NBS Source
I'm a manufacturer

"mechanical cleaning chemical systems"

6,934 results found

Sort by:

Showing 253-288 of 1961

Sponsored
Temple Carrig School

Temple Carrig School

Forbo Flooring Systems

Inspired by the mountainous views to the west and seaside views to the east, McCarthy O'Hora (MCOH) architects reflected the colours of the natural world that surrounds Temple Carrig School by specifying an array of vibrant shades from Forbo Flooring Systems' Marmoleum range.
Sponsored
The Richard Pate School

The Richard Pate School

Concept Cubicle Systems

Concept Cubicle Systems provided a complete washroom supply and installation for the school’s Nursery and Reception areas. They required a durable washroom solution that allowed for teacher supervision whilst maintaining student privacy.Read the full case study on our website.
Sponsored
Bishop Auckland, Durham

Bishop Auckland, Durham

K Systems Insulated Facades

The Bishop Auckland refurbishment project, is a stellar example of K Systems ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Durham Homes commissioned K Systems to refurbish its residential development of 120 terraced houses. The primary aim of this project was to improve the thermal performance rating of each home. The challenge for K Systems was to provide a suitable EWI solution whilst retaining the character of the homes by replicating the existing brick and stone walls.Due to this unique mix of required finishes, we were presented with an extremely complex project that required careful attention of several aesthetic and design considerations.Having a good reputation for matching systems with finishes to deliver clients’ visions, we worked in collaboration with our approved installer Westdale Group, to scope out the project and specification in fine detail, with particular focus on insulating properties and aesthetic.These poorly insulated brick and stone terraced houses were given a thermal upgrade to enhance occupier comfort. An attractive brick render finish was used over insulation to provide an aesthetic finish that is in keeping with the current street scene.This satisfied the client’s requirements whilst providing a total revamp for the properties, which has resulted in energy efficient and aesthetically pleasing homes for the client and residents.Our ServiceWe worked in collaboration with Durham Homes and approved installer Westdale Group to upgrade these poorly insulated brick and stone terraced houses and deliver a total revamp of the properties, resulting in thermally efficient homes.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Our Application Specialists visited the site regularly throughout the project working in collaboration with the approved contractor to ensure correct installation and detailing.As a result, we delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Durham Homes, and the residents of the newly improved homes.Joe Rogers at Westdale Group, said:“To deliver such a large project (120 houses), it requires multiple teams to work seamlessly together and have absolute trust in the other’s skill, vision, and judgement. That’s exactly what we had with K Systems on this Bishop Auckland project. The team’s innate understanding of pairing systems with finishes for optimal performance is second to none and together we delivered a best-in-class refurbishment which was an absolute pleasure.”Technical Project DetailsEffective demand planning and technical detailing ensured that the Durham Homes project was completed on time in March 2022.Having comprehensively assessed the project requirements, taking into consideration thermal u-value target, aesthetics and cost, our K Systems E BrickRend EWI system was specified. This high-performing system is lightweight utilising expanded polystyrene (EPS) panels that are enhanced with graphite to further enhance thermal performance.The E BrickRend system has a fire performance rating of B2-s1,d0. It’s low moisture absorption and resistance to mould growth ensures a high level of durability.The system was specifically tailored to meet the thermal performance criteria of the project. Utilising 90mm EPS panels, the target U-value of 0.30W/m2K was achieved, delivering the benefits of improved thermal comfort and lower heating costs for residents, whilst helping the local authority achieve it’s environmental carbon reduction targets.Several finish options were considered to meet the client’s requirement of replicating the existing brick/stone appearance of the properties whilst remaining within the project budget.K Systems specified BrickRend, a bespoke, specially formulated polymer render which was colour-matched to the existing masonry. It was then down to the skill of our approved installer to apply pigments to tint and shade the render surface and simulate the appearance of real stonework. The surface is then sealed to provide a long-term durability. A dash render finish was applied to the rear of the Bishop Auckland properties.This particular finish didn’t just ‘fit the bill’ at the time of delivery, but is an economic, durable, lightweight solution, easily applied, with an increased bond strength compared to sand and cement, which will protect the insulation and structural fabric of the homes from environmental deterioration in years to come.This customised finish and attention to detail is a perfect example of how K Systems works with all clients to fulfil any specific design criteria and go above and beyond the standard requirements to deliver superior quality.
Sponsored
Type G200 - Duff & Phelps

Type G200 - Duff & Phelps

Movawall Systems Ltd

Kroll (previously Duff & Phelps) operate within the risk and financial advisory sector, with UK offices based in Manchester’s Northern Quarter for which we had the pleasure of providing a Type G200 folding partition system during a recent refurbishment. The operable wall allows the space to be transformed from a large open plan area into two separate rooms as and when required.The Type G200 system offers impressive acoustic, achieving up to Rw 47dB when fully closed – minimising noise transfer between the two spaces, without compromising on light transfer. In this instance, a fully glazed, full height pass door allows for easy access between the two smaller rooms when the system is in use.
Sponsored
Manchester Construction Site

Manchester Construction Site

CLD Physical Security Systems

Eric Wright Construction are an organisation based in the North West of England, providing high quality construction services to customers for over 40 years.Back in 2017, work started on one of their new residential redevelopment projects in Manchester. Due to services and potential contaminates running directly underneath the construction site, they were in need of a zero ground strike fencing system that still held high security properties.The BriefThe brief was outlined by Eric Wright Construction through their specific requirements on the compound that CLD Fencing Systems and Wallbank Fencing needed to follow. Due to their inability to break ground, a permanent fencing system was not going to work.Zero ground strike fencing due to potential contaminates and servicesCompetitively pricedOperation and installation flexibility
Sponsored
Gaywood House, Bristol

Gaywood House, Bristol

K Systems Insulated Facades

Improving the thermal fabric performance and replicating the existing lookThe primary aim of the project was to improve the thermal fabric performance of the block and also to replicate the existing look. To achieve this, the client’s key requirements were two-fold. Firstly, to match the original external style as closely as possible in both colour and texture to satisfy the local authority’s requirements. The second key criteria was to ensure that all the systems used on the project were fully approved regarding fire performance, to meet the current regulations for buildings over the height of 18 meters in England. Delivering a robust, safe and aesthetic system solution to meet the project requirementsWe specified a combination of K Systems M VBriQ and K Systems M VBriQ+ to ensure we met the aesthetic planning requirements and comply with building regulations for resistance to fire in high-rise buildings. Our system incorporate mineral wool insulation which has an outstanding A1 non-combustible fire rating, which improves the thermal comfort and reduces heating costs for residents, whilst supporting Bristol City Council to meet their carbon emission targets.Our VBriQ acrylic brick slip finish was specified due to its lightweight characteristics and wide range of colours. Our Acrylic slips have a high UV resistance which will ensure the building maintains its appearance over time. Our VBriQ+ clay brick slip finish was specified for the ground floor and surrounding garage areas because of its robust and durable characteristics.Meeting the project deadlines and minimising disruptionsWe worked in collaboration with our approved installer Rateavon Ltd to ensure there was minimum disruption to the residents of Gaywood House. Our Technical team carried out regular site inspections to ensure the systems were installed to the highest standard with timely responses to technical detailing requests.
Sponsored
South West Land

South West Land

Aluclad Systems Limited

Project: South West Lands, Wembley Park 3ALocation: London WembleyProduct: Aluminium Copings System, Cassette Discrete Fix Panels, Colum Casings and various flashingsArchitect: White Ink ArchitectsContractor: McAleer & Rushe Ltd.
Sponsored
The Strand Palace

The Strand Palace

VIEGA LTD

How do you replace the water distribution system in a 100-year-old prominent building? That was the challenge for contractors Capri Mechanical Services who took on replacing and updating the domestic services at the prestigious Strand Palace. Their solution was simple: replace all pipework and utilise Viega press technology to install the systems in a way which protected the hotel and met building requirements.
Sponsored
Private Residential Project

Private Residential Project

Umbra

The Project That Harnessed Evolve ZeroThis residential project used Evolve Zero blinds to replace existing blind systems for a set of bifold doors.Evolve Zero blinds are one of the most high quality solutions on the market when it comes to covering large windows or doors.They are a solution unique to Umbra, being equipped with an anti-bending technology which allows the Evolve Zero to cover spaces monumentally larger than previously possible.Problems regular blinds face when covering large areas:The blind fabric sagging inwards.The roller mechanism becoming too large.The top mechanism bends out of shape with the weight of the blind.Benefits of the new anti-bending technology:Blinds can cover up to 5 meters horizontally.Mechanisms are more compact.There is less light leak than using two blinds to cover the same area.This project shows that Evolve Zero blinds are the perfect solution when covering large areas of glazing.
Sponsored
BISF Housing, Motherwell

BISF Housing, Motherwell

K Systems Insulated Facades

BackgroundThe BISF (British Iron and Steel Federation) constructed the Newarthill properties in the 1940’s, utilising steel-framed walls that were initially coated in cement render and vertical steel panels.In previous renovations overseen by the Local Authority, the upper level of the building was clad in PVC weatherboard, while the lowest floor had its exterior re-rendered. The building is characterised by its non-traditional construction style.The houses had extremely poor thermal performance and the flats were difficult and expensive to heat, especially with the rising fuel prices and current cost of living crisis, meaning some residents were in a state of fuel poverty.North Lanarkshire Council required an EWI solution that would achieve the following three key objectives:- Improve the thermal performance of the property portfolio- Specify a system that would achieve a U-value of 0.17 W/m²K and would involve as little technical detailing around the property as possible- Ensure the properties had a modern and aesthetically pleasing look as the current exterior was tired and datedUnderstanding and appreciating K System’s expertise in this sector and innate ability to deliver best-in-class refurbishments, North Lanarkshire Council appointed the partnership of K Systems and Ailsa Building Contractors to tackle the low rise refurbishment project.Our ServiceAs the Newarthill development was already occupied, a key element of this project was to deliver the refurbishment with minimal disruption to current residents and / or neighbouring houses.This is one of K Systems strengths, ensuring jobs are delivered in a timely fashion, without delay, without disruption, and with full disclosure of each phase given to residents throughout the project to build rapport, trust, and confidence.On this particular low rise refurbishment, which had limited access points for all traffic in and out surrounding its immediate vicinity, K Systems had to work closely with the contractor, main contractor, and local authority to ensure they were working in harmony to negate any unnecessary commotion.K Systems’ technical team also carried out regular site visits to make sure the system was installed to the highest standard, in line with specification, and to ensure all involved parties were delivering to time and budget.The refurbishment of the properties is a great example of K Systems’ unparalleled ability to deliver constructional excellence that not only meets but exceeds the expectations of its customers.Technical Project DetailsOn initial scope, the K Systems team identified that a major challenge for this project was going to be the technical detailing between the timber frame sheeted ply at the top storey and precast concrete slab at the bottom. Several U-value calculations were completed by the experienced K Systems team to support the Council’s request of minimal detailing around the property and the target U-value.To meet these requirements, the K Systems P EWI system was specified, which utilises phenolic foam insulation boards. This insulation is lightweight and has a high thermal performance, allowing for thinner sections of insulation to achieve optimal thermal efficiency - perfect for this project, achieving the target U-value of 0.17 W/m²K , up from 0.32 W/m²K.It is a suitable solution for buildings that are restricted in expanding their footprint due to pavements or nearby properties, and can be easily installed on masonry structures, as well as non-traditional structures - an ideal solution for the Newarthill properties.Addressing the request for a modernised aesthetic, a dash render finish was specified. This render is extremely robust, hard-wearing, and low maintenance, ensuring the properties’ refreshed exterior would remain for years to come. The dash render was also complementary to the existing local property portfolio which was something the Council wanted to achieve.This refurb completely transformed cold, weathered, distressed housing in a Scotland suburb into warm, comfortable, aesthetically pleasing homes that met the exact requirements of North Lanarkshire Council and reduced the energy bills for residents due to improved thermal performance.
Sponsored
AluOne - Herbert Road

AluOne - Herbert Road

Balco Balcony Systems Ltd

AluOne is a self-supporting, lightweight and recyclable open balcony system. Designed for structural simplicity and ease of installation, whilst stylishly complimenting the building facade. Manufactured at our state-of-the-art production facility, and constructed using a four column self-supporting lightweight system, AluOne ensures ease of implementation on site. Suitable for new builds, renovations and retro-fitting to existing buildings. We have a suitable solution for every building. Guaranteed durability, practicality and a high quality finish, AluOne is a truly bespoke modular system.Available in a wide-range of RAL colours, AluOne can be customised specifically for each project with a choice of balustrade and floor tile options. AluOne comes with a tiled floor of concrete paving slabs. The plates have been carefully sandblasted to allow the natural stone ballast in the plate to appear. Thanks to our manufacturing method, this plate has an unique colour resistance. The paving slabs are 400 x 400 in size and available in three colour shades. Always designed with drainage management in mind, AluOne has a hidden system in the balcony for optional rainwater drainage. The water flows discreetly under the paving slabs, allowing it to move into the drainage pipe via a gutter in the balcony frame. This is connected to the building's drainage system or to a drainage pipe that ensures the balcony rainwater discharge is properly managed. AluOne is available ins 12 different sizes. You can choose between four different widths and three depths, each in convenient increments of 400mm.
Sponsored
Nile Street - Grad Decking System

Nile Street - Grad Decking System

Alfresco Floors Ltd

Alfresco Floors were commissioned to refurbish the external terrace of a top floor apartment located on Nile Street, London. The brand new GRAD invisible fixings clip system was supplied and installed by Alfresco Floors, their first ever GRAD installation in the UK. The unique clip and groove design at the heart of the GRAD system means that decks can be installed about 30% faster than competing products. The GRAD system can be retrofitted onto existing timber joists, installed from scratch on top of a new timber sub-frame, or mounted onto the bespoke rail system.
Sponsored
CO-OP Live

CO-OP Live

CGL Systems Ltd

A new stunning Musical / arena named Co-Op Live in Manchester. Situated next door to the Etihad Stadium. We adopted a contemporary LED integrated design using our well renowned Hook-on Rainscreen system, with PPC finish using 3mm Aluminium to RAL 9005.
Sponsored
Park Plaza - Riverbank Hotel

Park Plaza - Riverbank Hotel

Licata Building Systems Ltd

With an enviable location on the South Bank of the River Thames, Park Plaza London Riverbank is ideal travellers from near and far to central London. Those travelling for leisure return again and again thanks to the prime central location, heated indoor swimming pool, enticing dining options and elegantly spacious rooms.Licata Building Systems was involved with the development of this project, providing several Licata systems, such as waterproofing and flooring systems. Licata waterproofing systems were used throughout the modern bathrooms and swimming pool facility. Licata resin flooring created a sleek and modern finish throughout public area of the hotel.
Sponsored
Cobalt Business Park

Cobalt Business Park

CLD Physical Security Systems

At 1.5 million sq ft, the Cobalt Business Park is the UK’s largest office park. The development is home to a number of public and private organisations such as the Department for Work and Pensions, North Tyneside Council, Utility Wise, Procter & Gamble, and Accenture.Along with the offices, the park also houses three data centres, designed to store data for companies. These Data Centres cover 10,000 sq M of Data Hall space, making it one of the largest carrier-neutral wholesale co-location campuses in the North.The BriefPhysical security was key for the creation of a Fencing and Gate package to protect over 10,000m2 of data hall space.358 LPS 1175 SR1 Fencing SystemAnti-Climb MeshSawtooth Security ToppingUpgradable System in event of change in security requirementsVarious Physical Access Control Systems
Sponsored
VINCI Construction UK, Widnes

VINCI Construction UK, Widnes

Vebro Polymers

A global construction, energy and infrastructure organisation required a durable, chemical resistant floor coating solution with an anti-slip profile that would withstand the daily wear and tear of its internal vehicle repair and maintenance facility. VINCI Construction is part of VINCI Group, a multinational enterprise with operations in the energy, infrastructure and construction industries. Founded in 1899, the company now has a presence in over 120 countries with a global team of around 220,000 people. The Widnes facility is one of ten VINCI Construction UK locations and houses, among other facilities, a vehicle maintenance workshop where the company ensures their fleet of general and specialist vehicles. The industrial unit that houses the workshop previously had a concrete paving slab floor that proved to be uneven, unsafe, and difficult to maintain.  Not only did the new flooring solution need to address these concerns, it also needed to be both slip and chemical resistant as well as feature clearly marked automotive bays and provide enough durability to withstand frequent wheeled traffic as well as the impact of dropped tools and the weight of heavy equipment. Installed in a combination of RAL 7037 Dusty Grey and RAL 6024 Traffic Green, vebrores EP HBC was installed across the 332 m2 vehicle workshop, with the Traffic Green used to mark out the facility’s six automotive bays, before being outlined using vebrodeck PU Linemarker in Yellow. Prior to the installation of vebrores EP HBC SR – a system comprising an initial layer of vebro EP Primer followed two coats of vebro EP Universal with a broadcast of 52 mesh silica sand after the first coat for an anti-slip profile – the pre-existing concrete paving slabs were first coated with an epoxy DPM and a 20.0 mm screed to level the surface. vebrores EP HBC SR is a pigmented, solvent-free, slip-resistant high build epoxy floor coating system that is best suited to floors in medium duty processing areas where a textured, hard-wearing, chemical resistant finish is required. Available in a wide range of BS 4008 or RAL matched shades, the system is ideally suited to areas where there is a need for navigational demarcation and zoning. 
Sponsored
Impressive Basement Extension, Berkshire

Impressive Basement Extension, Berkshire

Newton Waterproofing Systems

An impressive basement extension, housing a swimming pool and sauna, required a robust waterproofing solution at this large country home.Newton Specialist Contractor Stonehouse were brought onto this large residential project to waterproof an underground extension including a swimming pool and sauna. Set in a small village in Berkshire, the impressive countryside home was designed by architects Spratley and Partners.For the new below-ground structure, Stonehouse were required to install a failsafe and maintainable waterproofing system that would completely protect the luxurious basement from unwanted water ingress.Ensuring that the project was fully compliant with BS 8102:2009, Stonehouse recommended a combined waterproofing solution using a Type B reinforced and water-resistant concrete structure designed to BS EN 1992, combined with a full Type C internal cavity drain membrane system.As the most reliable and completely maintainable Type C waterproofing solution, the Newton CDM System was the ideal choice for this structure. Firstly, Newton 508 membrane was securely fixed to the internal walls of the basement using Newton's specialist MultiPlug fixings.Any water that is captured by the membrane is then drained away with Newton Basedrain channels, and pumped out of the property using a Titan-Pro sump chamber fitted with two NP400 pumps and supported by a failsafe battery back-up system.As an extremely experienced waterproofing contractor, Stonehouse were able to confidently recommend, design and install a comprehensive and truly failsafe waterproofing system that will protect the property from unwanted water ingress for many years to come. Stonehouse also provided complete peace of mind by offering a 10-year guarantee on the installation.
Sponsored
Two Rivers Primary School

Two Rivers Primary School

Forbo Flooring Systems

FORBO’S FLOORING ELEVATES THE SUSTAINABILITY ETHOS IN NEW ECO-FRIENDLY PRIMARY SCHOOL  Two Rivers primary school in Keynsham, Somerset, is only the second school in the country to achieve Passivhaus Plus accreditation. To achieve this impressive milestone, architects Hatcher Prichard had to make conscious choices when it came to choosing materials for this project. With outstanding sustainability credentials and a wide portfolio of solutions suitable for the education sector, Hatcher Prichard specified a variety of Forbo Flooring Systems’ contemporary floor coverings, including its Tessera carpet tiles, Sphera and Eternal vinyl floor coverings, as well as both its Surestep and Safestep safety flooring. A new build primary school for 420 pupils, Two Rivers Primary School was designed to add the much-needed provision for primary education to children in the Keynsham area, whilst also following sustainable building practices. With the requirement to achieve Passivhaus Plus accreditation, which meant the building had to produce as much energy as the occupants use, Hatcher Prichard had to carefully consider the materials used in the construction of this building.  Simon Hatcher, Director at Hatcher Prichard explains further: “Two Rivers achieved Passivhaus Plus accreditation in February 2023 and is only the second school in the country to do so. It is also the first to be built using standard building materials, including a steel frame with concrete floor slabs. When it came to specifying materials for the building, we looked for manufacturers that had strong sustainability credentials. With Forbo’s environmental goals so aligned with our own, and that of the building as a whole, it meant they were the perfect fit! In fact, Forbo’s sustainability credentials and flooring solutions were key to finishing this wonderful building.” However, as well as the sustainability objectives that Simon had to keep in mind, he also had to meet the design requirements. Simon commented on this, saying: “We were supplied with a document by the Department for Education on the Employer’s Requirements, which includes a section on floor coverings and the factors to consider when specifying materials for schools. The main area of consideration though was the functionality of the flooring; it had to withstand the heavy foot traffic we would expect to see in a school, whilst also being easy to clean and maintain.  “Additionally, the floor coverings needed to be installed seamlessly alongside each other to keep the joints between them flush, as well as provide some slip resistance. The chosen floor coverings also had to be suitable for the usage of each room, with the colourways used also needing to be appropriate for the age of the children using the space. The Forbo account managers really helped with this, thanks to their understanding of how specific products from Forbo’s portfolio met the individual requirements of each room in the school.” With the suitability of colours in mind, Simon looked to incorporate elements of the local environment into the design, as well as take inspiration from the school name too. He explained: “The design of the school draws from its location at the heart of Hygge Park, Keynsham. The surrounding area has a calm, Scandinavian palette of colours and materials, with the local houses made from light buff brickwork with white render above. We opted to use matching buff brick and white render externally, with complimentary blues, greys and whites for the walls and other surfaces inside. All the floor finishes were supplied using the contemporary and durable range of Forbo products required for each individual space. For example, Forbo’s Eternal vinyl was specified in the Washed Beech wood décor for the hall, hall store, studio and servery areas, which provided a natural contrast to the white paint on the walls, without being too distracting. “We also specified Forbo’s Sphera homogenous vinyl in a clear blue colourway, to represent the ‘two rivers’ of the school’s name, which runs along the ground floor corridor and extends back up along the first floor. We also used Forbo’s Eternal vinyl in the Smoke colourway for all the ground floor classrooms, which created a calm and neutral feeling.” What’s more, a selection of Forbo’s Tessera carpet tiles were chosen in a muted blue colourway for the first-floor classrooms, which helped to make them feel bright and spacious. Speaking on this decision, Simon said: “With the first-floor classrooms designed for the older students, we felt it would be more appropriate to use a textile flooring, as opposed to the vinyl flooring used in the Key Stage 1 classrooms. As such, Forbo’s Tessera Teviot carpet tiles were installed in the Mid Blue and Blue Moon colourways, both of which fit the colour theme running throughout the school. Additionally, the Tessera carpet tiles are really easy to clean, another requirement set out in the brief, so it ticked all the boxes.”  In addition to the above, Forbo’s Surestep and Safestep safety flooring were used across the project to ensure the safety of students throughout the building. Specified in the Smoke and Silver Grey colourways to match the colour scheme, the safety floors were installed in the wet rooms on both floors, as well as in the DT classroom on the first floor.  Simon concluded: “We’re really happy with the finished project, as are the school and students’ parents. The school held an open evening in mid-January where the Head and Deputy Head showed visitors around the building; both were delighted with every aspect, especially the hardwearing finishes throughout.” With the initial design stage beginning in August 2020, the school was completed in December 2022 and opened for students shortly afterwards in the new year. To find out more about Forbo’s offering for schools, visit: www.forbo-flooring.co.uk/education
Sponsored
JD Gyms

JD Gyms

Wedi Systems (UK) Ltd

JD Gyms are a reputable company within the leisure industry. When they started to experience serious leakage problems across their estate (especially on mezzanine floors), they quickly realised that their existing shower construction does not live up to the standard of their service – and would need a reliable, guaranteed system solution.In order to allow for a straightforward and safe replacement of existing showers without the need to change the existing pipework, a grid platform constructed of 80mm XPS building boards was proposed . The showers then were fitted with XPS linear shower trays featuring dry-fit drain technology, 12.5mm XPS building boards on the walls and surrounding floor areas were sealed by proprietary sealing and decoupling membrane, all ready to tile after 24 hours. Up till now, 18 different sites have been completed and the shower system solution comes with one manufacturer’s guarantee on the whole installation. 
Sponsored
Jubilee Wood School

Jubilee Wood School

Excelsior Panelling Systems Ltd

The Project  A new Primary School built as part of the school’s framework agreement with Milton Keynes.  Two storey portal frame build.Jestico & Whiles Architects The Challenge Produce a system suitable for use in an open space.Open plan arrangement of Cubicles and Solid Surface Vanities located directly off the corridor.Ensure safety of the user and create an anti-bulling, completely visible space. The Solution Excelsior Skyline Cubicle Range, a full height system with overhead panel. This extremely popular range is an ideal choice for school environments meeting the demands of modern education and providing complete privacy and comfort to the user.Full height cubicle systems have increased in popularity over the past few years. Skyline Range enables Schools, Colleges and the like to ensure both safety and anti-bulling objectives are met and Excelsior’s rise and fall hinge paired with the bespoke door design enables lift off access in the event of an emergency.Skyline range is an extremely durable system and comes as standard with a ‘P’ section headrail, ‘U’ channel base rail and over-panel providing maximum stability. Optional bolt through fixings are available and recommended.The successful open plan arrangement of cubicles and solid surface vanities in Orange and Pomme Verte is in keeping with the modern vibrant atmosphere of the school.
Sponsored
Park Plaza - Victoria Hotel

Park Plaza - Victoria Hotel

Licata Building Systems Ltd

Park Plaza Victoria Hotel is located in the heart of central London providing premium stays in close proximity to famous attractions such as Buckingham Palace, Big Ben, and the Houses of Parliament. Guests of the Park Plaza Victoria Hotel can enjoy the exclusive facilities available such as the sauna, swimming pools and on-site restaurant. Licata Building Systems are proud to have been a part of this project by providing full Licata waterproofing systems, flooring systems, and interior paints.
Sponsored
Ormskirk Hospital

Ormskirk Hospital

Forbo Flooring Systems

After nearly 30 years without refurbishment, the Paediatrics department at Ormskirk District General Hospital required a new lease of life to be injected into the building. With hospitals in operation around the clock by patients, visitors and staff, it was vital that the new flooring solution offered a combination of optimal performance benefits, whilst being quick and easy to install to minimise both disruption and downtime. Looking for a time and cost saving solution, Southport and Ormskirk NHS Hospital Trust chose Forbo Flooring Systems’ Modul’up adhesive free sheet vinyl for the refurbishment. Easy and quick to install during out of hours, the ‘fast fit’ floor covering delivers outstanding dimensional stability and indentation resistance.
Sponsored
Roman House

Roman House

Forbo Flooring Systems

Forbo Flooring Systems’ impressive digital printing capabilities gave Gilltown the scope to have some real fun with the interior design of new student accommodation in Newcastle, resulting in a scheme like no other – all while providing the performance properties required for a heavily used building.“The flooring played a key role within this project and we were determined to opt for floor coverings that have rarely been seen in this kind of environment before. After working with Forbo on earlier projects, we knew it’s wide range of high-end and quality products, along with its impressive bespoke design capabilities would help us to achieve this.” - James Gillespie, Project manager.
Sponsored
Basement Extension

Basement Extension

Delta Membrane Systems Ltd

The project was split into 2 phases. Phase 1, waterproofing the exiting basement and Phase 2, retrofit extension to the existing basement to create a luxurious multiuse living area. Due to the partially retaining nature of the structure, the project required a combination of Type B and C waterproofing systems to ensure a Grade 3 habitable environment.
Sponsored
The Newt Hotel & Spa, Somerset

The Newt Hotel & Spa, Somerset

Schlüter-Systems Ltd

Schlüter-Systems undertile heating and waterproofing products were used in a complete renovation and restoration of a Hotel and Spa in Somerset.
Sponsored
Nuway Tuftiguard Black Anodised

Nuway Tuftiguard Black Anodised

Forbo Flooring Systems

As a leading entrance matting installer, Andrew Scollan Matting Systems are a trusted partner for Nuway installations across Ireland.Here you can see several examples of Nuway Tuftiguard Black Anodised, which has been expertly installed by Andrew Scollan Matting Systems in offices and entrances throughout Ireland.In line with recent design trends, Nuway Tuftiguard Black Anodised is becoming increasingly popular for customers who wish to combine quality with design, when it comes to their primary barrier matting solution.
Sponsored
Park Plaza - Hercules House

Park Plaza - Hercules House

Licata Building Systems Ltd

The Park Plaza Hotel, Hercules House is positioned just south of Westminster Bridge overlooking the River Thames with spectacular views across London. The hotel provides high-end dining and premium facilities such as the spa, sauna and swimming pool. Within walking distance of London’s most famous attractions inclduing the London Eye, Big Ben, Westminster Abbey, the Houses of Parliament and the London Aquarium, Hercules House is the ideal place to stay in the Capital. Licata Building Systems was involved with the development of this project, providing several Licata systems, such as waterproofing and flooring systems. Licata waterproofing systems were used throughout the modern bathrooms and swimming pool facility. Licata resin flooring created a sleek and finish throughout public area of the hotel. 
Sponsored
NHS COVID-19 Projects

NHS COVID-19 Projects

Concept Cubicle Systems

Concept Cubicle Systems worked around the clock during the height if the Coronavirus outbreak for several Nightingale hospitals across the country.
Sponsored
Chailey School, Brighton

Chailey School, Brighton

Senior Architectural Systems Ltd

With a proven track record of successful work in the education sector, Senior Architectural Systems was more than qualified to deliver the fenestration package for this new secondary school in Brighton.The new Chailey School in South Lewes has been designed by leading architects Jestico + Whiles and features a full range of aluminium fenestration solutions including Senior’s thermally-efficient, slimline SF52 aluminium curtain wall system and robust SPW501 aluminium commercial doors. The new school has also reunited Senior with main contractor Bowmer & Kirkland, with whom Senior has an established supplier framework agreement. The two companies have collaborated together on numerous projects, with Bowmer & Kirkland being the first contractor to specify Senior’s patented low U-value PURe® aluminium window system when it was launched back in 2015. The main contractor has gone on to work with Senior and specify its aluminium windows, doors and curtain wall systems on many other education projects across the UK.Chailey School is itself part of Department of Education construction framework agreement to modernise educational facilities and improve the environmental efficiency of this sector. Senior worked closely with specialist contactor RKN Aluminium to design, fabricate and install the fenestration package for the new school building which comprises some 85 windows, 14 section of curtain wall and 12 door sets!
Sponsored
Church Road (Video)

Church Road (Video)

Balco Balcony Systems Ltd

An adaptable, modular balcony system with a range of balustrade, floor finishes and drainage options.Levitate is manufactured off-site in accordance with our Quality (ISO 9001) and Environmental (ISO 14001) Management Systems. The foundation of Levitate is the steel frame cassette with the anchoring locations to house our balustrade system, enclosed aluminium soffit and finished floor. Concrete floor tiles come as standard but aluminium decking is also available.Levitate comes with controlled drainage, including a drip edge which prevents water from cascading onto the balcony below. Piped drainage can also be incorporated into the balcony.The first part of the installation process can be carried out safely from the scaffold, where stub connectors are installed to the cast-in anchors, which once extended, can allow completion of the external façade works. Once completed, the installation of the Levitate arms can be undertaken as the scaffold is being struck. Levitate then then slides easily onto the Levitate arms and automatically locks into place.The methodology ensures improved efficiencies on-site and a reduction in crane time due to the ease of installation.Features and benefits:When using concrete tiles, the balcony system is available as standard in twenty-one different sizes.Choose between seven different widths and three depths. Bespoke sizes are available by using the optional aluminium decking.
Sponsored
Apex Hotel London

Apex Hotel London

Wedi Systems (UK) Ltd

wedi Primo completes luxury in central London Hotel.The Apex Temple Court Hotel is a luxury 4 star hotel, just off Fleet Street central London. Full architectural and interior design was by Ian Springford Architects, Edinburgh.A key factor in the selection of the wedi shower units for each of the 184 bedrooms was the requirement to achieve a high performance quality waterproof bespoke solution capable of adapting to the on site conditions. Ian Springford Architects has specified wedi shower units since 2004 and Apex Temple Court is the fourth Apex hotel where they have been successfully installed. Bespoke pre-fabricated shower units - Fast installation. The key benefits of using wedi were that the Fundo shower design provided simple, fast adaption to the individual shower configurations on site, as well as the detail of enabling the units to extend under the shower door to promote drainage back into the shower area from water falling off the door when in use.Complete prefabricated shower units allow fast dry and accurate construction in ONE integrated product system rather than a combination of different individual manufacturer’s products creating the risk of potential failures between the different systems during assembly and installation. The finished result was a fast track installation of a factory prepared shower system capable of on-site adjustment, delivering a completely waterproof system backed by warranty.
Sponsored
SPECIALIST PACKAGING MANUFACTURER, BELGIUM

SPECIALIST PACKAGING MANUFACTURER, BELGIUM

Gilcrest Manufacturing

Delivering a large ISO Class 7 clean room for a specialist package production facilityThe Puracore® clean room system was selected by installer NGS Cleanroom Solutions for an expansion project at a specialist packaging production facility in Belgium.
Sponsored
Waterproofing the London School of Economics

Waterproofing the London School of Economics

Newton Waterproofing Systems

In April 2016, the world-renowned London School of Economics announced that Grafton Architects were to design their next major project. The Marshall Building at 44 Lincoln’s Inn Fields, built by Mace Group, includes an extensive two-storey, mixed-use basement that will house plant areas, squash courts, changing facilities and a sports hall, covering a total of over 2,250m2 of floorspace and presenting quite the project for Newton Specialist Contractor Cast Contracting Ltd (CCL).Newton Specialist Contractor CCL were appointed to design, supply and install the waterproofing by principal contractor Mace Group in late 2019.To provide a completely dry, guaranteed solution on such a high profile project, CCL recommended the Newton CDM System.Otherwise known as Type C waterproofing, the CDM System is the safest and most reliable form of waterproofing.Prior to installation, CCL applied Newton 906 Lime Inhibitor to the new slab to prevent free lime from the concrete from affecting the drainage membranes. The Type A liquid waterproofing membrane Newton 103-S was also applied internally to many of the concrete surfaces as a barrier to water.With preparations complete, over 2,250m2 of Newton 520 eco membrane was installed to the floor and over 570m2 of Newton 508 membrane installed to the walls to create the Newton CDM System. A drainage system of Newton Basedrain channels also directs any water captured by the membranes to the point of discharge, and the whole system was sealed with Newton OverTape.Despite requiring dedicated delivery slots, and working to an extremely tight program of work, CCL were praised on the quality and speed of their installation, which was completed well within the time limit.The Newton recycling service was also a great success, recycling 115 kg of HDPE waste and therefore preventing over 132 kg of CO2 emissions.
Sponsored
Evoo Barzzeria

Evoo Barzzeria

Forbo Flooring Systems

The natural aesthetics, durable performance and extensive colour palette of Forbo Flooring Systems' Allura Wood luxury vinyl tiles (LVT) collection have all played a significant role in creating a contemporary, stand- out environment for Evoo, a new 'barzeria' in Barnsley, Yorkshire. 'Evoo- The Barzzeria' is a pizzeria and bar, which combines authentic Italian cuisine with Britian's popular cocktail cultur, forming the worlds first 'barzzeria'. Set in a once prominent building that was left derelict for years, Julie Poulter Interior Design (JPID) was tasked by restaurant owner, Jaz Boparai, to design 'the best looking bar' in Barnsley. Subsequently, the project was awarded 'commended' in the Fly Forbo competition 2018/2019.
Sponsored
The Hilton Garden Inn, Sunderland

The Hilton Garden Inn, Sunderland

Stone Cladding Systems

Architect: Redbox Design GroupMain Contractor: Tolent Construction Installer: Metcalfe Roofing & Building Services LtdStone: Cebecca LimestoneThe Sunderland Hilton Garden Inn, on the banks of the River Wear, is a 141 room hotel featuring MX curtain walling as well as Aztec 20mm Cebecca limestone Ventilated Rainscreen. Designed By Redbox the architects wanted a light and spacious building without the need for a heavy support system. The glass and limestone mix imparts this vision perfectly. Completed in 2016 The Aztec system was installed by Metcalf Roofing & Building.
Sponsored
Barratt Code Level 6 Homes Feature Posi-Joist

Barratt Code Level 6 Homes Feature Posi-Joist

MiTek Industries Ltd

The first homes at Barratt Homes’ new energy efficient Hanham Hall development feature Posi-Joists as the floor system of choice. Each home is constructed using highly insulated materials and is fitted with a Mechanical Ventilation with Heat Recovery (MVHR) system, which is why Posi-Joist was the natural choice for the floor system. Kingspan Potton have been involved throughout the design and delivery of the project, supplying both Structural Insulated Panels and the Posi-Joist floors.

Showing 253-288 of 1961

Feedback