NBS Source
I'm a manufacturer

"alumasc"

297 results found

Sort by:

Showing 37-39 of 39

Sponsored
Craven Cottage, Fulham FC - Gatic CastSlot

Craven Cottage, Fulham FC - Gatic CastSlot

Alumasc Water Management Solutions

A bespoke Gatic CastSlot system was installed as part of the redevelopment of the riverside stand for Craven Cottage, home to Fulham FC. The project, which began in July 2021, incorporates Gatic CastSlot Treadsafe, which was chosen to drain away any excess surface water from the seating/standing areas along the deck of the stand. It was installed by main contractors Buckingham Group.The unobtrusive profile of CastSlot sits neatly within concrete, asphalt, and block surface finishes and features an electro painted ductile iron throat section. This is securely fixed to the galvanised steel channel body to provide an exceptionally robust yet discreet drainage system.The treadsafe option was chosen for this project. Treadsafe is available for areas where there is regular foot traffic and is available with a 10mm or 30mm opening—ideal for stadium standing and seating areas.Bespoke access boxes were also created for the new stand, and channel throat depths were also extended for level changes, allowing a constant invert within the channel.
Sponsored
Wembley Park - Wade NE Channel & Streamline Gratings

Wembley Park - Wade NE Channel & Streamline Gratings

Alumasc Water Management Solutions

As part of a major transformation of Wembley Park, which includes Olympic Way, Wade Stainless Steel Linear Channels and Streamline, and perforated gratings were installed beneath the Olympic Steps to provide an effective and long-lasting drainage solution.Built by developer Quintain in a joint project with Brent Council, the Olympic Steps come at the end of Olympic Way—the stretch of road linking Wembley underground station to Wembley Stadium. It was named Olympic Way after it was originally constructed for the 1948 London Olympics.The final stages of this redevelopment were the iconic steps that lead up to the national stadium. The original ramp, known as the pedway, was built as part of the old Wembley Stadium and acted as a bridge over the old coach parks. The Olympic Steps development replaced the outdated, concrete pedway and extended the Olympic Way, increasing the width by 50% and improving accessibility for all visitors in and around Wembley Park. Volker Fitzpatrick was the main contractor on the project.“Working closely with Mick Hawkins, the Site Manager, the aim of the project was to fulfil the client’s drainage requirements to tight deadlines,” says Brian Holden-Earl, Area Sales Manager. “The area is frequently used by visitors, so it was important to deliver our services within a specific timescale.”
Sponsored
Alder Hey Children’s Health Park - Harmer Roof Outlets Harmer SML

Alder Hey Children’s Health Park - Harmer Roof Outlets Harmer SML

Alumasc Water Management Solutions

Harmer Drainage high performance Roof Outlets and SML above ground drainage were recently specified for a new, forward thinking children’s hospital in Liverpool.The Alder Hey Children’s Health Park is a large £250m project developed to improve the paediatric medical facility and enhance the experience of both patients and staff. The aim is to set the hospital as a new benchmark for the delivery of paediatric care in the UK and around the world. It includes six wards, a large critical care unit, 16 theatres and a host of clinical services, together with shops and cafes.

Showing 37-39 of 39

Feedback