NBS Source
I'm a manufacturer

"decking"

3,229 results found

Sort by:

Showing 217-252 of 373

Sponsored
Ogier

Ogier

Canal Architectural

The architects ORMS of London tasked the team at Canal Architectural to design a commercial helical staircase that was completely unsupported from below. The challenge was to create the right combination of strength as well as achieving simple lines. Without compromising the integrity of the design the upper floor needed to be decked out with architectural steelwork; creating a circular opening strong enough to support the load of the floating staircase.
Sponsored
Spectraplan forms roof terrace at Sandbanks Court in Poole

Spectraplan forms roof terrace at Sandbanks Court in Poole

AccuRoof

A green roof system was selected for this project as the client required a roof that would complement and accommodate the step in levels to follow timber decking lines to the 55m² roof terrace areas. IKO Single Ply’s Spectraplan SM120 light grey single ply waterproofing system was overlaid to the existing roof and newly built sun rooms, ready to receive a green roof system.
Sponsored
TEMPLE MEADS ROOF REFURBISHMENT WORK PROTECTED BY FIREFLY FIRE BARRIER

TEMPLE MEADS ROOF REFURBISHMENT WORK PROTECTED BY FIREFLY FIRE BARRIER

FIREFLY™ TBA

A three year £24 million programme of works to repair and repaint the roof structure to Bristol Temple Meads railway station is featuring the use of the ZEUS Horizontal fire barrier system from FIREFLY™: employed to enclose a series of shallow arch scaffold beams or ‘cassettes’ that span the tracks, thereby protecting the workforce from any potential train fire as they use the access deck above.
Sponsored
The Camp at The Wave

The Camp at The Wave

Gripsure (UK) Ltd

Surf’s up and Gripsure decking is down at The Camp at The Wave in Bristol!Our Classic non-slip boards have been installed at the first inland surfing destination of its kind in the UK. People of all ages and abilities come here to experience the thrill of riding a wave – or at least having a go. There are different lessons and sessions to suit beginners and experts, as well as a range of activities for children.Just metres from the most consistent surf break in the country, The Camp provides overnight accommodation where guests are perfectly placed for dawn patrols or sunset sessions. The 25 luxury safari tents aim to celebrate the simple things in life, offering a place to escape, chillout, connect, sleep and reset.Gripsure recently provided 9,165 linear meters of our Classic boards to be used for boardwalks around the campsite, as well as porch areas outside each tent. It was the second installment of Gripsure decking at The Wave. Previously, our Classic boards were used to create a pier, boardwalks and a viewing terrace at the popular destination, which attracts hundreds of visitors each year."It was a pleasure to work with Gripsure, they did a fantastic job over The Camp. The whole team were unbelieavably helpful - whether it was back office staff or the tea, that did the installation. Would use their services again in a heartbeart" - Jac Griffiths, Customer Experience ManagerThe Wave’s glamping style tents on its campsite sleep eight people and are kitted out with comfortable beds, a kitchenette, private toilet and a large balcony, where guests can relax after a long day of surfing. There are also two fully wheelchair accessible tents.The team at The Wave wanted to use Gripsure decking for this latest project because we share their strong commitment to sustainability. In recent years, Gripsure has taken great steps towards environmental sustainability, from working with sustainable FSC and PEFC-certified timber to reducing waste. We have just taken this a step further by signing up to a commitment of becoming a net zero carbon business."The nature of The Wave is watersports with kids around and people walking through the campsite in wetsuits. We didn't want people slipping over! Everybody has to be safe around the campsite and we're really pleased with how the latest installment of decking is working out. There have been no issues with anything. It looks really good and is completely fit for purpose." - Sam Jones, Accommodation Supervisor.The Wave also has sustainability built into its ethos. Environmentally, the business is continually striving to be resourceful, finding ways to minimise environmental impact.
Sponsored
Manor Road Quarter, London

Manor Road Quarter, London

AliDeck

AliDeck successfully supplied a diverse range of cutting-edge aluminium balcony solutions to the Manor Road Quarter project in Canning Town, London. The AliDeck Ultra Decking Board, AliRail Plate Fix 0.74kN Option (AliRail System 2), and the aesthetic AliClad Flow Cladding Board will now create a complete balcony solution, as this collaboration with Alloy Fabweld showcases our commitment to innovation and technical excellence.
Sponsored
AliDeck Supply a Wide Range of Aluminium Balcony Solutions to the Exciting New Build Project at Manor Road Quarter in Canning Town, London, in Partnership with Alloy Fabweld & Morgan Sindall

AliDeck Supply a Wide Range of Aluminium Balcony Solutions to the Exciting New Build Project at Manor Road Quarter in Canning Town, London, in Partnership with Alloy Fabweld & Morgan Sindall

AliDeck

AliDeck has successfully supplied a diverse range of cutting-edge aluminium balcony solutions to the Manor Road Quarter project in Canning Town, London. The AliDeck Ultra Decking Board, AliRail Plate Fix 0.74kN Option (AliRail System 2), and the aesthetic AliClad Flow Cladding Board will now create a complete balcony solution, as this collaboration with Alloy Fabweld showcases our commitment to innovation and technical excellence.
Sponsored
Mill Conversion to Apartments - AVRO, Manchester.

Mill Conversion to Apartments - AVRO, Manchester.

CDI Innovative Construction Materials Ltd

It’s not everyday you get a phone call from an architect asking for help on a grade 2 listed mill building, but that is what happened to us back in April 2017 when Stephenson Studios contacted us with a problem they were having with floor to ceiling heights on their Brownsfield Mill project in Manchester.Their design criteria was for the existing 75mm thick timber mill boards to be retained and each of the apartments in the building would have these as an exposed ceiling. The idea was to keep the building as rustic and to retain as much of the original look and feel of the listed mill building as possible. Because of this all of the acoustic (Part E.) and fire Building Regs. (Part B.) requirements would have to be installed above the existing floor.The drawings we were sent through identified a floor build up, on top of the mill boards, at nearly 300mm thick. This started with a self levelling compound on top of the mill boards, to level them to, and then a timber on timber solution with a final layer of cement particle board prior to the oak flooring being installed.This thick floor section was causing a problem due to the original oak beams that were in place meaning the floor to ceiling heights weren’t as high as they needed to be. This design was compounded flowing the removal of the bitumen floor covering. When the mill boards were exposed and then levels were taken across each of the floors it was clear that the original design was no longer suitable for the project.With the age of the building some of the mill boards were beyond repair and each of the floors needed levelling up so the use of self levelling compound and a timber/ cement board solution also became a very expensive solution. We were asked if we could come up with a solution that was able to reduce costs and time and also to be able to achieve the required acoustic and fire requirements for this type of conversion project.Our initial thoughts on the project was to use timber ferrings, 100mm wide at 600mm centres, to lay our Lewis Deck system onto. This was reducing the number of ferrings by 50% (these were originally at 400mm centres) and it also removed 4 layers of timber/ cement board as well as the self levelling compound from the project. Following a meeting on site however, and after being able to fully talk to the design team and developer about what the Lewis Deck system can do we agreed that we would look at putting the ferring strips at 1400mm centres with the Lewis Deck being laid across at these centres. Rubber granulate acoustic strips would be installed on top of each of the timbers and mineral wool insulation would then be installed between. This would allow more material to be removed from the project but crucially still hit both the acoustic and fire requirements of the project.A test floor was commissioned, by the acoustic engineer, and built in August 2018 which passed all tests. You can see from the photos below the Lewis Deck laid at 1400mm centres for the middle section of the test with the 15mm thick rubber granulate acoustic strip laid on top of the timber ferrings. These timbers, due to the nature of the mill boards below, had to be installed individually to differing heights.The first full delivery of Lewis Deck arrived on site at the beginning of June 2019 following on from the steel strengthening works that were being carried out on site.The deck was quickly installed across the whole first floor in just a couple of days and the first screed pour was scheduled for the following week. The whole floor was poured using an anhydrite screed in just a few hours.The project continued on and the last main section of floor was poured on 19th December 2019, exactly 6 months after the first of the pours.This grade 2 listed mill building was a great project to work on. One that gave us a lot of challenges to overcome from the outset and one that helped overcome a number of issues that kept dropping up as the remedial works on the building progressed. We are delighted with the final result.Developer: Urban SplashFloor Installer: Trent Construction Services Ltd.
Sponsored
Accoya was chosen for numerous features throughout this stunning Casa da Mata beach house

Accoya was chosen for numerous features throughout this stunning Casa da Mata beach house

Accoya

Accoya was used for all the superior decking and facades throughout the ‘Jungle House’ on Guarujá Beach. It was also used for some of the interior paneling & room furniture as well as for unique MUXARABI joineries. This is a special type of joinery used by architects to enhance the aestetic design of a project as the joinery acts as a light filter providing varying projections of light throughout the day. Accoya was also chosen due to its incredible durability to withstand Brazil’s intense heat and humidity.
Sponsored
Spectraplan chosen for green sedum roof at British Horse Society

Spectraplan chosen for green sedum roof at British Horse Society

AccuRoof

The British Horse Society headquarters is on a listed deer park with many protected trees. The building’s circular design posed key construction challenges. The single storey office building was constructed in a doughnut shape, to ensure that a mature oak tree on site was preserved. In keeping with its green surroundings Spectraplan SM120 Dark Grey, a polyester reinforced TPE waterproofing system was mechanically fixed to a composite metal deck, ready to receive a sedum blanket.
Sponsored
Castle Cove Sailing Club

Castle Cove Sailing Club

Polyroof Products Ltd

The Castle Cove Sailing Club in Weymouth, Dorset, constructed a new terrace area to provide a viewing platform for the sailing events in the London 2012 Olympic and Paralympic Games.The sailing club required a waterproofing system that could be installed directly to the concrete construction in order for the works to be completed as quickly as possible. It was essential that the system was compatible with timber decking and would provide long-term protection from the elements.The sailing club contacted KG Roofing, their local Polyroof Approved Contractor, to provide a waterproofing solution that could meet the demands of the project. The BBA-Approved Protec System was specified for the works due to its rapid cure times and high waterproofing performance. Timber battens were incorporated into the system to create fixing platforms, creating a striking yet functional support for the timber decking and glass balustrade.With the Protect System affording rapid curing times, the terrace was finished within the desired time-frame, leaving ample time before the beginning of the Olympic Games. The lucky viewers at Castle Cove Sailing Club witnessed many record-breaking performances from Team GB’s sailing team, including Ben Ainslie becoming Britain’s greatest ever Olympic sailor.
Sponsored
Comtemporary Folding Arm Awning at The Fence

Comtemporary Folding Arm Awning at The Fence

Breezefree Ltd

The terrace of a central London pub garden is given improved cover with a large awning by Breezefree. The rear garden at The Fence, in London’s bustling Spitalfields district, is one of the largest in the City, giving the pub a unique selling point that’s promoted prominently on their website. Despite being a destination venue, the only shelter on the decked terrace area was provided by a pair of gazebos that allowed water to run off onto other areas of the terrace, and did not complement the venue’s design concept...
Sponsored
Moto Services, Rugby

Moto Services, Rugby

Tata Steel

A long-awaited motorway service area on one of the countries busiest junctions - north of Rugby, at Junction 1 of the M6 - opened at the end of April 2021, bringing confidence to hauliers and logistics companies to make the switch to electric vehicles with provision of 24 ultra-rapid electric vehicle charging points.Around 3,500m2 of Tata Steel’s RoofDek D159 structural decking was used to form the support structure for the standing seam roof of the service areas main amenity building.
Sponsored
Coordinated furniture for local authority roof terrace

Coordinated furniture for local authority roof terrace

Furnitubes International Ltd

New development Colindale offices is recently home to London Borough of Barnet staff and community facilities. Furnitubes has supplied 6 table and bench sets and a further 7 independent benches from the RailRoad Inline range, with ‘Delta’ supports that can be readily bolted down to the decking of the new roof terrace located on the 4th floor. Eleven RailRoad planters have been placed in the gravel margins to perfectly compliment the nearby seating, and planted with contemporary box topiary balls.
Sponsored
Flame-Free Roofing System Supplied Due to Sensitive Contents

Flame-Free Roofing System Supplied Due to Sensitive Contents

Iko Ireland

No timber was allowed as part of the new refurb to conform to FM Global (Airbus Insurers) regarding system fire rating. IKO recommended an overlay on the existing deck, which complied with all the latest British Standards and Regulations. IKO Mach One System was chosen as it provided a flame-free System. Where detailing was difficult IKO Polimar EC/UV System was used. The roof refurbishment also included the installation of smoke vents, associated smoke control panels and accessories.
Sponsored
Koster Green Roof Waterproofing - Koster TPO Membrane

Koster Green Roof Waterproofing - Koster TPO Membrane

Koster Aquatecnic Ltd

The Koster TPO Single Ply membrane was selected to waterproof the flat roof on this new build development. The design called for a warm roof system installed over a timber deck followed by a sedum blanket (on protection membrane).Koster TPO 2mm Fleeceback membrane was used as it is highly resistant against mechanical damage, fully weldable so no weaknesses and it will not contaminate any of the planting such as a PVC membrane would.The Slate Grey RAL 7015 colour was selected to compliment the Zinc cladding.
Sponsored
Battersea Reach

Battersea Reach

Buzon UK Ltd

Battersea Reach, an award-winning development consists of 1,350 apartments spread over 14 separate buildings surrounded by beautiful landscaped gardens, shops and cafes. Buzon UK supplied and installed the DPH pedestal range for the composite decking and paving to many of the terraces and balconies across the 14 separate apartment buildings. The DPH pedestal system is perfect for use at roof level as they allow for 5% slope correction and can accommodate a range of services beneath floor level as well as giving excellent drainage.
Sponsored
One Hyde Park, London

One Hyde Park, London

Buzon UK Ltd

One Hyde Park is a major residential and retail complex located in Knightsbridge, London. The development includes three retail units totaling 35,800 m2 and 86 residential properties with prices starting at around £20 million. Buzon UK installed 28,000 DPH pedestals to support Ipe timber decking to all roofs across all four buildings. The project was a success and Buzon UK were proud to be involved in installing their first-class products to one of London’s most prestigious developments.
Sponsored
Conversion of a Grade II listed building into apartments

Conversion of a Grade II listed building into apartments

CDI Innovative Construction Materials Ltd

The project involved the conversion of the 1st floor of the Grade II listed Princes Building in Newcastle’s Quay side area into 10 apartments. The building, which was designed by William Parnel, who was responsible for some of the best architecture in the City, was built back in 1863 and as such posed some interesting problems when it came to bringing the building up to current standards. The introduction of the Lewis Dovetailed Metal Deck and screed system on top of the existing joists provided the necessary performance for airborne and impact sound and fire separation.
Sponsored
Accoya floating bridge

Accoya floating bridge

Accoya

Accoya has been used to create a unique “floating” bridge in the Dutch city of Bergen op Zoom. The deck of the bridge, which is made entirely from Accoya, sits close to the water at Pielekenswater. Exceeding the high-quality and aesthetic attributes of tropical hardwoods, Accoya also boasts excellent environmental credentials; it is sourced from FSC® certified forests and certified at Gold level by the Cradle-to-Cradle Products Innovation Institute. The bridge was built by Alldlex Watersports, from neighbouring Halsteren.
Sponsored
Degaflex Flat Roofing Repair

Degaflex Flat Roofing Repair

Degafloor Ltd

London GRP Roofing Ltd, specialists in fibreglass flat roofs and terraces, recently completed a Degaflex roofing installation using our high-performance system and gave their professional opinion.Stephen Knuckey, the Director of London GRP Roofing Ltd. posted on LinkedIn photos of their project along with a comment of ‘our "Degaflex overlay. Safe to say I am extremely pleased with the finish on this. Being a felt overlay and turning out this smooth, I’ll be looking forward to applying it directly to an OSB deck.’
Sponsored
Barnwood Distribution Centre, Gloucester

Barnwood Distribution Centre, Gloucester

Taylor Maxwell

Built on a 5.3-acre plot of land, Barnwood Distribution Centre sits alongside the A417 in Gloucester. Originally commissioned by client Amazon, the project was managed by Bowmer and Kirkland and delivered a 118,000sqm distribution centre that will now be sub-let to another company. The development includes a multi-storey van storage deck, offices and HGV and car parking spaces. We were pleased to supply polyester powder coated (PPC) Anvil metal cladding fins to the multi-storey car park.
Sponsored
Sadolin Classic – the versatile choice

Sadolin Classic – the versatile choice

Sadolin, product of Crown Paints Ltd

The ideal choice for specifiers looking for multi-functional wood protection, Sadolin Classic blends outstanding performance with a beautiful finish. Suitable for all exterior wood, Sadolin Classic delivers long-lasting protection for a wide range of timber, including decking, cladding and fencing. It features a high performance formulation which enables the product to absorb deep into the timber, providing exceptional protection against the elements. And as well as being a versatile choice, Sadolin Classic is also available in over 40 shades.
Sponsored
The Brunswick Centre

The Brunswick Centre

Ronacrete Ltd

Ronacrete was called to a site meeting at The Brunswick Centre in February 2017 to discuss detailing of Ronafix floating screeds laid to falls where the required balustrade heights on the podium decks restricted the minimum screed thickness. It was agreed that a minimum screed thickness of 35mm could be applied if plant and materials were only positioned on thicker sections of screed until after granite paving had been laid, to ensure that heavy point loads did not cause deformation of the insulation boards.
Sponsored
Marischal Square

Marischal Square

Bauder Ltd

Marischal Square Bauder Bakor Hot Melt structural waterproofingSynopsisMarischal square is a mixed use complex in the centre of Aberdeen based on the site of the former council headquarters building, St. Nicholas House. In 2011 Muse Developments undertook a £107m redevelopment of the site creating space for two new office buildings, seven restaurants and café bars, a 126-room hotel, a modern civic space and a new public space area in between the new buildings.Bauder Building BoardProject:Marischal SquareLocation:AberdeenRoof Area:5,400m²Client:Muse Development & Morgan SindallApproved Contractor:Briggs AmascoThe specificationWith large parts of the new roofing areas being accessible terraces and areas which will experience a significant amount of foot traffic, the Bauder hot melt structural system was a natural choice. The system was combined with hard and soft landscaping to provide the different aspects of the various terraces, stairways, podium decks and rooftops.The Bauder Hot Melt structural waterproofing system is ideally suited as a waterproofing system beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures.Project challengesA key challenge for this project was the fact that Muse Developments and Morgan Sindall, who were working jointly on the development, were looking for a single source waterproofing. Bauder proved to be the perfect fit, covering and delivering all elements of the waterproofing systems.The resultApproved contractor Briggs Amasco carried out the works on the 5,400m² of the separate roof areas, whilst expert Bauder site technicians carried out a total of 26 site visits over the duration of the project to ensure the quality of the installations. Following a final inspection, Bauder was able to issue a 20 year product and workmanship guarantee on the project.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
Heron Tower, London

Heron Tower, London

Vebro Polymers

Client: Heron Tower, LondonLocation: Bishopgate, LondonSector: Mixed-Use FacilityYear: 2021Project Size: 500 m²System: vebrodeck IDHeron Tower, a mixed-use high-rise development in London, required a bright, welcoming and durable floor coating material for its bike and scooter storage area, an environment used by the residents and staff of businesses based in the building. Heron Tower, located at 110 Bishopgate in the heart of London, is a mixed-use facility providing over 440,000 sq ft of premium office and leisure space over 36 floors. Enhanced to achieve net zero carbon, the building features a façade of solar panels and has achieved a BREEAM rating of Excellent. The impressive contemporary landmark, situated just a short walk from Liverpool Street Station, was — at the time of its construction — the tallest high-rise in the capital, standing at 230m tall including its mast. Featuring a range of corporate office spaces, restaurants and leisure spaces, as well as Britain’s largest privately-owned aquarium in its impressive lobby, the development has been designed to impress, providing building users with a premium experience throughout. This has extended to its more functional areas, with the transformation of its bicycle storage area; a dedicated space where building users are able to securely store their pushbikes and scooters. Installed in a combination of RAL 5018 Turquoise Blue and RAL 7035 Light Grey, the installation of vebrodeck ID has created a welcoming space for the building's climate-conscious cyclists and scooters to safely store their vehicles. vebrodeck ID is a durable resin deck wearing system, designed for use on driveways and parking bays of internal or basement level decks of multi–storey parking structures. vebrodeck ID is a protective deck coating system offering excellent wear resistance. The system deadens noise from unpleasant tyre squeal, is available in a wide range of colours, protects against oils, fuels and de-icing salts and can be tailored to ensure an anti-slip finish. 
Sponsored
Stair Edgings - Eiffel Tower Case Study

Stair Edgings - Eiffel Tower Case Study

Gradus

Gradus’ Traditional Bronze stair edgings have been installed on 20 staircases that guide visitors from the upper deck to the scenic view promenade. Standing 324m above the Paris skyline, the Eiffel Tower is France’s most visited tourist attraction. In the first renovation operation to be carried out at the tower in almost 30 years, the first-floor platform has been transformed with the installation of a gangway and glass panels all the way round the central void, to give visitors the impression of walking on air, 57 metres above the ground.
Sponsored
Creating a Vibrant and Attractive Office Environment, Including the Roof!

Creating a Vibrant and Attractive Office Environment, Including the Roof!

Iko Ireland

A detailed visual and physical inspection, together with core and moisture probe analysis carried out by IKO on the roof, patio and walkway areas, indicated that the waterproofing membrane was in a condition commensurate with the age and the type of the traditional membranes installed. They had become fragile and brittle. The decks were saturated due to water ingress, and natural ageing had played a principle part in the deterioration of the waterproofing system. The build-up would not have met the requirements of the current building regulations Part L. IKO worked to refine the specification for the main roof,
Sponsored
Neaco products make a splash at waterside conference centre

Neaco products make a splash at waterside conference centre

NEACO Ltd

Neaco’s semi-structural glass balustrade and aluminium decking have been extensively specified at The Slate, the University of Warwick’s impressive conference centre occupying a waterside setting in the heart of the campus near Coventry. Designed by Associated Architects and built by Speller Metcalfe, the facility comprises 650 sqm of flexible event space.The building maximises views of the adjoining lake with a predominance of glazing and no pillars or fixtures to obscure the outlook. Neaco’s balustrade lines the full-length of a front terrace overlooking the lake and accommodates the view with clear glass panel infills.
Sponsored
AKRI planters transform residential roof-top

AKRI planters transform residential roof-top

Furnitubes International Ltd

Furnitubes designed and manufactured a number of AKRI retaining steel wall planters with ped and tray system for rooftop scheme in in Bexleyheath, south London. AKRI’s unique ped and tray system allows the planters to be left freestanding, sitting on a layer of waterproof membrane. Decking and pergolas were installed and benches were later retro-fitted to the planters to seamlessly integrate seating, manufactured in all steel to accommodate the required A fire rating, creating stunning landscaped roof tops across both buildings in the heart of a bustling city.
Sponsored
Neaco balconies are Ready-Made for Modern Standards

Neaco balconies are Ready-Made for Modern Standards

NEACO Ltd

Our Clearview range of walk-on balconies have been installed across three floors alongside our Clearview Juliet balconies. A roof terrace also features our balustrade system and our A1 Fire Rated aluminium decking system. Kiran Parmar, Principal Architectural Technician at SGP, was impressed by our contribution, “Neaco offer really good, cost-effective products. They are also very helpful with technical support – they responded quickly in providing key information and design detailing, which was a definite plus point.”
Sponsored
Sherwin-Williams non-slip flooring solution provides a premier solution for Manchester City Football Club's Etihad Stadium

Sherwin-Williams non-slip flooring solution provides a premier solution for Manchester City Football Club's Etihad Stadium

Sherwin-Williams

Resucoat HB the high-build epoxy resin manufactured by Sherwin-Williams is over around 12000 square metres of concourse floor area. For this project with heavy and intense footfall it was essential to have a hard wearing coating with a degree of texture for non-slip performance which also would be cleanable to provide a great looking floor for this high profile facility. A special very hard aggregate is incorporated into the coating which is the same product used for non-slip texture on areas such as the decks of United States aircraft carriers.
Sponsored
CU Scarborough Campus

CU Scarborough Campus

Senior Architectural Systems Ltd

Coventry University Group’s £14m state-of-the-art campus in Scarborough was opened in September 2016. The building was designed to make sure that there was plenty of open and flexible space to give students both room to study and socialise. Facilities include a library, café, classrooms and open learning decks. As for energy efficiency, the choice of Senior’s high performance SF52 curtain wall and SPW600e windows ensures that energy bills are kept to a minimum. The result is a very vibrant building with all the facilities that students need to succeed and enjoy university life.
Sponsored
IKO Spectraplan - Sandbanks Court, Poole

IKO Spectraplan - Sandbanks Court, Poole

AccuRoof

Sandbanks Court apartments are situated within the expensive up-market area of the Dorset coastal peninsular and enjoy spectacular panoramic views across the sea. A green roof system was selected for this project as the client required a roof that would complement and accommodate the step in levels to follow timber decking lines to the 55m² roof terrace areas. IKO Single Ply’s Spectraplan SM120 light grey single ply waterproofing system was overlaid to the existing roof and newly built sun rooms, ready to receive a green roof system.
Sponsored
Kidbrooke, Greenwich

Kidbrooke, Greenwich

Redlynch Leisure Installations Ltd

We designed, supplied, installed, and surfaced this new playground in East London, with the project completing in December 2023. The customer was looking for strong, durable, and attractive looking equipment, and our stainless steel range from Spiel Bau was perfect for the requirement. Spiel Bau equipment comes with lifetime guarantees on stainless steel elements, and has been designed to provide excitement and challenge for children of all ages.The centrepiece unit, the Beeskow multiplay, features two decks linked by an inclined rope bridge, monkey bars, a fireman’s pole, traditional slide, rail slide, and an overhanging climbing wall. The stainless steel uprights combined with hardwood robinia decking and panelling gives a beautiful, architectural finish. The large size and wide variety of play features ensures a high number of children can use the structure at any one time, making it a great piece for parks in high use areas such as this.The multiplay was complimented by two stainless steel climbing frames, the first a crow’s nest look out tower and the second an linear, obstacle course style structure. A stainless steel rope end swing, Stainless Steel seesaw, Zip Wire, and two springers rounded off the equipment, all of which was surfaced by our inhouse surfacing teams with black and green fleck wet pour rubber. We loved working on this project, introducing high quality equipment and surfacing to a park in much need of redevelopment.
Sponsored
Versatile and impenetrable

Versatile and impenetrable

RENOLIT Cramlington Ltd

HMS Caroline – Museum ship... CHALLENGE HMS Caroline, the last surviving vessel from the 1916 Battle of Jutland, now rests in the Titanic Quarter in Belfast. After a second life as floating Headquarters of the Royal Navy during World War II, this living legend will continue to serve the country as a museum ship. For this purpose, however, extensive restoration appeared to be essential. The key requirement on HMS Caroline was to avoid penetration of the deck surface. To safeguard its historic heritage against damage, the Royal Navy sought a reliable waterproofing solution. SOLUTION Versatile and impenetrable! What used to be the properties of this battle cruiser, happen to apply to the RENOLIT synthetic single ply roofing membranes as well. That’s why RENOLIT ALKORPLAN was heralded as the optimal solution for the refurbishment of the ship’s gun deck. The lead grey RENOLIT ALKORPLAN A provided an ideal modern day solution with an impressive finish. On top of a new layer of insulation board, the calendered and laminated fleece-backed PVC membrane was fully bonded with a combination of the RENOLIT ALKORPLUS81068 polyurethane adhesive and the universal RENOLIT DUALFIX81065 glue. RENOLIT ALKORPLAN stands out above the competition given its excellent weldability, simplicity of detailing and overall versatility. Once installed, ongoing maintenance of the membrane will be minimal with a predicted life expectancy in excess of 35 years (BBA approved). On 31st of May 2016 the freshly refurbished HMS Caroline stole the show as a fitting backdrop for a commemoration honouring its centenary. 
Sponsored
Chase Farm Hospital

Chase Farm Hospital

Danosa UK Ltd

Some of our most important public sector assets are held within the healthcare system so choosing the correct specification is critical. Often these buildings host patients or the latest medical equipment, and this centrally funded NHS project at Chase Farm Hospital was no different. This particular project hosted an array of plant and equipment for the NHS and our lightweight DANOPOL HS 1.5mm mechanically fastened membrane was chosen as the waterproofing system to be installed onto the structural metal deck. The scheme also featured a tapered insulation scheme in partnership with Kingspan Insulation designed to 1:60 falls and 0.30 w/m2 K u-value. When installed to structural metal decks, all the mechanically fastened components are mechanically fastened to the crowns only, so careful consideration must be made to ensure that any mechanical fasteners coincide appropriately. A project-specific wind uplift calculation was completed by our technical team which provided detailed instructions and fastening patterns for the mechanical attachment of both the waterproofing membrane and tapered insulation scheme. In addition to ensuring that the system will resist any applicable windload, our calculations can reduce overall frequency of fasteners, ensuring that the project is not over-engineered and ensure that the installation progresses as quickly as possible.Waterproofing Systems:DANOPOL HS 1.5mm - Light GreyConstruction Type:New BuildWarm RoofSector: Public Sector Approx. Size:2,200m2 Warranty Period: 20 Years

Showing 217-252 of 373

Feedback