, while blocks B, C and D feature 47 flats across four storeys. Blocks E, F and G consists of 17 flats and retail units spanning across three and four storeys. Such a feat required specialist, structural panels with reliable reaction to fire properties.  “The project was to supply and erect timber frames as part of the design and construction of 104 residential dwellings and three commercial units,” said Emma Barry, Project Co Ordinator at Gibbs Timber Frame. “We had worked with SMARTPLY products before, but on smaller projects that required enhanced fire protection.” Around 3,500 sheets of SMARTPLY MAX FR B were used in the project, covering over 8,900m2. “We chose SMARTPLY MAX FR B panels for the Cat B and Cat C buildings and decking because of its flame retardant properties. Crucially, the product is also suitable for EC5 Design and Cat 1 racking, which is just what we needed.” SMARTPLY MAX FR B is a structural, moisture resistant OSB/3 panel, which as well as having outstanding and reliable reaction to fire properties, is ideal for use in a range of applications where strength, moisture resistance and improved flame retardance are paramount. Unlike standard, structural OSB/3 panels, SMARTPLY MAX FR B is treated with a water-based, non-toxic flame retardant solution during the manufacturing process, which provides enhanced fire protection throughout the thickness of the panel. This means that even if it’s cut, the level of protection remains, unlike some post-treated panels.  SMARTPLY MAX FR B is CE certified according to EN 13986 and meets the requirements for load-bearing panels for use in humid conditions (Type OSB/3) as defined in EN 300 and Eurocode 5. The project began in January 2020 and is due to be completed in October 2021. Gibbs Timber Frame are manufacturers of high-quality timber frame structures with over twenty years’ experience in the construction industry. Their expertise ranges from luxury detached homes, specialised structures, bungalows, chalets, terrace housing, apartment blocks, commercial buildings and home extensions.  Find out more and keep up with them here: www.gibbstimberframe.co.uk  Discover more about the benefits of SMARTPLY MAX FR B here:
Sponsored
Fire safety and cleanability design for Battersea Dogs and Cats Home, London

Fire safety and cleanability design for Battersea Dogs and Cats Home, London

Dortek Ltd

Battersea Dogs & Cats Home was established in 1860 by Mary Tealby as the Temporary Home for Lost and Starving Dogs. Since it opened, the charity has cared for more than 3.1 million dogs and cats. To increase capacity at their old Windsor site BDCH are adding a new wing.The animal charity required specialist doors for a new intake building which includes 27 kennels and 4 maternity kennels.Dortek supplied hygienic hinged doors with Stainless Steel frames throughout the new building. Some doors also had automations and access control locks for ease of access and increased security. Fire doors with 30 minutes certification were also supplied for the protection of animals and staff throughout the facility.The GRP construction of Dortek doors makes them easy to clean, waterproof and extremely robust. They are ideally suited to animal care facilities requiring a low maintenance design.
Sponsored
A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

Automatic Systems UK & Ireland

As a specialist in the automation of access control, Automatic Systems is well aware of the issues faced, especially in the light of recent events, and can offer tailored solutions that not only meet student and staff security needs but also the health and wellbeing of all.
Sponsored
Island Rest: the contemporary family home featuring Reynaers Hi-finity sliding system

Island Rest: the contemporary family home featuring Reynaers Hi-finity sliding system

Reynaers Aluminium

Island Rest, in the Isle of Wight, is designed to be a contemporary family escape offering unique views across the Solent – a 20-mile stretch of water, while equipping occupants with everyday functionality. There are many layers to Island Rest which enable the building to blend into and celebrate its beautiful environment. Glazing is a key part of this - Hi-Finity is utilised to create a variety of features, from full-height windows which frame the spectacular views, through to large sliding doors which open up living spaces onto a courtyard and landscaped gardens.
Sponsored
Bolton Gate Thermafold Doors protect the Fire Station at Hong Kong Disneyland

Bolton Gate Thermafold Doors protect the Fire Station at Hong Kong Disneyland

Bolton Gate Company

When the Hong Kong Disneyland Resort was planned, the project included a 7-bay fire / ambulance station which featured a garden style theme to enable the buildings to harmonise with the green surrounding and the nearby Theme Park. Bolton Gate were specified to provide fourteen electric folding doors which included a special green powder coating, Lexan vision panels and faux louvres to each door. In addition, the doors had to be designed to resist typhoon loadings of up to 3Kpa, were manufactured in Bolton and shipped to Hong Kong where they were installed by the local agent Deacon.
Sponsored
FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property

FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property

FIREFLY™ TBA

Scotland’s biggest building services contractor has just completed upgrading the fire compartmentation within an existing West Lothian warehouse building which is being converted to serve as high bay storage facility to support the organisation’s existing distribution facility elsewhere in West Lothian and is, for the first time, making use of products from the range of TBA FIREFLY™, including APOLLO Lite™ 30:30 to create new fire barriers together with TBA’s expert advice and installer training.
Sponsored
Central Station Berlin
Completed Works:
- Metal Ceiling
- FLOOR and more
- NORTEC
- Plasterboard partition systems
- Fire protection doors

Central Station Berlin Completed Works: - Metal Ceiling - FLOOR and more - NORTEC - Plasterboard partition systems - Fire protection doors

Lindner Group

Completed Works:- Metal Ceiling- FLOOR and more- NORTEC- Plasterboard partition systems- Fire protection doors
Sponsored
Flowcrete UK Extinguishes Floor Failures at Edinburgh Airport’s Fire Station

Flowcrete UK Extinguishes Floor Failures at Edinburgh Airport’s Fire Station

Flowcrete – a brand of Tremco CPG UK Ltd

The fire station and training centre at Edinburgh Airport worked with Flowcrete UK to identify and install a floor finish that would be able to cope with the difficult on-site conditions. A new floor was required as the previous quarry tile surface was incorrectly laid to a fall, this caused water to run in the wrong direction - ending up at the back of the building as well as ponding between the bays.
Sponsored
Home Gas Fire Conversion

Home Gas Fire Conversion

Kompozit'All UK

application area: domestic heatinguse type: gas fireplace project scope: restore fireplaces, rebuild chimney, line chimney ductadded value: 25-year guarantee on liner, quick and clean install, non-destructiveBackgroundThe camera survey revealed cracks in the chimney flue of a large victorian house in Muswell Hill. To protect against carbon monoxide leaks, the chimneys had to be lined before the gas fireplaces could be fitted. A flexible and uninflated FuranFlex tube was placed inside the chimney duct. Each FuranFlex liner is produced to fit the dimensions of the duct. Hot steam is used to inflate and harden the liner, fixing it in position.Statement of workThe installation took one day per chimney. The jointless and air-tight liner provides good draught and a clean and safe operation for the fireplaces. When FuranFlex liners are inflated they take up the shape of the chimney, providing maximum lined diameter and natural draught.
Sponsored
Dagenham Flats

Dagenham Flats

Sertus

United Living approached Sertus to supply automatic smoke ventilation products for all seven blocks, to keep fire escape routes via stairwells and communal corridors free from smoke in the event of a fire.Project Name: Dagenham FlatsLocation: East LondonSector: ResidentialClient: London Borough of Barking & DagenhamInitial BriefUnited Living is one of the UK’s leading providers of refurbished and new build dwellings. The company was tasked with the refurbishment of seven apartment blocks in the London borough of Dagenham and Barking. As multi-storey blocks occupied by demographically-diverse residents, including families and the elderly, the requirement for safe escape routes in the event of a fire was clear; and the existing ventilation within this 1970's building had been identified as less than optimal.Sertus' Façade Louvre Blade (Glass) vents were used in this project. View the product here.OutcomeThe addition of windows has improved overall quality of life in the building by introducing more natural light, increasing ventilation and comfort, and reducing the energy costs associated with both.Fitting into the existing window frames and supplied with full wiring schematics, the window vents proved simple and speedy to install, which kept costs down and reduced disruption for residents during the scheme of works. All products are certified to residential building regulations, including EN12101-2, delivering total peace of mind for client, contractor and residents alike.
Sponsored
Rhymes Nursery Case study

Rhymes Nursery Case study

Abloy UK

Escape Door System compliant to BS EN 13637 for electrically controlled exit systems for use on escape routes installed at Rhymes Nursery.
Sponsored
G Park Northampton - Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton

G Park Northampton - Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton

Promat UK

Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton - providing a tailored 240-minutes fire resistance solution for Unit 4, a132,000 sq. ft speculative warehouse/distribution unit.  Situated within the popular Moulton Park industrial estate just north of the town and within 10 miles of J15 of the M1, G-Park has exceptional transport links, access to national markets, a locally skilled workforce and is home to a wide range of regional and national companies.   At short notice, the latest and final unit within the park required a solution that provided 4-hour fire resistance for the steel frame construction. Sub-contractor FAA Installation Ltd traditionally uses intumescent paints in its projects, but as this method was unable to meet the 4-hour fire protection required for the steelwork structure it was decided that boarding would be a more suitable alternative.  Promat VERMICULUX®-S and TD Boards® were specified for the project by Encon, a leading Promat distributor, as they knew that these were two of a limited number of products on the market that could meet the project’s requirements.   Promat worked closely with Encon and FAA on the final specification to provide a solution that could not only achieve the 240-minute requirement, but could also overcome the design complexities of the project, including fixing to both the structural steel and cladding rails, which most traditional boards were unable to accommodate. The completed installation demonstrates how VERMICULUX®-S and TD Boards® can interface together to create robust fire protection for warehouse and industrial applications. 
Sponsored
Leicester Southern Fire Station

Leicester Southern Fire Station

HD Sharman Ltd.

Upon inspection of this property, Sharmans found the existing gutters corroded and extensive cut edge corrosion to the existing roof sheets. Delamination of the existing roof coating was also present so Sharmans recommended a full gutter and roof refurbishment using the Plygene Gutterline system, Seamsil for cut edge corrosion and the Delcote architectural roof coating system.
Sponsored
Media City Manchester

Media City Manchester

FSi Limited

It is a 200 Acre development to house almost any media based business along with retail outlets, leisure facilities and office space. It includes BBC, University of Salford and ITV as well as the Oasis Academy. FSi Ltd products were used throughout the various buildings to protect the means of escape and compartmentalisation of the development. FSi Products used Stopseal® 60 mm Batt, Pyrocoustic® Fire Resistant Sealant, Stopseal® Ablative Spray Coating, Silver liner® Rainscreen Barrier
Sponsored
Bespoke Glazed Roof Access - The McLaren Technology Centre

Bespoke Glazed Roof Access - The McLaren Technology Centre

Surespan

The McLaren Technology Centre hosts a variety of diverse environments including; manufacturing facilities, a futuristic wind tunnel, restaurant, pool, gymnasium, museum, visitor centre, and exhibition and conference areas. Surespan was chosen to design and engineer the making of a 70m diameter glazed roof structure that would act as the roof for the visitor's centre. The structure has two fire escape hatches which would be used in the case of an emergency. The team at Surespan were proud to have been selected for such a project because of their superior engineering expertise and unique skills.
Sponsored
Bolton Gate's Contour Shutters provide fire and security at Newcastle International Airport Duty-Free Area

Bolton Gate's Contour Shutters provide fire and security at Newcastle International Airport Duty-Free Area

Bolton Gate Company

When the Duty-Free Retail Area of the airport was recently refurbished, the design incorporated large sweeping curves on plan which also incorporated the shopfronts. The demise line of the shopfronts also entailed that they needed the facility to be closed off outside trading hours from a security point of view in addition to each unit being an individual fire compartment. Bolton Gate’s Contour shutters were specified which operate laterally and coil into a box at one end - this innovative product can describe an infinite number of bends and curves whilst closing off openings up to 100 metres wide.
Sponsored
Early Years Eco-Building at Colston's Lower School | Commercial Non-Slip Decking Case study

Early Years Eco-Building at Colston's Lower School | Commercial Non-Slip Decking Case study

Gripsure (UK) Ltd

TG Escapes designed and built an early years eco-building for their client Colston’s Lower School in Bristol. The building was tailored to the school’s needs, providing a separate learning space to house all the early years' students in one building. When designing any environment for young children, safety is a priority. That is why TG Escapes chose non-slip decking to surround the new school building. Gripsure met TG Escapes' rigorous non-slip requirements on this project with brown-treated Gripsure Classic, featuring three anti-slip strips. This is the first project regular Gripsure customer TG Escapes has completed in a brown-treated decking. They chose this finish to complement the Western Red Cedar cladding used on the eco-building. It is also the first project for which TG Escapes has used three-strip non-slip decking to further reduce the risk of slips and falls. A representative for TG Escapes explained “In early years buildings some of the children are of nursery age. Their feet may be so small that they would fit in between the space of two anti-slip infills, and be offered no coverage at all. Having three anti-slips eliminated this risk.” With a PTV value of 100, Classic allows access all year round offering peace of mind.
Sponsored
The German museum Villa Wippermann - plank gratings

The German museum Villa Wippermann - plank gratings

Elefant Gratings T/A PcP Gratings Ltd

Villa Wippermann in Halver, Germany is an old factory owner’s beautiful villa, originally belonging to the Wippermann family, built back in 1892. The old villa was renovated to serve as a regional museum and a cultural meeting place. The fire protection and heritage conservation requirements, in particular, presented a demanding challenge to the planners of the escape routes and escape staircases. Space-saving design was required, while creating a staircase system without any additional connection to the building (no transfer of forces into the historical building structure). The architectural appearance of the building also had to be preserved in the best possible way, and safe use by visitors had to be guaranteed in the event of an emergency.The criteriaThe client, City of Halver, involved experts, architects and engineers in the make-over of the museum. The project had a significant focus on safety in case of fire or other events that need safe evacuation. The parties involved required a spiral staircase as a fire escape solution, to be installed without causing any damage to the building.Minimum strainThe engineer and architect were both very aware of the fact that various environmental conditions such as wind and vibrations can cause too much load, leading to damage to the building.DesignAs stated in the project criteria, the architectural heritage of the building had to be preserved. This called for a safe but well-designed spiral staircase, fitting into the environment and to the unique architecture of the building and maintaining the appealing aesthetics of the Villa Wippermann museum.The solutionBased on these project criteria, PcP delivered a proposal that presented a safe and secure spiral staircase for the museum. The project architects and the planners from the building and heritage authorities accepted the proposal.Spiral staircase made of galvanised steelA complete spiral staircase system was designed and tailor-made to support the unique criteria of the project. A large steel pipe at the centre of the staircase provided solid support to the entire structure. A slim handrail system followed the spiral shape of the staircase. All details and products were made of galvanised steel, matching the architectural and aesthetical look of the building. The staircase links the historical building together with modern architecture.The staircase was designed by PcP and manufactured using modern industrial production methods, combined with handmade finishes and details.OPTIMO® steel treads and gratingsThe PcP OPTIMO® O3 spiral treads and gratings were used for treads and landings, providing safety in terms of optimal slip resistance, capacity and fire proofing. The high and certified slip resistance according to evaluation group R13/V10 and the limited views below allow even people with a fear of heights to walk safely. The surface of OPTIMO® O3 flooring delivers the very best drainage of liquids.The resultAs a result of the strong collaboration between architects, structural engineers and planners from heritage protection and fire protection, a safe, solid and aesthetically pleasing spiral staircase now compliments the museum.Today, Villa Wippermann museum stands as a harmonious building with a perfect balance between modern and old architecture in beautiful surroundings.
Sponsored
Full Steam ahead for Crittall in Birmingham

Full Steam ahead for Crittall in Birmingham

Crittall Windows Ltd

A new education facility for Birmingham City University – STEAMhouse 2 - marries the restored frontage of a former Victorian industrial building with a brand new addition designed to promote interdisciplinary courses that bring together artists, scientists and engineers with input from industry.  The locally-listed red brick and terracotta façade of the 1899 Belmont cycle works was preserved after a disastrous fire gutted the building in 2007. That now fronts a new brick building the rear elevation of which boasts Corporate W20 windows in black plus two fire-rated Crittall windows and two fire-rated Crittall doors installed in a fire escape. Beyond this is a new four and five-storey building comprising workshops and teaching spaces. The new and reconstructed buildings are linked by an open central space, beneath a transparent roof, to encourage interaction between students and trainees attending the new STEM (Science, Technology, Engineering and Mathematics) – based university courses on offer.  The Crittall profiles are sensitive to the industrial heritage of the original building while complementing the 21st century ethos underpinning the STEAMhouse’s ambitions. 
Sponsored
Flimwell Park - NORclad Lite treated British Larch, EuroClass B Fire Treatment - Timber Cladding

Flimwell Park - NORclad Lite treated British Larch, EuroClass B Fire Treatment - Timber Cladding

NORclad Limited

NORclad have been supplying the timber cladding on this project over the past couple of years, a mixture of Tongue and Groove boards, feature fins, and open rainscreen profile.Areas for accommodation and high footfall required to also receive EuroClass B fire treatment.A HomeGrown Larch was selected for this project, having a fair spread of knots and character to be in keeping with its surrounding, a great example of selecting a suitable timber species that fits. Potentially if a timber with a lower knot content, or less defined grain would not have worked as well as this, in these natural surroundings.With English Grown Larch only being classified as slightly/ moderately durable by TRADA, the decision was made to use a high pressure treatment on all of the timber supplied for this project. NORclad Lite preservative treatment was selected, which allows the timber to naturally weather down to the silver grey as you’d expect from timber after being exposed to UV light, the treatment also offers a 30 year warranty against rot & insect attack.
Sponsored
160 fire and smoke protection doorsets between the antarctic and rainforest ensure the safety of the visitors to Klimahaus® Bremerhaven 8

160 fire and smoke protection doorsets between the antarctic and rainforest ensure the safety of the visitors to Klimahaus® Bremerhaven 8

Teckentrup UK Ltd

Klimahaus® Bremerhaven 8° is a spectacular exhibition complex, north of Bremen, Germany. The idea behind the large project is a simulated journey around the world measured at eight degrees 34 minutes east. This is the longitude of Bremerhaven and all the other locations on the journey: Switzerland, Sardinia, the Sahel, the African rain forest, the Antarctic, Samoa, Alaska and the north Frisian island of Langeness. Teckentrup provided smoke and fire doorsets to ensure unobtrusive and safe everyday passage and emergency egress for visitors to the exhibition. Almost every doorset was individually planned.
Sponsored
Hospital - Revolving Door Main Entrance

Hospital - Revolving Door Main Entrance

FAAC Entrance Solutions UK

The hospital needed to ensure good accessibility and create demarcation areas for staff and visitors. We provided various systems including automatic revolving doors and sliding doors, an automatic revolving door with a diameter of 5.4 meters, and various swing door operators for the automation of both wooden single-action doors and fire-resistant doors. We installed swing door operators and sliding door operators which ensure convenient, comfortable and safe access between the departments. In addition to the benefits of comfort and energy-savings, the solution provides safe escape routes and easy access for both able-bodied and disabled people.
Sponsored
Ancoats Urban Village

Ancoats Urban Village

RYNO

Situated on the edge of Great Ancoats Street, in the Artisan residential complex featuring luxurious water features and tranquil gardens, this project is very close to Piccadilly and the heart of Manchester City Centre.This attractive residential development was part of a remediation project with the aim of upgrading the building to bring it in line with the latest regulations on fire safety.We worked closely with AEW Architects in the design and specification stage of the decking system and worked closely with Insulated Render Systems Scotland Ltd., who carried out the installation.As is the case with many of our renovation projects, we had to consider the loading criteria required to meet the needs of the balcony walkways, which also formed part of the building’s escape routes.Fire escape routes are required to meet higher loading criteria in accordance with EN 1991-1-1:2002 and the associated National Annex, so our BalcaSmart® Aluminium system was the perfect choice.Designed to fix directly to the balcony steels enabling fast and efficient installation, the BalcaSmart Aluminium system creates safe and secure decked balconies, however challenging the design and performance requirements are. This renovation project presented us with low threshold heights to work with, so we opted for JH50 Joist Hangers to replace the existing timber joists with aluminium ones, which allowed the top of the joist to be flush with the steel frame.Martyn Mounter, Senior Technician – AEW Architects, claimed that this project presented two challenges: balconies with a domestic load and walkways with a heavy load requirement. Martin expressed reassurance with all the technical documentation, certifications, and support provided throughout the project.BalcaSmart Aluminium carries our IGNO mark of assurance, which should provide owners, residents and users with the peace of mind they deserve.

Showing 181-216 of 459

Feedback