NBS Source
I'm a manufacturer

"brick block cutting services"

6,467 results found

Sort by:

Showing 1513-1524 of 1524

Sponsored
Flood Recovery – Grade II Listed Building

Flood Recovery – Grade II Listed Building

Delta Membrane Systems Ltd

Delta products were used at ground level on a semi-detached property in Hertfordshire that suffered from severe flooding. After the flood at the Grade II listed property in Long Marston, restoration experts DJ Hutchings of Towcester was called in, and – in turn – they called upon the services of Peter Cox . Work includes the full strip-out of all wall finishes and the solid floor on the ground floor. Mass underpinning took place to all the external walls. Included in the materials supplied by Delta is the MS500 system applied to all ground floor walls and MS20 on the floors.
Sponsored
Changing Places for Local Authorities

Changing Places for Local Authorities

Closomat

Closomat works closely with local authorities across the country, installing high-spec Changing Places toilets in community centres, car parks, information centres, leisure centres and other vital community hubs, as part of refurbishment programmes and new constructions.Closomat has vast experience in these areas, working alongside other contractors to ensure facilities are robust and meet all the required standards. The company also frequently works with local authorities to realise facilities utilising funding from The Department for Levelling Up, Housing and Communities, central government Changing Places fund, for which it is a preferred supplier.Closomat has installed Changing Places facilities for the following local authorities: Birmingham City Council - Birmingham LibaryBolton Council – Barlow Park Youth CentreBournemouth City Council – Bournemouth GardensBracknell Forest Council – The Look Out Discovery Centre, Swinley ForestCheshire West & Chester Council - Storyhouse in Chester, Sandy Lane Aqua Park & Play Area, Grosvenor Park and Frodsham StreetDoncaster Council – Civic OfficesHull City Council – Wilson CentreLeicester City Council – Haymarket Bus StationLiverpool City Council – Calderstone Park, Newsham Park, Croxteth Hall ParkNorth Norfolk County Council – Wells toilet block, Stearmans Carpark, Cromer Information Centre, Vicarage Street, North Walsham, Queens Road, Fakenham.Manchester City Council – Town Hall, Lloyd Street.Mid Suffolk District Council – Mid Suffolk Leisure CentreSolihull Council – The Core, Solihull’s flagship community building including library, theatre, art gallery and café/bars Stoke on Trent City Council – Stoke Bus StationTamworth Borough Council –Tamworth CastleTorbay Council – Festival Apollo toilet block on Paignton seafrontWarminster Town Council – Warminster Civic CentreWest Berkshire Council – Northcroft Leisure CentreWiltshire Council – County Hall in TrowbridgeFacilities at Calderstone Park, Liverpool; The Look Out Discovery Centre (Swinley Forest); Mid Suffolk Leisure Centre; Northcroft Leisure Centre, West Berkshire; Tamworth Castle; Warminster Civic centre and Wilson Centre, Hull, include the added benefit of a Closomat wash and dry toilet. These facilities go above and beyond British Standards, allowing them to support a wider range of users including those who require additional help with cleaning after toileting.
Sponsored
Crimple Hall, Harrogate

Crimple Hall, Harrogate

Tobermore

The Challenge Modern paving was required for a contemporary farmer market and restaurant  Crimple Garden Centre in Harrogate has increased its retail offering to include a food hall, restaurant, gift shop and art gallery. The vision for the new building was to provide an open plan artisan style farmer market and restaurant that comfortably coexists with the existing garden centre.  The modern building form was driven by its highly sustainable design with natural ventilation, northlights and its saw-tooth style roof adding originality to the scheme. A key point when designing the area was the importance of creating an identity which relates to the adjacent garden centre but gives distinction to the new offering.  A visually appealing external area was important to attract customers into the farmers market and garden centre. Modern paving that could withstand significant footfall was required to complement the contemporary aesthetic of the new market.  The Solution Artro linear paving harmonises the styling, lines and tones of the new building  Tobermore worked closely with the project team to ensure design aspirations were met. Crimple required a unique external area to align with the quirky finish of the new artisan style farmer market and restaurant. Tobermore’s Artro linear block paving was the perfect hard landscaping solution for the main entrance area.  Artro’s strength lies in its ability to adapt its look depending on the colour and laying pattern used. A unique look was created using a mix of two cool grey tones. A high percentage of the lighter Platinum was combined with a low percentage of the darker Carbon. Artro’s stretcher bond orientation naturally guides customers inside the Crimple building. The linear paving blocks offer a modern, hard-wearing surface that will withstand significant footfall and vehicle trafficking, if required. With accessibility in mind, Artro provides confidence with a low slip/skid surface in all-weather conditions. The smooth surface finish is suitable for prams and wheelchair users.  A featured walkway from the front row parking bays to the main entrance was created using Tobermore’s Mayfair Flags. The silver slabs feature sparkling natural granite aggregates that add to the scheme’s contemporary aesthetic. As sustainability was a key consideration of the project, Tobermore’s permeable paving option Hydropave Tegula Duo was chosen with its ability to function as a SuDS paving system. Laid in the warm shade Bracken, the contrast between the paving products helped to zone the pedestrian areas.   Tobermore’s granite aggregate Fusion Edge added the finishing touch to the project with its modern aesthetic.    
Sponsored
Delivering a local early flood warning and monitoring system to keep people, homes and businesses safe for Kirklees Council

Delivering a local early flood warning and monitoring system to keep people, homes and businesses safe for Kirklees Council

Andel Ltd

Slaithwaite suffered extensive flood damage in 2015 after a blocked debris screen caused Crimble Clough Stream to back up, demolishing the wall at the end of Clough Road, flooding the area and causing extensive damage to local homes and businesses.Slaithwaite is a village within the Metropolitan Borough of Kirklees in West Yorkshire, situated in the Colne Valley five miles south west of Huddersfleld.The devastating flood of 2015 in Slaithwaite The 2012 Kirklees Flood Risk Management Strategy identified that around 2,000 properties were at high risk of flooding with a potential £70 million of damage. When we started our conversation with Kirklees Council, they clearly expressed an interest in a local flood warning and monitoring system to proactively respond to future flood risk.Kirklees Local Flood AuthorityKirklees Council in West Yorkshire is the third largest metropolitan council in the region. As the lead local flood authority for the district, Kirklees manages local flood risk from surface water, groundwater and smaller watercourses and ensures cooperation between local risk management authorities. As part of a smart monitoring project for flood risk areas, funded by Chester University, Andel worked with the Kirklees Council flood risk team to design a local flood alert and monitoring solution for Crimble Clough, enabling the Kirklees Council to better manage the risk of flooding in Slaithwaite.The challengeThe project is designed to monitor high water levels at Crimble Clough caused by debris washed down from the upper wooded catchment and blocking the debris screen. The sensor-based system monitors the difference between water levels, before and after the debris screen, automatically sending alerts for pre-set trigger points.No real-time information: in 2015 the Crimble Clough debris screen became blocked by debris washed down from the upper wooded catchment, with no warning system in place to alert the screen contractors.No strategic information: in 2015, there were many flood hotspots that needed attention but with limited council resources. Because there was no remote monitoring system in place, it was difficult to choose where best to deploy support.Extensive damage: In 2015, due to the stream backing up and demolishing the wall, homes and businesses downstream from Clough Road were flooded and severely damaged.Disruption: following the flood, the clear-up and restoration process for the affected area meant residents had to leave their homes and businesses were closed for months. The economic damage from the 2015 flood was significant with many hours of Kirklees Council labour invested into the recovery. With a monitoring and alert system in place, all of this could have been prevented.The solution – Andel FloodAlertAndel FloodAlert provides 24/7 local monitoring and alerts for areas at risk from flooding. FloodAlert provides real-time information on rising water levels and automatically sends out early flood warnings. The robust and reliable system is easy to install and set up and tracks water levels in watercourses and other parameters for up to 15km from a gateway.From a single water-level sensor to a catchment sensor network monitoring water levels, soil moisture, rainfall data and water quality, FloodAlert provides real-time local flood monitoring and alerts for projects of any size.Installing Andel’s FloodAlert system now means that Kirklees Council has:A cost-effective, real-time local flood monitoring and alert system. A water level monitoring system at the debris screen that sends out SMS and email alerts when water levels reach critical. A system that recognises that the debris screen is blocked by monitoring water levels before and after the screen, sending out SMS and email alerts when the difference is too much. A dataset with detailed catchment data including rainfall, water levels at strategic points and soil moisture in the surrounding farmland – all helping to develop future flood risk models and flood alerts. Live monitoring of sensor data via a cloud-based portal with easy-to-use visualisation accessible from any device with internet connectivity. A system that can communicate with an unlimited number of designated users. Communication via a low-power, low-impact LoRaWAN ® network.The resultsAn effective early warning system: Kirklees Council now receives real-time alerts, allowing for timely response to blockages of the debris screen at Clough Road that has historically caused flooding during periods of heavy rain.Data collection: Kirklees Council can now collect detailed data about how the Crimble Clough catchment responds to rainfall and can develop models to predict future response.Impact measurement: Kirklees Council is developing a baseline to measure the effectiveness of natural flood management interventions at critical locations within the catchment.What the customer saidWorking together on the ‘buildbacktogether’ project was a pleasurable experience, it was essential to have the complimentary skills that made the outcome of the project much more effective. The support from team Andel was very useful and Gerbren Haaksma especially was extremely supportive and efficient with his quick response and stimulating input through the term of the project. I am keen to continue our collaboration and work with the local communities on more engagements like the Slaithwaite project.Namrata Bhattacharya-Mis, Programme Leader, Natural Hazard Management (BA/BSc), Chester University
Sponsored
Commercial | The Haymarket Building, Dublin

Commercial | The Haymarket Building, Dublin

Venesta Washroom Systems Ltd

Shower and changing facilities bind practicality and design at this new-build office development in Smithfield. At The Haymarket Building, practicality meets excellent design, and Architects Reddy Architecture + Urbanism have created a sophisticated space that the tenants can be proud of. The building is accessed via an impressive double-height lobby, and this grandeur is maintained throughout the entire building, including the washrooms.Split over two floors, the basement houses a gym and self-contained male and female changing rooms with a separate toilet block on the upper basement level. Venesta’s Unity Full Height cubicle range was the product of choice for the designers of this project, due to its versatility.Model Z Active 400mm Bench Lockers were specified for both the male and female changing rooms. The unique Z-shaped locker provides space for storing bags and hanging clothes and has the benches integrated into the locker units saving on floor space for a minimalist room layout. The Model Z Active Lockers come readily constructed for quick, easy installation and are finished in SGL making them hardwearing, impact and scratch resistant.  Read the full case study for more details.
Sponsored
158 bespoke Classic Pocket Door Systems supplied to 1 Crown Place, London

158 bespoke Classic Pocket Door Systems supplied to 1 Crown Place, London

Eclisse UK

One Crown Place is a development that sets a new standard of architecture with two prismatic towers hosting 246 private apartments, rising 28 and 33 storeys into the sky. At lower levels, it is home to 109,675sq ft of high-quality office space and a variety of retail units.A Georgian terrace, a retained warehouse facade on Earl Street and 54 Wilson Street, and a 1970s block make up the remaining parts of this 24/7 destination delivering a boutique hotel, restaurant, collection of club lounges, bars, and affordable office space.ECLISSE UK Ltd supplied 158 bespoke Classic Pocket Door Systems for the project in various sizes, plus accessories. The pocket doors were used to provide convenient access to the ensuite bathrooms.Start on site: April 2018Completion date: May 2021Address: One Crown Place, 54 Wilson Street London EC2A 2ERGross internal floor area: 49,500m2 (new build)Construction cost: £518 millionArchitect: Kohn Pedersen Fox AssociatesClient: MTD GroupDevelopment manager: CBREProject manager: CBRE
Sponsored
Wright Place

Wright Place

Schöck Ltd

Outdoor life tends to take place inside the perimeter of block buildings in towns and cities. An inner courtyard becomes the outdoor area of choice, shielded from the noise from the roads that surround the building. The Wright Place project involved the installation of 60 balconies that were also planned as design elements. Schöck Isokorb® type KS was used for both structural stability and thermal insulation.Precast balconies as design elementsA total of 300 Schöck Isokorb® elements – between four and six per balcony, depending on size – were installed in the building structure, with some welded to the reinforcement to prevent tipping during concrete application. The Isokorb® used was type KS from Schöck's standard range, which functions as a load bearing thermal insulation element, eliminating thermal bridges between reinforced concrete and steel structures and thus preventing mould formation at the critical joints. The Schöck Isokorb® allows steel and metalworkers to prefabricate to a large degree, thus reducing installation times to a minimum. Its superb load bearing capacity offers enormous scope for balcony design while ensuring outstanding structural stability.
Sponsored
EWI for two high-rise residential towers

EWI for two high-rise residential towers

Sto Ltd

Located in Tower Hamlets, Gayton House and Sleaford House are managed by housing association Poplar HARCA. Following amendments to Building Regulations, which banned the use of combustible materials in external walls of high-rise buildings above 18m, StoTherm Mineral K was specified to replace the existing EWI system.BBA-certified, StoTherm Mineral K comprises mineral fibre insulation boards and the system is classified with an A2-s1, d0 reaction to fire in accordance with BS EN 13501-1.Working on behalf of Westminster Building Company, Square 1 Architectural Solutions was responsible for removing the existing EWI and installing the StoTherm Mineral K system onto four elevations on each 23-storey block. The non-combustible mineral fibre insulation boards were secured to the existing concrete substrate using adhesive and mechanical fixings, and without the need for additional expansion joints.A StoLevell Duo Plus reinforcing coat embedded with Sto-Glass Fibre Mesh was then applied to the face of the insulation boards. This was followed by the application of 1.5mm stippled StoSilco, a silicone resin render that provides high levels of water repellence to protect the walls from weathering.
Sponsored
Bellway Homes HQ

Bellway Homes HQ

Tobermore

After almost 30 years, Bellway Homes has relocated to a new purpose-built headquarter office building. Based in Newcastle Upon Tyne, the company have settled into the newly formed energy- efficient Airview Park adjacent to Newcastle Airport.  The company were previously based in a small, listed property with cellular offices that were no longer fit for purpose. With light and spacious open-plan office space, the move was the perfect opportunity to support the company’s growth.  The facility houses 100 staff members and include high-spec welfare facilities including a gym, breakout room and a roof terrace. The state-of-the-art office space also features a new training hub providing educational facilities for Bellway Academy. Benefitting from a rich landscape setting, the overall design concept was to create a ‘Pavilion in a Park’. With this in mind, the external design was equally as important as the building itself. Various Tobermore block paving and permeable paving products were used. The hard landscaping featured Tobermore’s award winning paving product Braemar. The premium product fulfilled both aesthetic and design aspirations. 
Sponsored
Omega Flow permeable paving manages the surface water at the new home of Old Saltleians Rugby Football Club.

Omega Flow permeable paving manages the surface water at the new home of Old Saltleians Rugby Football Club.

Brett Landscaping

Brett Landscaping, leading provider of high-quality hard landscape materials, has partnered with O’Brien Contractors, to supply block paving for the development of a new sports facility for the Old Saltleians Rugby Football Club in Warwickshire. The club, which was formed 95 years ago has been a fixture of West Midlands amateur rugby was required to relocate due to their original home obstructing the route of the HS2 development. With a sizeable budget at hand due to generous compensation from HS2, there were high expectations for top specification materials and an impressive finish at the new Water Orton site. O’Brien Contractors were appointed in 2021 to transform 17 acres of farmland into a state-ofthe-art sporting facility. The aim was to create a modern facility for sport and events, with the inspiration for the project being the surrounding natural environment. For Old Saltleians, this meant four high-standard grass pitches featuring advanced trench and pipe drainage (adhering to Sports England Standards), with irrigation ensuring year-round playability. The relocation included the addition of an ultra-modern clubhouse offering social spaces for the club and community to host events. This meant including extensive parking for the site was required on the site.
Sponsored
Elm Park Gardens

Elm Park Gardens

TRC Windows

Mitie selected TRC to conduct surveys, removals, manufacturing, and installation of more than 600 traditional double-glazed box sash windows in this delightful housing estate, originally designed by George Godwin in 1885.Located in the heart of Chelsea and offering easy access to both Fulham Road and Kings Road, Elm Park Gardens comprises multiple blocks.TRC embarked on the demanding task of surveying the existing windows and balcony doors, obtaining precise manufacturing measurements from within the flats, all without the need for external scaffolding. They maintained a close collaboration with the primary contractor and coordinated appointments with residents over a span of six months.Working within occupied flats, TRC ensured that residents’ expectations were met with cleanliness, protection, and politeness while installing the new bespoke timber windows and balcony doors.The projectThe comprehensive window replacement project covered the following aspects:The new traditional box sash windows were meticulously matched with the original style and proportions, including shape, glazing bar size and placement, overall glazing patterns, opening methods, materials, and finishes.
Sponsored
Hudson Quarter, North Yorkshire

Hudson Quarter, North Yorkshire

Tobermore

Hudson Quarter is a prestigious, multi-award-winning, mixed-use development of 127 apartments and 9,570m2 of Grade A office space. The apartments are housed within three residential buildings with one office building based around a central courtyard. The sustainable project achieved a BREEAM Excellent rating upon completion.  The site, previously an existing 1960’s office building is based in a highly sensitive location within the ancient city walls of York. Sensitively designed to sit comfortably within its historic setting, Hudson Quarter has been created respecting its past whilst embracing 21st century working and living.  A dedicated parking area was incorporated into the design, available for both office staff and residents. Tobermore worked closely with the design team to ensure appropriate hard landscaping was chosen for the large car park adjacent to Hudson Quarter.  Tobermore’s Artro block paving was perfect for Hudson Quarter as it can withstand significant trafficking and its clay-like look adds a heritage feel with a modern twist to the hard landscaping. The herringbone laying pattern was specified, not only for appearance, but also because of its trafficability. 

Showing 1513-1524 of 1524

Feedback