NBS Source
I'm a manufacturer

"electrode direct electric boilers"

1,650 results found

Sort by:

Showing 289-324 of 454

Sponsored
INNOVATIVE FENCE WALKWAY SYSTEM FOR INSTALLERS SAFETY

INNOVATIVE FENCE WALKWAY SYSTEM FOR INSTALLERS SAFETY

Zaun Limited

In preparation for the 2012 Olympics, where over 10,000 athletes from more than 200 countries competed in London, Zaun developed a walkway system that would enable technicians to work safely at height to install fencing as well as attach CCTV and security enhancements to the highest parts of the fencing.Project ChallengesThe project required a range of unique and innovative solutions because of the varied challenges that were in play. The system needed to adhere to strict health and safety regulations, especially as working at heights has many potential dangers, and worker safety is a huge priority. We needed to create a cost-effective solution that installers could use in various venues and areas.We also needed to ensure that this walkway system did not damage the 358 mesh. The walkway also needed to facilitate the repair and installation of Perimeter Intrusion Detection (PID) and pulse-monitored electric fencing systems and razor wire. As such, it was essential that installers could easily and safely access materials, equipment and tools.Biggest Sporting Event In The WorldAs the Olympics is one of the biggest events in the world, global attention was on London and the various venues needed to be as secure as possible. From camera operators and athletes to volunteers and security personnel, the huge number of people involved in the Olympics meant that the security team needed to be able to see as much as possible at all times. To do this, it was best to put the security monitoring equipment along the fence line to survey the whole area and reduce the requirement for additional civils for CCTV cameras. Security measures during big events like the Olympics need to be incredibly stringent. The installation of these surveillance and security measures is of utmost importance to the security of the entire event.Innovative Walkway SystemZaun designed and manufactured a unique walkway system that allowed installers to work at heights safely without damaging the mesh fencing. Our innovative system was designed specifically to support the installation and maintenance of 358 security mesh fencing, CCTV cameras and electric fencing at the top of the fence line. We created an innovative walkway solution that easily attached to 358 mesh so technicians could check and access the security measures whilst safely working at height.
Sponsored
Ahl Masr Hospital, New Cairo - F. Ball chosen for Cairo Hospital Installation

Ahl Masr Hospital, New Cairo - F. Ball chosen for Cairo Hospital Installation

Ball, F and Co Ltd

A high-performance levelling compound and adhesives from F. Ball and Co. Ltd. have been chosen to install floorcoverings in the Middle East and Africa’s principal healthcare and research centre for the treatment of burns and trauma, the Ahl Masr Hospital in New Cairo, Egypt.Flooring contractors from Cairo-based Tradelink installed floorcoverings throughout the newly built hospital, including in inpatient rooms, intensive care units, nurse stations, blood donation areas, emergency department, administration centre and corridors, a total area of over 5,500m2.Tradelink began by undertaking moisture tests to ensure that the building’s subfloors were dry enough to receive floorcoverings. Surfaces were then primed using Stopgap P131 general-purpose primer to promote the application characteristics of subsequently applied subfloor preparation products.Stopgap Red Bag was then applied throughout to create a perfectly smooth base for floorcoverings to be installed. The water-mix, self-smoothing underlayment is designed for areas that are subject to light wheeled traffic and can be used over normal underfloor heating installations.Styccobond F44 solvent-free acrylic emulsion adhesive was used to install Gerflor Taralay Impression Compact safety flooring throughout the hospital, with the exception of operating theatres and X-ray rooms. Styccobond F44 provides a high bond strength, strong initial tack along with a long open time and is protected against biodegradation.Gerflor Mipolam Elegance EL5 conductive flooring was installed using Styccobond F57 in the operating theatres and X-ray rooms. Carbon fibres in the adhesive mean that when set it will conduct electricity, so when used to install conductive/anti-static floorcoverings, it stops the build-up of electrical charges that can affect sensitive electronic equipment. The solvent-free adhesive also offers strong initial tack and a high bond strength.Finally, Tradelink used Styccobond F60 contact adhesive to install skirting and capping and coving, as well as anti-bacterial PVC wall-guards, throughout the hospital.
Sponsored
NIBE Ground Source & PV-T for large-scale project at the University of West London

NIBE Ground Source & PV-T for large-scale project at the University of West London

NIBE Energy Systems Ltd

University of West LondonLocated in the heart of England’s Capital, the University of West London (UWL) is committed to playing a leading role in tackling the global climate crisis by becoming net zero carbon by 2030. The University reported a 60% reduction in carbon emissions in 2021 compared to 2005. However, with a long way still to go before it is able to operate at net zero, UWL welcomed a £5 million award from the Government’s Public Sector Decarbonisation Scheme (PSDS) in 2021. With aspirations to retrofit its main sites in Ealing and Brentford, the funding unlocked a major opportunity to improve air quality around the borough whilst taking a big step towards meeting its net zero pledge by 2030.The SolutionUWL contracted Ameresco as principal contractor and designer, who partnered with NIBE Energy Systems and JKN Renewables, Ltd. The first and main challenge was to design a ground source heat pump (GSHP) system for the university without disrupting the main car park on the campus to reduce the impact on students. This, in turn, resulted in an innovative solution, combining a ground source heat pump system working with boreholes and solar PVT panels. The designed system not only supplies 222 kW of PV electricity generation but, crucially, acts as a collector system for the GSHP, capturing naturally occurring energy in the air to drive the heat pump process, and therefore reducing the number of boreholes required. The old gas boilers previously heating the campus were replaced with 584 solar PVT panels in combination with 34 169-meter boreholes to provide 900 kW of heating and hot water throughout the site. Further reducing disruption across the campus, JKN Renewables carried out an off-site build, with the pre-built PVT and plant room modules being delivered on time despite constraints caused by the COVID-19 pandemic. The heat pumps and solar PVT were supplied by NIBE Energy Systems, and JKN Renewables undertook the design, installation and commissioning of the system.The ResultsThis transformation really highlights the benefits of combining multiple technologies to deliver efficient, low-carbon solutions. Whilst the full capacity could have been delivered using boreholes, which would have been a less costly option, the University welcomed the installation of PVT as an innovative and space-saving option.The major project will save an estimated 500 tonnes of carbon each year, and 9,460 tonnes across the equipment’s lifetime. It will also save 3,116,738 kWh of gas-derived energy per year (equivalent to 70 heated homes) whilst improving local air quality.The project is thought to be one of the world’s largest PVT projects, and positions UWL as a leader in higher education for addressing the climate crisis. The project was recognised by the Energy Managers Association’s (EMA) Energy Management Awards, receiving the Highly Commended designation in the Decarbonisation Project Category.Testimonial“We have invested more than £150 million in our campus recently to create an inspiring social and learning environment for our students. But we know all this great work will be for nothing, unless we do our bit to tackle climate change. We have been taking a leading role in our community to tackle the global climate crisis… Recently, the university declared a climate emergency and pledged to become a zero net carbon institution by 2030. A big step to meeting this pledge, has been our decarbonisation program, that has seen the university harness the latest renewable technology to create our own energy and introduced energy saving measures across the campus. Backed by more than £5 million of Government funding, the project is the largest of its kind in the higher education sector, and really underlines our ambition to be one of the most sustainable universities in the UK.”Anthony WoodmanProfessor, deputy vice chancellor and provost for health of the University of West LondonAbout the installerJKN Renewables are specialists in low energy heating, cooling and hot water systems. They provide design, consultancy and installation services to both domestic and commercial sectors, with a range of experience in the renewable heating sector. They pride themselves on providing expert advice and quality installations of ground and air source heat pumps, underfloor heating and solar thermal.
Sponsored
Bespoke design for Birmingham regeneration project | In collaboration with Briggs and Forrester Living and Vinci Construction

Bespoke design for Birmingham regeneration project | In collaboration with Briggs and Forrester Living and Vinci Construction

Towelrads

The Perry Barr Residential Scheme forms part of an exciting £700m regeneration project in north-west Birmingham.When complete, it will welcome thousands of new residents to over 1,400 modern homes. They’ll also have vibrant restaurants and retailers right on their doorstep, along with upgraded transport infrastructure.Towelrads provided radiators for Plot 7, a six-storey residential building with ground floor retail. These included bespoke non-UK market sizes which Towelrads successfully manufactured and shipped into the UK, fulfilling a quick turnaround on a prompt call-off basis. Towelrads also supplied all the chrome electric towel rails in the apartments’ bathrooms.Originally planned to be the Athletes’ Village for the Birmingham 2022 Commonwealth Games, the first residents are due to move into the former Birmingham CityUniversity site in 2023. They’ll be setting up home in houses and apartments spanning the private sector, shared ownership and social housing overseen by BirminghamCity Council.
Sponsored
Wisteria Lodge, Broadstone

Wisteria Lodge, Broadstone

Cellecta Ltd

Wisteria Lodge is a collection of 6 well-appointed apartments, some with a balcony or alternatively private garden, situated in a convenient central location close to Broadstone’s shops and amenities in the popular Ridgeway. The apartments benefit from numerous features including open plan living with bespoke kitchen and quartz worktops, solid internal doors, underfloor heating, air source heat pump for efficient home energy and master bedroom with en-suite shower room. Included with a communal lift, communal bike store and landscaped gardens and 1 allocated car parking space, future proofed with provision for electric charging points.Cellecta’s Mojave S1-8 was specified due to it being a lightweight option for an acoustic composite floor build up. This system has a low energy use, reducing running costs and CO₂ emissions, which benefits the environment.Harry J Palmer was supplied 536m² of Cellecta products for this development in Broadstone.
Sponsored
Armadilla with Accoya cladding

Armadilla with Accoya cladding

Accoya

Accoya cladding supplied by International TimberArmadilla create luxury experiential garden buildings. They currently focus on two core markets, hospitality and education, providing a self-contained environment for the users. Armadilla offer a smaller ‘Pod’ or the larger ‘Wave’ design but both options are ‘eco smart’, meeting the sustainability ethos of Armadilla.The garden buildings meet industry-leading insulation standards, have low energy air source heat pump technology and mechanical ventilation heat recovery. The smaller design, The Pod, can run off a one 13 amp electricity source.By endorsing the concept of the ‘Circular Economy’, all elements of Armadilla products can be recycled, repaired or reused. This is why Accoya is the perfect material choice for the external cladding, with a 50 year warranty. Accoya is a new introduction for Armadilla, justifying their product as world-leading for its sustainability and durability.Armadilla were awarded the 2020 Queen’s Award for Enterprise in Innovation.
Sponsored
Versatile sound control within an SS Great Britain visitor attraction feature

Versatile sound control within an SS Great Britain visitor attraction feature

Hush Acoustics

Hush Acoustics provided an acoustic control solution for the main exhibit at the SS Great Britain visitor attraction called ‘Brunel’s Mind’, in which visitors enter inside the head of Isambard Kingdom Brunel to see the world through his eyes.Working with Electrosonic, the technology experts ho were tasked with supplying and fitting most of the audio-visual equipment for the project, Hush Acoustics ensured any concerns around the reverberation times in this area could be effectively addressed. The solution came with Hush Wall Covering, a highly versatile product which is formed of unique non-woven high-density polyester to target mid-range frequency sound i.e. speech etc. Its used ensured that the audio presentation within this visitor feature would sound as it should.The Hush Wall Covering product used at the SS Great Britain is just 10mm thick so it utilises little space, which was perfect for the room. The product was developed as a direct result of extensive consultation with influential members of the education sector.Chris Hurst from Electrosonic was very pleased with the results of the wall covering and for our quick turnaround time, saying the product does “exactly what it says on the tin”.
Sponsored
Malmaison Hotel Composite Decking

Malmaison Hotel Composite Decking

EnviroBuild Materials Ltd

Slate Hyperion Frontier Composite Decking was selected for Malmasion Hotel's renovations. The client had old and weathered hardwood decking in the hotel terrace areas and all of the room balconies, on a seafront hotel which required replacing as part of a complete hotel refurbishment.To replace the current decking the client required a commercial grade, anti-slip board that could withstand the harsh salt water environment for over 25 years.The SolutionFrontier range in the Slate colour was specified for the project as the highly durable outer board layer provided the perfect protection against the elements and the high customer usage. With the additional warranty against stains and fading the client was assured at the lasting quality and aesthetics of the board with little maintenance ever being required.EnviroBuild’s expert team also provided full project support including bespoke short notice delivery direct to site, which helped the client complete the job on schedule.Customer FeedbackAfter the successful installation and service received from the EnvrioBuild team, the client has specified Hyperion decking on a number of other Malmaison hotels across the UK.Project DetailsSize: 450 m²Product: Substructure: Treated timberBuild time: 4 weeksLocation: Brighton
Sponsored
DeltaWing used for screening balconies at social housing project

DeltaWing used for screening balconies at social housing project

Lang+Fulton

Emmett Russell Architects has designed social housing on several infill sites on the Northern fringes of Bristol to Passivhaus standard, achieving thermal comfort solely by post-heating or post-cooling of the fresh air mass. The projects address the demand for smaller housing units.The key architectural challenge was to make efficient use of tight site limitations without overlooking neighbouring properties. The metal screened balconies allow light into the first floor flats whilst minimising views into adjacent gardens. The balcony screens step down at the sides to open up and allow longer oblique views.DeltaWing-70 was chosen to fulfil this requirement. The louvred panels were inverted to provide a privacy screen which combined the maximum screening effect in a downwards direction with minimum restriction of natural daylight.Lang+Fulton also supplied panels of PL-66×11/30×2 to form a heel-proof decking for the balconies.In addition, DeltaWing-100 was used to create secure, visually obscured storage for two bikes at each property which was integrated within the entrance canopies. Some of the properties had 2000mm wide stores with double doors, others were 900mm wide with single swing doors for vertically hung bikes.
Sponsored
Blackheath Halls

Blackheath Halls

Anderson, GEC Ltd

The conclusion of a far-reaching and detailed refurbishment contract within the country’s oldest purpose-built cultural entertainment venue has included the installation of custom designed stainless steel units and worktop, supplied and installed by G.E.C Anderson for the food preparation area.  The project at the historic Blackheath Halls in Lee Road, South-East London, has been carried out by the equally long established Sykes and Son on behalf of the operating company, a wholly owned subsidiary of the Trinity Laban Conservatoire of Music and Dance. The scope of the work included the redevelopment of the Great Hall, bar and box office/foyer areas. With such construction work as electrical rewiring, plumbing and plastering completed, G.E.C Anderson’s project management team carried out a precise survey of the food preparation area, located to one at the North end of the main bar, in order for the design and fabrication process to commence. While many clients choose to make use of G.E.C Anderson’s standard ranges of sinks and other sanitaryware, the conservation considerations to the work within Blackheath Halls required a bespoke solution. The sector specialist manufacturer’s workshops duly produced a set of three base cabinets in stainless steel, and a single-piece L-shaped stainless steel work-surface with integral sink and splashbacks. Such custom made installations offer a pristine appearance that is ideal for such public facing applications, while helping establishments maintain an efficient cleaning regime essential in achieving the high standards of hygiene essential in commercial premises.   Hannah Benton, Operations Manager for Blackheath Halls whose responsibilities include the servery area, commented: “The refurbishment of the different areas of the venue – including the general building work, updating of plumbing and electrical services and installation of the new servery facilities, was completed to schedule for the reopening in November. All of the equipment matches the scope of the works effectively as well as hygiene requirements.”Since its formation in 1962, G.E.C Anderson has built its reputation for the supply of top end stainless steel sinks and sanitaryware on a combination of innovative design, top quality materials and expert craftsmanship. In addition to the company’s Decimetric system of cabinets, sinks, drainers and other equipment - widely specified for sectors including health and catering – it is able to create custom engineered solutions to exactly fit any space or specification.
Sponsored
Continuous louvre wall for intensive ventilation Sancroft building in London

Continuous louvre wall for intensive ventilation Sancroft building in London

Duco Ventilation & Sun Control NV

Nestled in the vibrant heart of London, Sancroft is an office building that stands tall, a commanding structure that spans over 10 floors with 2 levels of basement with a GIA of circa 429,000sqft. When the building’s architects, Buckley Gray Yeoman Ltd, were tasked with providing intensive ventilation in the building, they turned to Price Engineered Solutions for advice. Price Engineered Solutions, renowned for their leadership in supplying heating and ventilation components for key projects across the UK. They recommended the architects to work with DUCO for the installation of intensive ventilation. A Breath of Fresh Air: Continuous louvre walls with value for moneyTo ensure the Sancroft building is ventilated naturally and continuously it was decided to install the sturdy, robust aluminium louvre-wall system, DucoWall Screening 70 & 75.John Biss, Contracts Manager from Price Engineering Ltd, explains: “The selection of the DucoWall Screening 70/75 was purly down to our recommendations and budget constraints. DUCO's louvre-wall system emerged as the ideal choice in terms of cost-effectivness.” Innovative design and aesthetic appearanceWhat sets this project apart is its innovative design, which distinguishes it from the neighbouring structures.John Biss continues: “This project is truly unique due to its innovative design. For instance, we had to incorporate bracketry to support a wire trelis that over time, will host climbing plants. . The sleek appearance of the DucoWall Screening adds to the uniqueness of the building”.Super-quick assembly and high airflowThe Z-shaped louvre blades of the DucoWall Screening are clicked directly onto the support section thanks to a direct clip system, ensuring super-quick assembly. The very large span and high airflow of the louvre wall ensures high ventilation values and thus an optimal indoor climate for all office workers present.John Biss : « With Duco’s patented ‘Direct Clip’ system, the louvre blades are clicked onto the support section directly, ensuring fast installation. In a world where everything has to be delivered very quickly and the next job is waiting in line, this is a very welcome asset!”Fine collaboration and postive feedbackThe collaboration between other parties, such as Britplas, leading commercial glazing specialist in the UK, and the engineers and contractors was very great. We had open communications between all parties involved which led to yet another project going off without a hitch”. Our client expressed profound satisfied, not only with the DucoWall Screening louvre wall but also with our adapt management of the design and installation process all while minimizing disruptoin to other trades” As John Biss aptly concludes,” We’ve delivered a project that exceeds expectations, offering a breath of fresh air in every sense” Architect: Buckley Gray Yeoman LtdBuilding contractor: Price Engineered SolutionsCommercial glazing specialist: Britplas     
Sponsored
Sliding Roof Access - Ferrari World

Sliding Roof Access - Ferrari World

Surespan

IntroductionFerrari World in Abu Dhabi is the world's first Ferrari theme park. The park includes 37 different rides and attractions and features the world's fastest rollercoaster “Formula Rossa” – reaching 240 km/h in 4.9 seconds. The park has been open since 2010 and has been nominated for numerous awards. Project:Ferrari World in Abu Dhabi needed a unique solution to allow for the maintenance of rollercoaster carts. Due to restricted space, a sliding hatch was proposed to allow easy craning in and out.Products Supplied Surespan manufactured and supplied an SLHE Aluminium, thermally broken, single leaf, electrically operated, sliding roof access hatch. The hatch was a large 5400 x 4000 structural opening sliding hatch.A sliding hatch allowed maximum clear space. Operated by a 230v geared motor. The lid and upstand are filled with 50mm thick CFC and HCFC free Polyisocyanurate insulation which offers a U-Value of 0.43W/m²K.
Sponsored
Double Leaf Roof Hatch - National Oilwell Varco

Double Leaf Roof Hatch - National Oilwell Varco

Surespan

IntroductionFollowing consultations with our design team, Surespan designed and manufactured a large double roof hatch for the National Oilwell Varco Dunfermline factory in Scotland.Products suppliedWe supplied;Surespan designed and manufactured bespoke double leaf hatches, measuring 4 metres by 4.3 metres. These hatches enable an external crane to lift the manifold units through the roof.With the use of a key, these hatches are controlled by a small PLC that electrically operates the Hatches in an automated sequence.Features:The bespoke double leaf hatches were specially designed to stay open utilising strut locking to withstand the wind condition they specified with the design team.The projectThe NOV Dunfermline factory experienced difficulties building tall manifold assemblies due to the restricted height of the building. Following a consultation with our experienced design team, they were able to design a solution to solve the issue.The outcome: NOV were able to continue its operation in the existing factory without having to hire temporary premises.
Sponsored
Smart fire prevention system installed in prestige student accommodation in  Cardiff University

Smart fire prevention system installed in prestige student accommodation in Cardiff University

Firechief Global

The Fitzalan is a high-end student accommodation building located right in the heart of Cardiff city. As well as a variety of modern bedroom accommodation ranging from studios to two-bedroom apartments, the communal spaces include a cinema room, game rooms, luxury ‘snugs’ , an on-site gym, a common room and a communal kitchen.The present accommodation was created back in 2017 when a series of one- and two-storey vertical extensions were added to the existing buildings to increase the size of the accommodation to a total of 357 beds.The Fitzalan’s present owners McLaren Property, are in the process of selling the building. The new owner has requested a full upgrade of all electrical installations and fire safety measures prior to completion. As all accommodation has a fully kitted out kitchen with a combi microwave and hob, fire prevention in these areas was considered of particular importance. The buildings new owners specified that the Firechief Kitchen Stove Guard be fitted as standard in all 313 apartments and studios in addition to the existing fire suppression system.
Sponsored
Zinc clad windows in contemporary community church

Zinc clad windows in contemporary community church

Fakro GB Ltd

Westhill Community Church was a new, green field project in Aberdeenshire. Its highly contemporary style was designed for maximum functionality and to encourage use by the wider community. Natural light and climate controllability were the central considerations for the clients of McLean Architects during initial discussions - a common request for high ceiling, large space developments.The architect, McLean Architects (based in Glasgow), had used FAKRO roof windows on a number of other projects and specified FAKRO products because of the excellent technical support and the option to specify matching zinc flashings.33 FAKRO roof windows were discreetly positioned to flood the stage with natural light as well as illuminate a cluster of buildings that formed the sanctuary, low-rise foyer, and adjoining offices.Products included electrically operated FTP-V U3 windows with a rain sensor, specially constructed EFW Kerb Upstands were made to enhance the internal light with combination flashings, Smoke Vent windows, wall switches, and remote controls.
Sponsored
IFA2 Converter Station - GRP Products

IFA2 Converter Station - GRP Products

Dura Composites Ltd

Non-Conductive Fencing, Trench Covers and Access Structures | Case StudyPower and Energy Infrastructure Contractor Morgan Sindall was appointed to design, build and commission the new converter station and chose to work with Dura Composites to provide safe, non- metallic Glass Reinforced Polymer (GRP) utility fencing for the AC/DC Halls, as well as a range of non-conductive access structures, utility trench covers & handrailing across the site.The IFA2 project aims to connect the electricity systems of Great Britain and France using high voltage subsea cables and will be capable of exporting or importing 1000MW of power between the UK and France, enough to power up to 1 million homes. In this project, the client specification mandated the use of non-conductive and non-metallic materials which could be used to construct removable fencing, permanent fencing and sliding gates to enable access to specific authorised personnel, whilst preventing others from accessing high-risk areas.
Sponsored
Moto Service Station, Rugby (2021)

Moto Service Station, Rugby (2021)

Artform Urban Furniture Limited

Artform Urban were approached by Illman Young Landscape Design in 2018 to discuss a range of design led street furniture elements including seating and litter bins to a brand new service station located at junction 1 of the M6 in Rugby, planned to open in 2021. The seating product selected was the Multiplicity Bench, a popular product featuring a cast aluminium leg frame with hardwood seat.The Box Wood Litter Bin featuring a Triangular Ashtray fixture was also supplied. This incredibly popular and versatile waste disposal unit can be customised with 4 different variations of door style. The Rugby Moto services opted for the hardwood timber slats version which complements the surrounding architecture and street furniture.The new MOTO services opened its doors to motorists in April 2021, the build will create 120 jobs and cost investment of £40 million. It is the UK's flagship electric vehicle charging motorway services, offering 24 rapid-charging points.
Sponsored
Designing a Dream Kitchen on Television with DCM

Designing a Dream Kitchen on Television with DCM

Warmup plc

The Allsop family started planning their kitchen renovation project in September 2021 and wanted to create an inviting room featuring special touches such as glass work surfaces alongside the latest in energy-saving technology. As they had already installed underfloor heating in their home before, they knew that an electric floor heater would be the ideal heating solution due to its ease of use, sustainable technology, and low running costs. The DCM-PRO was chosen as the most efficient solution, offering rapid installation times and increased and huge savings on energy bills due to its efficiency, further enhanced after being paired with our 6iE Thermostat. This system was perfect for use with the Allsop’s new Karndean vinyl floors and is also ideal for kitchens with stone or ceramic floor tiles as its decoupling technology helps protect tiled floors from damage. The low-profile design of the DCM-PRO is also perfect for all types of refurbishment projects in rooms with fixed ceiling heights as it will have a negligible impact on floor levels.
Sponsored
Brockley, South East London - Alumasc Flushjoint

Brockley, South East London - Alumasc Flushjoint

Alumasc Water Management Solutions

There is nothing quite like an ambitious project executed to the highest standard.This complete rebuild and extension of a late Victorian terraced house in Brockley, south east London, presented challenges at every turn. The existing house suffered from the addition of poor-quality extensions and structural problems, but was redesigned by Conibere Philips architects with the specification of Alumasc Rainwater Flushjoint downpipes and hoppers. This ensured elegant and efficient water management, as well as security against water ingress into the new masterpiece of a home.“It’s extremely unusual for a mid-terrace to be demolished and rebuilt in this way, but it was decided as the most economic and sensible course of action to take in this case. This also allowed us to adapt the property on rebuilding to look much more contemporary and elegant,” explained Robin Philips, Partner Director at Conibere Philips. Elegance was also firmly the desired direction when considering water management.“We chose to specify Rainwater Flushjoint downpipes and hoppers from Alumasc to maximise on their sleek and minimal design that would further contribute to the contemporary look of the building,” Robin confirms.“The joints in the RWP sections are very elegant. The whole effect is much less cluttered than most other RWP products. A simple, modern elevation would have been ruined with more traditional RWP products.”
Sponsored
Dungannon Council Offices

Dungannon Council Offices

Polyroof Products Ltd

The roofs of The Dungannon & South Tyrone Borough Council offices had fallen into a poor condition and a large amount of standing water was threatening to leak into the offices below. With the office roof areas in such a poor state, the council turned to Polyroof to refurbish nearly 1,000 square metres of roof, split into 13 areas, before they fell into a further state of disrepair. DTL Construction, a local Polyroof Approved Contractor, were tasked with installing the Protec System, removing the issue of standing water and giving the roof a long service life, whilst giving the council peace of mind that leaks would not pose an issue in future.The standing water was cleared before the existing roof materials were stripped back in order to install the new system. This allowed a new warm-roof system to be installed, along with new cut-to-falls insulation. Polyroof’s Protec Cut-to-Falls insulation is an innovative two-layer system which doesn’t only improve thermal performance, it also directs standing water away from the roof.Following this, the BBA-approved Protec system was used to seamlessly waterproof the entirety of the office roofs. The system, once inspected by Polyropof’s Technical Services team, was issued with a 20-year guarantee, so the client could now have reassurance their roof would last for decades to come.
Sponsored
TIMBER VERTICAL FIN CLADDING FOR CONTEMPORARY HOUSE

TIMBER VERTICAL FIN CLADDING FOR CONTEMPORARY HOUSE

Technowood UK

One of the most talked about subjects in timber cladding are the Vertical Fins.Solid timber or even huge steel forms are cumbersome, heavy and expensive. They often require specialist structural fixings and tame consuming to install.Technowood fins have been created to transform this arena. Simple in design, ultra-light weight and easy to install, saving on materials and labour for large scale commercial projects. In the main they are fabricated in Aluminium and if the spans are excessive they can be manufactured in GRP. All Technowood finishes are real timber…Vertical Fins, which uses Technowood products in facade design, attracts attention with its impressive architecture.There are multiple options for cladding and facade design within the world of Technowood. Interspersed vertical forms with spaces between or even panels of cladding… all manufactured under one roof and delivered to site at the same time, same batch, same material, same colour, same texture all with the same impressive result.Technwood have a showroom in Sky House Design Centre in Amersham, quick access from the Metro line. They also offer CPD presentation during the week direct to your practice… samples and product brochures all also available. Architect: Gokhan Aksoy Architects in collaboration with AS ArchitectsLocation:Private residenceProductTechnowood Fins, Cladding and PanelingCompletion:2016
Sponsored
Retrofit NIBE air source heat pump project for Manchester City Council

Retrofit NIBE air source heat pump project for Manchester City Council

NIBE Energy Systems Ltd

Background to the projectSouthway Housing Trust is a South Manchester based housing association managing 6,000 local homes.Southway has pledged to be zero-carbon by 2038 and has identified switching its homes from gas to electric heating as crucial to achieving this target.In 2022, a survey of Southway’s residents found that 88% were keen to reduce their impact on climate change, and Southway’s commitment to reducing carbon is in line with Manchester City Council’s net-zero ambitions.The Arrowfield Low Carbon Living Project represents an early and ambitious retrofit of a south Manchester neighbourhood that will reduce the estate’s carbon footprint by as much as 50%.Southway is replacing 396 of Arrowfield’s inefficient gas boilers in-line with long term government plans to electrify heat and will also improve the fabric of homes to make them more energy efficient.The scale of the project, part funded by the European Regional Development Fund (ERDF), has made it one of the UK’s biggest home retrofit schemes.NIBE products used:NIBE F2040 Air Source Heat PumpKey stats:112 NIBE F2040 Air Source Heat Pumps installedContributes to project to remove 370 tonnes per annum of CO2 in ArrowfieldInstalled by Rothwell Plumbing GroupPart of a project to retrofit 199 homes with air source heat pumpsThe solution to the projectArrowfield Low Carbon Living is a flagship scheme in Manchester, retrofitting 199 homes and 197 apartments with air source heat pumps. NIBE was chosen as one of two heat pump providers to bring low carbon, sustainable heating to residents living in the Arrowfield estate. NIBE’s high quality, reliable heat pump systems provide optimum savings and automatically adapt to each home’s output requirements.Rothwell Plumbing Group (RPS) was chosen as the installation partner for the project, with a proven track record for delivering high quality heat pump systems, in both the public and private sectors. RPS are also MCS & Trustmark accredited, with the experience and technical ability to install NIBE systems to the highest of standards.Southway’s aim is for the project to act as a learning process and blueprint for how it can scale up the retrofitting of its entire housing stock over the next 15 years.Ahead of this ambitious project, a community engagement programme enabled greater awareness of heat pumps as a low carbon heating solution, whilst providing the opportunity to listen and respond to resident feedback.The Arrowfield Hub, located in in a repurposed empty house on the estate, became a venue for regular engagement between the residents and the project team, creating an open forum for questions and comments on the proposed scheme.The Hub was also heated by an air source heat pump, allowing residents to witness a live heat pump in operation and experience the warmth of the building.Residents were also able to express their concerns surrounding the project, and these could be addressed accordingly. This regular and open engagement was key to keeping residents informed and more familiar with their soon-to-be new heating systems.The Hub also allowed for the project team to dispel common myths and misconceptions about air source heat pumps and reassure residents that their homes would remain warm throughout the yearThe Results112 NIBE’s F2040 Air Source Heat Pumps have been providing heat and hot water to residents across the estate, adapting to the requirements of each and every home in the estate, whilst providing powerful output even down to outdoor temperatures as low as -20°C.The systems will provide homes across the estate with optimised energy and cost savings, whilst supplying a supply line temperature of up to 58°C regardless of outdoor temperatures.TestimonialMatt Roberts, Strategic Director of Property and Development at Southway Housing, said:"Community engagement for the Arrowfield Low Carbon Living Project was central to the project's aims. Foregrounding the needs of Arrowfield's residents as central to the project’s implementation, helped us to better convey the benefits of low carbon heating and address concerns and suggestions brought forward by homes set to benefit from the retrofit scheme.Air source heat pumps are essential to Southway Housing Trust decarbonising our housing stock and achieving our net-zero goals. Working in partnership with NIBE is part of that process and has contributed to achieving carbon savings of 370 tonnes CO2 per annum on Arrowfield.”About the installerRothwell Plumbing Services Group Ltd, formed in 1997, are a family run business specialising in delivering renewable solutions across the North of England. The company helped to ensure residents in Arrowfield Estate could access maximum energy savings and reduced energy bills.
Sponsored
New Inn Broadway

New Inn Broadway

Allgood Ltd

Located on the surviving remains of London’s first purpose-built theatre, New Inn Broadway is a new V&A museum exhibition and office building in Shoreditch. ‘The Theatre’ - which was the forerunner to ‘The Globe’- was originally built in 1576 and was home to some of William Shakespeare’s early plays. The five-storey building has been developed to celebrate the unique history of the site.New Inn Broadway is a location steeped in history.With its origins stretching back to Elizabethan times, and now playing host to the V&A and a commercial office space there was a lot to consider during the specification process.This dual purpose presented specific access concerns for the client, wanting to easily control who can move between the museum and office space, while also keeping everything secure. Allgood’s team of security and access control consultants worked with the client and electrical consultants to create a system design that met these requirements. This detailed technical planning was followed by careful execution and installation, using the latest in security and access control equipment.The final solution involved a state-of-the-art system that allows differing levels of access across the separate areas of the multi-use venue. This work was complemented with a coordinated ironmongery package including a complete Modric Doc M installation.Allgood Secure was specified by mechanical and electrical consultants Waterman Group to collaborate on system design, and supply and fit access control an audio visual intercom system, CCTV intruder detection, and an alarm system.As this was a multi-use development comprising the V&A museum as well as commercial office space, it was imperative that the building had a network access control system to manage access and maintain security as well as allow the end user to change access rights easily.Stainless steel entrance panels were specified at the main entrance doors and at the stairwells of each lettable office space floor, with a one-way video system that calls the internal handsfree monitors.A HD CCTV system was selected to allow remote monitoring from a different site, and a mixture of bullet and dome cameras were installed and finished in a bespoke RAL finish to complement the contemporary ceiling.Allgood Secure managed the installation of an intruder alarm system which features high-end technology offering peace of mind for staff.As well as a high-tech security system, Allgood’s Modric washroom package was specified by Gallus Studio architects, particularly its Doc M package.
Sponsored
Living cladding at McArthurGlen Paris-Giverny Designer Outlet

Living cladding at McArthurGlen Paris-Giverny Designer Outlet

Biotecture Limited

After successfully completing living walls at the McArthurGlen Designer Outlet in Ashford, we were approached to design and implement a similar scheme for McArthurGlen’s newest outlet on the outskirts of Paris.This development exemplifies McArthurGlen’s commitment to sustainability. The scheme was built according to ‘Excellent’ High Environmental Quality (HQE) standards and includes 20,000 square metres of green roofs, 1,000 square metres of living walls and 120 electric parking spaces.The architect, Arte Charpentier wanted to create a ‘rich and welcoming experience’ for visitors and the living walls contribute to that vision. At the heart of the development lies a central ellipse, adorned with two gracefully curved stretches of Biotecture’s living cladding, each spanning an impressive 90 metres in length and standing at a height of 11 metres. Two more expansive sections of living wall frame the east entrance.The living walls are a visually striking architectural feature and help to cultivate a serene shopping environment. In addition to their aesthetic contributions, the plants will play a vital role in improving air quality and promoting biodiversity within the outlet.
Sponsored
Three Bridges Station

Three Bridges Station

A J Wells & Sons

AJ Wells designed, manufactured and installed just over 1000m2 of vitreous enamel wall cladding with a metal ceiling to modernise the public areas of Three Bridges Station and provide easy access to hidden electrical and telecommunication services.The metal soffit was designed and installed to act as both a water management system and create an aesthetically pleasing ceiling in the subway and platform access areas. The ceiling also incorporated inspection hatches so that the underside of the rail bridges could be inspected periodically by the relevant parties.AJ Wells carried out the installation work under extremely challenging conditions as Three Bridges station is open 24 hours a day throughout the year. As a result the majority of works could only be carried out during the evening and in the early hours of the morning when customer traffic flow was at a minimum.AJ Wells worked closely with the other trades on the project in order to ensure that all interfaces achieved their required purpose.KEY FEATURES:• Vitreous Enamel Cladding system• PM13 ceilingA.J WELLS SERVICES:• Design• Manufacture• Installation
Sponsored
Sixty London Wall

Sixty London Wall

Profab Access Ltd

Located within the epicentre of central London, Sixty London Wall delivers high quality Grade A office accommodation combined with superior retail opportunities, all housed within a visually striking contemporary development that stands apart from neighbouring buildings.Delivering 325,000 sq. ft of premium office space over 10 floors, the extensively renovated property offers collaborative working areas, bolstered by first class end of journey facilities for commuters, including 380 cycle spaces and lockers and 38 showers and changing rooms.As part of the construction process, almost 500 Profab Access high quality riser doors and access panels have been installed throughout the entire building by specialist carpentry, joinery and fit-out contractors, JJ Sweeney.Specified in a range of sizes and configurations for installation throughout the communal areas and washrooms on every floor, Profab Access’ robust and resilient INTEGRA 4000 Series and VISION 8000 Series fire-rated Riser Doors provide concealed access to mechanical and electrical services.
Sponsored
ENSURING LONGEVITY: ESSENTIAL CARE FOR YOUR EXTERNAL DOOR HARDWARE

ENSURING LONGEVITY: ESSENTIAL CARE FOR YOUR EXTERNAL DOOR HARDWARE

ASH Door Furniture & Entrance Specialists Ltd

External door hardware face constant environmental challenges, enduring exposure to pollution, corrosive salt air in coastal regions, and the relentless elements. Unlike their internal counterparts, external hardware requires special attention to maintain optimal functionality and appearance.PROACTIVE MEASURES FOR LONGEVITY:ortunately, these issues can be easily avoided with a proactive approach to care and maintenance. Implementing regular tender loving care (TLC) with the right products can make a significant difference in preventing complications and ensuring customer satisfaction.HOW TO MITIGATE COMMON ISSUES:TEA STAINING AND FLASH RUST ON HARDWARETea staining, a common cosmetic issue on the surface of stainless steel, doesn’t compromise structural integrity but can affect the hardware’s aesthetics. To address this concern:Regular Cleaning: Tea staining can be avoided with routine cleaning. Use a soft cloth and mild soapy water to gently clean the hardware.Proper Drying: After cleaning, ensure thorough drying with a clean, soft cloth to prevent residue accumulation.Correct Cleaning Technique: Rub or wipe the hardware in the direction of the brush or polish lines to maintain its appearance.By incorporating these simple yet effective practices into your hardware maintenance routine, you can extend the lifespan of your external door hardware, promoting customer satisfaction and minimizing the need for costly call-backs. Remember, a little care goes a long way in preserving the integrity and aesthetics of your hardware.
Sponsored
All wrapped up...

All wrapped up...

RENOLIT Cramlington Ltd

Private house, Jersey CHALLENGE Glulam beams – or glued laminated timber – are an ideal light weight alternative for steel or reinforced concrete that allow for much longer spans, heavier loads and complex shapes. Over the years timber rot may occur to such a degree that renovation becomes imminent and irreversible. That’s exactly what has happened to the property of a Jersey customer of RENOLIT’s approved contractor Advanced Roofing. A solution was sought to “save” the existing Glulam beam structure without too many structural changes. SOLUTION The RENOLIT ALKORPLAN roofing contractor solved the problem as follows: For the first stage they removed the failed, rotten areas and treated the remaining areas for insect infestation. Then they covered the glulam beams at each change of direction with RENOLIT ALKORPLAN metal sheet. Over the metal the beams were completely wrapped in reinforced RENOLIT ALKORPLAN membrane. Nicely packed… and completely waterproof. It worked really well and actually quite an ingenious idea! The glulam beams can start a second life resistant to all weather conditions. Once the glulam beams were encased there was still the issue of the solar shading to be re-fitted. Preferably without having to penetrate the newly applied membrane! The brilliant idea of using RENOLIT ALKORSOLAR profiles welded to the top edges of the glulam beams as a safe and solid support for the solar shading evolved. This project is again an excellent proof of the versatility of our RENOLIT ALKORSOLAR mounting system.
Sponsored
Haberdashers' Aske's Boys' School

Haberdashers' Aske's Boys' School

Schöck Ltd

A high-profile project, involving the unique new Sconnex® type W thermally insulating wall connection, is Haberdashers’ Boys’ School, just north of London.   It is one of the UK’s leading independent boys' schools and sets exemplary standards, in both educational terms and in its facilities as well.  Demonstrated by the new reinforced concrete extension to the Preparatory School, where cube_design architects were commissioned to produce a design for three additional classrooms and relocated changing facilities.  Jane Lock-Smith, the founder of cube_design and RIBA Client Design Advisor within the Building Schools for the Future programme, observes: “The design is respectful to the style of the existing building, but offers a contemporary twist through the use of full height glazing and charred timber cladding. A colonnade also minimises the buildings footprint.  Our detailing took into account that around 40% of all thermal bridges in a building are caused by walls and supports.  The Schöck product offers an application-friendly, high-quality solution that contributes to a permanently sustainable building concept”.   The outstanding insulation performance is combined with an excellent load bearing capacity, which transmits very high pressure, tensile and shear forces, both in the longitudinal and transverse direction. The ultra-high performance pressure buffer achieves compressive strength levels in excess of 175 N/mm2. Sconnex® type W also achieves a significant cost reduction when compared with the installation of insulation beneath the floor slab.  
Sponsored
The Pathé Building

The Pathé Building

Allgood Ltd

Originally home to Pathé films and situated in the heart of London’s famous Soho district, The Pathé Building at109 Wardour Street is a newly refurbished developmentconsisting of 15 apartments. With exquisite interiors drawingon a classic British palette of textures, the apartments offer2-3 bedrooms with communal area and kitchen. With flatsretailing at the higher end of the market, it was imperativethat Allgood’s specification complemented the luxuryaesthetic of the apartments.Initial discussions revealed that the architect wanted tospecify the same finish throughout the entire building.This presented a challenge for Allgood as there wereseveral different types of doors and door colours:orange, white and grey. Allgood felt stainless steel,while a finish that would suit the décor, would not beappropriate for this type of residential building so abronze finish was agreed upon. The grey apartmentfront doors were supplied with bronze door closers,thumb turns, lever handles, hinges and flushbolts,whilst the bathroom doors were fitted with bronze pullhandles and thumbturns.The building also required signage to direct residentsand guests to various areas of the facility. However,the architect wanted to continue the bronze themeinto this so Allgood manufactured bespoke individualnumerals, letters and various symbols including abicycle in a bronze finish.Like with any central London residential building, spaceis an extremely valuable commodity. In order to maximisespace in the apartments, Allgood supplied bronze pocketdoor locking kits for all the bathrooms.
Sponsored
Emseal SJS System installed to seal wide seismic movement joints for the main Stadium at Basra Sports City, Basra, Iraq

Emseal SJS System installed to seal wide seismic movement joints for the main Stadium at Basra Sports City, Basra, Iraq

NCC – Emseal Movement Joints

Client: Basra Sports City, Iraq Project Design: 360-Architecture Structural Engineering: Thornton Tomasetti Main Products Used: EMSEAL SJS SystemThis spectacular 65,000-seat, combined FIFA and Olympic event compliant stadium in the City of Basra, Southern Iraq, is built on geology that dictated the need for substantial seismic stadium expansion joints up to 400mm wide. The Project Design team had good experience on major projects with EMSEAL jointing systems for use in demanding situations such as stadium concourses, so they specified the EMSEAL SJS-Seismic Joint System. Each custom assembly was produced in our Toronto facility to the measured field dimensions for installation according to a detailed plan, with training at EMSEAL’s Boston, USA Training Centre, with a full-size mock-up of a tread-riser-tread assembly to match those in Basra. The EMSEAL SJS System ensures continuity of a watertight seal through changes in plane and direction, whilst accommodating the potentially high movement within the joints and without transferring any tensile stress to the structure. The system is free of any additional hard, noisy anchors or connections and does not present any slip or trip hazards. It also safely accommodates the high point loads of small-wheeled fork lifts and stacker trucks for facility maintenance crews and of course, the food and drink wagons and millions of footfalls per game from the fans. 
Sponsored
Parc Gelli Werdd - state of the art sustainable industrial units & BREEAM excellent

Parc Gelli Werdd - state of the art sustainable industrial units & BREEAM excellent

HAG Ltd. - The Door Specialists

THE PROJECT Introducing our latest collaboration – Parc Gelli Werdd in South Wales, showcasing 15 Q doors – the pinnacle of resilient, superbly insulated industrial door systems.Nestled in Parc Gelli Werdd lies a cutting-edge development of workshops, industrial units, and offices, conveniently located just an hour away from Cardiff, the vibrant capital of Wales. Engineered for adaptability, these units cater primarily to advanced manufacturing, agri-food technology, creative industries, and energy & environmental sectors. The exterior amenities include generous parking spaces, electric vehicle charging stations, a service yard, bike storage facilities, and meticulously crafted landscapes.At the heart of this business park lies a commitment to sustainability, reflected in both its design ethos and operational practices. By embracing Active Building and Passivhaus principles, which prioritize superior insulation, our premium Q doors, renowned for their exceptional insulation properties and longevity, seamlessly align with the development’s sustainability objectives.This endeavor, aimed at achieving ‘Net Zero carbon in-use,’ has garnered remarkable accolades, boasting an impressive BREEAM “Excellent” rating and an EPC “A” certification. BREEAM evaluates sustainability aspects encompassing energy usage, water conservation, and material selection, while the EPC rating system in the UK measures energy efficiency on a scale from A to G, considering factors such as insulation and heating efficiency. Securing both distinctions underscores the project’s commitment to sustainability and its exceptional energy-efficient design.THE PRODUCTQ Doors boast exceptional thermal insulation capabilities, delivering long-term cost savings while enhancing both security and the architectural allure of any structure.Functioning as a versatile bi-folding solution, Q Doors can be seamlessly installed externally to address spatial limitations, thus optimising space within appliance bays. With a plethora of customisation options available, you can tailor your Q Door to meet specific needs, including the incorporation of insulated double-glazed windows, an array of colour choices, and the flexibility of manual or electric operation.In harmony with our sustainability objectives, we offer customisation options such as personnel doors, reducing the need to fully open the Q Door. This strategic approach not only conserves energy but also diminishes the building’s carbon footprint, aligning seamlessly with our commitment to environmental stewardship. The Q Doors sealing system complies with top European requirements, and still met them at 3 times the required test pressure! (The top European class 3 for air leakage describes air leakage (T Value) as at best 1.5m3/m2/h at 50 Pa pressure. i.e. 1.5m3/m2/h to 150 Pa).
Sponsored
Barratt Zed House

Barratt Zed House

Symphony Group

Here at Symphony, we pride ourselves on leading the way in design and manufacture innovation. We are also always ensuring that sustainability is at the forefront of everything we do. That’s why we were thrilled to work with Barratt Developments to create the first zero carbon home concept from a major housebuilder. The Zed HouseWith carbon neutral homes being such a hot topic, with everything from the move to heat pumps to electric car charging at home, we were honoured to be invited to work with leading housebuilder Barratt Developments on its unique and flagship zero carbon home concept. The Zed House will be the first new home in the UK built by a major housebuilder to go beyond the new Future Homes Standard by delivering a carbon reduction of 125%. The Future Homes Standard ensures that all new homes built from 2025 will produce 75-80% less carbon emissions than homes under current regulations. The carbon reduction of 125% is from 100% regulated and 25% unregulated energy using heat recovery, low carbon and renewable technologies. The Zed House will be lived in and monitored over time in order to assess its performance on an ongoing everyday basis. We can’t wait to see the results.The future of housebuildingDesigned and developed to show what is achievable for the housebuilding market in terms of sustainability, the Zed House is a great example of how our homes could look in the next few decades. At Symphony we have a constantly evolving list of eco credentials that we use in everything we do. How this project worked is that Barratt challenged its supply chain partners to bring in the most cutting-edge products to help reduce its carbon footprint. We chose our Urban kitchen in Grey Walnut, as the door and drawer fronts are made from 100% recycled chipboard and the handles contain renewable coconut fibre. Not only that but the cabinets are also made from 49% recycled board while cutlery trays and drawer storage are all Hemp and Kenaf based. We thought this was the perfect example of how kitchens can be a sustainable and environmentally friendly purchase without sacrificing style. The stainless-steel sink from Franke was chosen as it contains 80% recycled materials and was supplied with a waste disposal unit that processes organic waste to reduce the amount of food waste going to landfill. The Insinkerator 4 in 1 tap supplies filtered water to reduce the need to purchase bottled water and therefore encourages the reduction of single use plastic. It also replaces the need for a kettle by providing boiling water, which reduces both energy usage from boiling a kettle but also only provides the amount of boiling that is required. The appliances were also selected for their sustainability credentials including energy efficiency and minimising water use. The worksurface is a carbon neutral material from the Sunlit Days collection from Silestone by Cosentino, the first carbon neutral quartz range in the engineered stone industry that contains recycled glass and minerals. Eco buildThe Zed House itself is made from a closed panel timber frame with highly insulated cladding. It also includes EV charging points, PV solar panels and battery storage. The interior comes with infra-red electronic hands-free taps, reducing water consumption by up to 80%, and a smart electric tariff that automatically moves energy usage to access the cheapest rates. EV charging pointWith more and more people looking to swap their fuel-guzzling car to an efficient electric model, the Zed House also comes with its own EV charging point. The Zed House is located on the main campus at the University of Salford. It contains a knowledge hub built into the garage to display all the products, technologies and results of the home’s occupation on an ongoing basis. We are thrilled to have been a part of this exciting project and can’t wait to see what the future holds.Further informationHead to https://www.barrattdevelopments.co.uk/showcase/z-house for more information on Barratt Homes and www.symphony-group.co.uk/sustainability for more information on Symphony’s sustainability credentials.
Sponsored
Tauheedul Islam Boys School

Tauheedul Islam Boys School

Brett Martin Daylight Systems

Rooflights deliver top class performance at new-build educational facilityBrett Martin supplied new-build Tauheedul Islam School with a combination of Marvault vault rooflight systems and Glass Link rooflights meeting no less than 2 design solutions.The Marvaults were installed over the stunning refectory in lengths of more than 15 metres and spans of 2.3 metres, where large continuous runs were needed.These vaults provide the optimum combination of light transmission and UV protection and play a crucial role in reducing demand for electric lighting as well as lowering CO2 emissions and running costs. A series of 8 premium Glass Link rooflights then, which met the requirement for high light transmission and thermal performance, were fitted to flood the multi-sports complex with natural daylight. A laminated inner pane also ensures the safety of those below.Both rooflight systems deliver exceptional levels of daylight into the school optimising internal environment conditions. They play a crucial role in both the aesthetic and thermal performance of the school whilst having a positive impact on students’ wellbeing.
Sponsored
Surespan provide access to space - Kielder Observatory

Surespan provide access to space - Kielder Observatory

Surespan

Kielder Observatory Surespan designed and manufactured two sets of bespoke double leaf hatch doors for the Kielder Observatory located in England’s largest forest in Northumberland.  The ProjectAs part of the Kielder Art and Architecture program, Charles Barclay Architects designed Kielder Observatory for the Forestry Commission. The all-timber observatory was constructed from Douglas fir with larch cladding, the pier-like building has rotating turrets that house two permanent telescopes and an observation deck. The turrets can be rotated through 360 degrees.The observatory generates its energy using a wind turbine and photovoltaic panels and includes a composting toilet. The observatory has received 2009 awards from the RIBA and The Civic Trust and featured in the inaugural World Architecture Festival.  The ProductSurespan design and manufactured two sets of bespoke double leaf hatch doors for the roof and the front of the Observatory’s two rotating turrets – one to house a 20” Pulsar manual telescope and the other for a small Mead 14” telescope.  FeaturesThese hatches are electrically operated and have been specially designed to open in a specific sequence using remote control via 24v dc actuators.      
Sponsored
Bespoke Double Leaf Hatch - Kielder Observatory, England

Bespoke Double Leaf Hatch - Kielder Observatory, England

Surespan

IntroductionSurespan design and manufactured two sets of bespoke double leaf hatch doors for the Kielder Observatory located in England’s largest forest in Northumberland. Products suppliedWe supplied;Surespan designed and manufactured two sets of bespoke double leaf hatch doors for the roof and the front of the Observatory’s two rotating turrets – one to house a 20” Pulsar manual telescope and the other for a small Mead 14” telescope. Features:These hatches are electrically operated and have been specially designed to open in a specific sequence using remote control via 24v dc actuators.The projectAs part of the Kielder Art and Architecture program, Charles Barclay Architects designed Kielder Observatory for the Forestry Commission.The all-timber observatory was constructed from Douglas fir with larch cladding, the pier-like building has rotating turrets that house two permanent telescopes and an observation deck. The turrets can be rotated through 360 degrees.The observatory generates its energy using a wind turbine and photovoltaic panels and includes a composting toilet.The observatory has received 2009 awards from the RIBA and The Civic Trust and featured in the inaugural World Architecture Festival.

Showing 289-324 of 454

Feedback