NBS Source
I'm a manufacturer

"energy management systems"

4,356 results found

Sort by:

Showing 109-117 of 117

Sponsored
Railroad low energy home

Railroad low energy home

Intelligent Membranes

Magly MGO board spray applied with Passive Purple for a MAGLPLY advert on Whitehaus bespoke timber frame build in london
Sponsored
Craven Cottage, Fulham FC - Gatic CastSlot

Craven Cottage, Fulham FC - Gatic CastSlot

Alumasc Water Management Solutions

A bespoke Gatic CastSlot system was installed as part of the redevelopment of the riverside stand for Craven Cottage, home to Fulham FC. The project, which began in July 2021, incorporates Gatic CastSlot Treadsafe, which was chosen to drain away any excess surface water from the seating/standing areas along the deck of the stand. It was installed by main contractors Buckingham Group.The unobtrusive profile of CastSlot sits neatly within concrete, asphalt, and block surface finishes and features an electro painted ductile iron throat section. This is securely fixed to the galvanised steel channel body to provide an exceptionally robust yet discreet drainage system.The treadsafe option was chosen for this project. Treadsafe is available for areas where there is regular foot traffic and is available with a 10mm or 30mm opening—ideal for stadium standing and seating areas.Bespoke access boxes were also created for the new stand, and channel throat depths were also extended for level changes, allowing a constant invert within the channel.
Sponsored
Wimbledon Centre Court - Alumasc Skyline Soffit

Wimbledon Centre Court - Alumasc Skyline Soffit

Alumasc Water Management Solutions

Skyline fascia soffits from architectural rainwater specialists Alumasc, have been used for the extensive refurbishment of The All England Lawn Tennis and Croquet Club in Wimbledon.Driven by the need to enable all-weather play, renovation of the legendary Centre Court included a state-of-the-art retractable roof. From the outset, Alumasc worked closely with Architects Populous of London, on the massive six-year undertaking which resulted in one of Alumasc’s largest rainwater product installations to date. Alumasc’s Skyline soffit system was specified for the underside canopy of the stadium bowl, in order to meet the demanding performance requirements for the arena’s ceiling cladding. 6000 individual soffit modules were supplied, in 80 varying profiles and sizes, totalling an impressive 6500m² of aluminium and associated fittings. Dedication to client support was priority, with Alumasc attending numerous site meetings and manning extra shifts in order to accommodate workload and deadlines. Alumasc’s premium level of technical assistance involved the provision of full product mock-ups prior to manufacture and regular testing of the Skyline system throughout the construction process, to ensure compliance with the client’s requirements at all times.
Sponsored
Office Expansion Calls For Sustainable Refurbishment Approach

Office Expansion Calls For Sustainable Refurbishment Approach

Forbo Flooring Systems

Forbo Flooring Systems’ Marmoleum was the product of choice for a creative breakout space at investment management firm, Triple Point. With its growing headcount, Triple Point appointed AW Spaces to create an environment that could accommodate the company’s hybrid working strategy, whilst developing a light and warm aesthetic.  Founded in 2004, Triple Point employ 215 people and manage over £2.7 billion of private, institutional and public capital across five distinct investment strategies: Social Housing, Energy, Digital Infrastructure, Private Credit, and Venture. Each of these strategies helps to solve a problem society faces, and each one creates opportunities for investors.  With the company’s increased headcount and the new hybrid working strategy, AW Spaces suggested increasing the size of the breakout area available to employees. The aim was to make this area feel different from the working environment, by incorporating warmer colours with a dynamic flooring design.   Another important aspect for this project was the environmental impact. Lisa McLeod, Design Director at AW Spaces spoke on this, saying: “Sustainability was a big part of Triple Point’s brief. As such, when it came to choosing a floor covering for the space, the sustainability aspect led us to look at products such as Forbo’s Marmoleum. After discussing the sustainable flooring with Triple Point, where I also sent them a concept image of a design, we decided it was the perfect solution.  “Not only did Marmoleum fit the sustainability requirements, but it’s also available in a variety of contemporary designs that match in tone with each other, which allowed us to create a very dynamic space. Additionally, it’s a really nice material to work with, which aided the installation process.”   Forbo’s Marmoleum was specified in Terracotta, Titanium and Vintage Blue from the Marmoleum Walton range, and in Neptune Blue from Marmoleum Piano. Lisa commented on these choices, saying: “We chose these colours as they work beautifully together and coordinated with the joinery so it looked as though those elements rise from the ground. We also really liked the warmth of the Terracotta colourway and the brightness of Neptune Blue, which provided some contrast from eachother without looking disjointed from the joinery they connected to. The choice of colours really helped us to convey the feeling that this space was for relaxation rather than work, with all the colours flowing into one-another nicely.”  This refurbishment wasn’t like a typical installation as there were multiple different colourways which had to be combined in different shapes. As opposed to a typical refurbishment where tiles or sheet flooring is laid; this flooring had to be cut into shape in situ. The finished flooring mixes curved edges with sharp points, with all four colourways meeting towards the middle of the floor then flowing out at different angles around the room.  Lisa continued “The pattern was quite complex, so Forbo recommended an installer called Medifloor to us who could take on this challenge. We had worked with them on a couple of occasions before, so we knew they had the credentials, and they did a fantastic job with pinpoint accuracy!  “We’re absolutely delighted with the finished result and I’d say the breakout space remains my favourite part of the entire project.”  With a unique installation, a specialist approach had to be taken by installers, Medifloor. Jim Gordon, the Director of Medifloor, spoke on this, saying: “AW Spaces gave us this amazing design for Triple Point, which was extremely challenging to create with all the different curvatures. So, to achieve it we actually used computer aided templates which allowed us to cut the perfect curve – something that’s really hard to acheive in flooring.   “Forbo’s Marmoleum Walton was perfect for this, as it’s the only sheet flooring that lends itself to the natural materials used in this project and looks amazing when finished.”  With this method, a creative and dynamic flooring solution was created. With the installation starting in July 2022, Triple Point’s office refurbishment was finished in mid-September 2022 and has been well received by the staff who use it.  Luke Francois, Guest and Employee Experience Manager at Triple Point, concluded: “We asked AW Spaces to create a bright and inviting space, with a focus on using sustainable products and services, and Forbo’s Marmoleum ticked all the boxes for this. We’re happy with the end product delivered by AW, Medifloor and Forbo.” For more information about Forbo’s range of office products, visit: www.forbo-flooring.co.uk/offices  
Sponsored
An energy efficient design for The Royal Liverpool University Hospital

An energy efficient design for The Royal Liverpool University Hospital

Dortek Ltd

Following a refurbishment for the hospitals operating theatres, Dortek were asked to replace existing timber doors with a more functional and hygienic alternative. Dortek installed our specialist hermetic sliding doors with automations for easy access. The doors have a unique hermetically sealing gasket system which gives them a 99% air tight seal. After installing the doors the hospital were able to reduce the volume of clean air fed into the theatres by over 20%. Dortek doors have a smooth, void free surface which prevents them from harbouring bacteria and makes them easy to clean for flawless hygiene and infection control.
Sponsored
Shipston High School - Alumasc Skyline Coping, Cladding Trims

Shipston High School - Alumasc Skyline Coping, Cladding Trims

Alumasc Water Management Solutions

AWMS Skyline specified in prestigious educational projectThe INCA 2019 New Build Award Winner features one of Alumasc Water Management Solution (AWMS) most innovative products. AWMS Skyline range helped to create the now nationally recognised £5 million Shipston on Stour project.The construction of the Shipston High School began in November of 2017 and was completed last March (2019). Originally requiring a new teaching section, the educational institution acquired an entire new block. The successful new addition to the building was provided through extensive reviews of the building’s estate and cost modelling.With its new contemporary architectural design, the school earnt itself the winning position as the 2019 New Build and Judges’ Choice award. Shipston High School was said to demonstrate impressive window detail, as well as a simple and effective overall minimalist design.As the construction of the project focused on a simple and modern style, it comes as no surprise that AWMS Skyline products were specified for the school’s cladding, capping and trims.
Sponsored
Air Rotation Warehouse Heating - Derbyshire

Air Rotation Warehouse Heating - Derbyshire

Powrmatic Ltd

OverviewIn partnership with Tidyco, Powrmatic was selected to supply an energy-efficient air rotation heating system for a 5,100m2 warehouse storage facility in Derbyshire using a Powrmatic TEx41 Air Rotation Heater measuring over 20ft tall.Project BackgroundTidyco was approached by a customer who is involved with manufacturing, transport and additional services in the aerospace industry amongst others. After recent success, their customer needed to expand their footprint and managed this by moving into a newly built warehouse situated in Derbyshire.SolutionAs this was a brand-new commercial building, there was no heating provision and just the original lighting installed by the builder, which was not fit for purpose. Tidyco was tasked with installing an efficient and effective means of heating solution for the 5,100m2 (55,000 sq ft) vast space along with a modern lighting system. In order to heat and illuminate this space, which occupied a space of more than seven and a half football pitches, some heavy-duty kit was required.ResultFor the heating aspect, Tidyco engineers installed an internal Powrmatic TEx 41 air rotation heater, manufactured in the UK. With an output of 350 kW, the unit measured in at over six metres (20 ft) tall. This particular TEx model was gas-powered and has the superior capacity to provide complete climate control for a 55,000 sq ft with a single TEx Air Rotation Heater.
Sponsored
More Energy Hayes

More Energy Hayes

Gerflor Flooring UK Limited

The existing main gym area required 130m sq m of new flooring to meet the expected increase in demand of users. Gerflor’s stunning Creation 55 LVT in Eramoza Gold would turn out to be the perfect choice for the refurbishment.
Sponsored
Lancaster's London - Alumasc Apex Heritage Cast Iron

Lancaster's London - Alumasc Apex Heritage Cast Iron

Alumasc Water Management Solutions

Heritage Cast Iron Rainwater systems from Alumasc have been used at The Lancasters, one of London’s most exclusive and prestigious residential developments.Overlooking Hyde Park, The Lancasters was originally a parade of 15 magnificent stucco-fronted Grade II listed houses dating from the mid nineteenth century. More recently used as a hotel, it has now been restored and developed into 77 prestige homes. A leading team of developers, architects and interior designers has created a unique fusion of traditional architecture with brand new design and construction.Alumasc’s Heritage Cast Iron system was specified by the architects Nilsson, for its combination of traditional manufacture and modern quality control standards. The result is a highly robust rainwater solution that provides a visually sympathetic finish to fully complement the stunning Victorian architecture.The Heritage Cast Iron was installed by Premier Services Installations (PSI) Ltd and comprised traditional 4” downpipes and ogee gutters finished in a bespoke white, created especially for The Lancasters by Alumasc who created a dedicated paint line to ensure the order was completed on time.Dave Jones of PSI Ltd commented: “The Lancasters is the largest fascia construction project in Europe and boasts one of the longest and highest Victorian residential terraces in the UK. The sheer height of the building required eighteen 1.8m lengths of downpipe from ground level to the hopper heads.

Showing 109-117 of 117

Feedback