NBS Source
I'm a manufacturer

"decking"

3,232 results found

Sort by:

Showing 361-377 of 377

Sponsored
Waterproofing the Houses of Parliament

Waterproofing the Houses of Parliament

Newton Waterproofing Systems

Waterproofing this historic London landmark – external waterproofing with Newton 403 HydroBond, internal waterproofing with Newton System 500, installed by Newton Specialist Basement Contractor MacLennanUK.Newton Waterproofing were delighted to return for this project at the prestigious Houses of Parliament in London, a landmark that has dominated London’s skyline for over 150 years. Newton Specialist Basement Contractor MacLennan Waterproofing was approached to specify a guaranteed waterproofing solution for the new-build basement.After reviewing the technical drawings, MacLennan decided to bring the job to Newton, whose product range was perfectly suited to the project requirements. Newton and MacLennan are both privileged to be the companies chosen to share in securing the future of the Palace of Westminster.This complex project required the design and installation of an external waterproofing system, an internal cavity drain system, and a polyurea roofing system to ensure a high standard of waterproofing.Externally, Newton’s innovative ‘Type A’ 403 HydroBond membrane was applied extensively to ensure the necessary waterproofing around the basement, whilst internally, Newton 508 and Newton 520 membranes were both applied from floor to ceiling as part of Newton’s complete System 500 cavity drainage solution. With the finished structure in place, the waterproofing was finally completed by the application of both a polyurea coating and further drainage membrane to the roof deck of the basement.With a waterproof basement fully compliant with the requirements of BS 8102:2009, coupled with guaranteed protection against water ingress, this newly completed, large basement area, situated directly next to the River Thames, provides a durable and well-established waterproofing solution, utilising multiple Newton Systems to great effect.
Sponsored
Case Study - Proteus Pro-Cold® - The Gatehouse Whaddon

Case Study - Proteus Pro-Cold® - The Gatehouse Whaddon

Proteus Waterproofing

The Gatehouse in Whaddon, Milton Keynes required a complete roof renewal with a new roof lantern installation. Over the years, the roofs had undergone several failed repairs, therefore, the client required a robust, cold applied, cost effective solution. Proteus Waterproofing specified Proteus Pro-Cold® as it's a single pack, fully reinforced polyurethane system that is cold applied, seamless and elastomeric, providing up to 20 years further life to the structures it is applied to.High Performance WaterproofingThe existing roof was a EPDM roof that had to be completely stripped. The deck was replaced and a complete warm roof build up, including Proteus Pro- Therm PIR insulation boards, was installed and finished with Proteus Pro-Cold®. As ponding was an issue on this roof, a new gutter was created to solve this problem. The client was incredibly pleased with the finish, so much so, that their neighbours have requested our Proteus Approved Contractor to carries out their roofing works. Health & SafetyAs the building is an occupied residential building, keeping the residents safe was paramount. As Proteus Pro-Cold® is cold applied, it met all the health and safety criteria, as well as keeping disruptions to a minimum.Long Term PerformanceProteus Pro-Cold® offers a low maintenance, durable waterproofing and protection solution for a range of new build and refurbishment applications. It is cold applied, eliminating the risk of fire and once cured, provides a completely seamless waterproof protection and has excellent UV stability, making it suitable to use in all climates. Proteus Pro-Cold® forms a seamless, fully adhered membrane and has BROOF(t4) certification.
Sponsored
Timber Wharf

Timber Wharf

RYNO

A residential development, Timber Wharf is located on the corner of the Roman-built Kingsland Road and 19th-century Regents Canal and features commercial space as well as a canal-side restaurant.The residential area is grouped around a quiet cobbled courtyard offering a sheltered play area, while the waterfront apartments make up the courtyard’s northern edge and are set back from the canal, overlooking a very attractive, quaint and safe community garden.We worked very closely with Kier Group PLC (one of the largest regional builders in the UK) and ALU Installations (a leading installer of non-combustible decking and cladding systems in the UK) to deliver this very important remediation project.The timber boards on the walkways and balconies along the facade and the waterfront were replaced with our BalcaSmart® Aluminium and TerraSmart® Aluminium systems, which are ideal for remediation, new-build, and refurbishment projects.The refurbishment project was completed this year, delivering peace of mind to residents and owners alike, especially after the Grenfell Tower fire and changes to fire safety regulations.Installed with great care and attention to detail, seamlessly meeting stairwells and other structural elements, our BalcaSmart and TerraSmart Aluminium systems complement the overall aesthetics of the building, are lightweight, long-lasting, and most importantly able to meet the load requirements of its walkways, which also form part of the fire escape routes.Both BalcaSmart and TerraSmart Aluminium systems carry our IGNO mark of assurance for non-combustibility and reassure specifiers by way of a 30-year warranty and a 60-year design life (when used as part of a complete RYNO IGNO system).
Sponsored
Gloucester Transport Hub

Gloucester Transport Hub

Bauder Ltd

Gloucester Transport Hub Bauder Thermofol PVC single ply waterproofing system SynopsisThe replacement bus station and regeneration of the surrounding area has created a unique and distinctive city centre building for the town. The design connects with Gloucester’s Roman heritage and association with aviation. The innovative roof design incorporated a canopy intended to reflect an aircraft wing that required a lightweight waterproofing and renewable energy photovoltaic (PV) solution.Bauder Building BoardProject:Gloucester Bus StationLocation:GloucesterProject Type:RefurbishmentRoof Size:1520m²Constructor: Kier Group PlcApproved Contractor:Kovara Projects LtdThe specificationThe Bauder Thermofol PVC single ply waterproofing system with the BauderSOLAR F PV solution met the brief precisely without compromising the aesthetics of the roof. This combination of Thermofol PVC single ply waterproofing system and BauderSOLAR F PV delivered a high quality, strong, energy efficient flat roof.This system was selected for the project because of its lightweight properties which complemented the deck and roof design. Light grey was chosen to reflect the colour of the cladding as the aesthetics was a key objective for the client.The OMG Rhinobond induction welding system was specified as the installation method which provided multiple advantages to the project, not only saving time and fasteners, but also optimising the field fix pattern of installation and ensuring that the load on the roof was spread between the induction welding plates. Products appliedBauder Thermofol U15 FR MembraneA high grade virgin polymer Thermofol PVC membrane ensures the optimum membrane characteristics to deliver high performance and a BBA stated life expectancy in excess of 35 years.BauderSOLAR F An aerodynamically optimised system for flat roofs using framed modules and mounting units, securing them to the roof using membrane-to-membrane welding techniques. This installation method means that the roof is not compromised by penetrations of fasteners or is it ballasted.Project challengesThe design of the Transport Hub and city centre location proved to be the key challenge to this project. The unusual roof configuration required a bespoke insulation scheme using BauderPIR M, an efficient rebated PIR insulation board, in order to achieve the required U-value of 0.18W/M²K.The deck configuration equally made the installation of the Bauder Thermofol PVC waterproofing system complex with the perimeter zone having to be carefully marked in compatability the wind calculation which included measuring factors such as wind speed, altitude, direction and exposure. Bauder and Kovara Projects were required to work closely together to ensure all criteria of the wind calculations were met. 40 modules of the lightweight BauderSOLAR PV solution were installed on the west side of the Transport Hub’s roof.The location of the project, Gloucester city centre, presented logistical challenges. Delivery of the roofing products had to be carefully scheduled and managed to avoid creating congestion in the area.The resultThe installation required constant co-operation and communication to embrace the live site operations within the restricted city centre location whilst allowing the bus station to remain fully functional. The roofing contractor delivered a superior standard solution and any complex issues that arose during the project were resolved promptly and collaboratively.System installedBauderThermofol PVC single ply waterproofing system  1 Bauder THERMOFOL U15 FR1.5mm polyvinyl chloride membrane (PVC) reinforced with a pre-coated polyester cross-weaved matting for mechanically fixed installations. 2 BauderPIR MThis efficient tissue-faced flatboard insulation has been specially developed for use within Bauder single ply systems. 3 BauderSYN DB-PE 100A blue, polyethylene air and vapour control layer. The product is installed by loose laying and suitable for Thermofol mechanically fastened and ballasted single ply systems.
Sponsored
Case Study - Proteus Pro-System® Plus - Bloomsbury Mansions Russell Square

Case Study - Proteus Pro-System® Plus - Bloomsbury Mansions Russell Square

Proteus Waterproofing

The Proteus Waterproofing roof survey carried out found the existing flat roof system to be saturated. The existing roof build-up needed to be stripped back to the roof deck, with the main challenge of the roof refurbishment being the low up-stand heights available to the penthouses.The project required a flat roof system manufacturer involved at the initial roof survey and specification design stage, followed by the manufacturers technical back-up to assist with unforeseen and unexpected situations to ensure a successful installation of the new roof systems.High Performance WaterproofingThe terrace roofs above hated spaces demanded a waterproofing system with BBA certification. The fully bonded and seamless Pro- System® Plus was selected for its high performance and low odour, in conjunction with Proteus Pro-Therm Insulation to improve the roofs thermal performance and reduce the existing condensation risk.The flat roofs that were not above heated spaces required Proteus Pro-System® Plus low odour, seamless waterproofing overlay. Proteus Waterproofing worked closely with the Client and the Proteus Approved Contractor, which also acted as the Main Contractor, to ensure the installation complied with the specification design.Health & SafetySafety on construction sites is always of the utmost importance, as well as keeping disruptions to other trades to a minimum. Proteus Pro-System® Plus was selected for its high performance, low odour, phased cold installation and seamless waterproofing.Long Term Performance​Proteus Pro-System® Plus creates an elastomeric, seamless, cold applied waterproofing membrane. The Proteus Pro-System® Plus system can include warm roof insulation. The membrane does not become brittle with age, is BBA Certified with a durability statement of at least 30 years.
Sponsored
Luxury New Hillside Home, North London

Luxury New Hillside Home, North London

Newton Waterproofing Systems

This stunning new-build with floor-to-ceiling glass panels is built into the hillside and thus required a robust waterproofing solution for failsafe protection. After the original property on this site in Barnet was demolished, construction began for a new building that could take full advantage of the stunning location. With floor-to-ceiling glass panels on one side of the property , this new-build is the best place to admire the views over London.Built into the hillside, the property was therefore partially-retaining and required a full waterproofing system throughout to protect from unwanted water ingress. As such, Newton Specialist Contractor Stonehouse were called in to expertly install a robust waterproofing system to the entire structure.The client appointed Stonehouse's Richard Allen as the waterproofing design specialist on this project, to ensure a fully BS 8102:2009 compliant build.Due to the partially-retaining nature of the structure, Richard recommended a combination of Type A, B and C waterproofing systems to ensure a Grade 3 habitable environment. Relying on an effective Type B structure, Stonehouse then applied a cementitious coating of Type A Newton 107F to the external surface of the flat roof decks and to the internal area of the lower lift pit.Given the high risk from water, the failsafe Newton CDM System was also installed on both levels of the structure. Newton 508 membrane was securely fixed to the internal walls using Newton's ancillary products, with water from the upper level being bunded and piped down to the lower level, then drained via gravity fall using Newton Basedrain.As one of our most experienced specialist contractors, Stonehouse expertly recommended, designed and installed a truly failsafe waterproofing system that will continue to protect this contemporary home for many years to come. Furthermore, Stonehouse were able to provide a 10-year guarantee for the installation, for complete peace of mind.
Sponsored
Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Polyroof Products Ltd

The building that would be the St Margaret’s Primary School, officially opened by Robert Leitch the local parish vicar in 1889 provided education to children up to fourteen. The school underwent many changes in structure throughout its over 100-year existence continuing to provide the high level of teaching it always held. In 2012 it underwent a further change in the form of a huge modernisation project that would extend the school and allow more students to be taken. Unfortunately, leaks were reported on the older parts of the building and despite localised repairs were not ultimately solving the problem.After reports of leaks it was imperative that the roofs in question were inspected to find where the issues were originating, in action to this a site survey was undertaken. The survey highlighted the original build-up consisted of an asphalt on a timber deck, this original system was in a aged condition. It was also shown that standing water and vegetarian had developed on the roof. In order to protect the building from further leaking it was determined that the roof would benefit greatly from the installation of a high-performance waterproofing system.Along with waterproofing improvements, there would also be improvements made to the falls which would reduce the amount of standing water present on the roof.Waterproofing would not be the only recommendation; the roof was also to receive a full thermal upgrade which would further provide the benefit of increase fuel bills and less energy consumption for the school.Taking into consideration all these points, the Polyroof Technical team began creating a bespoke specification that would provide the details needed to make these recommendations a reality. The Polyroof Approved contractor Thomas Cassie & Sons was specifically chosen to undertake this project due to their experience in liquid roofing systems. With a specification and approved contractor ready the project could officially commence.
Sponsored
Trinity Buoy Wharf

Trinity Buoy Wharf

Polyroof Products Ltd

Container City is an outstanding example of upcycling architecture in the London Docklands. The buildings are constructed from old shipping containers that have been refurbished and then fixed and welded together, creating an innovative modular building solution that houses offices.The roofs had been waterproofed with an EPDM membrane as part of an inverted roof design, however due to failings within the roof coverings leaks were occurring.It was also felt that the inverted roof insulation was unable to provide satisfactory thermal performance, leading to excessive fuel bills during winter. The architect responsible for finding a solution used Polyroof’s Solution Finder Tool to quickly find a recommendation for improving the thermal properties whilst providing long-term waterproof protection. Equipped with the key information needed, the architect specified the Protec Warm Roof System for the roof refurbishment works.Polyroof Technical Services carried out a full technical survey of the existing roof to identify all existing issues and provide a full set of recommendations. One of the key drivers for the refurbishment was the ability to easily access the roof membrane to carry out regular cleaning and maintenance works, so the specification included for converting the roofs from an inverted roof to a warm roof design.Polyroof Approved Contractor A R Roofing Ltd began by stripping away the old inverted roof components and the failed EPDM membrane to expose the metal roofs of the containers below. A self-adhesive vapour barrier was then laid onto the metal decks and Polyroof RES Insulation (T&G) was bonded on top using PU adhesive. Lastly, the Protec system was laid direct to the insulation boads to create a seamless, smooth and long-lasting finish that came with a 20 year insurance backed guarantee. This striking piece of upcycled architecture now has a roofing solution to match the innovation behind its creation.
Sponsored
Soundis Bespoke Acoustic Flooring at Mollies Manchester

Soundis Bespoke Acoustic Flooring at Mollies Manchester

Soundis

This exciting project at Old Granada Studios, Manchester will the see the existing office building refurbished and fitted out into the new hotel, complete with a vertical extension to form an outdoor swimming pool and roof-top bar area on the eighth and ninth floors. An additional two-story extension to the side of the main building will form a new restaurant and additional rooms.Old Granada Studios is a true Manchester landmark; a building brimming with heritage and history. The re-invention of this famous building will create a place where people come together to work, stay and play. It will be a new cultural destination for the city. It will be a culture of cool places, a world-renowned hotel, studios, workspace, food and drink.The old Granada Studios is anchored by the internationally renowned Soho House Group with their stylish members’ club, restaurant, bar and the new concept Mollie’s Motel. The iconic studios have also been modernised and activated by Manchester Studios with the best production and broadcast facilities in Manchester, they are once again the city’s leading creativity complex for TV, film, music and digital content.Soundis supplied of an area approximately 7,000 sq meters, across 9 different levels which consisted of various flooring build ups.  Systems included, the Soundis Cradle & Batten Acoustic Flooring System to help improve both airborne and impact performance, this system is also compliant with Robust Details FFT2. Overlayed were the Soundis Dry Screed Panels; applied to level the structural deck to minimum of SR2 Standards. Another flooring system we supplied at this project was the Soundis CineSystem Ultra Floor offering many additional acoustic benefits. This system also offers the greatest strength, whilst the large dead load that the floated slab provides, ensures minimal movement under the addition of any live loading.
Sponsored
Library of Birmingham

Library of Birmingham

Radmat Building Products Ltd

Also the largest public cultural space in Europe, the new 35,000m² Library of Birmingham replaces the old Central Library and is seen by Birmingham City Council as a flagship project for the redevelopment of the city.Designed by architects Mecanoo, working with multi-discipline engineers Buro Happold and main contractor Carillion, the multi-tiered roof of the library features two garden terraces which have both contributed to the BREEAM Excellent rating.Radmat Approved Contractor Prater delivered a roofing solution that is BBA Certified to last ‘the life of the building’. Consisting of Radmat PermaQuik PQ6100 Hot Melt Monolithic waterproofing membrane, root resistant Cap Sheet and ProTherm inverted roof insulation, the entire roof was electronically tested for integrity prior to the installation of aluminum powder coated cappings to the perimeter roof upstands.Once the installation of the 7,500m. of PermaQuik PQ6100 roofing system on the roof and ground level podium deck was signed off by a Radmat Technical Adviser, Prater brought in specialist green roof contractor Frost Landscapes. They then carried out the installation of the complex intensive green roofs, at levels 3 and 7, which were created to attract local wildlife and to offer visitors a pleasant environment to enjoy all year round.Combining durability and flexibility with independent verification of life expectancy and a market leading guarantee the PermaQuik PQ6100 Hot Melt Monolithic waterproofing system is set to deliver exceptional performance befitting of the uniquely designed structure which has set a remarkably high standard for library design.With Radmat’s high performance roofing solution providing weathertight protection for years to come, the Library of Birmingham looks set to not only form the catalyst for further regeneration within the city but also how future libraries are designed and perceived by the user.
Sponsored
Balance self-levelling pedestals for luxury rooftop living

Balance self-levelling pedestals for luxury rooftop living

Wallbarn Ltd

Balance pedestals form Wallbarn provide ultimate in precision and performance for roof terrace construction.This large roof terrace in a luxury residential redevelopment of a commercial block next to the Royal Courts of Justice demanded a high end finish. The roof deck had been waterproofed and insulated and 50mm limestone slabs needed to be raised and supported to achieve optimum drainage and ventilation to the structure.The client wanted a flat upper surface with no ridges or interruptions between individual slabs and the Balance self-levelling pedestals were able to create a smooth upper surface with reduced trip hazard and more attractive aesthetics across the terrace.The self-levelling nature of the headpiece meant any blemishes on the surface beneath such as laps between the waterproofing layers and drains, services etc. were accommodated easily without any noticeable effect on the upper surface.Because the self-levelling headpiece has an optic type mechanism it moves in all directions and achieves a perfectly flat upper level by itself, there is no need for installers to wind up and down separate segments of the head. it creates a better finish in much less time. The installer on this project simply loves Balance and will not use any other brand for self-levelling solutions. The limestone slabs were installed in a staggered layout and the Balance pedestals coped with this easily as the positioning lugs could be snapped off at T junction and other detail areas to create clean finishes. Weight tolerance was a major issue as heavy planters, a large barbecue, seating and other furniture were to be placed onto the slabs. Balance pedestals have a normal weight tolerance of 683kg each and a break point of over 1 tonne, so could cope with the additional weight easily. The end result was stunning. The client was delighted with the result and used this terrace on the show flat for the whole development.
Sponsored
University of York Student Residences

University of York Student Residences

Alumasc Roofing

Heslington East Campus Student Residences: Sustainable and Efficient Expansion Alongside the preservation of listed buildings, the University of York is investing in a flagship £130m development for students that promotes wellbeing, community, and sustainability. The initial phase sees 16 brand new student accommodation blocks and 2 communal hub buildings providing flexible social spaces. Surrounded by stunning lake views and natural habitats, the buildings are part of a huge initiative to expand the student accommodation offering.GOALSArchitects Sheppard Robson alongside Graham Construction sought to futureproof accommodation by incorporating multi-use buildings, including catering outlets and social hubs. Key to the brief was using the latest in safety, energy efficiency, longevity, and warranty credentials. Graham Construction’s use of modular external sandwich panels, prefabricated steel bathroom pods, and pre-assembled services distribution racks used Modern Methods of Construction with off-site construction techniques.CHALLENGESThe major challenge was to specify a roofing system that could keep up with the pace of the build, given the typical building was constructed from start to finish in circa 14 weeks.The roof deck comprised of precast concrete slabs which facilitated the works programme for speed of construction and consistency in build quality.Alumasc’s challenge was to find not only a waterproofing solution that was able to keep up with such speed of construction but also to meet a truly sustainable life cycle equalling the lifetime of the building.A key consideration in the design was the roofing materials’ thermal properties. To meet the u-value target of 0.15, Alumasc’s XPS Plus insulation was specified, providing a single layer of 175mm, which reduced the height of the overall build-up when compared traditional XPS.SOLUTIONHydrotech 6125 Waterproofing System / Derbigum Hybrid Upstands For over half a century Hydrotech Monolithic Membrane has been successfully used by architects and specifiers, ensuring some of the world’s most prestigious buildings and structures are kept watertight. With no product failures in over 50 years and guaranteed waterproofing integrity for the lifetime of the structure, Hydrotech offers a total life cycle solution for the building.Hydrotech was specified on the main roof areas for this project as it easily meets individual requirements of the buildings. In addition, the system is designed to last the lifetime of the building or structure to which it is applied, giving long-term waterproofing integrity and no future replacement costs.Applied in a hot liquid state to the deck, and including a polyester reinforcement, the bond of Hydrotech MM6125 is 100% absolute. There is no risk of water tracking below the membrane and because it is monolithic, no possibility of lap failure.DERBIGUM WATERPROOFINGDerbigum sustainable roof system was selected for the upstand areas. This hybrid solution was developed to improve the thermal efficiency in all areas to mitigate against cold-bridging with minimal insulant thickness. Derbigum bituminous membranes are high-performance waterproofing systems offering extended warranties and the highest levels of project support. The upstand zones benefited from Derbigum Mineral which is a mineral surfaced composite reinforced membrane.ROOFTOP MANAGEMENT STRATEGYIn addition to the waterproofing solution the buildings benefit from the full Alumasc rooftop management service. This included the design and supply of safety systems, accessories, and over 20 AOV smoke hatches meeting all British and European standards.Specific safe zones were designed by Alumasc Roof-Pro and positioned around all roofs for safe access. Purpose made clips for installing lightning conductor tape without roof penetration were also provided. All rooftop accessories are part of the Alumasc Roofing specification and therefore can be found back-to-back within the Alumasc 35-year system warranty.PROJECT DATACompletion: Autumn 2022 BuildingType: Student Accommodation ProductApplication: Hydrotech & Derbigum waterproofing systems Certification: BBA Approved & European Technical Approval Architect: Sheppard RobsonMain Contractor: Graham ConstructionAlumasc Registered Roofing Contractor: Tandragee Roofing
Sponsored
Unique, aesthetic and ecological

Unique, aesthetic and ecological

RENOLIT Cramlington Ltd

Ghent Diamond CHALLENGE The Ghent Diamond is proudly overlooking the Ghent-Sint-Pieters railway station and surrounding neighbourhood. On top of a stonelike base with a pattern inspired by the city of Ghent’s historical architecture, an impressive crystalline edifice rises. The 33m high office building has – as the name indicates – not only the brilliance, but also the shape of a gigantic, polished diamond with numerous facets. The special design makes the building unique, and that is exactly where the difficulty lies: roof surfaces with different inclines, steep and hard-to-reach slopes, kinks in the façade and a serious wind load. On the pitched roof segments connecting the glass facade, an exterior roof finish with Linius RENSON blades is to be installed. Just for aesthetic reasons! Such a finish creates a nice play of light, shadow and reflection. But this can only be achieved if the finish has been executed perfectly! But how to execute the construction so precisely, and at the same time be perfectly watertight? A true challenge for both architect and roofing contractor. SOLUTIONFor the internationally renowned New York-based architects practice Asymptote this monumental Diamond project is just another jewel in the crown. Innovative and visionary, they always pursue extreme and experimental challenges. And yes, this impressive Diamond really was a challenge, especially for the Belgian ROTEAM roof experts. The special shape, the height and the different slopes up to 47° made it a complex, gargantuan waterproofing project. On top of the steel deck structure tongue and groove insulation panels were installed. This guarantees a strong, perfectly fitting and smooth construction. After all this is very important in order to achieve this monumental task. The high wind load and shear forces were decisive for the choice of roofing membrane to be used on this difficult structure. Asymptote architects therefore opted for the mechanically fastened RENOLIT ALKORPLAN F membrane. This PVC-P roofing membrane is specifically suited for such a project, thanks mainly to its flexibility, lightweight and long life.
Sponsored
Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Proteus Waterproofing

On the Grand Union Canal in Hemel Hempstead, the Nash Mills Wharf housing development features a range of stylish new build 1-4 bedroom houses and luxury apartments offering high quality waterside living in this Hertfordshire town.With a waterproofing system required to protect the concrete podium above the ground floor car park, a selection of hot and cold applied products were provided by Proteus Waterproofing that met the requirements of the client Linden Homes. The licensed roofing contractor worked with Proteus Waterproofing on a dual system specification which included the fast and economical Proteus Hot-Melt waterproofing system, and for the intricate detailing around upstands and to avoid hot works around the plastic soil and vent pipes, the Cold Melt® waterproofing system was the ideal solution.Fast, hassle-free applicationWith the podium deck covering 3000m2, the Proteus Hot Melt® system was the optimum waterproofing solution for a robust, cost effective, seamless and fast application. This solution worked exceptionally well for the Licensed Contractor and is compatible with the fast applied Cold Melt® solution which was used for high detail items including plastic soil and vent pipes and upstands. There was also the added challenge of wet brickwork and an exacting building program to keep to. To overcome this problem, Proteus isolated the wet substrate with Pro-DPM Primer (Damp Proof Primer) which can be applied to green concrete 3 days old and then followed immediately by the Proteus waterproofing system. This enabled the Cold Melt® to be installed on to the vertical elevations will no loss of time.Quality controlProteus Waterproofing worked in close partnership with its Licensed Contractor to successfully deliver the project to a very high standard within the required timeframe.Long term performanceIncorporating recycled rubber-crumb and other organically grown products, Cold Melt® creates an elastomeric, seamless, cold applied membrane and can outlast the lifetime of the substrate on which it is installed.
Sponsored
Non-Combustible Luxury Italian Porcelain- Bomore Road

Non-Combustible Luxury Italian Porcelain- Bomore Road

EnviroBuild Materials Ltd

EnviroBuild provided 223m² of Non-Combustible Luxury Italian Porcelain for the The redevelopment of 1 Bomore Road, located in Kensington London. This project  involved the removal of outdated wooden planks to be redesigned and fitted with high quality materials and non-combustible options. This contemporary 5-storey project, orientated around unique architecture, luxury living and sharp aesthetics, now offers 32 new residential units. Developed with a focus around landscaping, modernity and sustainability, 1 Bomore Road needed external flooring materials that would suit the existing clean creative of the project plans and comply with contemporary construction requirements, contributing to its unique architectural juxtaposition of harshness and harmony.Due to the non-combustible benefits and sustainable values, EnviroBuild’s Porcelain Paving and 145 Pro-Grip aluminium decking was chosen to furnish the external floors and attachments on this leading-edge development.From the Luna range, silver porcelain tiles brighten the communal courtyard, patio and corridor areas of 1 Bomore Road, as well as the rooftop penthouse terrace, providing an authentically light and natural stone furnishing. Offering impressive durability, stain resistance and anti-fade technology, the fire-rated A-class porcelain flooring system has been engineered to be naturally slip and scratch resistant. Furthermore, made with 40% recycled material and 100% renewable energy, EnviroBuild porcelain paving is designed to the highest standards, offering innovative solutions to current harmful construction materials and methods.These reliable fire-rated porcelain tiles are supported by complete non-combustible substructure and accessories for a beautifully efficient and time-saving balcony and terrace flooring option, making planning and installation as easy as possible.Project DetailsSize: 223m²Colour: Silver 800x800mmProduct: Non-Combustible Luxury Italian PorcelainSubstructure: Non-Combustible pedestalsLocation: LondonClient: Graniger Plc.Contractor: Axis EuropeArchitect: 3D Reid
Sponsored
Burton Green Primary School

Burton Green Primary School

Polyroof Products Ltd

Burton Green Primary School is located in the historic city of York, an outstanding school at the heart of a local community this primary school strives for excellence. The challenging and nurturing learning environment allows children to learn and grow, while achieving the highest potential possible in all areas of the 21st century curriculum.When the roof began showing signs of ageing, it was clear that a long-term solution was required. Working with Project Managers Charles Garth and Principal Contractor Castle Special Projects, Polyroof would work towards providing the best solution to refurbish the ageing roof.The work required and condition of the roof needed to be established first, to do this a survey was scheduled to take place. The survey was conducted on roofing area and it was determined that there were 6 flat roofs that required refurbishment. Areas 1 to 2 were constructed of a built up felt with mineral cap sheet, 50mm PUR insulation, bituminous vapour control, asphalt, 12mm fibreboard and a 50mm woodwood slab deck with timber joists. Areas 3 to 5 were constructed of a built up felt with mineral cap sheet, 50mm Jablite insulation, bituminous vapour control, asphalt, 12mm fibreboard and a 50mm wood wool slab deck with timber joists. Roof area 6 was made up of built-up felt with mineral cap, plywood and timber joist. The original build-up of roofs 1 to 5 needed to be stripped back to the asphalt due to the aged condition of the built-up felt, numerous leak reports were reported. Roof 6 and its original waterproofing was to be retained and made good, later this surface would act as the substrate for the new waterproofing system.Once the survey was completed, a bespoke specification was written and it was recommended that the roofing areas would all benefit from a high-performance waterproofing system. In addition to this it was specified that the roof would be thermally upgraded to reduce the risk of condensation and provide lower fuel bills and energy consumption for Primary School further adding benefits to making improvements to the roof.Liquid Roofing Limited an experienced roofing contractor and Polyroof Approved Contractor was chosen to undertake the work to this project. The proposed system for this project would be Polyroof Protec Warm Roof System. Protec’s liquid roof membrane has a unique flexible hybrid polymer formulation and can be applied to virtually all common roof surfaces.The areas that were required for installation firstly needed to be stripped and removed back to the asphalt, areas 1 to 5 required this. Area 6 was then repaired of any defects and made good where necessary. All roofs required a deep clean, removing any dirt or debris that remained from the first stage. Once this preparation was completed an Air & Vapour Control Layer (AVCL) was then installed to roof areas 1 to 5 making sure that all surfaces are smooth and without voids.Using a Polyroof Twin Pack Insulation Adhesive the Polyroof RES insulation (T&G) boards were bonded and laid to each of the 6 roof areas completing the second stage of the warm roof upgrade. Before the last stage of the installation could begin all joints in the insulation were sealed using taping matt and Polyroof Protec Resin. Polyroof’s extra-tough GRP trims were then installed to create neat and robust edge detailing for exposed perimeters before the main Protec system application commenced.During the project there were some challenging aspects that required care and attention. The project featured a large array of different details ranging from installation of new substrates and trims for parapet walls to the removal of and preservation of tiles/cladding so that the Protec system could be applied correctly. These features required delicate work so that the original tiles/cladding could be reinstated after the application of the system was completed. During the project the rooflight that was originally in place was removed and replaced with a new, before this could happen the Protec system was taken up the upstands and then sealed under flange.Once the project was completed within the relevant time frame of the client and within the budget specified, the Polyroof Technical Services team conducted a detailed inspection showing a high level of workmanship which lead to the client gaining the trusted Polyroof Accredited System Guarantee.
Sponsored
Cranbrook Primary School

Cranbrook Primary School

Bauder Ltd

Cranbrook Primary SchoolBauder Total Roof System (BTRS) with Tapered insulation schemeSynopsisCranbrook Primary School in Ilford, London, was experiencing some major water ingress due to the advanced deterioration of the existing roof system. A roof survey was conducted by Stuart Parratt, Bauder area technical manager, where core test samples were taken to identify the existing roof construction to deck level and to provide an indication of the roof condition. The survey revealed that the existing waterproofing was in extremely poor condition, with extensive evidence of water ingress.  Bauder Building BoardProject:Cranbrook Primary School Location:LondonProject Type:RefurbishmentRoof Area:440m² Client:London Borough of Redbridge Council Approved Contractor:Thameside Roofing Ltd The specificationThe original waterproofing had been poorly overlaid with EPDM which had subsequently debonded. Before the installers could begin laying the new system, they had to strip the substrate back to the original asphalt. The client required a robust system that would deliver durability, value and longevity. 390m² of bitumen waterproofing, Bauder Total Roof System (BTRS), was specified for the main roof areas and 50m² of our cold applied liquid waterproofing, LiquiTEC, for an area that had limited upstands due to clerestory windows that could not be repositioned. Products appliedBauderPIR tapered insulation  A lightweight and cost effective alternative method of providing falls to a roof, whilst also providing thermal insulation. The client opted for this scheme at Cranbrook to minimise standing water on the roof. Bauder Total Roof SystemA two-layer bituminous waterproofing system robust enough to withstand foot traffic and most permanently sited plant. For use within warm and cold roof scenarios, as well as overlaying existing roofing materials. BTRS meets current UK Building Regulations Part B for external fire protection and features torch-free and safe to torch installation on combustible details. LiquiTEC Cold Applied liquid waterproofing Utilising Bauder’s PMMA cold applied liquid waterproofing on one of the roof areas ensured a fully watertight solution around rooflights and below upstands that could not be raised.  Project challengesAlthough the deck appeared to be in a reasonable condition for reuse as part of the refurbishment, there were large deflections to some areas and the existing waterproofing that overlaid the original system had been poorly installed and had pulled away from the asphalt below and so needed stripping prior to works commencing. The existing insulation was inadequate and left the building falling short of the current requirements. A thermal upgrade was incorporated into the works using a tapered insulation scheme which helped to solve the deflection issues by creating falls on the roof. To meet the minimum upstand requirements, the existing extractor vents needed to be removed to allow for the increase in the kerb height. Large continuous structural rooflights providing natural light to the building below were deemed thermally inefficient. The rooflights were upgraded during the refurbishment to meet current standards.  The resultBauder systems are only installed by Bauder approved contractors to ensure quality. The installation on this project was expertly carried out by Thameside Roofing Ltd, overseen by Dave Gregory and John White. After sign-off from Bauder site technician, Paul Osbourne, this system was awarded a comprehensive guarantee.  Systems installedBauder Total Roof System (BTRS) with Tapered insulation1 Bauder K5KHeavy duty, torch-applied SBS elastomeric bitumen capping sheet featuring a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUO Technically advanced self-adhesive SBS elastomeric bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. 3 BauderPIR FA G16Tapered PIR Insulation board manufactured in accordance with BS EN 13165 with no facings. It is lightweight with a high compressive strength and has zero Ozone depletion potential. The product provided effective drainage as well as efficient thermal insulation.4 BauderTEC KSD FBSA technically advanced, self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish on the upper surface to allow easy bonding of insulation using the specified Bauder Insulation Adhesive.

Showing 361-377 of 377

Feedback